1 New Jersey Pilot Study Testing Potential MAP-21 System Performance Measures for Two Corridors Executive Summary October 2014

2 ABOUT THE NJTPA THE NJTPA IS THE FEDERALLY AUTHORIZED Metropolitan Planning Organization for 6.6 million people in the 13-county northern New Jersey region. Each year, the NJTPA oversees more than $2 billion in transportation improvement projects and provides a forum for interagency cooperation and public input. It also sponsors and conducts studies, assists county planning agencies and monitors compliance with national air quality goals. DISCLAIMER THIS DOCUMENT WAS PREPARED by the North Jersey Transportation Planning Authority, Inc. with funding from the Federal Transit Administration and the Federal Highway Administration and technical contributions from the New Jersey Department of Transportation. The NJTPA is solely responsible for its content. The document is meant for informational purposes only. PROJECT TEAM BRIAN FINEMAN, NJTPA, Director, Systems Planning KEITH MILLER, NJTPA, Principal Planner, Data Analysis and Forecasting SUTAPA BHATTARCHARJEE, NJTPA, Principal Transportation Planner JOHN ALLEN, NJDOT, Section Chief, Commuter/Mobility Strategies

3 New Jersey Pilot Study Testing Potential MAP-21 System Performance Measures for Two Corridors Executive Summary Since the passage of the Moving Ahead for Progress in the 21st Century Act (MAP-21, P.L ), the transportation and planning community has engaged in an extensive national discussion regarding the legislation s performance management provisions. State departments of transportation and Metropolitan Planning Organizations (MPOs) around the country will be required to conduct performance-based planning and programming in order to make use of federal transportation funds. Specifically, states and MPOs will need to apply national measures of transportation system performance and infrastructure condition through data monitoring, target setting, and integration within plans and programs. Measures related to system performance, reliability, congestion, and freight movement involve particularly challenging analytical and policy issues. Considering the importance of these issues in the context of regional mobility, sustainable economic growth, and environmental preservation, the North Jersey Transportation Planning Authority (NJTPA) and the New Jersey Department of Transportation (NJDOT) set out to investigate system performance measures that may emerge as the U.S. Department of Transportation (USDOT) promulgates rules implementing MAP-21. This report offers our study findings. Formulated as a pilot test, our examination included both practical matters in calculating performance measures, and what those measures might ultimately reveal about actual system performance. The national performance measures will apply to the overall Interstate System, the non-interstate National Highway System (NHS), and freight movement on the Interstate System. We therefore focused on two illustrative New Jersey corridors: I-78 and NJ Route 18, an interstate highway and a principal arterial roadway on the NHS. We based our measures of system delay and reliability and the methods used to calculate them on those proposed by national transportation stakeholders, including the American Association of State Highway and Transportation Officials (AASHTO, through its Standing Committee on Performance Measurement, or SCOPM). PERFORMANCE MEASURES Delay on roadways is a common measure of performance and traffic congestion. Time spent traveling on a road in excess of an established threshold is counted as delay. Reliability of the system considers how travel time varies from day to day. An unreliable system obliges travelers to either budget extra time because their trips are unpredictable, or suffer the consequences of late arrivals at work, school, appointments, etc. i

4 Our findings illuminate differences that emerge from various alternative performance measure formulations, both quantitatively (with different numerical results), and qualitatively (how they reflect the underlying traveling conditions on roadways and the planning context of the places that surround them). We also report on data gaps and challenges, recognizing the approaching need to report on entire regional and state systems. Finally, we make some specific recommendations regarding the methodologies and suggest additional work that we think is critical in fully understanding the implications of MAP-21 s system performance program. To that end, here are some key observations from the study: User Perspective Fundamental to system performance measures is the choice of the user perspective. For example, we tabulated hours of delay (over the course of a year) for both vehicle- and passengerbased trips. We believe that the latter is more indicative of our mission (moving people and goods), and would be sensitive to improvements that serve more traveling customers. A personbased approach does require (appropriate) attention to data for public transit and shared ride modes. Similarly, we brought volumes of truck traffic into the equation, illustrating where delays affect freight movement. This measure formulation would be sensitive to system changes that reduce delays in locations and times when trucks are traveling. Thresholds and Delay Performance measure calculations for both delay and reliability are highly dependent on choices of thresholds. For example, we found that a good case can be made that a free-flow threshold which considers any extra time spent traveling due to interference from other vehicles to be counted as delay is an untenable standard for planning purposes, encouraging inefficient use of expensive infrastructure. Counting delay in this way yields much larger delay values than use of other thresholds for acceptable travel times. Thresholds that vary from place to place can help planners and decision-makers take context into account, recognizing that some congestion in more densely developed areas is an unavoidable aspect of metropolitan life and economic activity. Our comparisons of different thresholds for delay suggest that tailoring to specific types of places (urban, suburban, rural, etc.) can yield values of delay that are more representative of local planning objectives. For other choices of thresholds we took into account different expectations for peak and offpeak travel as well as allowing for the greatest throughput of vehicles, with results varying accordingly (i.e., more or less delay counted). We found that thresholds tied to maximizing throughput can yield reasonable results, and may also motivate efficient use of existing infrastructure. Reliability The reliability indexes we tested are ratios of an extreme (or unexpected) travel time and a threshold (or expected) travel time. In other words, how many times longer does travel take in unexpected conditions compared to what the traveler expects? ii

5 As ratios, reliability measures are more challenging conceptually and mathematically. Rather than simply adding up total hours of delay over the course of a year, a reliability index quantifies how travel times vary from day to day. By definition this implies that, to evaluate an entire system, an averaging of some kind is required from place to place throughout the system and throughout the year. We tested different approaches to weighting when we averaged reliability values for corridor segments. Weighting by person or vehicle hours and miles traveled emphasize different dimensions and thus different policy intent. Weighting by truck and bus volumes can help to emphasize the reliability of those modes. Our own reliability index formulation takes into account expected or routine travel times by time of day. This method yields more moderate reliability values and may be more appropriate than using the same expected travel time at all times of the day. With particular measure formulations, we were able to observe roadway segments in our test that were reliable but routinely experience significant delay. The ability to make this distinction seems important from a policy standpoint, especially as reliability is such a critical issue to the traveling public. We note (but did not test) alternate considerations for such extreme times. We used travel times that are exceeded in only one out of five days (80 th percentiles, as suggested by SCOPM). One might choose even more extreme, longer travel times that occur even less frequently, such as one out of twenty days (95 th percentiles). This choice should reflect what types of problems are being targeted regular unreliability or rarer but more significant breakdowns. It may be appropriate to use different values of thresholds for reliability and delay. This is due to the differing nature of what thresholds represent in reliability measures (expected travel times that are compared with extreme travel times) versus what they represent in delay measures (travel times above which travelers experience delay). Data and Analysis We were able to successfully apply archived operations, traffic volume, bus, truck, and vehicle occupancy data to calculate the measures of interest using resources that we have available in New Jersey. We made extensive use of the I-95 Corridor Coalition s data (from the Vehicle Probe Project), along with Geographic Information Systems (GIS) and database tools. The substantial level of effort required for our two corridors strongly suggests that more powerful analytical and data management tools will be needed for regional and statewide analysis. To join the data from disparate sources, we needed to apply geographic conflation techniques. Future data and GIS development should better integrate these sources to support performance measure calculation. We identified several important data limitations, not least of which being the coarser data available for traffic volumes. While newly available operations data provides continuous speed and travel time information, volume data is typically extrapolated from discrete traffic counting. Also, additional data will be needed (at least in New Jersey) to cover MAP-21 s expanded NHS designations. iii

6 We note the critical attention needed to examine how performance measures change over time, which was beyond the scope of this study. This is the primary function of performance measures in planning and programming. It will involve a whole set of additional analytical issues, such as maintaining data consistency, ensuring sensitivity to changes of interest (distinguishing externalities from the effects of investments), and addressing the timeliness of data availability. Performance measures must be able to inform planners and decision-makers about actual impacts of implemented projects and programs. As we await the USDOT establishment of the national system performance measures, our pilot test has readied us for some of the inevitable challenges that will emerge. It has also helped us to clarify issues regarding the reporting of performance measures and the communication of their meaning. We fully recognize, however, that we have merely scratched the surface in investigating the full ramifications of particular performance measures. We trust that MPOs and state transportation departments like ourselves will continue to be engaged in developing and fine-tuning performance measures that are effective and meaningful both nationally and for our local jurisdictions. iv

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA Introduction: North Jersey Transportation Planning Authority NJTPA Congestion Management Process Study Goals Analysis

More information

Congestion Management Process (CMP)

Congestion Management Process (CMP) Congestion Management Process (CMP) Introduction The Congestion Management Process (CMP) is a systematic, data-driven, and regionally accepted approach that aims to improve the performance of the transportation

More information

New Jersey Pilot Study

New Jersey Pilot Study New Jersey Pilot Study Testing Potential MAP-21 System Performance Measures for Two Corridors Summary Report October 2014 ABOUT THE NJTPA THE NJTPA IS THE FEDERALLY AUTHORIZED Metropolitan Planning Organization

More information

Performance Measures for Transportation Planning Part 1

Performance Measures for Transportation Planning Part 1 Performance Measures for Transportation Planning Part 1 Flint, MI July 12, 2011 Brian Betlyon FHWA Resource Center Overview Performance Measurement in Transportation Planning Module Outcomes Describe performance

More information

Regional Evaluation Decision tool for Smart Growth

Regional Evaluation Decision tool for Smart Growth Regional Evaluation Decision tool for Smart Growth Maren Outwater, Robert Cervero, Jerry Walters, Colin Smith, Christopher Gray, Rich Kuzmyak Objectives This project is one of the SHRP 2 Capacity projects

More information

Association for Commuter Transportation Recommendations to USDOT on MAP-21 Performance Measures

Association for Commuter Transportation Recommendations to USDOT on MAP-21 Performance Measures Association for Commuter Transportation 1341 G Street, NW, 10th Floor Washington, DC 20005 Tel: 202.719.5331 www.actweb.org Association for Commuter Transportation Recommendations to USDOT on MAP-21 Performance

More information

Technical Methods Part 2

Technical Methods Part 2 Technical Methods Part 2 Performance Measurement in Transportation Planning Leading for results means that performance must be planned, not just reported Learning Objectives Describe a sample technical

More information

MAP 21 Freight Provisions and Seaports

MAP 21 Freight Provisions and Seaports MAP 21 Freight Provisions and Seaports September 20, 2012 American Association of Port Authorities 703.684.5700 www.aapa-ports.org 3 New Freight Eligibility in Core Highway Formula Programs Surface Transportation

More information

Crystal Jones. Office of Freight Management and Operations. USDOT Federal Highway Administration

Crystal Jones. Office of Freight Management and Operations. USDOT Federal Highway Administration Crystal Jones Office of Freight Management and Operations USDOT Federal Highway Administration September 2007 Context 25% of the U.S. GDP is related to international trade and is predicted to grow to 35%

More information

Appendix O Level of Service Standard and Measurements

Appendix O Level of Service Standard and Measurements July 8, 2016 Appendix O. Appendix O Standard and Measurements Definition Level of service (LOS) is a mechanism used to determine how well a transportation facility is operating from a traveler s perspective.

More information

Transportation Improvement Program (TIP) Relationship to 2040 Metropolitan Transportation Plan (MTP) - Goals and Performance Measures

Transportation Improvement Program (TIP) Relationship to 2040 Metropolitan Transportation Plan (MTP) - Goals and Performance Measures Mid-Region Metropolitan Planning Organization Mid-Region Council of Governments 809 Copper Avenue NW Albuquerque, New Mexico 87102 (505) 247-1750-tel. (505) 247-1753-fax www.mrcog-nm.gov Transportation

More information

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation

INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation 96 INDIANA S INTERMODAL MANAGEMENT SYSTEM Stephen C. Smith Planning Manager, Transportation Planning Division Indiana Department of Transportation Indiana is in the process of developing an Intermodal

More information

Performance Based Planning and Federal Target Setting. Transportation Policy Board September 13, 2018

Performance Based Planning and Federal Target Setting. Transportation Policy Board September 13, 2018 Performance Based Planning and Federal Target Setting Transportation Policy Board September 13, 2018 Federal Requirements - Background MAP-21 and the FAST Act established new emphasis on performance and

More information

TTAC STAFF REPORT. State Targets for the MAP-21/FAST Act National Highway Performance Program. MEETING DATE: August 2, 2018 AGENDA ITEM: 5

TTAC STAFF REPORT. State Targets for the MAP-21/FAST Act National Highway Performance Program. MEETING DATE: August 2, 2018 AGENDA ITEM: 5 TTAC STAFF REPORT SUBJECT: State Targets for the MAP-21/FAST Act National Highway Performance Program MEETING DATE: August 2, 2018 AGENDA ITEM: 5 STAFF CONTACT: Andrew Orfila, Jared Carvalho RECOMMENDATION:

More information

NOTICE OF PROPOSED RULEMAKING. 23 CFR Part 490

NOTICE OF PROPOSED RULEMAKING. 23 CFR Part 490 NOTICE OF PROPOSED RULEMAKING 23 CFR Part 490 National Performance Management Measures; Assessing Performance of the National Highway System, Freight Movement on the Interstate System, and Congestion Mitigation

More information

9.0 Meeting the Challenges

9.0 Meeting the Challenges 9.0 Meeting the Challenges 9.1 SLRTP Goals The SLRTP is built around the six TxDOT Strategic Plan goals. 1. Develop an organizational structure and strategies designed to address the future multimodal

More information

SBCAG STAFF REPORT. MAP-21/FAST Act Performance Measures and Targets. MEETING DATE: September 20, 2018 AGENDA ITEM: 4H

SBCAG STAFF REPORT. MAP-21/FAST Act Performance Measures and Targets. MEETING DATE: September 20, 2018 AGENDA ITEM: 4H SBCAG STAFF REPORT SUBJECT: MAP-21/FAST Act Performance Measures and Targets MEETING DATE: September 20, 2018 AGENDA ITEM: 4H STAFF CONTACT: Andrew Orfila, Jared Carvalho RECOMMENDATION: Approve and accept

More information

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office

Management. VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office VDOT and MAP-21 Performance Management VA SITE Annual Meeting June 27, 2013 Jay Styles Performance and Strategic t Planning Manager, Business Transformation Office Overview Map-21- How is VDOT Preparing?

More information

New Jersey Congestion Management System

New Jersey Congestion Management System New Jersey Congestion Management System - Proposed System Update - Presentation to the ISIB Prepared by: Bureau of Systems Planning April 15, 2008 ~ Commissioner s Conference Room ~ 1:30 PM Today s Objective

More information

TRANSPORTATION PERFORMANCE MANAGEMENT

TRANSPORTATION PERFORMANCE MANAGEMENT MAY 2018 TRANSPORTATION PERFORMANCE MANAGEMENT PAVEMENT PERFORMANCE MANAGEMENT PAVEMENT PERFORMANCE REQUIREMENTS The Federal Highway Administration (FHWA) published in the Federal Register (82 FR 5886)

More information

Addendum #3 to the Regional Transportation Plan

Addendum #3 to the Regional Transportation Plan Nashville Area Metropolitan Planning Organization Addendum #3 to the Regional Transportation Plan Effective November 21, 2018 Nashville Area Metropolitan Planning Organization 138 Second Avenue North Nashville,

More information

Florida s Approach to Maximizing Advances in Data and Technology for Performance Management

Florida s Approach to Maximizing Advances in Data and Technology for Performance Management Florida s Approach to Maximizing Advances in Data and Technology for Performance Management June 2, 2015 Topics 1. Florida s MPM Program 2. Data needs and sources 3. Use of measured data vs modeled 4.

More information

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY

Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY Appendix O Congestion Management Program REGIONAL TRANSPORTATION PLAN/SUSTAINABLE COMMUNITIES STRATEGY 2014 REGIONAL CONGESTION MANAGEMENT PROGRAM 2014 RTP/SCS APPENDIX O SAN JOAQUIN COUNCIL OF GOVERNMENTS

More information

FHWA Programs Supporting Freight

FHWA Programs Supporting Freight FHWA Programs Supporting Freight Institute for Trade and Transportation Studies Conference Office of Operations 1200 New Jersey Avenue S.E. Washington, D.C. 20590 www.ops.fhwa.dot.gov/freight Jeff Purdy,

More information

The ipems MAP-21 Module

The ipems MAP-21 Module The ipems MAP-21 Module Producing the information you need from the National Performance Management Research Data Set (NPMRDS) January 2015 Innovation for better mobility Use the ipems MAP-21 Module to

More information

Union County Freight Profile

Union County Freight Profile Union County Freight Profile 2040 Freight Industry Level Forecasts ABOUT THIS PROFILE The NJTPA has developed a set of alternative freight forecasts to support transportation, land use, and economic development

More information

Designing the Future of NMDOT

Designing the Future of NMDOT Designing the Future of NMDOT NM Infrastructure Finance Conference October 28, 2015 Anne McLaughlin, Statewide Planning Bureau Chief Tamara P. Haas, P.E. Asset Management & Planning Division Director Tamarap.Haas@state.nm.us

More information

Prioritization for Infrastructure Investment in Transportation

Prioritization for Infrastructure Investment in Transportation FREIGHT POLICY TRANSPORTATION INSTITUTE Prioritization for Infrastructure Investment in Transportation Jeremy Sage Motivation Why do we (and should we) care about the productivity of Freight Transportation?

More information

Chapter #9 TRAVEL DEMAND MODEL

Chapter #9 TRAVEL DEMAND MODEL Chapter #9 TRAVEL DEMAND MODEL TABLE OF CONTENTS 9.0 Travel Demand Model...9-1 9.1 Introduction...9-1 9.2 Overview...9-1 9.2.1 Study Area...9-1 9.2.2 Travel Demand Modeling Process...9-3 9.3 The Memphis

More information

TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO)

TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO) TRANSPORTATION SYSTEMS MANAGEMENT & OPERATIONS (TSMO) Statewide Strategic Plan Texas Association of Metropolitan Planning Organization (TEMPO) Meeting March 2, 2018 Today s Speakers Marco Cameron, P.E,

More information

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process

Proposed Comprehensive Update to the State of Rhode Island s Congestion Management Process Proposed Comprehensive Update to the State of Rhode Island s Statewide Planning Program January 2018 Summary Outline of of Action Steps 1. Develop Objectives for Congestion Management What is the desired

More information

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance APPENDICES Appendix D: Functional Classification Criteria and Characteristics, and MnDOT Access Guidance D.1 Functional classification identifies the role a highway or street plays in the transportation

More information

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction:

Corpus Christi Metropolitan Transportation Plan Fiscal Year Introduction: Introduction: Traffic congestion in the Corpus Christi Metropolitan area is not as much a function of population growth as the function of the increase in single occupant trips. Using census data, the

More information

2017 TRANSPORTATION POLICY STATEMENT

2017 TRANSPORTATION POLICY STATEMENT 0 TRANSPORTATION POLICY STATEMENT 1 1 1 1 1 1 0 1 0 1 0 1 Critical investments are needed to maintain and improve Virginia s transportation network. The structural imbalance between critical needs and

More information

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES 3.20.2017 PREPARED FOR: CITY OF JACKSONVILLE 55 Railroad Row White River Junction, VT 05001 802.295.4999

More information

What is the Dakota County Principal Arterial Study?

What is the Dakota County Principal Arterial Study? What is the Dakota County Principal Arterial Study? The Dakota County is underway and will address future designations of certain highways as Principal Arterials. What Are Principal Arterials? Principal

More information

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 12/31/2013

Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 12/31/2013 Project Title: Using Truck GPS Data for Freight Performance Analysis in the Twin Cities Metro Area Prepared by: Chen-Fu Liao (PI) Task Due: 12/31/2013 TASK #5: IDENTIFY FREIGHT NODE, FREIGHT SIGNIFICANT

More information

CHAPTER 7. TRAVEL PATTERNS AND TRAVEL FORECASTING

CHAPTER 7. TRAVEL PATTERNS AND TRAVEL FORECASTING CHAPTER 7. TRAVEL PATTERNS AND TRAVEL FORECASTING TRAVEL PATTERNS Northwest Arkansas has experienced unprecedented growth in population and employment in the past 25 years. The economic vitality and diversity

More information

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance

Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Appendix D Functional Classification Criteria and Characteristics, and MnDOT Access Guidance Functional classification identifies the role a highway or street plays in the transportation system. Some highways

More information

Driveway Permits Following Guidelines PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT LAND USE CONTROLS ECONOMIC DEVELOPMENT

Driveway Permits Following Guidelines PLANNING REQUIREMENTS CAPABILITIES ASSISTANCE ACCESS MANAGEMENT LAND USE CONTROLS ECONOMIC DEVELOPMENT CHAPTER 5 Access Management PASSIVE Driveway Permits Following Guidelines Comprehensive Access Management PLANNING REQUIREMENTS Access Restrictions CAPABILITIES Process ASSISTANCE ACCESS MANAGEMENT LAND

More information

MONITORING IMPLEMENTATION AND PERFORMANCE

MONITORING IMPLEMENTATION AND PERFORMANCE 12 MONITORING IMPLEMENTATION AND PERFORMANCE The FAST Act continues the legislation authorized under MAP-21, which created a data-driven, performance-based multimodal program to address the many challenges

More information

FHWA FREIGHT PERFORMANCE MEASURES WORKSHOP. May 2012

FHWA FREIGHT PERFORMANCE MEASURES WORKSHOP. May 2012 FHWA FREIGHT PERFORMANCE MEASURES WORKSHOP May 2012 Before we begin Introductions Agenda Additional Information Performance Measures Overview The surplus, that which is produced in one place to be consumed

More information

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L)

VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L) VTrans2040 Multimodal Transportation Plan Corridors of Statewide Significance Needs Assessment Western Mountain Corridor (L) 77 Table of Contents I. Corridor Overview Land Use and Demographics Corridor

More information

10. PROJECT DEVELOPMENT, LEADERSHIP, AND OVERSIGHT GUIDELINES

10. PROJECT DEVELOPMENT, LEADERSHIP, AND OVERSIGHT GUIDELINES 10. PROJECT DEVELOPMENT, LEADERSHIP, AND OVERSIGHT GUIDELINES It is important to note that the Transitway Guidelines are not intended to be prescriptive, but rather to provide a consistent basis for planning,

More information

National Performance Measure Target Recommendations

National Performance Measure Target Recommendations National Performance Measure Target Recommendations March 2018 TC Workshop Review of National Performance Measures PURPOSE: Transportation Commission must adopt National Performance Measure Targets in

More information

Traffic Data Quality Analysis. James Sturrock, PE, PTOE, FHWA Resource Center Operations Team

Traffic Data Quality Analysis. James Sturrock, PE, PTOE, FHWA Resource Center Operations Team Traffic Analysis James Sturrock, PE, PTOE, FHWA Resource Center Operations Team Source Material Traffic Measurement http://ntl.bts.gov/lib/jpodocs/repts_te/14058.htm Seven DEADLY Misconceptions about Information

More information

Mobility and System Reliability Goal

Mobility and System Reliability Goal Mobility and System Reliability Goal Provide surface transportation infrastructure and services that will advance the efficient and reliable movement of people and goods throughout the state. Background:

More information

OKI Congestion Management System Analysis. Data Collection Report Year 1

OKI Congestion Management System Analysis. Data Collection Report Year 1 OKI Congestion Management System Analysis Data Collection Report Year 1 May 2002 Prepared by the Ohio-Kentucky-Indiana Regional Council of Governments Acknowledgments Title OKI Congestion Management System

More information

Forecasting Intermodal Competition in a Multimodal Environment

Forecasting Intermodal Competition in a Multimodal Environment TRANSPORTATION RESEARCH RECORD 1139 15 Forecasting Intermodal Competition in a Multimodal Environment KEVIN NEELS AND JOSEPH MATHER In this paper, the problem or accurately describing patterns of intermodal

More information

Context. Case Study: Albany, New York. Overview

Context. Case Study: Albany, New York. Overview Case Study: Albany, New York Overview The Capital District, a four-county region surrounding Albany, New York, has experienced dramatic growth in vehicle-miles of travel (VMT) in recent years, which has

More information

NATMEC June 30, 2014 Anita Vandervalk, PE, PMP

NATMEC June 30, 2014 Anita Vandervalk, PE, PMP NATMEC June 30, 2014 Anita Vandervalk, PE, PMP Agenda 1. Florida s MPM Program 2. Research Efforts and Progress 3. Source Book 4. Transitioning to Real Time Data 5. Next Steps Importance of Mobility Providing

More information

Chapter 14 Work Program

Chapter 14 Work Program Chapter 14 Work Program The Metropolitan Council will carry out or participate in many studies and plans over the next three years. This is not an exhaustive list of all work to be completed by the Metropolitan

More information

GDOT-Office of Planning Update

GDOT-Office of Planning Update GDOT-Office of Planning Update GAMPO Conference Athens, Georgia Matthew Fowler, PTP Assistant Planning Administrator November 30, 2010 AGENDA Atlanta Region Managed Lane System Plan I-85 HOV to HOT Conversion

More information

SCOPM Task Force Findings on National-Level Performance Measures

SCOPM Task Force Findings on National-Level Performance Measures November 9, 2012 SCOPM Task Force Findings on National-Level Performance Measures AASHTO Standing Committee on Performance Management Task Force on Performance Measure Development, Coordination and Reporting

More information

PERFORMANCE-BASED PLANNING AND PROGRAMMING

PERFORMANCE-BASED PLANNING AND PROGRAMMING February 2017 performance-based planning and programming Boston Region MPO PERFORMANCE-BASED PLANNING AND PROGRAMMING WHAT IS PERFORMANCE-BASED PLANNING AND PROGRAMMING? Performance-based planning and

More information

MAP-21 themes. Strengthens America s highway and public transportation systems. Creates jobs and supports economic growth

MAP-21 themes. Strengthens America s highway and public transportation systems. Creates jobs and supports economic growth MAP-21 themes Strengthens America s highway and public transportation systems Creates jobs and supports economic growth Supports the Department s aggressive safety agenda Simplifies and focuses the Federal

More information

Institute of Transportation Engineers Inc.

Institute of Transportation Engineers Inc. August 20 th, 2016 Gregory G. Nadeau Administrator, Federal Highway Administration US Department of Transportation 1200 New Jersey Avenue, SE Washington, DC 20590 RE: Docket No. FHWA-2013-0054 Dear Administrator

More information

GUIDING PRINCIPLES MEMORANDUM

GUIDING PRINCIPLES MEMORANDUM M E T R O P O L I TAN TRA NS P O RTATI O N PLAN GUIDING PRINCIPLES MEMORANDUM El Paso Metropolitan Planning Organization INTRODUCTION The guiding principles for development of the El Paso MPO s Destino

More information

INVESTMENT SCENARIOS CHAPTER Illustrative Investment Approaches Public Outreach 6-1

INVESTMENT SCENARIOS CHAPTER Illustrative Investment Approaches Public Outreach 6-1 CHAPTER 6 As detailed in Chapters 4 and 5, Texas multimodal transportation needs estimated at $21 billion annually (2014 constant dollars) illustrated in Exhibit 4-12 far outstrip the approximately $9.1

More information

Chapter 8 - The Decision-Making Process

Chapter 8 - The Decision-Making Process Chapter 8 - The Decision-Making Process KEY POINTS One of the most important products of this Missouri State Freight Plan is a consistent process to prioritize freight investments (projects). The process

More information

PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA

PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA PROPOSED AMENDMENT OF THE I 76 INTEGRATED CORRIDOR MANAGEMENT PROJECT TO THE CONNECTIONS 2040 PLAN FOR GREATER PHILADELPHIA Background and Project Description In July 2013, the Delaware Valley Regional

More information

IDOT PERFORMANCE BASED PROJECT METRICS. February 2018

IDOT PERFORMANCE BASED PROJECT METRICS. February 2018 IDOT PERFORMANCE BASED PROJECT METRICS February 2018 March 5, 2018 2 What is Performance Management? Performance Management of the Federal Highway Program is a systematic approach to making investment

More information

Policy Research CENTER

Policy Research CENTER TRANSPORTATION Policy Research CENTER Methodologies Used to Estimate and Forecast Vehicle Miles Traveled (VMT) What Is Vehicle Miles Traveled? Vehicle miles traveled (VMT) is a measure used extensively

More information

FHWA COST EFFECTIVENESS TABLES SUMMARY

FHWA COST EFFECTIVENESS TABLES SUMMARY FHWA COST EFFECTIVENESS TABLES SUMMARY FHWA COST EFFECTIVENESS TABLES Summary... 1 Background And Summary Finding... 1 Introduction... 1 MAP-21... 2 Key Analytical Assumptions and Limitations... 2 Development

More information

2. Guiding Principles, Objectives, and Policies

2. Guiding Principles, Objectives, and Policies 2. Guiding Principles, Objectives, and Policies INTRODUCTION The guiding principles for the 2040 MTP Update establish the vision and key focus areas for this planning effort. They combine the guidance

More information

TEXAS FREIGHT MOBILITY PLAN 2017

TEXAS FREIGHT MOBILITY PLAN 2017 TEXAS FREIGHT MOBILITY PLAN 2017 Texas Transportation Commission September 28, 2017 Overview of the Texas Freight Mobility Plan 2016 Plan First multimodal freight mobility plan Identified freight network,

More information

RESOLUTION NO

RESOLUTION NO RESOLUTION NO. 2018-12 RESOLUTION OF THE SOUTHEASTERN WISCONSIN REGIONAL PLANNING COMMISSION AMENDING THE TRANSPORTATION IMPROVEMENT PROGRAM FOR SOUTHEASTERN WISCONSIN: 2017-2020 WHEREAS, the Southeastern

More information

MARC Congestion Management Process Policy

MARC Congestion Management Process Policy MARC Congestion Management Process Policy Adopted by the MARC Board of Directors on May 24, 2011 Background Traffic congestion can be generally defined as a condition where the volume of users on a transportation

More information

ODOT Asset Management Plan 0

ODOT Asset Management Plan 0 ODOT Asset Management Plan 0 Table of Contents Executive Summary... 1 ODOT s Experience with Asset Management... 1 A New Way of Doing Business... 2 ODOT s Investment Plans... 3 Moving Forward... 5 1.0

More information

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050

EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 EXECUTIVE SUMMARY REGIONAL TRANSPORTATION PLAN 2050 Introduction Goals Policies, and Performance Measures Growth Forecast and Planned Land Use Development Key Recommendations i Executive Summary April

More information

WELCOME. Schedule. Contact Information. Please Provide Written Comments

WELCOME. Schedule. Contact Information. Please Provide Written Comments WELCOME Schedule April 18, 2012 Open House: 6:30 p.m. to 8:30 p.m. Project Presentation: 7:00 p.m. Mary Ellen Henderson Middle School 7130 Leesburg Pike Falls Church, VA 2203 Contact Information Kala Leggett

More information

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS

6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.0 CONGESTION HOT SPOT PROBLEM AND IMPROVEMENT TRAVEL DEMAND MODEL ANALYSIS 6.1 MODEL RUN SUMMARY NOTEBOOK The Model Run Summary Notebook (under separate cover) provides documentation of the multiple

More information

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS

USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS Mack, Sullivan 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 USING REMAINING SERVICE LIFE AS THE NATIONAL PERFORMANCE MEASURE OF PAVEMENT ASSETS Word Count

More information

12 Evaluation of Alternatives

12 Evaluation of Alternatives 12 Evaluation of Alternatives This chapter evaluates the effectiveness of the No-Build Alternative and the proposed METRO Blue Line Light Rail Transit (BLRT) Extension project based on the information

More information

USDOT PERFORMANCE BASED PLANNING AND PROGRAMMING (PBPP)

USDOT PERFORMANCE BASED PLANNING AND PROGRAMMING (PBPP) USDOT PERFORMANCE BASED PLANNING AND PROGRAMMING (PBPP) Eric Randall TPB Transportation Engineer Jane Posey TPB Transportation Engineer MWAQC TAC February 14, 2017 Agenda Item 4 Performance Based Planning

More information

AICP EXAM REVIEW. Transportation Planning. February 19, 2016

AICP EXAM REVIEW. Transportation Planning. February 19, 2016 AICP EXAM REVIEW Transportation Planning February 19, 2016 Agenda Defining transportation planning Transportation stakeholders Transportation plan development Transportation funding Project development

More information

Using INRIX Data in Iowa. Kyle Barichello, Iowa DOT Skylar Knickerbocker, InTrans

Using INRIX Data in Iowa. Kyle Barichello, Iowa DOT Skylar Knickerbocker, InTrans Using INRIX Data in Iowa Kyle Barichello, Iowa DOT Skylar Knickerbocker, InTrans What is probe data? What is INRIX data? INRIX Data Overview Purchased traffic data Covers Interstates, State Highway, some

More information

9. TRAVEL FORECAST MODEL DEVELOPMENT

9. TRAVEL FORECAST MODEL DEVELOPMENT 9. TRAVEL FORECAST MODEL DEVELOPMENT To examine the existing transportation system and accurately predict impacts of future growth, a travel demand model is necessary. A travel demand model is a computer

More information

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner

Regional Performance Measures Annual Progress Report TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner 2015 TPO Board - 2/4/2016 Presentation by: Chris Wichman, Senior Planner Overview History and definition of performance-based planning & programming Review of 2015 TPO Board Action Requested 2 History

More information

2040 Addendum Performance-Based Planning November 2018

2040 Addendum Performance-Based Planning November 2018 2040 Long Range Transportation Plan 2040 Addendum Performance-Based Planning November 2018 Adopted June 13, 2018 250 S. Orange Ave, Suite 200, Orlando, FL 32801 407-481-5672 www.metroplanorlando.org MetroPlan

More information

Regional Transportation Performance Measures

Regional Transportation Performance Measures Regional Transportation Performance Measures March 5, 2014 Presented by Tom Murtha Regional Transportation Performance 2 Measures: Introduction Regional Transportation Performance Measures address needs

More information

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS

APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS APPENDIX H: TRAVEL DEMAND MODEL VALIDATION AND ANALYSIS Travel demand models (TDM) simulate current travel conditions and forecast future travel patterns and conditions based on planned system improvements

More information

1 INTRODUCTION 1-1 CTPS

1 INTRODUCTION 1-1 CTPS 1 INTRODUCTION This report of the Congestion Management System (CMS) for the Boston Region Metropolitan Planning Organization (MPO) documents the region s mobility concerns. (The region is shown in Figure

More information

APPENDIX D. Glossary D-1

APPENDIX D. Glossary D-1 APPENDIX D Glossary D-1 Glossary of Transportation Planning Terms ANNUAL AVERAGE DAILY TRAFFIC (AADT): The total number of vehicles passing a given location on a roadway over the course of one year, divided

More information

Warren County Freight Profile

Warren County Freight Profile Warren County Freight Profile 2040 Freight Industry Level Forecasts ABOUT THIS PROFILE The NJTPA has developed a set of alternative freight forecasts to support transportation, land use, and economic development

More information

PennDOT Office of Planning

PennDOT Office of Planning Every Voice Counts PennDOT Office of Planning Environmental Justice Plan Executive Summary Developed for: Pennsylvania Department of Transportation Office of Planning Center for Program Development and

More information

Essex County Freight Profile

Essex County Freight Profile Essex County Freight Profile 2040 Freight Industry Level Forecasts ABOUT THIS PROFILE The NJTPA has developed a set of alternative freight forecasts to support transportation, land use, and economic development

More information

Operations in the 21st Century DOT Meeting Customers Needs and Expectations

Operations in the 21st Century DOT Meeting Customers Needs and Expectations Operations in the 21st Century DOT Meeting Customers Needs and Expectations 1 Purpose of this Meeting: Share Thoughts & Discuss Challenges brought about by the changing transportation environment and public

More information

Freight and Rail Stakeholder Webinar. January 7, 2014

Freight and Rail Stakeholder Webinar. January 7, 2014 Freight and Rail Stakeholder Webinar January 7, 2014 Agenda Modal Needs Baseline Revenue Modal Scenarios Website Statewide Freight Plan Statewide Rail Plan Jeff Carroll MULTIMODAL TRANSPORTATION NEEDS

More information

PERFORMANCE-BASED PLANNING AND PROGRAMMING

PERFORMANCE-BASED PLANNING AND PROGRAMMING February 2017 performance-based planning and programming Boston Region MPO PERFORMANCE-BASED PLANNING AND PROGRAMMING WHAT IS PERFORMANCE-BASED PLANNING AND PROGRAMMING? Performance-based planning and

More information

Summary of transportation-related goals and objectives from existing regional plans

Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Appendix A: Summary of transportation-related goals and objectives from existing regional plans SMTC 2050 Long Range Transportation Plan Summary of transportation-related

More information

Chapter 3 - Goals, Objectives, & Strategies

Chapter 3 - Goals, Objectives, & Strategies Chapter 3 - This chapter presents goals, objectives, and strategies that have been developed as part of the Richmond Area MPO 2026 Long-Range Transportation Plan (LRTP) update. Strategies have been developed

More information

congestion management process

congestion management process congestion management process c o r p u s c h r i s t i m e t r o p o l i t a n p l a n n i n g o r g a n i z a t i o n Corpus Christi Metropolitan Planning Organization 602 N. Staples Street, Suite 300

More information

PERFORMANCE-BASED PLANNING AND PROGRAMMING

PERFORMANCE-BASED PLANNING AND PROGRAMMING September 2018 performance-based planning and programming Boston Region Metropolitan Planning Organization: PERFORMANCE-BASED PLANNING AND PROGRAMMING WHAT IS PERFORMANCE-BASED PLANNING AND PROGRAMMING?

More information

SCOPM Task Force Findings on MAP-21 Performance Measure Target-Setting*

SCOPM Task Force Findings on MAP-21 Performance Measure Target-Setting* March 22, 2013 SCOPM Task Force Findings on MAP-21 Performance Measure Target-Setting* AASHTO Standing Committee on Performance Management Task Force on Performance Measure Development, Coordination and

More information

CHAPTER 2: MODELING METHODOLOGY

CHAPTER 2: MODELING METHODOLOGY CHAPTER 2: MODELING METHODOLOGY 2.1 PROCESS OVERVIEW The methodology used to forecast future conditions consisted of traditional traffic engineering practices and tools with enhancements to more accurately

More information

NJTPA Region. Bergen Essex Hudson Hunterdon Jersey City Middlesex Monmouth Morris. Newark Ocean Passaic Somerset Sussex Union Warren

NJTPA Region. Bergen Essex Hudson Hunterdon Jersey City Middlesex Monmouth Morris. Newark Ocean Passaic Somerset Sussex Union Warren NJTPA Region Bergen Essex Hudson Hunterdon Jersey City Middlesex Monmouth Morris Newark Ocean Passaic Somerset Sussex Union Warren North Jersey Transportation Planning Authority The Metropolitan Planning

More information

Recommended Roadway Plan Section 3 Existing Facilities & System Performance

Recommended Roadway Plan Section 3 Existing Facilities & System Performance Recommended Roadway Plan Section 3 Existing Facilities & System Performance RECOMMENDED ROADWAY PLAN SECTION 3 Existing Facilities and System Performance 3.1 Introduction An important prerequisite to transportation

More information

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES

GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES GUIDE FOR THE PREPARATION OF TRAFFIC IMPACT STUDIES Adopted by Town Council on November 25, 2008 Prepared By: HNTB Engineering Department Planning Department TABLE OF CONTENTS I. INTRODUCTION... 1 II.

More information

SCOPM Performance Measures Webinar

SCOPM Performance Measures Webinar SCOPM Performance Measures Webinar Wednesday, October 20, 2010 11:30am to 1:00pm Webinar: https://www.livemeeting.com/cc/icollaboration/join?id=scopm&role=attend Audio Portion: 866-537-1617, passcode 9371567

More information