1 Phase II Environmental Site Assessment 8 No. 3 Sideroad Milton, Ontario Royal Park Homes c/o Shad & Associates Inc. 83 Citation Drive, Unit 9 Vaughan, ON, L4K 2Z6 Attention: Mr. Doug Skeffington May 6, 2013 Pinchin File: Pinchin Environmental Ltd. 875 MAIN STREET WEST, UNIT 11, HAMILTON, ONTARIO L8S 4R9 PHONE: (905) FAX: (905) ENVIRONMENTAL HEALTH & SAFETY MANAGEMENT SERVICES FROM OFFICES ACROSS CANADA

2 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: EXECUTIVE SUMMARY Pinchin Environmental Ltd. ( Pinchin ) was retained by Mr. Doug Skeffington of Royal Park Homes ( Client ) to conduct a Phase II Environmental Site Assessment ( ESA ) of the property located at 8 No. 3 Sideroad in Milton, Ontario (hereafter referred to as the Site ). The Site is developed with a vacant single-storey building ( Site Building ) formerly utilized as a school. The purpose of this Phase II ESA was to address potential issues of environmental concern identified during a Phase I ESA conducted by Pinchin in relation to the potential redevelopment of the Site. Pinchin completed a Phase I ESA in connection with the Site on behalf of the Client, the findings of which are provided in the document entitled Phase I Environmental Site Assessment, 8 No.3 Sideroad, Milton, Ontario dated November 11, 2010 ( 2010 Pinchin Phase I ESA ). The 2010 Pinchin Phase I ESA was completed in general accordance with the Canadian Standards Association ( CSA ) document entitled Phase I Environmental Site Assessment, CSA Standard Z dated Based on the findings of the 2010 Pinchin Phase I ESA, the Site consisted of a 0.84 hectare parcel of land developed with a single-storey building formerly occupied by a school and most recently a day care facility. Pinchin observed what appeared to be a steel ventilation pipe and two fill ports typically associated with an underground storage tank ( UST ) adjacent to the southwest exterior wall of the Site Building. Pinchin recommended that a Phase II ESA be completed at the Site to assess the location of the suspected UST, as well as the soil and groundwater within its vicinity. Based on recent correspondence between Pinchin and Client, Pinchin understands that the Client is planning on redeveloping the Site in association with the lands located to the north and east as a residential neighbourhood. Pinchin was informed by the Client that a Record of Site Condition ( RSC ) with the Ontario Ministry of the Environment ( MOE ) is required by Halton Region and the Town of Milton in order to proceed with issuing site plan approval. The Phase II ESA was completed at the Site by Pinchin between April 22 and April 25, 2013, and consisted of the advancement of five (5) boreholes, all of which were completed as groundwater monitoring wells. Select worst case soil samples collected during the borehole drilling program were submitted for laboratory analyses of petroleum hydrocarbons ( PHCs ) in the F1 to F4 fraction ranges ( F1-F4 ), as well as benzene, toluene, ethylbenzene and xylenes (collectively referred to as BTEX ) and polycyclic aromatic hydrocarbons ( PAHs ). Groundwater samples collected from the newly installed monitoring wells were submitted for laboratory analyses of PHCs (F1- F4), BTEX and PAHs Pinchin Environmental Ltd. Page i

3 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: Based on Site-specific information, the soil and groundwater quality was assessed based on the Ontario Ministry of the Environment ( MOE ) Table 2 Standards for residential/parkland/ institutional land use and fine to medium textured soils. All reported concentrations in the soil and groundwater samples submitted for analyses of PHCs (F1-F4), BTEX and PAHs satisfied the applicable MOE Table 2 Standards. Based on the findings of this Phase II ESA, it is Pinchin s opinion that no further subsurface investigation is required in relation to the findings of the Phase I ESA. This Executive Summary is subject to the same standard limitations as contained in the report and must be read in conjunction with the entire report Pinchin Environmental Ltd. Page ii

4 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: TABLE OF CONTENTS PHASE II ENVIRONMENTAL SITE ASSESSMENT NO. 3 SIDEROAD...1 MILTON, ONTARIO...1 ATTENTION: MR. DOUG SKEFFINGTON...1 MAY 6, PINCHIN ENVIRONMENTAL LTD INTRODUCTION Background Scope of Work METHODOLOGY Ground Penetrating Radar Survey Borehole Investigation Monitoring Well Installation Groundwater Monitoring and Elevation Survey Sampling and Laboratory Analysis Soil Groundwater Analytical Laboratory QA/QC Protocols Ontario Water Well Records Site Condition Standards RESULTS Site Geology and Hydrogeology Soil Vapour Concentrations Field Observations Analytical Soil Groundwater FINDINGS AND CONCLUSIONS DISCLAIMER SIGNATURE PAGE...11 APPENDICES Appendix I Figures Appendix II Borehole Logs Appendix III Summary Tables Appendix IV - Laboratory Certificates of Analyses 2013 Pinchin Environmental Ltd. Page iii

5 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: FIGURES Figure 1 Key Map Figure 2 Site and Surrounding Land Use Plan Figure 3 Monitoring Well Location Plan Figure 4 Groundwater Elevation Plan 2013 Pinchin Environmental Ltd. Page iv

6 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: TABLES Table 1 Monitoring Well Construction Details Table 2 - Groundwater Elevation Data Table 3 - Samples Submitted for Laboratory Analyses Table 4 ph and Grain Size Analyses Table 5 Petroleum Hydrocarbon and BTEX Analyses for Soil Table 6 Polycyclic Aromatic Hydrocarbon Analyses for Soil Table 7 Petroleum Hydrocarbon and BTEX Analyses for Groundwater Table 8 Polycyclic Aromatic Hydrocarbon Analyses for Groundwater 2013 Pinchin Environmental Ltd. Page v

7 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: INTRODUCTION Pinchin Environmental Ltd. ( Pinchin ) was retained by Mr. Doug Skeffington of Royal Park Homes ( Client ) to conduct a Phase II Environmental Site Assessment ( ESA ) of the property located at 8 No. 3 Sideroad in Milton, Ontario (hereafter referred to as the Site ). The Site location is shown on Figure 1 (all Figures are provided in Appendix I). The Site is developed with a vacant single-storey building ( Site Building ) formerly utilized as a school. The purpose of this Phase II ESA was to address potential issues of environmental concern identified during a Phase I ESA conducted by Pinchin in relation to the potential redeveloping of the Site. 1.1 Background Pinchin completed a Phase I ESA in connection with the Site on behalf of the Client, the findings of which are provided in the document entitled Phase I Environmental Site Assessment, 8 No.3 Sideroad, Milton, Ontario dated November 11, 2010 ( 2010 Pinchin Phase I ESA ). The 2010 Pinchin Phase I ESA was completed in general accordance with the Canadian Standards Association ( CSA ) document entitled Phase I Environmental Site Assessment, CSA Standard Z dated Based on the findings of the 2010 Pinchin Phase I ESA, the Site consisted of a 0.84-hectare parcel of land developed with a single-storey building formerly occupied by a school and most recently a day care facility. Pinchin observed what appeared to be a steel ventilation pipe and two fill ports typically associated with an underground storage tank ( UST ) adjacent to the southeast exterior wall of the Site Building. Pinchin recommended that a Phase II ESA be completed at the Site to assess the location of the suspected UST, as well as the soil and groundwater within its vicinity. Based on recent correspondence between Pinchin and Client, Pinchin understands that the Client is planning on redeveloping the Site in association with the lands located to the north and east as a residential neighbourhood. Pinchin was informed by the Client that a Record of Site Condition ( RSC ) with the Ontario Ministry of the Environment ( MOE ) is required by Halton Region and the Town of Milton in order to proceed with issuing site plan approval. 1.2 Scope of Work This Phase II ESA was completed in general accordance with the following documents: Phase II Environmental Site Assessment, CSA Standard Z (R2008), dated 2000 and reaffirmed in 2008; and Ontario Regulation 153/04 as amended by Ontario Regulation 511/09 ( O. Reg. 153/04 as amended ) Pinchin Environmental Ltd. Page 1

8 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: The scope of work completed by Pinchin, as outlined in the Pinchin proposal entitled Phase Two Environmental Site Assessment and Record of Site Condition, 8 No. 3 Sideroad, Milton, Ontario submitted to the Client on October 9, 2012, included the following: Advancement of five (5) boreholes following the clearance of underground services, all of which were instrumented with a monitoring well; Conduct GPR Survey in the vicinity of the suspect UST; Submission of select worst case soil samples for laboratory analysis of petroleum hydrocarbons ( PHCs ) in the F1 to F4 fraction ranges ( F1-F4 ), as well as benzene, toluene, ethylbenzene and xylenes (collectively referred to as BTEX ) and polycyclic aromatic hydrocarbons ( PAHs ); Collection of groundwater samples from each of the newly installed monitoring wells, following well development and purging, for laboratory analyses of PHCs (F1-F4), BTEX and PAHs; Submitted one soil and one groundwater field duplicate for chemical analyses of PHCs, BTEX and PAHs for quality control / quality assurance ( QA/QC ) purposes; Completion of an elevation survey and depth to groundwater measurements at the newly installed monitoring wells to determine the inferred direction of groundwater flow; Comparison of the soil and groundwater laboratory analytical results to the applicable regulatory criteria; and Preparation of a factual report (this report) detailing the findings of the Phase II ESA and recommendations. 2.0 METHODOLOGY The investigation methodology was conducted in general accordance with the MOE document entitled Guidance on Sampling and Analytical Methods for Use at Contaminated Sites in Ontario dated December 1996 ( MOE Sampling Guideline ). 2.1 Ground Penetrating Radar Survey Pinchin completed a ground penetrating radar ( GPR ) survey at the Site to assess the size of the UST area adjacent to the southeast exterior wall of the Site Building. The results of the GPR survey indicated two anomalies within this location. It is unclear if these anomalies represent two USTs or a second feature within the UST area. The position of the UST is shown on Figures 3 and Pinchin Environmental Ltd. Page 2

9 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: Borehole Investigation Pinchin retained Strata Soil Sampling Inc. ( Strata ) to complete the borehole drilling program at the Site on April 22, 2013 following the clearance of underground services in the vicinity of the work area by public utility locators and a private utility locator retained by Pinchin. Strata is licensed by the MOE in accordance with Ontario Regulation 903 (as amended) to undertake borehole drilling/well installation activities. The boreholes were advanced to a maximum depth of 6.10 metres below ground surface ( mbgs ) using a Geoprobe 7822 DT direct push drill rig. Soil samples were collected at continuous 1.52 metre intervals using 5.1 centimetre ( cm ) outer diameter ( OD ) direct push soil samplers with dedicated single-use sample liners. Discrete soil samples were collected from the single-use liners and containerized in laboratory-supplied glass sampling jars. Subsurface soil conditions were logged on-site by Pinchin personnel at the time of drilling. Soil samples were examined for visual and olfactory evidence of impacts and a portion of each sample was analyzed in the field for solvent and petroleum-derived vapour concentrations in soil headspace using a photoionization detector ( PID ) and a hydrocarbon surveyor ( RKI Eagle ) operated in methane elimination mode. The locations of the boreholes are shown on Figures 2 and 3, and a description of the subsurface stratigraphy encountered during the drilling program is documented in the borehole logs included in Appendix II. 2.3 Monitoring Well Installation Groundwater monitoring wells were installed in boreholes MW01 to MW05 to enable groundwater monitoring and sampling. The monitoring wells were constructed with 5.1 cm inner diameter ( ID ) flush-threaded Schedule 40 polyvinyl chloride ( PVC ) risers, followed by a length of 5.1 cm ID No. 10 slot PVC screen that intersected the water table. Each well screen was sealed at the bottom using a threaded cap and each riser was sealed at the top with a lockable J-plug cap. Silica sand was placed around and above the screened interval to form a filter pack around the well screen. A layer of bentonite was placed above the silica sand and was extended to the ground surface. A protective flush-mount cover was installed at the ground surface over each riser pipe and cemented in place. The locations of the monitoring wells are shown on Figures 2 and 3. The monitoring well construction details are shown on the borehole logs included in Appendix II and on Table 1 in Appendix III (all tables are provided within Appendix III) Pinchin Environmental Ltd. Page 3

10 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: Groundwater Monitoring and Elevation Survey The water levels within the monitoring wells were measured on April 25, 2013 using an interface probe. The presence/absence of non-aqueous phase liquid ( NAPL ) was also assessed during groundwater monitoring using the interface probe. Pinchin completed a relative elevation survey of the newly installed groundwater monitoring wells on April 25, 2013, using a Topcon rotating laser level and laser sensor. A temporary benchmark was used to determine the relative elevation of the top of the monitoring well casings and the ground surface at each well location. The temporary benchmark used was the top pin of a fire-hydrant located on the southeast side of No. 3 Sideroad, adjacent to the southeast side of the Site, which was arbitrarily assigned the elevation of metres. These elevation measurements represent a relative (not a geodetic) elevation. A summary of the elevation data is presented in Table 2. The groundwater elevations are provided on Figure Sampling and Laboratory Analysis Soil One most apparent worst case soil sample, based on vapour concentrations as well as visual and/or olfactory considerations, recovered from each borehole was submitted for laboratory analyses of PHCs (F1-F4), BTEX and PAHs. In addition, representative soil samples were submitted for ph analysis and grain size distribution analysis to confirm the Site Condition Standards applicable to the Site as provided in the MOE document entitled, Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act dated April 15, 2011 ( MOE Standards ). The borehole locations are shown on Figures 2 and 3. Table 3 provides a summary of the soil samples submitted for laboratory analyses Groundwater On April 22 and 23, 2013, all newly installed groundwater monitoring wells were developed by purging until dry, in accordance with Pinchin s standard field procedures. On April 25, 2013, newly installed groundwater monitoring wells MW01 to MW05 were purged until dry, prior to sampling, in accordance with Pinchin s standard field procedures. Upon groundwater recovery, groundwater samples were collected from these monitoring wells and submitted for laboratory analyses of PHCs (F1-F4), BTEX and PAHs. All monitoring well development activities were conducted using dedicated inertial pumps comprised of Waterra TM polyethylene tubing and foot valves. The purging and sampling of the monitoring wells was completed using a peristaltic pump and dedicated polyethylene tubing Pinchin Environmental Ltd. Page 4

11 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: The monitoring well locations are shown on Figures 2 and 3. Table 3 provides a summary of the groundwater samples submitted for laboratory analyses Analytical Laboratory All collected soil and groundwater samples were delivered to Maxxam Analytics Inc. ( Maxxam ) in Mississauga, Ontario for analysis. Maxxam is an independent laboratory accredited by the Canadian Association for Laboratory Accreditation. Formal chain of custody records of the sample submissions were maintained between Pinchin and the staff at Maxxam. 2.6 QA/QC Protocols Various quality QA/QC protocols were followed during the Phase II ESA to ensure that representative samples were obtained and that representative analytical data were reported by the laboratory. Field QA/QC protocols that were employed by Pinchin included the following: Soil samples were extracted from the interior of the sampling device (where possible), rather than from areas in contact with the sampler walls to minimize the potential for cross-contamination; Soil and groundwater samples were placed in laboratory-supplied glass sample jars; The monitoring wells were developed following installation and were purged to remove stagnant water prior to sample collection so that representative groundwater samples could be obtained. Dedicated purging and sampling equipment was used for monitoring well development, purging and sampling to minimize the potential for crosscontamination; All soil and groundwater samples were placed in coolers on ice immediately upon collection, with appropriate sample temperatures maintained prior submission to the laboratory; Submitted one soil and one groundwater field duplicate for chemical analysis of PHCs, BTEX and PAHs for QA/QC purposes; Dedicated and disposable Nitrile gloves were used for all sample handling; All non-dedicated monitoring and sampling equipment (e.g., interface probe) was cleaned before initial use and between uses to minimize the potential for cross-contamination by washing with an Alconox /potable water mixture followed by a deionized water rinse; and Sample collection and handling procedures were performed in general accordance with the MOE Sampling Guideline. Maxxam s internal laboratory QA/QC consisted of the analysis of laboratory duplicate, method blank, matrix spike and spiked blank samples, an evaluation of relative percent difference calculations for laboratory duplicate samples, and an evaluation of surrogate recoveries for the method blank, matrix spike and spiked blank samples Pinchin Environmental Ltd. Page 5

12 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: Ontario Water Well Records Ontario Regulation 903 (as amended) requires that all wells installed to depths greater than 3.0 mbgs have a water well record completed by a licensed well technician. The owner of the monitoring well must keep the water well record on file for a period of two years and the monitoring wells must be decommissioned as per Ontario Regulation 903 (as amended) if monitoring wells are no longer in use. Strata is a licensed well driller under Ontario Regulation 903 (as amended), and submitted a water well record to the MOE and the Client to fulfill the requirements of Ontario Regulation 903 (as amended). 2.8 Site Condition Standards The Site is institutional property located within the Town of Milton. It is Pinchin s understanding that potable water for the Site and surrounding area is supplied by municipal services, with Lake Ontario serving as the water source, as well as private wells in the surrounding area. Ontario Regulation 153/04 (as amended) states that a Site is classified as an environmentally sensitive area if the ph of the surface soil (less than 1.5 mbgs) is less than 5 or greater than 9, the ph of the subsurface soil (greater than 1.5 mbgs) is less than 5 or greater than 11, or if the Site is an area of natural significance or is adjacent to or contains land within 30 m of an area of natural significance. Two representative soil samples collected from the boreholes advanced at the Site were submitted for ph analysis. The ph values measured in the submitted soil samples were within the limits for non-sensitive sites. The Site is also not an area of natural significance and it is not adjacent to, nor does it contain land within, 30 m of an area of natural significance. As such, the Site is not an environmentally sensitive area. One representative soil sample collected from the boreholes advanced at the Site was submitted for 75 micron single-sieve grain size analysis. Based on the results of this analysis, the soil at the Site is interpreted to be medium/fine-textured for the purpose of selecting the appropriate MOE Standards. The ph and grain size analytical results are summarized in Table 4. Based on the above, the appropriate Site Condition Standards for the Site are: Table 2: Full Depth Generic Site Condition Standards for Use in a Potable Ground Water Condition, provided in the MOE Standards Table 2 Standards for: o Medium/fine-textured soils; and o Residential/parkland/institutional property use. As such, all analytical results have been compared to these Table 2 Standards Pinchin Environmental Ltd. Page 6

13 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: RESULTS 3.1 Site Geology and Hydrogeology Based on the soil samples recovered during the borehole drilling program, the soil stratigraphy at the drilling locations below the grass generally consists of inter-layered silt and clay that extended to the maximum borehole completion depth of 6.10 mbgs. Wet soil conditions were generally observed between 4.88 and 5.49 mbgs. A detailed description of the subsurface stratigraphy encountered during borehole advancement is documented in the borehole logs located in Appendix II. The water level information obtained during groundwater monitoring is presented in Table 2 and on the borehole logs in Appendix II. The depths to groundwater measured within the monitoring wells on April 25, 2013 ranged from 0.22 mbgs at monitoring well MW05 to 4.69 mbgs at monitoring well MW02. Pinchin completed a relative elevation survey of the newly installed groundwater monitoring wells on April 25, However the monitoring wells are positioned closely together in the vicinity of the UST and elevation data does not allow Pinchin to define the groundwater flow at the Site. Sixteen Mile Creek is located approximately 200 metres southeast of the Site. The topography of the Site and surrounding area was observed to slope downwards to the southeast. Groundwater flow at the Site is inferred to be towards the south based on the topography of the Site area and the location of Sixteen Mile Creek. 3.2 Soil Vapour Concentrations Vapour concentrations measured in the soil samples collected during the drilling investigation are presented on the borehole logs in Appendix II and ranged from less than 5 parts per million by volume ( ppm v ) to a maximum of 550 ppm v in soil sample MW03-7 collected at a depth of 4.57 to 5.33 mbgs in borehole MW Field Observations No odours or staining were observed in the soil samples collected during the borehole drilling program. No odours or evidence of NAPL were observed during groundwater monitoring and sampling Pinchin Environmental Ltd. Page 7

14 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: Analytical Soil As indicated in Tables 5 and 6, all reported concentrations of PHCs (F1-F4), BTEX and PAHs in the soil samples submitted for analyses met the Table 2 Standards. The laboratory Certificates of Analyses for the soil samples are provided in Appendix IV Groundwater As indicated in Tables 7 and 8, all reported concentrations in the groundwater samples submitted for analyses of PHCs (F1-F4), BTEX and PAHs met the Table 2 Standards. The laboratory Certificates of Analyses for the groundwater samples are provided in Appendix IV. 4.0 FINDINGS AND CONCLUSIONS Based on the work completed, the following is a summary of the activities and findings of this Phase II ESA: Pinchin retained Strata to advance five (5) boreholes at the Site on April 22, The boreholes were advanced to a maximum depth of 6.10 mbgs using a Geoprobe 7822 DT direct push drill rig. Each borehole was instrumented with a monitoring wells to enable groundwater monitoring and sampling. The soil stratigraphy at the drilling locations generally consisted of inter-layered silt and clay that extended to the maximum borehole completion depth of 6.10 mbgs. The soil was generally observed to be wet between 4.88 and 5.49 mbgs. Groundwater levels at the Site measured on April 25, 2013 varied between 0.22 mbgs (MW05) and 4.69 mbgs (MW02). Inferred groundwater flow is expected to be south based on topography and the presence of Sixteen Mile Creek approximately 200 metres southeast of the Site. Based on Site-specific information, the soil and groundwater quality was assessed based on the MOE Table 2 Standards for residential/parkland/institutional land use and fine to medium textured soils. Five (5) worst case soil samples based on the results of field screening were submitted for laboratory analyses of PHCs (F1-F4), BTEX and PAHs. Groundwater samples were collected from monitoring wells MW01 to MW05 installed by Pinchin on April 25, 2013 and were submitted for laboratory analyses of PHCs (F1- F4), BTEX and PAHs. All reported concentrations in the soil samples submitted for analyses of PHCs (F1-F4), BTEX and PAHs satisfied their respective Table 2 Standards. Based on the findings of this Phase II ESA, it is Pinchin s opinion that no further subsurface investigation is required at the Site in relation to the findings of the Phase I ESA Pinchin Environmental Ltd. Page 8

15 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: DISCLAIMER This Phase II ESA was performed for Royal Park Homes ( Client ) in order to investigate potential environmental impacts at 8 No. 3 Sideroad, Milton, Ontario ( Site ). The term recognized environmental condition means the presence or likely presence of any hazardous substance on a property under conditions that indicate an existing release, past release, or a material threat of a release of a hazardous substance into structures on the property or into the ground, groundwater, or surface water of the property. This Phase II ESA does not quantify the extent of the extent of the current and/or recognized environmental condition or the cost of any remediation. Conclusions derived are specific to the immediate area of study and cannot be extrapolated extensively away from sample locations. Samples have been analyzed for a limited number of contaminants that are expected to be present at the Site, and the absence of information relating to a specific contaminant does not indicate that it is not present. No environmental site assessment can wholly eliminate uncertainty regarding the potential for recognized environmental conditions on a property. Performance of this Phase II ESA to the standards established by Pinchin is intended to reduce, but not eliminate, uncertainty regarding the potential for recognized environmental conditions on the Site, and recognizes reasonable limits on time and cost. This Phase II ESA was performed in general compliance with currently acceptable practices for environmental site investigations, and specific Client requests, as applicable to this Site. The scope of work completed by Pinchin, as part of this Phase II ESA, is not sufficient (in and of itself) to meet the reporting requirements for the submission of a Record of Site Condition ( RSC ) in accordance with Ontario Regulation 153/04 (as amended). If an RSC is an intended end product of work conducted at the Site, further consultation and/or work will be required. This report was prepared for the exclusive use of the Client, subject to the conditions and limitations contained within the duly authorized proposal. Any use which a third party makes of this report, or any reliance on or decisions to be made based on it, are the responsibility of the third parties. If additional parties require reliance on this report, written authorization from Pinchin will be required. Pinchin disclaims responsibility of consequential financial effects on transactions or property values, or requirements for follow-up actions and costs. No other warranties are implied or expressed. Furthermore, this report should not be construed as legal advice. Pinchin will not be responsible for any consequential or indirect damages. Pinchin will only be held liable for damages resulting from the negligence of Pinchin. Pinchin will not be liable for any losses or damage if the Client has failed, within a period of two years following the date 2013 Pinchin Environmental Ltd. Page 9

16 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: upon which the claim is discovered within the meaning of the Limitations Act, 2002 (Ontario), to commence legal proceedings against Pinchin to recover such losses or damage. Pinchin makes no other representations whatsoever, including those concerning the legal significance of its findings, or as to other legal matters touched on in this report, including, but not limited to, ownership of any property, or the application of any law to the facts set forth herein. With respect to regulatory compliance issues, regulatory statutes are subject to interpretation and these interpretations may change over time Pinchin Environmental Ltd. Page 10

17 Phase II Environmental Site Assessment 8 No. 3 Sideroad, Milton, Ontario May 6, 2013 Royal Park Homes Pinchin File: SIGNATURE PAGE We trust that the foregoing information is satisfactory for your present requirements. Should you have any questions about the report or require additional information, please contact the undersigned. Yours truly, PINCHIN ENVIRONMENTAL LTD. per: Jason Laplante Project Technologist Environmental Due Diligence & Remediation jlaplante@pinchin.com per: Andy D. Vanin, P.Eng., QP Regional Manager Environmental Due Diligence & Remediation avanin@pinchin.com J:\62000s\62395 Shad&Assoc,8No.3SideRoad,Milton,153P1\ Shad&Assoc,8No.3SideRoad,Milton,153P1\Report\ PhII ESA, 8 No.3 sideroad, Milton, ON May 2, 2013.docx JL/AV/db/gt 2013 Pinchin Environmental Ltd. Page 11

18 APPENDIX I FIGURES

19

20

21

22

23 APPENDIX II BOREHOLE LOGS

24 Log of Borehole: MW01 Project #: Logged By: JL Project: Phase II Environmental Site Assessment Client: Royal Park Homes Location: 8 No.3 Sideroad, Milton, Ontario Drill Date: April 22, 2013 Project Manager: SF SUBSURFACE PROFILE SAMPLE Depth Symbol Description Depth (m) Monitoring Well Details Sampler # Recovery (%) N-Value Sample ID Soil Vapour Concentration (ppm) PID/RKI Eagle Laboratory Analysis ft m Ground Surface Sand Dark brown, some silt and clay, moist. Clay Dark brown, some silt and sand, moist. Brown mottled grey, damp. Silt Dark brown, trace sand and clay, damp. Dark grey Riser Screen Silica Sand Bentonite NA NA NA MW01-1 MW01-2 MW01-3 MW01-4 MW01-5 MW /<5 2.9/<5 2.3/<5 2.3/5 1.6/5 1.5/5 PHCs BTEX PAHs Clay Dark grey, trace sand and silt, wet. End of Borehole NA Groundwater level at 4.25 mbgs as measured on April 25, MW01-7 MW /<5 1.1/<5 ph Contractor: Strata Soil Sampling Drilling Method: Direct Push Well Casing Size: 51 mm Pinchin Environmental Ltd. 875 Main Street West, Unit 11 Hamilton, ON L8S 4R9 Grade Elevation: 0 Top of Casing Elevation: 0 Sheet: 1 of 1

25 Log of Borehole: MW02 Project #: Logged By: JL Project: Phase II Environmental Site Assessment Client: Royal Park Homes Location: 8 No.3 Sideroad, Milton, Ontario Drill Date: April 22, 2013 Project Manager: SF SUBSURFACE PROFILE SAMPLE Depth Symbol Description Depth (m) Monitoring Well Details Sampler # Recovery (%) N-Value Sample ID Soil Vapour Concentration (ppm) PID/RKI Eagle Laboratory Analysis ft m Ground Surface Sand Dark brown, some silt and clay, moist. Clay Dark brown, some silt and sand, moist. Brown mottled grey, damp. Silt Dark brown, trace sand and clay, damp Riser Screen Silica Sand Bentonite NA NA NA MW02-1 MW02-2 MW02-3 MW02-4 MW02-5 MW /<5 1.9/<5 1.1/<5 0.8/<5 2.3/<5 3.0/<5 PHCs BTEX PAHs Clay Dark grey, trace sand and silt, wet. End of Borehole NA Groundwater level at 4.69 mbgs as measured on April 25, MW02-7 MW /<5 0.8/<5 Contractor: Strata Soil Sampling Drilling Method: Direct Push Well Casing Size: 51 mm Pinchin Environmental Ltd. 875 Main Street West, Unit 11 Hamilton, ON L8S 4R9 Grade Elevation: 0 Top of Casing Elevation: 0 Sheet: 1 of 1

26 Log of Borehole: MW03 Project #: Logged By: JL Project: Phase II Environmental Site Assessment Client: Royal Park Homes Location: 8 No.3 Sideroad, Milton, Ontario Drill Date: April 22, 2013 Project Manager: SF SUBSURFACE PROFILE SAMPLE Depth Symbol Description Depth (m) Monitoring Well Details Sampler # Recovery (%) N-Value Sample ID Soil Vapour Concentration (ppm) PID/RKI Eagle Laboratory Analysis ft m Ground Surface Sand Dark brown, some silt and clay, moist. Clay Dark brown, some silt and sand, moist. Brown mottled grey, damp. Silt Dark grey, trace sand and clay, damp Riser Screen Silica Sand Bentonite NA NA NA MW03-1 MW03-2 MW03-3 MW03-4 MW03-5 MW /5 3.7/<5 5.1/<5 4.2/<5 3.2/<5 2.2/5 grain size Clay Dark grey, trace sand and silt, wet. End of Borehole NA Groundwater level at 2.45 mbgs as measured on April 25, MW03-7 MW / /10 PHCs BTEX PAHs Contractor: Strata Soil Sampling Drilling Method: Direct Push Well Casing Size: 51 mm Pinchin Environmental Ltd. 875 Main Street West, Unit 11 Hamilton, ON L8S 4R9 Grade Elevation: 0 Top of Casing Elevation: 0 Sheet: 1 of 1

27 Log of Borehole: MW04 Project #: Logged By: JL Project: Phase II Environmental Site Assessment Client: Royal Park Homes Location: 8 No.3 Sideroad, Milton, Ontario Drill Date: April 22, 2013 Project Manager: SF SUBSURFACE PROFILE SAMPLE Depth Symbol Description Depth (m) Monitoring Well Details Sampler # Recovery (%) N-Value Sample ID Soil Vapour Concentration (ppm) PID/RKI Eagle Laboratory Analysis ft m Ground Surface Sand Dark brown, some silt and clay, moist. Clay Dark brown, some silt and sand, moist. Brown mottled grey, damp. Silt Dark grey, trace sand and clay, damp Riser Screen Silica Sand Bentonite NA NA NA MW04-1 MW04-2 MW04-3 MW04-4 MW04-5 MW /<5 1.3/5 2.8/<5 2.2/15 3.4/<5 3.8/<5 ph PHCs BTEX PAHs Wet. End of Borehole NA Groundwater level at 3.44 mbgs as measured on April 25, MW04-7 MW /5 2.4/<5 Contractor: Strata Soil Sampling Drilling Method: Direct Push Well Casing Size: 51 mm Pinchin Environmental Ltd. 875 Main Street West, Unit 11 Hamilton, ON L8S 4R9 Grade Elevation: 0 Top of Casing Elevation: 0 Sheet: 1 of 1

28 Log of Borehole: MW05 Project #: Logged By: JL Project: Phase II Environmental Site Assessment Client: Royal Park Homes Location: 8 No.3 Sideroad, Milton, Ontario Drill Date: April 22, 2013 Project Manager: SF SUBSURFACE PROFILE SAMPLE Depth Symbol Description Depth (m) Monitoring Well Details Sampler # Recovery (%) N-Value Sample ID Soil Vapour Concentration (ppm) PID/RKI Eagle Laboratory Analysis ft m Ground Surface Sand Dark brown, some silt and clay, moist. Clay Dark brown, some silt and sand, moist. Brown mottled grey, damp. Silt Dark grey, trace sand and clay, damp. Wet. End of Borehole Riser Screen Silica Sand Bentonite NA NA NA NA Groundwater level at 0.22 mbgs as measured on April 25, MW05-1 MW05-2 MW05-3 MW05-4 MW05-5 MW05-6 MW05-7 MW /<5 3.9/<5 3.1/<5 2.9/<5 1.6/<5 3.2/<5 2.7/10 1.9/<5 PHCs BTEX PAHs Contractor: Strata Soil Sampling Drilling Method: Direct Push Well Casing Size: 51 mm Pinchin Environmental Ltd. 875 Main Street West, Unit 11 Hamilton, ON L8S 4R9 Grade Elevation: 0 Top of Casing Elevation: 0 Sheet: 1 of 1

29 APPENDIX III SUMMARY TABLES

30 TABLE 1 MONITORING WELL CONSTRUCTION DETAILS Royal Park Homes 8 No. 3 Sideroad, Milton, Ontario Well Number MW01 MW02 MW03 MW04 MW05 Calculated Surveyed TOC Elevation Surveyed Ground Elevation Difference Between Ground and TOC Length of Screen (mrel) (mrel) (m) (m) Notes: mrel TOC m Indicates Groundwater Elevation (metres) Relative to Site Benchmark with Assumed Elevation of Metres Indicates Top of Casing Metres Pinchin File:

31 TABLE 2 GROUNDWATER ELEVATION DATA Royal Park Homes 8 No. 3 Sideroad, Milton, Ontario Well Number MW01 MW02 MW03 MW04 MW05 Date (dd/mm/yyyy) NAPL Level Water Level Water Level Calculated Measurement Measurement from Measurement from Product Water Level from TOC TOC Ground Thickness Elevation (m) (m) (mbgs) (m) (mrel) 25/04/2013 ND ND /04/2013 ND ND /04/2013 ND ND /04/2013 ND ND /04/2013 ND ND Notes: mrel NAPL ND TOC mbgs m Indicates Groundwater Elevation (metres) Relative To Site Benchmark with Assumed Elevation fo Metres Non-Aqueous Phase Liquid Not Detected Indicates Top of Casing Metres Below Ground Surface Metres Pinchin File:

32 TABLE 3 SAMPLES SUBMITTED FOR LABORATORY ANALYSES Royal Park Homes 8 No. 3 Sideroad, Milton, Ontario Samples Parameters Borehole/ Monitoring Well ID Sample ID Sample Depth Range (mbgs) 2.29 to 3.05 PHCs (F1-F4) BTEX PAHs ph Grain Size Analysis MW01 MW01-4 To assess soil quality in vicinity of underground storage tank. MW to 6.10 To assess soil for site condition standards. MW01 NA 3.81 to 4.57 PHCs (F1-F4) BTEX PAHs To assess groundwater quality in vicinity of underground storage tank. MW02 MW02-6 To assess soil quality in vicinity of underground storage tank. MW02 NA To assess groundwater quality in vicinity of underground storage tank. MW03 MW to 3.05 To assess soil for site condition standards to 5.33 MW03-7 To assess soil quality in vicinity of underground storage tank. MW03 NA To assess groundwater quality in vicinity of underground storage tank. MW04 MW to 0.76 To assess soil for site condition standards to 3.05 MW04-4 To assess soil quality in vicinity of underground storage tank. MW04 NA 4.57 to 5.33 SOIL SAMPLES Rationale/Notes To assess groundwater quality in vicinity of underground storage tank. MW05 MW05-7 To assess soil quality in vicinity of underground storage tank. GROUNDWATER SAMPLES Notes: MW05 NA PHCs (F1-F4) Petroleum Hydrocarbons (Fraction 1 to Fraction 4) BTEX Benzene, Toluene, Ethylbenzene, and Xylenes PAHs Polycyclic Aromatic Hydrocarbons mbgs Metres Below Ground Surface To assess groundwater quality in vicinity of underground storage tank. Pinchin File:

33 TABLE 4 ph AND GRAIN SIZE ANALYSES Royal Park Homes 8 No. 3 Sideroad, Milton, Ontario Notes: Parameter ph Sieve #200 <0.075 mm Sieve #200 >0.075 mm NA mbgs Units Sample Designation Sample Collection Date (dd/mm/yyyy) Sample Depth (mbgs) MW01-8 MW04-1 MW03-4 Lab Duplicate of MW /04/ /04/ /04/ /04/ to to to to 3.05 Sub-Surface Surface Sub-Surface Sub-Surface Surface: 5 < ph < 9 Subsurface: 5 < ph < NA NA % 50% NA NA % 50% NA NA Grain Size FINE FINE Not Analysed Metres Below Ground Surface MOE Site Condition Standard Selection Criteria Pinchin File:

34 TABLE 5 PETROLEUM HYDROCARBON AND BTEX ANALYSES FOR SOIL Royal Park Homes 8 No. 3 Sideroad, Milton, Ontario Lab Duplicate of MW01-4 MW02-6 MW03-7 MW04-4 MW09-4 Field Duplicate of MW04-4 MW01-4 MW /04/ /04/ /04/ /04/ /04/ /04/ /04/ to to to to to to to 5.33 Benzene 0.17 <0.02 NA <0.02 <0.02 <0.02 <0.02 <0.02 Toluene 6 <0.02 NA <0.02 <0.02 <0.02 <0.02 <0.02 Ethylbenzene 1.6 <0.02 NA <0.02 <0.02 <0.02 <0.02 <0.02 Xylenes (Total) 25 <0.04 NA <0.04 <0.04 <0.04 <0.04 <0.04 Petroleum Hydrocarbons F1 (C 6 - C 10 ) 65 <10 NA <10 <10 <10 <10 <10 Petroleum Hydrocarbons F2 (>C 10 - C 16 ) 150 <10 <10 <10 <10 <10 <10 <10 Petroleum Hydrocarbons F3 (>C 16 - C 34 ) 1300 <50 <50 <50 <50 <50 <50 <50 Petroleum Hydrocarbons F4 (>C 34 -C 50 ) 5600 <50 <50 <50 <50 <50 <50 <50 Notes: Parameter MOE Table 2 Standards* Sample Designation Sample Collection Date (dd/mm/yyyy) Sample Depth (mbgs) MOE Table 2 Standards* Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act, April 15, 2011, Table 2 Standards, Medium and Fine Textured Soils, Potable Groundwater Condition, for Residential / Parkland / Institutional Property Use. NA Units mbgs BTEX Not Analysed All Units in μg/g Unless Otherwise Noted. Metres Below Ground Surface Benzene, Toluene, Ethylbenzene and Xylenes Pinchin File:

35 TABLE 6 POLYCYCLIC AROMATIC HYDROCARBON ANALYSES FOR SOIL Royal Park Homes 8 No. 3 Sideroad, Milton, Ontario Acenaphthene Acenaphthylene Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(b)fluoranthene Benzo(ghi)perylene Benzo(k)fluoranthene Chrysene Dibenzo(a,h)anthracene Fluoranthene Fluorene Indeno(1,2,3-cd)pyrene Methylnaphthalene 2-(1-) Naphthalene Phenanthrene Pyrene Notes: Parameter MOE Table 2 Standards* MOE Table 2 Standards* Sample Designation Sample Collection Date (dd/mm/yyyy) Sample Depth (mbgs) MW09-4 Field Duplicate of MW04-4 MW01-4 MW02-6 MW03-7 MW04-4 MW /04/ /04/ /04/ /04/ /04/ /04/ to to to to to to <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < < <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 < < < < < < < <0.005 <0.005 <0.005 <0.005 <0.005 < <0.005 < <0.005 <0.005 < <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act, April 15, 2011, Table 2 Standards, Medium and Fine Textured Soils, Potable Groundwater Condition, for Residential / Parkland / Institutional Property Use. Units mbgs All Units in μg/g Unless Otherwise Noted. Metres Below Ground Surface Pinchin File:

36 TABLE 7 PETROLEUM HYDROCARBON AND BTEX ANALYSES FOR GROUNDWATER Royal Park Homes 8 No. 3 Sideroad, Milton, Ontario Parameter MOE Table 2 Standards* Sample Designation Sample Collection Date (dd/mm/yyyy) MW09 Field Duplicate of MW01 MW02 MW03 MW03 MW04 MW05 25/04/ /04/ /04/ /04/ /04/ /04/2013 Benzene 5 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 Toluene 24 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 Ethylbenzene 2.4 <0.2 <0.2 <0.2 <0.2 <0.2 <0.2 Xylenes (Total) 300 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 Petroleum Hydrocarbons F1 (C 6 - C 10 ) 750 <25 <25 <25 <25 <25 <25 Petroleum Hydrocarbons F2 (>C 10 - C 16 ) 150 <100 <100 <100 <100 <100 <100 Petroleum Hydrocarbons F3 (>C 16 - C 34 ) 500 <200 <200 <200 <200 <200 <200 Petroleum Hydrocarbons F4 (>C 34 - C 50 ) 500 <200 <200 <200 <200 <200 <200 Notes: MOE Table 2 Standards* Units mbgs Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act, April 15, 2011, Table 2 Standards, Medium and Fine Textured Soils, Potable Groundwater Condition, for All Types of Property Use. All Units in μg/l Metres Below Ground Surface Pinchin File:

37 TABLE 8 POLYCYCLIC AROMATIC HYDROCARBON ANALYSES FOR GROUNDWATER Royal Park Homes 8 No. 3 Sideroad, Milton, Ontario Notes: Parameter Acenaphthene Acenaphthylene Anthracene Benzo(a)anthracene Benzo(a)pyrene Benzo(bj)fluoranthene Benzo(ghi)perylene Benzo(k)fluoranthene Chrysene Dibenzo(a,h)anthracene Fluoranthene Fluorene Indeno(1,2,3-cd)pyrene Methylnaphthalene 2-(1-) Naphthalene Phenanthrene Pyrene MOE Table 2 Standards* Units mbgs MOE Table 2 Standards* Sample Designation Sample Collection Date (dd/mm/yyyy) MW09 Field Duplicate of MW01 MW02 MW03 MW03 MW04 MW05 Lab Duplicate of MW05 25/04/ /04/ /04/ /04/ /04/ /04/ /04/ <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 < <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.071 <0.071 <0.071 <0.071 <0.071 <0.071 < <0.05 <0.05 <0.05 <0.05 <0.05 <0.05 < <0.03 <0.03 <0.03 <0.03 < <0.05 < <0.05 <0.05 <0.05 Soil, Ground Water and Sediment Standards for Use Under Part XV.1 of the Environmental Protection Act, April 15, 2011, Table 2 Standards, Medium and Fine Textured Soils, Potable Groundwater Condition, for All Types of Property Use. All Units in μg/l Metres Below Ground Surface Pinchin File:

38 APPENDIX IV LABORATORY CERTIFICATES OF ANALYSIS

39 Your Project #: /PHASE II Site Location: 8 NO.3 SIDE ROAD, MILTON Your C.O.C. #: , Attention: Sarah Ferguson Pinchin Environmental Ltd Unit Main St W Hamilton, ON L8S 4R9 Report Date: 2013/04/29 CERTIFICATE OF ANALYSIS MAXXAM JOB #: B Received: 2013/04/22, 16:07 Sample Matrix: Soil # Samples Received: 9 Date Date Method Analyses Quantity Extracted Analyzed Laboratory Method Reference Methylnaphthalene Sum 6 N/A 2013/04/26 CAM SOP EPA 8270 Petroleum Hydro. CCME F1 & BTEX in Soil /04/ /04/25 CAM SOP CCME CWS Petroleum Hydrocarbons F2-F4 in Soil /04/ /04/25 CAM SOP CCME CWS Moisture 6 N/A 2013/04/25 CAM SOP R.Carter,1993 PAH Compounds in Soil by GC/MS (SIM) /04/ /04/25 CAM SOP EPA 8270 ph CaCl2 EXTRACT /04/ /04/26 CAM SOP SM 4500H+ B Sieve, 75um 1 N/A 2013/04/25 CAM SOP M.R Carter SSMA Remarks: Maxxam Analytics has performed all analytical testing herein in accordance with ISO and the Protocol for Analytical Methods Used in the Assessment of Properties under Part XV.1 of the Environmental Protection Act. All methodologies comply with this document and are validated for use in the laboratory. The methods and techniques employed in this analysis conform to the performance criteria (detection limits, accuracy and precision) as outlined in the Protocol for Analytical Methods Used in the Assessment of Properties under Part XV.1 of the Environmental Protection Act. Reporting results to two significant figures at the RDL is to permit statistical evaluation and is not intended to be an indication of analytical precision. The CWS PHC methods employed by Maxxam conform to all prescribed elements of the reference method and performance based elements have been validated. All modifications have been validated and proven equivalent following the 'Alberta Environment Draft Addenda to the CWS-PHC, Appendix 6, Validation of Alternate Methods'. Documentation is available upon request. Maxxam has made the following improvements to the CWS-PHC reference benchmark method: (i) Headspace for F1; and, (ii) Mechanical extraction for F2-F4. Note: F4G cannot be added to the C6 to C50 hydrocarbons. The extraction date for samples field preserved with methanol for F1 and Volatile Organic Compounds is considered to be the date sampled. Maxxam Analytics is accredited for all specific parameters as required by Ontario Regulation 153/04. Maxxam Analytics is limited in liability to the actual cost of analysis unless otherwise agreed in writing. There is no other warranty expressed or implied. Samples will be retained at Maxxam Analytics for three weeks from receipt of data or as per contract. * RPDs calculated using raw data. The rounding of final results may result in the apparent difference. * Results relate only to the items tested. Page 1 of 10

40 Maxxam Job #: B Report Date: 2013/04/29 Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO.3 SIDE ROAD, MILTON Sampler Initials: JL -2- Encryption Key Please direct all questions regarding this Certificate of Analysis to your Project Manager. Antonella Brasil, Project Manager ABrasil@maxxam.ca Phone# (905) ==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page. Total cover pages: 2 Page 2 of 10

41 Maxxam Job #: B Report Date: 2013/04/29 RESULTS OF ANALYSES OF SOIL Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO.3 SIDE ROAD, MILTON Sampler Initials: JL Maxxam ID RG1481 RG1482 RG1483 RG1484 RG1485 Sampling Date 2013/04/ /04/ /04/ /04/ /04/22 10:00 11:00 12:00 01:45 02:45 Units MW01-4 MW02-6 MW03-7 MW04-4 MW05-7 RDL QC Batch Inorganics Moisture % Maxxam ID RG1486 RG1487 RG1488 RG1488 RG1489 Sampling Date 2013/04/ /04/ /04/ /04/ /04/22 03:00 03:10 03:10 03:10 03:10 Units MW09-4 MW01-8 MW03-4 MW03-4 QC Batch MW04-1 RDL QC Batch Lab-Dup Inorganics Moisture % Available (CaCl2) ph ph Miscellaneous Parameters Grain Size % FINE FINE N/A Sieve - #200 (<0.075mm) % N/A Sieve - #200 (>0.075mm) % N/A N/A = Not Applicable RDL = Reportable Detection Limit QC Batch = Quality Control Batch Page 3 of 10

42 Maxxam Job #: B Report Date: 2013/04/29 SEMI-VOLATILE ORGANICS BY GC-MS (SOIL) Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO.3 SIDE ROAD, MILTON Sampler Initials: JL Maxxam ID RG1481 RG1482 RG1483 RG1484 RG1485 RG1486 Sampling Date 2013/04/ /04/ /04/ /04/ /04/ /04/22 10:00 11:00 12:00 01:45 02:45 03:00 Units MW01-4 MW02-6 MW03-7 MW04-4 MW05-7 MW09-4 RDL QC Batch Calculated Parameters Methylnaphthalene, 2-(1-) ug/g ND ND ND ND ND ND Polyaromatic Hydrocarbons Acenaphthene ug/g ND ND ND ND ND ND Acenaphthylene ug/g ND ND ND ND ND ND Anthracene ug/g ND ND ND ND ND ND Benzo(a)anthracene ug/g ND ND ND ND ND ND Benzo(a)pyrene ug/g ND ND ND ND ND ND Benzo(b/j)fluoranthene ug/g ND ND ND ND ND ND Benzo(g,h,i)perylene ug/g ND ND ND ND ND ND Benzo(k)fluoranthene ug/g ND ND ND ND ND ND Chrysene ug/g ND ND ND ND Dibenz(a,h)anthracene ug/g ND ND ND ND ND ND Fluoranthene ug/g ND ND ND ND ND ND Fluorene ug/g ND ND ND ND ND ND Indeno(1,2,3-cd)pyrene ug/g ND ND ND ND ND ND Methylnaphthalene ug/g ND ND ND ND ND ND Methylnaphthalene ug/g ND ND ND ND ND Naphthalene ug/g ND ND ND ND ND ND Phenanthrene ug/g ND ND ND ND Pyrene ug/g ND ND ND ND ND ND Surrogate Recovery (%) D10-Anthracene % D14-Terphenyl (FS) % D8-Acenaphthylene % ND = Not detected RDL = Reportable Detection Limit QC Batch = Quality Control Batch Page 4 of 10

43 Maxxam Job #: B Report Date: 2013/04/29 PETROLEUM HYDROCARBONS (CCME) Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO.3 SIDE ROAD, MILTON Sampler Initials: JL Maxxam ID RG1481 RG1481 RG1482 RG1483 RG1484 RG1485 RG1486 Sampling Date 2013/04/ /04/ /04/ /04/ /04/ /04/ /04/22 10:00 10:00 11:00 12:00 01:45 02:45 03:00 Units MW01-4 MW01-4 MW02-6 MW03-7 MW04-4 MW05-7 MW09-4 RDL QC Batch Lab-Dup BTEX & F1 Hydrocarbons Benzene ug/g ND ND ND ND ND ND Toluene ug/g ND ND ND ND ND ND Ethylbenzene ug/g ND ND ND ND ND ND o-xylene ug/g ND ND ND ND ND ND p+m-xylene ug/g ND ND ND ND ND ND Total Xylenes ug/g ND ND ND ND ND ND F1 (C6-C10) ug/g ND ND ND ND ND ND F1 (C6-C10) - BTEX ug/g ND ND ND ND ND ND F2-F4 Hydrocarbons F2 (C10-C16 Hydrocarbons) ug/g ND ND ND ND ND ND ND F3 (C16-C34 Hydrocarbons) ug/g ND ND ND ND ND ND ND F4 (C34-C50 Hydrocarbons) ug/g ND ND ND ND ND ND ND Reached Baseline at C50 ug/g YES YES YES YES YES YES YES Surrogate Recovery (%) 1,4-Difluorobenzene % Bromofluorobenzene % D10-Ethylbenzene % D4-1,2-Dichloroethane % o-terphenyl % ND = Not detected RDL = Reportable Detection Limit QC Batch = Quality Control Batch Page 5 of 10

44 Maxxam Job #: B Report Date: 2013/04/29 Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO.3 SIDE ROAD, MILTON Sampler Initials: JL Package C Each temperature is the average of up to three cooler temperatures taken at receipt GENERAL COMMENTS Cooler custody seal was present and intact. Page 6 of 10

45 Maxxam Job #: B Report Date: 2013/04/29 QUALITY ASSURANCE REPORT Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO.3 SIDE ROAD, MILTON Sampler Initials: JL Matrix Spike Spiked Blank Method Blank RPD QC Standard QC Batch Parameter Date % Recovery QC Limits % Recovery QC Limits Value Units Value (%) QC Limits % Recovery QC Limits ,4-Difluorobenzene 2013/04/ % Bromofluorobenzene 2013/04/ % D10-Ethylbenzene 2013/04/ % D4-1,2-Dichloroethane 2013/04/ % Benzene 2013/04/ ND, RDL=0.020 ug/g NC Toluene 2013/04/ ND, RDL=0.020 ug/g NC Ethylbenzene 2013/04/ ND, RDL=0.020 ug/g NC o-xylene 2013/04/ ND, RDL=0.020 ug/g p+m-xylene 2013/04/ ND, RDL=0.040 ug/g NC F1 (C6-C10) 2013/04/ ND, RDL=10 ug/g NC Total Xylenes 2013/04/25 ND, RDL=0.040 ug/g F1 (C6-C10) - BTEX 2013/04/25 ND, RDL=10 ug/g NC D10-Anthracene 2013/04/ % D14-Terphenyl (FS) 2013/04/ % D8-Acenaphthylene 2013/04/ % Acenaphthene 2013/04/ ND, RDL= ug/g NC Acenaphthylene 2013/04/ ND, RDL= ug/g NC Anthracene 2013/04/ ND, RDL= ug/g NC Benzo(a)anthracene 2013/04/ ND, RDL= ug/g NC Benzo(a)pyrene 2013/04/ ND, RDL= ug/g NC Benzo(b/j)fluoranthene 2013/04/ ND, RDL= ug/g NC Benzo(g,h,i)perylene 2013/04/ ND, RDL= ug/g NC Benzo(k)fluoranthene 2013/04/ ND, RDL= ug/g NC Chrysene 2013/04/ ND, RDL= ug/g NC Dibenz(a,h)anthracene 2013/04/ ND, RDL= ug/g NC Fluoranthene 2013/04/ ND, RDL= ug/g NC Fluorene 2013/04/ ND, RDL= ug/g NC Indeno(1,2,3-cd)pyrene 2013/04/ ND, RDL= ug/g NC Methylnaphthalene 2013/04/ ND, RDL= ug/g NC Methylnaphthalene 2013/04/ ND, RDL= ug/g NC Naphthalene 2013/04/ ND, RDL= ug/g NC Phenanthrene 2013/04/ ND, RDL= ug/g NC Pyrene 2013/04/ ND, RDL= ug/g NC o-terphenyl 2013/04/ % F2 (C10-C16 Hydrocarbons) 2013/04/ ND, RDL=10 ug/g NC F3 (C16-C34 Hydrocarbons) 2013/04/ ND, RDL=50 ug/g NC F4 (C34-C50 Hydrocarbons) 2013/04/ ND, RDL=50 ug/g NC Moisture 2013/04/ Moisture 2013/04/ Page 7 of 10

46 Maxxam Job #: B Report Date: 2013/04/29 QUALITY ASSURANCE REPORT Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO.3 SIDE ROAD, MILTON Sampler Initials: JL Matrix Spike Spiked Blank Method Blank RPD QC Standard QC Batch Parameter Date % Recovery QC Limits % Recovery QC Limits Value Units Value (%) QC Limits % Recovery QC Limits Sieve - #200 (<0.075mm) 2013/04/ Sieve - #200 (>0.075mm) 2013/04/ N/A = Not Applicable RDL = Reportable Detection Limit RPD = Relative Percent Difference Duplicate: Paired analysis of a separate portion of the same sample. Used to evaluate the variance in the measurement. Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference. QC Standard: A sample of known concentration prepared by an external agency under stringent conditions. Used as an independent check of method accuracy. Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate method accuracy. Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination. Surrogate: A pure or isotopically labeled compound whose behavior mirrors the analytes of interest. Used to evaluate extraction efficiency. NC (RPD): The RPD was not calculated. The level of analyte detected in the parent sample and its duplicate was not sufficiently significant to permit a reliable calculation. Page 8 of 10

47 Validation Signature Page Maxxam Job #: B The analytical data and all QC contained in this report were reviewed and validated by the following individual(s). Cristina Carriere, Scientific Services Floyd Mayede, Senior Analyst Medhat Riskallah, Manager, Hydrocarbon Department Mamdouh Salib, Analyst, Hydrocarbons ==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page. Page 9 of 10

48 Page 10 of 10

49 Your Project #: /PHASE II Site Location: 8 NO3 SIDE ROAD MILTON Your C.O.C. #: , Attention: Sarah Ferguson Pinchin Environmental Ltd Unit Main St W Hamilton, ON L8S 4R9 Report Date: 2013/05/01 CERTIFICATE OF ANALYSIS MAXXAM JOB #: B Received: 2013/04/25, 11:58 Sample Matrix: Water # Samples Received: 6 Date Date Method Analyses Quantity Extracted Analyzed Laboratory Method Reference Methylnaphthalene Sum 6 N/A 2013/04/30 CAM SOP EPA 8270 Petroleum Hydro. CCME F1 & BTEX in Water 6 N/A 2013/04/30 CAM SOP CCME CWS Petroleum Hydrocarbons F2-F4 in Water /04/ /04/27 CAM SOP CCME Hydrocarbons PAH Compounds in Water by GC/MS (SIM) /04/ /04/30 CAM SOP EPA 8270 Remarks: Maxxam Analytics has performed all analytical testing herein in accordance with ISO and the Protocol for Analytical Methods Used in the Assessment of Properties under Part XV.1 of the Environmental Protection Act. All methodologies comply with this document and are validated for use in the laboratory. The methods and techniques employed in this analysis conform to the performance criteria (detection limits, accuracy and precision) as outlined in the Protocol for Analytical Methods Used in the Assessment of Properties under Part XV.1 of the Environmental Protection Act. Reporting results to two significant figures at the RDL is to permit statistical evaluation and is not intended to be an indication of analytical precision. The CWS PHC methods employed by Maxxam conform to all prescribed elements of the reference method and performance based elements have been validated. All modifications have been validated and proven equivalent following the 'Alberta Environment Draft Addenda to the CWS-PHC, Appendix 6, Validation of Alternate Methods'. Documentation is available upon request. Maxxam has made the following improvements to the CWS-PHC reference benchmark method: (i) Headspace for F1; and, (ii) Mechanical extraction for F2-F4. Note: F4G cannot be added to the C6 to C50 hydrocarbons. The extraction date for samples field preserved with methanol for F1 and Volatile Organic Compounds is considered to be the date sampled. Maxxam Analytics is accredited for all specific parameters as required by Ontario Regulation 153/04. Maxxam Analytics is limited in liability to the actual cost of analysis unless otherwise agreed in writing. There is no other warranty expressed or implied. Samples will be retained at Maxxam Analytics for three weeks from receipt of data or as per contract. * RPDs calculated using raw data. The rounding of final results may result in the apparent difference. * Results relate only to the items tested. Encryption Key Please direct all questions regarding this Certificate of Analysis to your Project Manager. Antonella Brasil, Project Manager ABrasil@maxxam.ca Phone# (905) ==================================================================== Page 1 of 9

50 Maxxam Job #: B Report Date: 2013/05/01 Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO3 SIDE ROAD MILTON Sampler Initials: JL -2- Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page. Total cover pages: 2 Page 2 of 9

51 Maxxam Job #: B Report Date: 2013/05/01 SEMI-VOLATILE ORGANICS BY GC-MS (WATER) Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO3 SIDE ROAD MILTON Sampler Initials: JL Maxxam ID RH3840 RH3841 RH3842 RH3843 RH3844 RH3844 RH3845 Sampling Date 2013/04/ /04/ /04/ /04/ /04/ /04/ /04/25 09:30 09:45 10:00 10:15 10:30 10:30 10:45 Units MW01 MW02 MW03 MW04 MW05 MW05 MW09 RDL QC Batch Lab-Dup Calculated Parameters Methylnaphthalene, 2-(1-) ug/l ND ND ND ND ND ND Polyaromatic Hydrocarbons Acenaphthene ug/l ND ND ND ND ND ND ND Acenaphthylene ug/l ND ND ND ND ND ND ND Anthracene ug/l ND ND ND ND ND ND ND Benzo(a)anthracene ug/l ND ND ND ND ND ND ND Benzo(a)pyrene ug/l ND ND ND ND ND ND ND Benzo(b/j)fluoranthene ug/l ND ND ND ND ND ND ND Benzo(g,h,i)perylene ug/l ND ND ND ND ND ND ND Benzo(k)fluoranthene ug/l ND ND ND ND ND ND ND Chrysene ug/l ND ND ND ND ND ND ND Dibenz(a,h)anthracene ug/l ND ND ND ND ND ND ND Fluoranthene ug/l ND ND ND ND ND Fluorene ug/l ND ND ND ND ND ND ND Indeno(1,2,3-cd)pyrene ug/l ND ND ND ND ND ND ND Methylnaphthalene ug/l ND ND ND ND ND ND ND Methylnaphthalene ug/l ND ND ND ND ND ND ND Naphthalene ug/l ND ND ND ND ND ND ND Phenanthrene ug/l ND ND ND ND ND Pyrene ug/l ND ND ND ND ND Surrogate Recovery (%) D10-Anthracene % D14-Terphenyl (FS) % D8-Acenaphthylene % ND = Not detected RDL = Reportable Detection Limit QC Batch = Quality Control Batch Page 3 of 9

52 Maxxam Job #: B Report Date: 2013/05/01 PETROLEUM HYDROCARBONS (CCME) Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO3 SIDE ROAD MILTON Sampler Initials: JL Maxxam ID RH3840 RH3841 RH3842 RH3843 RH3844 RH3845 Sampling Date 2013/04/ /04/ /04/ /04/ /04/ /04/25 09:30 09:45 10:00 10:15 10:30 10:45 Units MW01 MW02 MW03 MW04 MW05 MW09 RDL QC Batch BTEX & F1 Hydrocarbons Benzene ug/l ND ND ND ND ND ND Toluene ug/l ND ND ND ND 0.33 ND Ethylbenzene ug/l ND ND ND ND ND ND o-xylene ug/l ND ND ND ND ND ND p+m-xylene ug/l ND ND ND ND ND ND Total Xylenes ug/l ND ND ND ND ND ND F1 (C6-C10) ug/l ND ND ND ND ND ND F1 (C6-C10) - BTEX ug/l ND ND ND ND ND ND F2-F4 Hydrocarbons F2 (C10-C16 Hydrocarbons) ug/l ND ND ND ND ND ND F3 (C16-C34 Hydrocarbons) ug/l ND ND ND ND ND ND F4 (C34-C50 Hydrocarbons) ug/l ND ND ND ND ND ND Reached Baseline at C50 ug/l YES YES YES YES YES YES Surrogate Recovery (%) 1,4-Difluorobenzene % Bromofluorobenzene % D10-Ethylbenzene % D4-1,2-Dichloroethane % o-terphenyl % ND = Not detected RDL = Reportable Detection Limit QC Batch = Quality Control Batch Page 4 of 9

53 Maxxam Job #: B Report Date: 2013/05/01 Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO3 SIDE ROAD MILTON Sampler Initials: JL Package C Package C Each temperature is the average of up to three cooler temperatures taken at receipt GENERAL COMMENTS Cooler custody seal was present and intact. All F1 vials contained visible sediment. All 500 ml amber glass bottles for F2-F4 and PAH contained visible sediemnt, which was included in extraction. Sample MW09 contained 1.3 cm of sediment for both 500 ml bottles for PAH and 1.4 and 1.5 cm of sediment in bottles for F2-F4 respectively. Page 5 of 9

54 Maxxam Job #: B Report Date: 2013/05/01 QUALITY ASSURANCE REPORT Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO3 SIDE ROAD MILTON Sampler Initials: JL Matrix Spike Spiked Blank Method Blank RPD QC Batch Parameter Date % Recovery QC Limits % Recovery QC Limits Value Units Value (%) QC Limits ,4-Difluorobenzene 2013/04/ % Bromofluorobenzene 2013/04/ % D10-Ethylbenzene 2013/04/ % D4-1,2-Dichloroethane 2013/04/ % Benzene 2013/04/ ND, RDL=0.20 ug/l NC Toluene 2013/04/ ND, RDL=0.20 ug/l NC Ethylbenzene 2013/04/ ND, RDL=0.20 ug/l NC o-xylene 2013/04/ ND, RDL=0.20 ug/l NC p+m-xylene 2013/04/ ND, RDL=0.40 ug/l NC F1 (C6-C10) 2013/04/ ND, RDL=25 ug/l NC Total Xylenes 2013/04/30 ND, RDL=0.40 ug/l NC F1 (C6-C10) - BTEX 2013/04/30 ND, RDL=25 ug/l NC o-terphenyl 2013/04/ % F2 (C10-C16 Hydrocarbons) 2013/04/ ND, RDL=100 ug/l NC F3 (C16-C34 Hydrocarbons) 2013/04/ ND, RDL=200 ug/l NC F4 (C34-C50 Hydrocarbons) 2013/04/ ND, RDL=200 ug/l NC D10-Anthracene 2013/04/ % D14-Terphenyl (FS) 2013/04/ % D8-Acenaphthylene 2013/04/ % Acenaphthene 2013/04/ ND, RDL=0.050 ug/l NC Acenaphthylene 2013/04/ ND, RDL=0.050 ug/l NC Anthracene 2013/04/ ND, RDL=0.050 ug/l NC Benzo(a)anthracene 2013/04/ ND, RDL=0.050 ug/l NC Benzo(a)pyrene 2013/04/ ND, RDL=0.010 ug/l NC Benzo(b/j)fluoranthene 2013/04/ ND, RDL=0.050 ug/l NC Benzo(g,h,i)perylene 2013/04/ ND, RDL=0.050 ug/l NC Benzo(k)fluoranthene 2013/04/ ND, RDL=0.050 ug/l NC Chrysene 2013/04/ ND, RDL=0.050 ug/l NC Dibenz(a,h)anthracene 2013/04/ ND, RDL=0.050 ug/l NC Fluoranthene 2013/04/ ND, RDL=0.050 ug/l NC Fluorene 2013/04/ ND, RDL=0.050 ug/l NC Indeno(1,2,3-cd)pyrene 2013/04/ ND, RDL=0.050 ug/l NC Methylnaphthalene 2013/04/ ND, RDL=0.050 ug/l NC Methylnaphthalene 2013/04/ ND, RDL=0.050 ug/l NC Naphthalene 2013/04/ ND, RDL=0.050 ug/l NC 30 Page 6 of 9

55 Maxxam Job #: B Report Date: 2013/05/01 QUALITY ASSURANCE REPORT Pinchin Environmental Ltd Client Project #: /PHASE II Site Location: 8 NO3 SIDE ROAD MILTON Sampler Initials: JL Matrix Spike Spiked Blank Method Blank RPD QC Batch Parameter Date % Recovery QC Limits % Recovery QC Limits Value Units Value (%) QC Limits Phenanthrene 2013/04/ ND, RDL=0.030 ug/l NC Pyrene 2013/04/ ND, RDL=0.050 ug/l NC 30 N/A = Not Applicable RDL = Reportable Detection Limit RPD = Relative Percent Difference Matrix Spike: A sample to which a known amount of the analyte of interest has been added. Used to evaluate sample matrix interference. Spiked Blank: A blank matrix sample to which a known amount of the analyte, usually from a second source, has been added. Used to evaluate method accuracy. Method Blank: A blank matrix containing all reagents used in the analytical procedure. Used to identify laboratory contamination. Surrogate: A pure or isotopically labeled compound whose behavior mirrors the analytes of interest. Used to evaluate extraction efficiency. NC (RPD): The RPD was not calculated. The level of analyte detected in the parent sample and its duplicate was not sufficiently significant to permit a reliable calculation. Page 7 of 9

56 Validation Signature Page Maxxam Job #: B The analytical data and all QC contained in this report were reviewed and validated by the following individual(s). Ewa Pranjic, M.Sc., C.Chem, Scientific Specialist Floyd Mayede, Senior Analyst Medhat Riskallah, Manager, Hydrocarbon Department Suzana Popovic, Supervisor, Hydrocarbons ==================================================================== Maxxam has procedures in place to guard against improper use of the electronic signature and have the required "signatories", as per section of ISO/IEC 17025:2005(E), signing the reports. For Service Group specific validation please refer to the Validation Signature Page. Page 8 of 9

57 Page 9 of 9

Phase II Environmental Site Assessment

Phase II Environmental Site Assessment Phase II Environmental Site Assessment 59 Industrial Park Crescent Sault Ste. Marie, Ontario Paddon and Yorke Inc. 222 McIntyre Street West, Suite 204 Sault Ste. Marie, ON P1B 2Y8 Attention: Mr. Ken Peake

More information

FINAL Limited Phase II Environmental Site Assessment Joseph Wolfond Park West Guelph, Ontario

FINAL Limited Phase II Environmental Site Assessment Joseph Wolfond Park West Guelph, Ontario FINAL Limited Phase II Environmental Site Assessment Joseph Wolfond Park West Guelph, Ontario Prepared for: City of Guelph 1 Carden Street Guelph, ON N1H 3A1 Attn: Mr. Prasoon Adhikari Environmental Engineer

More information

October 27, Dundas Corporation 2184 Providence Road Oakville, Ontario L6H 6Z2

October 27, Dundas Corporation 2184 Providence Road Oakville, Ontario L6H 6Z2 October 27, 2014 14-122 103 Dundas Corporation 2184 Providence Road Oakville, Ontario L6H 6Z2 Attention: Re: Mr. Zaki Wahbeh Soil and Groundwater Testing 103 Dundas Street West, Oakville, Ontario Dear

More information

Soil Remediation and Verification Sampling Program 18 Main Street St. Eustache, Manitoba

Soil Remediation and Verification Sampling Program 18 Main Street St. Eustache, Manitoba Soil Remediation and Verification Sampling Program 18 Main Street St. Eustache, Manitoba Business Development Bank of Canada Suite 200, 1655 Kenaston Boulevard Winnipeg, Manitoba R3P 2M4 Attention: Mr.

More information

Phase II Environmental Site Assessment (ESA) Update. Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 Ottawa, Ontario K1B 5N1

Phase II Environmental Site Assessment (ESA) Update. Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 Ottawa, Ontario K1B 5N1 Phase II Environmental Site Assessment (ESA) Update 2720 Richmond Road Bernard Benoit Project Management (BBPM) 2212 Gladwin Crescent, Unit B4 K1B 5N1 Centre Multiservices Francophone de l Ouest d Ottawa

More information

PHASE II ENVIRONMENTAL SITE ASSESSMENT CAPONE S RESTAURANT 831 INDUSTRIAL AVENUE OTTAWA, ONTARIO

PHASE II ENVIRONMENTAL SITE ASSESSMENT CAPONE S RESTAURANT 831 INDUSTRIAL AVENUE OTTAWA, ONTARIO PHASE II ENVIRONMENTAL SITE AEMENT CAPONE S RESTAURANT 831 INDUSTRIAL AVENUE OTTAWA, ONTARIO Prepared for: Huntington Capital Corporation 260 Hearst Way, suite 300 Kanata, Ontario K2J 3HL Pinchin Environmental

More information

SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT APPLEBY MALL 5111 NEW STREET AND 499 & 505 APPLEBY LINE BURLINGTON, ONTARIO

SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT APPLEBY MALL 5111 NEW STREET AND 499 & 505 APPLEBY LINE BURLINGTON, ONTARIO SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT APPLEBY MALL 5111 NEW STREET AND 499 & 505 APPLEBY LINE BURLINGTON, ONTARIO SUPPLEMENTAL PHASE II ENVIRONMENTAL SITE ASSESSMENT APPLEBY MALL 5111 NEW

More information

LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT

LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT REPORT ON LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT 2005 Greenwood Road Shreveport, Louisiana October 2012 Prepared for: Biomedical Research Foundation of Northwest Louisiana 1505 Kings Highway Shreveport,

More information

Submitted to: Glen Smith, Director of Public Works & Parks Township of Scugog 181 Perry Street Port Perry, Ontario L9L 1A7

Submitted to: Glen Smith, Director of Public Works & Parks Township of Scugog 181 Perry Street Port Perry, Ontario L9L 1A7 LIMITED SUBSURFACE ENVIRONMENTAL INVESTIGATION, GREENBANK AIRPORT, 114 HIGHWAY 47 EAST, UXBRIDGE, ONTARIO Submitted to: Glen Smith, Director of Public Works & Parks Township of Scugog 181 Perry Street

More information

FINAL Phase Two Environmental Site Assessment 1276, 1280, 1288, 1290 & 1294 Wharf Street and 607 Annland Street Pickering, Ontario

FINAL Phase Two Environmental Site Assessment 1276, 1280, 1288, 1290 & 1294 Wharf Street and 607 Annland Street Pickering, Ontario FINAL Phase Two Environmental Site Assessment 1276, 1280, 1288, 1290 & 1294 Wharf Street and 607 Annland Street Pickering, Ontario Prepared for: R.B Morgan Construction 1289 Wharf Street Pickering, Ontario,

More information

City of Sarnia. 255 Christina Street South Sarnia, Ontario N7T 7N2. Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure

City of Sarnia. 255 Christina Street South Sarnia, Ontario N7T 7N2. Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure City of Sarnia 255 Christina Street South Sarnia, Ontario N7T 7N2 Attention.: Mr. Pratt Rawat, Manager of Design and Infrastructure Environmental Subsurface Investigation Project Name 1541 Blackwell Road,

More information

EXECUTIVE SUMMARY 160-P HG-R

EXECUTIVE SUMMARY 160-P HG-R EXECUTIVE SUMMARY LVM inc. (LVM) was retained by ODC Tooling & Molds, a division of Ontario Die Company Ltd. (ODC), to complete a of the property described as 93, 97, 99, 13, 17, 19, 111, and 119 Roger

More information

Reference: OTCD B 17 September Soil Sampling Program th Line Road, Metcalfe, ON

Reference: OTCD B 17 September Soil Sampling Program th Line Road, Metcalfe, ON Trow Associates Inc. 154 Colonnade Road South Ottawa, Ontario K2E 7J5 Telephone: (613) 225-9940 Facsimile: (613) 225-7337 E-mail: ottawa@trow.com Web Site: www.trow.com Reference: OTCD00019239B 17 September

More information

address, Ontario Pinchin File:

address, Ontario Pinchin File: Phase Two Environmental Site Assessment DRAFT company date address, Ontario Pinchin File: 48048.004 Phase Two Environmental Site Assessment 288 and 420 Bayshore Drive Midland, Ontario Unimin Canada Ltd.

More information

PHASE II ENVIRONMENTAL SITE ASSESSMENT

PHASE II ENVIRONMENTAL SITE ASSESSMENT PHASE II ENVIRONMENTAL SITE ASSESSMENT VIA Rail Ottawa Train Station, Site C CB Richard Ellis Global Corporate Services On Behalf of Owner VIA Rail Canada Inc. 3 Place Ville-Marie, Suite 500, Montreal,

More information

Figure 1 illustrates the location of the Site and Figure 2 illustrates the Site layout, including borehole locations.

Figure 1 illustrates the location of the Site and Figure 2 illustrates the Site layout, including borehole locations. 1.0 Introduction Stantec Consulting Ltd. (Stantec) was retained by Mr. John Doe, on behalf of The Client to conduct a Phase II Environmental Site Assessment (ESA) at a property located at 151 Main Street,

More information

Jindal Developments Ltd.

Jindal Developments Ltd. 1965, 1975, 1985 Cottrelle Boulevard, Brampton, Ontario Type of Document Final Project Name Phase Two ESA Project Number Prepared By: EXP 1595 Clark Boulevard Brampton, ON L6T 4V1 Canada Date Submitted

More information

2650 Queensview Drive Ottawa, Ontario, K2B 8H6, CANADA T: Proposed Development, 1158 Second Line Road, Ottawa, ON

2650 Queensview Drive Ottawa, Ontario, K2B 8H6, CANADA T: Proposed Development, 1158 Second Line Road, Ottawa, ON 2650 Queensview Drive Ottawa, Ontario, K2B 8H6, CANADA T: 1.613.688.1899 www.exp.com March 13, 2018 Mr. Joey Theberge Theberge Homes Ltd. 904 Lady Ellen Place Ottawa, Ontario K1Z 5L5 Via Email: joeytheberge@thebergehomes.com

More information

Phase Two Environmental Site Assessment

Phase Two Environmental Site Assessment Phase Two Environmental Site Assessment Project Address: 671 River Road, Ottawa, Ontario Client: Shoppers Drug Mart, Inc. 243 Consumers Road North York, Ontario M2J 4W8 Project Number: OTT-00221164-D0

More information

Phase Two Environmental Site Assessment 2887 Riverside Drive Ottawa, Ontario

Phase Two Environmental Site Assessment 2887 Riverside Drive Ottawa, Ontario Phase Two Environmental Site Assessment 2887 Riverside Drive Ottawa, Ontario Submitted to: Cahdco 200415 Gilmour Street Ottawa, Ontario K1P 5W8 Phase Two Environmental Site Assessment Proposed Youth Hub

More information

FINAL REPORT. Environmental Monitoring Services during the Underground Storage Tank Removal at Fire Hall # Nicola Street

FINAL REPORT. Environmental Monitoring Services during the Underground Storage Tank Removal at Fire Hall # Nicola Street FINAL REPORT Environmental Monitoring Services during the Underground Storage Tank Removal at Fire Hall #6 1001 Nicola Street Prepared for: City of Vancouver 453 West 12 th Avenue Vancouver, BC V5Y 1V4

More information

patersongroup Consulting Engineers October 7, 2010 File: PE2100-LET.01 Springcress Properties Inc. 6 Gurdwara Road, Suite 200 Ottawa, Ontario K2E 8A3

patersongroup Consulting Engineers October 7, 2010 File: PE2100-LET.01 Springcress Properties Inc. 6 Gurdwara Road, Suite 200 Ottawa, Ontario K2E 8A3 patersongroup Consulting Engineers 28 Concourse Gate, Unit 1 Ottawa, Ontario Canada, K2E 7T7 Tel: (613) 2267381 Fax: (613) 2266344 October 7, 2010 File: PE2100LET.01 Springcress Properties Inc. 6 Gurdwara

More information

PHASE TWO ENVIRONMENTAL SITE ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT DERRY ROAD AND REGIONAL ROAD #25 MILTON, ONTARIO

PHASE TWO ENVIRONMENTAL SITE ASSESSMENT PROPOSED RESIDENTIAL DEVELOPMENT DERRY ROAD AND REGIONAL ROAD #25 MILTON, ONTARIO PHASE TWO ENVIRONMENTAL SITE AEMENT PROPOSED RESIDENTIAL DEVELOPMENT DERRY ROAD AND REGIONAL ROAD #25 MILTON, ONTARIO Prepared for: BRIARWOOD GROUP 636 Edward Avenue, Unit 14 Richmond Hill, ON L4C 0V4

More information

GAMSBY AND MANNEROW Limited CONSULTING PROFESSIONAL ENGINEERS GUELPH- OWEN SOUND- LISTOWEL

GAMSBY AND MANNEROW Limited CONSULTING PROFESSIONAL ENGINEERS GUELPH- OWEN SOUND- LISTOWEL GAMSBY AND MANNEROW Limited GUELPH- OWEN SOUND- LISTOWEL 255 WOODLAWN ROAD WEST, SUITE 210 GUELPH, ONTARIO, N1H 8)1 PHONE (519) 824-8150 FAX (519) 824-8089 email: info@gamsby.com February 22, 2005 Our

More information

APPENDIX B. Soil Sample Certificate of Analysis

APPENDIX B. Soil Sample Certificate of Analysis APPENDIX B Soil Sample Certificate of Analysis 5 SHOREHAM DR DOWNSVIEW, ON M3N1S4 SOIL ANALYSIS REVIEWED BY: Mike Muneswar, BSc (Chem), Senior Inorganic Analyst TRACE ORGANICS REVIEWED BY: Jacky Takeuchi,

More information

PHASE TWO ENVIRONMENTAL SITE ASSESSMENT

PHASE TWO ENVIRONMENTAL SITE ASSESSMENT METROPIA PHASE TWO ENVIRONMENTAL SITE ASSESSMENT 1856 NOTION ROAD, PICKERING, ONTARIO, CANADA OCTOBER 16, 2017 PHASE TWO ENVIRONMENTAL SITE ASSESSMENT 1856 NOTION ROAD, PICKERING, ONTARIO, CANADA METROPIA

More information

APPENDIX B SUPPLEMENTAL SAMPLING (SEDIMENT CORES)

APPENDIX B SUPPLEMENTAL SAMPLING (SEDIMENT CORES) APPENDIX B SUPPLEMENTAL SAMPLING (SEDIMENT CORES) March 2017 1776663-7045 Table 1 Summary of Sediment Analytical Results - Polycyclic Aromatic Hydrocarbons IOCO Former Refinery and Active Distribution

More information

BROWARD COUNTY ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) MINIMUM CRITERIA FOR MONITORING WELL INSTALLATION AND SAMPLING

BROWARD COUNTY ENVIRONMENTAL PROTECTION DEPARTMENT (EPD) MINIMUM CRITERIA FOR MONITORING WELL INSTALLATION AND SAMPLING Failure to follow these criteria, or to obtain approval for variation to these criteria, is a citationable offense and bears an associated civil penalty, as provided in Section 27-38(h) (9), of the Broward

More information

Phase 2 Environmental Site Assessment of the Fuel Station Located at (& 11509)Wyoming Street, Detroit MI 48204

Phase 2 Environmental Site Assessment of the Fuel Station Located at (& 11509)Wyoming Street, Detroit MI 48204 Timmermans Environmental Services, Inc. Phase 2 Environmental Site Assessment of the Fuel Station Located at 11511 (& 1159)Wyoming Street, Detroit MI 4824 Prepared For: Fast Track Ventures 2541 Ecorse

More information

Pre-Station Construction Groundwater and Surface Water Baseline Conditions Report, Hydro One - Clarington Transformer Station, Addendum

Pre-Station Construction Groundwater and Surface Water Baseline Conditions Report, Hydro One - Clarington Transformer Station, Addendum Pre-Station Construction Groundwater and Surface Water Baseline Conditions Report, Hydro One - Clarington Transformer Station, Addendum Prepared for: Hydro One Networks Inc. 483 Bay Street South Tower,

More information

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360

ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 ENVIRONMENTAL ASSESSMENT FINDINGS AND CONCLUSIONS WEBER SIGN SERVICE, INC. th 730 EAST 8 STREET MICHIGAN CITY, INDIANA 46360 Prepared for: THE MICHIGAN CITY REDEVELOPMENT COMMISSION 100 EAST MICHIGAN BOULEVARD

More information

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M SEPTEMBER 22 TO OCTOBER 19, 2015

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M SEPTEMBER 22 TO OCTOBER 19, 2015 MONTHLY UPDATE REPORT - PRIMROSE SOUTH 09-21-067-04 W4M SEPTEMBER 22 TO OCTOBER 19, 2015 1 Introduction The Canadian Natural Resources Limited Primrose South in situ oil sands project is located in the

More information

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES

WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES WASTE ACCEPTANCE CRITERIA AND DEVELOPMENT OF SOIL TRIGGER VALUES FOR EPA-LICENSED SOIL RECOVERY FACILITIES 1. Introduction This guidance document applies to soil recovery facilities which exceed the operational

More information

PHASE II ENVIRONMENTAL SITE ASSESSMENT

PHASE II ENVIRONMENTAL SITE ASSESSMENT CITY OF TORONTO PHASE II ENVIRONMENTAL SITE ASSESSMENT 1300 Wilson Avenue Toronto, Ontario FINAL REPORT August 27, 2013 Terrapex Environmental Ltd. 49 Coldwater Road, Toronto, Ontario, M3B 1Y8 Telephone:

More information

APPLICATION OF SUBSURFACE VAPOUR ASSESSMENT AT HYDROCARBON IMPACTED SITES

APPLICATION OF SUBSURFACE VAPOUR ASSESSMENT AT HYDROCARBON IMPACTED SITES APPLICATION OF SUBSURFACE VAPOUR ASSESSMENT AT HYDROCARBON IMPACTED SITES Mitch Kenaschuk, P.Eng. Peter Olmsted, M.Sc.,P.Eng. October 2004 OUTLINE Introduction Regulatory Framework and Methodology Vapour

More information

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA)

Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial Heating Oil Systems. National Oilheat Research Alliance (NORA) Guidance Document Risk-Based Corrective Action (RBCA) For Residential and Commercial National Oilheat Research Alliance (NORA) Forward Heating oil is used to heat many private homes as well as small commercial

More information

P Temporary piezometer. MW Piezometer to remain in place. P Temporary piezometer

P Temporary piezometer. MW Piezometer to remain in place. P Temporary piezometer 2. Field Program 2.1 Health and Safety Plan Prior to beginning the field program, CH2M HILL developed a health and safety plan (H&SP). The H&SP provided a summary of potential physical hazards that could

More information

1375 CLYDE AVENUE, NEPEAN, ON PHASE II ENVIRONMENTAL SITE ASSESSMENT ENGINEERING LABORATORY. 400 Esna Park Drive, Unit 15 Markham, ON L3R 3K2

1375 CLYDE AVENUE, NEPEAN, ON PHASE II ENVIRONMENTAL SITE ASSESSMENT ENGINEERING LABORATORY. 400 Esna Park Drive, Unit 15 Markham, ON L3R 3K2 ENGINEERING LABORATORY PHASE II ENVIRONMENTAL SITE ASSESSMENT 1375 CLYDE AVENUE, NEPEAN, ON 400 Esna Park Drive, Unit 15 Markham, ON L3R 3K2 Tel: (905) 475-7755 Fax: (905) 475-7718 www.fisherenvironmental.com

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM NEWTON GEO-HYDROLOGY CONSULTING SERVICES P.O. BOX 0 SANTA BARBARA, CALIFORNIA 0 TECHNICAL MEMORANDUM TO: FROM: Citizens For Responsible Oil And Gas (CFROG) Brad Newton, Ph.D., P.G. 0 0 0 RE: Summary Review

More information

Fsub. patersongroup. Phase II - Environmental Site Assessment Vacant Property 900 Albert Street Ottawa, Ontario. Prepared For

Fsub. patersongroup. Phase II - Environmental Site Assessment Vacant Property 900 Albert Street Ottawa, Ontario. Prepared For Geotechnical Engineering Fsub Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase II - Environmental Site Assessment Vacant Property 900 Albert Street

More information

Phase Two Environmental Site Assessment. 770 Somerset Street West Ottawa, Ontario Prepared For: DCR Phoenix Group

Phase Two Environmental Site Assessment. 770 Somerset Street West Ottawa, Ontario Prepared For: DCR Phoenix Group Phase Two Environmental Site Assessment 770 Somerset Street West Ottawa, Ontario Prepared For: DCR Phoenix Group December 2012 14-12815-001-PH2 December 12, 2012 14-12815-001-PH1 Mr. Michael Boucher Manager

More information

PHASE TWO ENVIRONMENTAL SITE ASSESSMENT 89 BEECHWOOD AVENUE GUELPH, ONTARIO

PHASE TWO ENVIRONMENTAL SITE ASSESSMENT 89 BEECHWOOD AVENUE GUELPH, ONTARIO PHASE TWO ENVIRONMENTAL SITE ASSESSMENT 89 BEECHWOOD AVENUE GUELPH, ONTARIO SUBMITTED TO: Mr. Pete Graham 89 Beechwood Inc. c/o Acorn Developments 80 Southgate Drive Guelph, Ontario N1G 4P5 FILE NO.: E16318

More information

FIELD INVESTIGATION The Field work was completed on March 12, Specifically, the field work included the following tasks:

FIELD INVESTIGATION The Field work was completed on March 12, Specifically, the field work included the following tasks: September 2, 204 Mr. Donald Webb President City of Beech Grove Redevelopment Commission 806 Main Street Beech Grove, Indiana 4607 RE: Letter Report Documenting Additional Phase II Environmental Site Assessment

More information

CALA Directory of Laboratories

CALA Directory of Laboratories CALA Directory of Laboratories Membership Number: 3573 Laboratory Name: AGAT Laboratories (Grande Prairie) Parent Institution: AGAT Laboratories Ltd. Address: 10203B - 123 Street Grande Prairie AB T8V

More information

April 16, Dear Mr. Beedie:

April 16, Dear Mr. Beedie: April 16, 2012 Mr. Michael Beedie, P.E. City of Ft. Walton Beach Engineering Services Department 105 Miracle Strip Parkway SW Ft. Walton Beach, FL 32548 Re: Proposal for a Supplemental Site Assessment

More information

PHASE TWO ENVIRONMENTAL SITE ASSESSMENT

PHASE TWO ENVIRONMENTAL SITE ASSESSMENT PHASE TWO ENVIRONMENTAL SITE ASSESSMENT at 747 Liverpool Road, Pickering, Ontario Prepared for Madison Liverpool Limited CCIG Project No: T1685EN CCIG Contact: Bob Gordanifar, P.Eng., QP ESA and RA bobg@ccigroupinc.ca

More information

IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B

IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B IN-SITU CHEMICAL OXIDATION REMEDIATION PROGRAM INTERIM REPORT PHASE 2B SITE: CHAMPAIGN FORMER MGP SITE CHAMPAIGN, ILLINOIS JULY 24, 2013 PREPARED FOR: PSC INDUSTRIAL OUTSOURCING, LP 210 WEST SAND BANK

More information

August 28, 2018 Project No GROUNDWATER QUALITY MONITORING, LAKERIDGE ROAD, SCUGOG, ONTARIO

August 28, 2018 Project No GROUNDWATER QUALITY MONITORING, LAKERIDGE ROAD, SCUGOG, ONTARIO August 28, 2018 Project No. 18104887 Ms. Carol Coleman, P.Eng., Director of Public Works, Parks and Recreation Township of Scugog 181 Perry Street P.O. Box 780 Port Perry, Ontario L9L 1A7 GROUNDWATER QUALITY

More information

Submitted to: Toronto Transit Commission Engineering Department 5140 Yonge Street, 6 th Floor Toronto, Ontario M2N 6L9.

Submitted to: Toronto Transit Commission Engineering Department 5140 Yonge Street, 6 th Floor Toronto, Ontario M2N 6L9. DRAFT PHASE II ENVIRONMENTAL SITE AEMENT LFLRV MAINTENANCE AND STORAGE FACILITES FLEET REPLACEMENT PROJECT LAKE SHORE BOULEVARD EAST AND LESLIE STREET TORONTO, ONTARIO Submitted to Toronto Transit Commission

More information

DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, PICATINNY PICATINNY ARSENAL, NEW JERSEY

DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, PICATINNY PICATINNY ARSENAL, NEW JERSEY DEPARTMENT OF THE ARMY INSTALLATION MANAGEMENT COMMAND HEADQUARTERS, UNITED STATES ARMY GARRISON, PICATINNY PICATINNY ARSENAL, NEW JERSEY 07806-5000 March 9, 017 SUBJECT: Comprehensive Environmental Response,

More information

DES Waste Management Division 29 Hazen Drive; P.O. Box 95 Concord, NH

DES Waste Management Division 29 Hazen Drive; P.O. Box 95 Concord, NH DES Waste Management Division 29 Hazen Drive; P.O. Box 95 Concord, NH 03302 0095 Underground Storage Tank Closure Report Concord Steam 123 Pleasant Street Concord, NH NHDES Site Number: 198608003 Project

More information

Applicant: JOOLZ Date: Jan 30, 2015 NIEUWE HERENGRACHT 51-53, AMSTERDAM, THE NETHERLANS

Applicant: JOOLZ Date: Jan 30, 2015 NIEUWE HERENGRACHT 51-53, AMSTERDAM, THE NETHERLANS Applicant: JOOLZ Date: Jan 30, 2015 NIEUWE HERENGRACHT 51-53, AMSTERDAM, THE NETHERLANS Attn: THEO SZARAFINSKI This is to supersede Report No. SZHH00933753 dated Jan 28, 2015 Sample Description: One (1)

More information

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M MAY 19 TO JUNE 22, 2015

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M MAY 19 TO JUNE 22, 2015 MONTHLY UPDATE REPORT - PRIMROSE SOUTH 09-21-067-04 W4M MAY 19 TO JUNE 22, 2015 1 Introduction The Canadian Natural Resources Limited Primrose South in situ oil sands project is located in the Cold Lake

More information

QuES&T Quality Environmental Solutions & Technologies, Inc.

QuES&T Quality Environmental Solutions & Technologies, Inc. QuES&T Quality Environmental Solutions & Technologies, Inc. May 11, 2012 White Plains City School District Facilities Building 580 North Street White Plains, NY 10605 Attn: Frank Stefanelli, Director of

More information

PHASE III ESA, HHERA AND RAP, NORTHWEST POINT, LABRADOR. Appendix 4a. Site Drawings. East Bulk Fuel Storage Site

PHASE III ESA, HHERA AND RAP, NORTHWEST POINT, LABRADOR. Appendix 4a. Site Drawings. East Bulk Fuel Storage Site PHASE III ESA, HHERA AND RAP, NORTHWEST POINT, LABRADOR Appeix 4a Site Drawings East Bulk Fuel Storage Site PHASE III ESA, HHERA AND RAP, NORTHWEST POINT, LABRADOR Appeix 4b Site Photos East Bulk Fuel

More information

City Policy & Procedure

City Policy & Procedure City Policy & Procedure Subject: Methane Gas Site Policy Policy: 1004 Covers: Development within, and monitoring of, all former & current landfill sites. Revised: July 20, 2015 Effective: October 1, 2015

More information

E N V I R O N M E N T A L I N C O R P O R A T E D

E N V I R O N M E N T A L I N C O R P O R A T E D H P E N V I R O N M E N T A L I N C O R P O R A T E D April 10, 2015 Ms. Lisa Wiersma Development Manager Vornado/Charles E. Smith 2345 Crystal Drive Suite 1100 Arlington Virginia 22202 Re: Limited Phase

More information

Case Studies in Risk Management Methods as a Component of the Remedial Process

Case Studies in Risk Management Methods as a Component of the Remedial Process Case Studies in Risk Management Methods as a Component of the Remedial Process Cecile Willert, P.Eng., QP RA January/February 2013 Agenda Issues Summary Case Study # 1 RA of DNAPL site (combined with remediation)

More information

EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS

EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS EXPORT SOIL-MATERIAL QUALITY REQUIREMENTS GENERAL Industrial operations have been conducted on Port of Long Beach property since the 1930s. Though it is unlikely that hazardous substances will be encountered

More information

PLEASANT PARK LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT TONKA BAY, MINNESOTA. January 14, 2016

PLEASANT PARK LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT TONKA BAY, MINNESOTA. January 14, 2016 LIMITED PHASE II ENVIRONMENTAL SITE ASSESSMENT PLEASANT PARK TONKA BAY, MINNESOTA January 14, 2016 for City of Tonka Bay 1901 Manitou Road Tonka Bay, MN 55331 WSB PROJECT NO. 1987-570 701 Xenia Avenue

More information

PHASE II ENVIRONMENTAL SITE ASSESSMENT

PHASE II ENVIRONMENTAL SITE ASSESSMENT PHASE II ENVIRONMENTAL SITE ASSESSMENT POPLAR WOODS DEVELOPMENT PHASE 2 PART OF LOTS 5 & 6, CONCESSION 8 (LOBO), ONTARIO MUNICIPALITY OF MIDDLESEX CENTRE, ONTARIO Submitted to: Poplar Woods Ltd. 611 Wonderland

More information

patersongroup Site Information Consulting Engineers February 3, 2011 File: PE2224-LET.01

patersongroup Site Information Consulting Engineers February 3, 2011 File: PE2224-LET.01 patersongroup February 3, 2011 File: PE2224-LET.01 Starwood Group Inc. 800-188 Eglington Avenue East Toronto, Ontario M4P 2X7 Consulting Engineers 28 Concourse Gate, Unit 1 Ottawa, Ontario Canada, K2E

More information

A Laboratory Test to Evaluate Potential for Steam Enhanced Removal of Coal Tar in a Sand Matrix. Ishwar P. Murarka, Ph.D. Chief Scientist, Ish Inc.

A Laboratory Test to Evaluate Potential for Steam Enhanced Removal of Coal Tar in a Sand Matrix. Ishwar P. Murarka, Ph.D. Chief Scientist, Ish Inc. A Laboratory Test to Evaluate Potential for Steam Enhanced Removal of Coal Tar in a Sand Matrix Ishwar P. Murarka, Ph.D. Chief Scientist, Ish Inc. Kent S. Udell, Ph.D. Professor, University of California

More information

Hamilton Works. Toxic Substance Reduction Plan Summary. Sulphuric Acid Zinc Mercury Benzene.

Hamilton Works. Toxic Substance Reduction Plan Summary. Sulphuric Acid Zinc Mercury Benzene. Hamilton Works Toxic Substance Reduction Plan Summary Name of Substance CAS # of Substance Sulphuric Acid 7664-93-9 Zinc 7440-66-6 Mercury 7439-97-6 Benzene 71-43-2 Toluene 108-88-3 Xylene 1330-20-7 7H-dibenzo(c,g)carbazole

More information

patersongroup Phase II Environmental Site Assessment Commercial Properties 1445 and 1451 Wellington Street West Ottawa, Ontario Prepared For

patersongroup Phase II Environmental Site Assessment Commercial Properties 1445 and 1451 Wellington Street West Ottawa, Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase II Environmental Site Assessment Commercial Properties 1445

More information

TEKLAB, INC ANALYTICAL QC SUMMARY REPORT. TestCode: SV_8310S_W. CLIENT: Kelron Environmental Work Order: Project: CHMGP/

TEKLAB, INC ANALYTICAL QC SUMMARY REPORT. TestCode: SV_8310S_W. CLIENT: Kelron Environmental Work Order: Project: CHMGP/ TEKLAB, INC CLIENT: Kelron Environmental Date: 16-Jun-5 Sample ID: MB-25734 MBLK SeqNo: 12673 Acenaphthene ND.1.3 Acenaphthylene ND.5.15 Anthracene ND.1.3 Benzo(a)anthracene ND.3.9 Benzo(a)pyrene ND.4.12

More information

Phase I Environmental Site Assessment, 16 Isabella Street South, St. Jacobs, Ontario dated January 24, 2012.

Phase I Environmental Site Assessment, 16 Isabella Street South, St. Jacobs, Ontario dated January 24, 2012. January 17, 2018 File No.: E17484 Mr. Mike Puopolo Polocorp Inc. 379 Queen Street South Kitchener, Ontario N2G 1W6 RE: Phase Two Environmental Site Assessment Summary 16 Isabella Street South, St. Jacobs,

More information

patersongroup Phase I Environmental Site Assessment Vacant, Undeveloped Land 1021 Thomas Spratt Place Ottawa, Ontario Prepared For

patersongroup Phase I Environmental Site Assessment Vacant, Undeveloped Land 1021 Thomas Spratt Place Ottawa, Ontario Prepared For Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Phase I Environmental Site Assessment Vacant, Undeveloped Land 1021

More information

California Regional Water Quality Control Board San Francisco Bay Region

California Regional Water Quality Control Board San Francisco Bay Region California Regional Water Quality Control Board San Francisco Bay Region Linda S. Adams Secretary for Environmental Protection 1515 Clay Street, Suite 1400, Oakland, California 94612 (510) 622-2300 Fax

More information

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to

On March 6, 2014, 17 shallow soil samples were collected along the proposed trail alignment according to LAKE EWAUNA TRAIL LEVEL 2 FIELD SAMPLING ASSESSMENT the proposed alignment (Figure 1). The trail will also include the installation of a geothermal snow melt system, allowing for year round use of the

More information

Environmental Peer Review Gordon Marine South Street, Gananoque, Ontario Pinchin File: 74984

Environmental Peer Review Gordon Marine South Street, Gananoque, Ontario Pinchin File: 74984 June 15, 2012 Gordon Marine Limited 129 South Street Gananoque, ON K7G 1A1 Attention: Re: Mr. Sandy Gordon Environmental Peer Review Gordon Marine - 129 South Street, Gananoque, Ontario Pinchin File: 74984

More information

Tennessee Cleanup Standards for Hydrocarbon Contaminated Groundwater

Tennessee Cleanup Standards for Hydrocarbon Contaminated Groundwater Tennessee Cleanup Standards f Hydrocarbon Contaminated Groundwater Product (Residential) 0.001 mg/l 0.005 mg/l 0.072 mg/l Toluene 0.001 mg/l 1.0 mg/l 4.31 mg/l Gasoline Ethylbenzene 0.002 mg/l 0.7 mg/l

More information

Part 1: Property Ownership, Property Information and Owner s Certifications

Part 1: Property Ownership, Property Information and Owner s Certifications Part 1: Property Ownership, Property Information and Owner s Certifications Information about the owner who is submitting or authorizing the submission of the record of site condition Owner name Owner

More information

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008

FINAL PLAN OF REMEDIAL ACTION. Burns and McBride. South Market and A Streets August 19, 2008 FINAL PLAN OF REMEDIAL ACTION Burns and McBride South Market and A Streets August 19, 2008 Wilmington, Delaware DNREC Project No. DE-0325 This Revised Final Plan of Remedial Action (Final Plan) presents

More information

Interim Source Removal Summary Groundwater Extraction System Former American Beryllium Company Site Tallevast, Florida

Interim Source Removal Summary Groundwater Extraction System Former American Beryllium Company Site Tallevast, Florida Interim Source Removal Summary Groundwater Extraction System Former American Beryllium Company Site Tallevast, Florida Soil and Groundwater Sampling Program On August 3, 2008, approximately 5,000 gallons

More information

APPENDIX A GEOTECHNICAL REPORT

APPENDIX A GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 5-06 Template Version: C40606 - RW APPENDIX A GEOTECHNICAL REPORT AECOM 99 Commerce Drive 04 477 538 tel Winnipeg, MB, Canada R3P 0Y7 04 84 040 fax www.aecom.com

More information

Waste Classification Assessment Report for Soils. C Spencer Ltd. Energy Works Dalton Street Hull

Waste Classification Assessment Report for Soils. C Spencer Ltd. Energy Works Dalton Street Hull 1 Waste Classification Assessment Report for Soils C Spencer Ltd Energy Works Dalton Street Hull 2 Report Reference: 65445 Date of Report: 23.06.2017 Client: Site Address: C Spencer Ltd Energy Works Dalton

More information

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards

PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards PROTOCOL FOR THE CONTAMINATED SITES REGULATION UNDER THE ENVIRONMENT ACT PROTOCOL NO. 5: Petroleum Hydrocarbon Analytical Methods and Standards Prepared pursuant to Part 6 Administration, Section 21, Contaminated

More information

Restover Truck Stop Groundwater Monitoring, Results of January 2000 Sampling

Restover Truck Stop Groundwater Monitoring, Results of January 2000 Sampling A D e p a r t m e n t o f E c o l o g y R e p o r t Restover Truck Stop Groundwater Monitoring, Results of January 2000 Sampling Abstract This progress report is one in a series describing results of groundwater

More information

Sent: Friday, June 24, :17 PM. Subject: RE: Southwood 4 - Monitoring Well update

Sent: Friday, June 24, :17 PM. Subject: RE: Southwood 4 - Monitoring Well update Sent: Friday, June 24, 2016 5:17 PM Subject: RE: Southwood 4 - Monitoring Well update Please see attached for a copy of our Draft Borehole Logs, Draft Borehole Location Plan and Interim Ground Water Monitoring

More information

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA

Residual LNAPL Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Residual Remediation Using BOS 200 at Budget Rental Car Site in Louisville, Kentucky USA Background Information Linebach Funkhouser, Inc. (LFI) personnel performed permanent closure, assessment and corrective

More information

SUBSURFACE INVESTIGATION AND PUMPING TEST REPORT

SUBSURFACE INVESTIGATION AND PUMPING TEST REPORT SUBSURFACE INVESTIGATION AND PUMPING TEST REPORT DeVito Service Station 880 Old Post Road (Route 35) Cross River, New York DUNS #0015-2900 NYSDEC Spill #84-01923 Project #97010 June 11, 2007 Prepared For:

More information

TRAFALGAR ENVIRONMENTAL CONSULTANTS

TRAFALGAR ENVIRONMENTAL CONSULTANTS TRAFALGAR ENVIRONMENTAL CONSULTANTS March 28, 2018 MacEwen Petroleum Inc. 18 Adelaide Street, P.O. Box 100 Maxville, Ontario K0C 1T0 Attention: Mr. Larry Duchscher Dear Sir: RE: Sampling Analytical Summary

More information

Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09)

Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Hamilton Works 2016 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Issued June 1, 2017 Basic Facility Information Section 1 Facility Information Owner U. S. Steel Canada Inc. Facility name Hamilton

More information

Study Summary. Evaluation of Soil Rx For Crude Oil Impacted Soil

Study Summary. Evaluation of Soil Rx For Crude Oil Impacted Soil Study Summary Evaluation of Soil Rx For Crude Oil Impacted Soil Study Completed In Cooperation With OES Industries Vinland Energy 3 Tier Technologies LLC June 2010 William M. Mitchell, PG, OES Industries

More information

Scope of Work for Water Sampling

Scope of Work for Water Sampling Scope of Work for Water Sampling From: Meghan Betcher, Environmental Scientist Downstream Strategies, LLC 100 Railroad Ave. 304-445-7200 mbetcher@downstreamstrategies.com Date: June 26, 2017 Downstream

More information

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M AUGUST 19 TO SEPTEMBER 22, 2014

MONTHLY UPDATE REPORT - PRIMROSE SOUTH W4M AUGUST 19 TO SEPTEMBER 22, 2014 MONTHLY UPDATE REPORT - PRIMROSE SOUTH 09-21-067-04 W4M AUGUST 19 TO SEPTEMBER 22, 2014 1 Introduction The Primrose South in situ oil sands project is located in the Cold Lake Air Weapons Range approximately

More information

M E M O R A N D U M May 20, Alison Rodrigues Issues Project Coordinator, Halton Peel District Office

M E M O R A N D U M May 20, Alison Rodrigues Issues Project Coordinator, Halton Peel District Office Ministry of the Environment Central Region Technical Support Section 5775 Yonge Street, 8 th Floor North York, Ontario M2M 4J1 Tel.: (416) 326-6700 Fax: (416) 325-6345 Ministère de l Environnment Région

More information

Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09)

Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Hamilton Works 2017 Annual Toxic Substances Reduction Report (O. Reg. 455/09) Issued June 1, 2018 Basic Facility Information Section 1 Facility Information Owner Stelco Inc. Facility name Hamilton Works

More information

Phase II Environmental Site Assessment 960 Washington Street City of Buffalo, Erie County, New York

Phase II Environmental Site Assessment 960 Washington Street City of Buffalo, Erie County, New York Phase II Environmental Site Assessment 960 Washington Street City of Buffalo, Erie County, New York Prepared For: State University Construction Fund 353 Broadway Albany, New York 12246 and UB Foundation

More information

the former Honeywell plant building (3 Hamilton Avenue) a single-storey brick industrial/commercial building (233 Armstrong Street)

the former Honeywell plant building (3 Hamilton Avenue) a single-storey brick industrial/commercial building (233 Armstrong Street) consulting engineers memorandum to: Tega Developments - Mr. Spyro Dimitrakopoulos - spyro@tegadevelopments.com re: Environmental Remedial Action Plan Proposed Residential Building 233 Armstrong Street

More information

Interpreting Analytical Results

Interpreting Analytical Results Interpreting Analytical Results Beyond Guidelines and Exceedances Frans Hettinga Tetra Tech EBA Inc. Calgary, Alberta Contents Focus on groundwater chemistry Some basics and tricks What is the value? A

More information

patersongroup Phase I - Environmental Site Assessment Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario Prepared For Regional Group

patersongroup Phase I - Environmental Site Assessment Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario Prepared For Regional Group Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Vacant Land, Strandherd Drive at Kennevale Drive Ottawa, Ontario

More information

Appendix B AMEC Laboratory Quality Assurance/Control Program

Appendix B AMEC Laboratory Quality Assurance/Control Program BLACKWATER GOLD PROJECT APPLICATION FOR AN ENVIRONMENTAL ASSESSMENT CERTIFICATE / ENVIRONMENTAL IMPACT STATEMENT ASSESSMENT OF POTENTIAL ENVIRONMENTAL EFFECTS Appendix 5.1.3.2B AMEC Laboratory Quality

More information

APPLICATION OF SUBSURFACE SOIL VAPOUR ASSESSMENT TO MANAGE HEALTH RISKS AND DEVELOP REMEDIATION CRITERIA AT HYDROCARBON IMPACTED SITES

APPLICATION OF SUBSURFACE SOIL VAPOUR ASSESSMENT TO MANAGE HEALTH RISKS AND DEVELOP REMEDIATION CRITERIA AT HYDROCARBON IMPACTED SITES APPLICATION OF SUBSURFACE SOIL VAPOUR ASSESSMENT TO MANAGE HEALTH RISKS AND DEVELOP REMEDIATION CRITERIA AT HYDROCARBON IMPACTED SITES By: Mitch Kenaschuk, P.Eng. and Peter Olmsted, M.Sc., P.Eng. SEACOR

More information

Ontario Ministry of the Environment and Climate Change - Record of Site Condition #

Ontario Ministry of the Environment and Climate Change - Record of Site Condition # Ontario Ministry of the Environment and Climate Change - Record of Site Condition # 217980 Record of Site Condition Under Part XV.1 of the Environment Protection Act Summary Record of Site Condition Number

More information

Ontario Ministry of the Environment - Record of Site Condition # Record of Site Condition Under Part XV.1 of the Environment Protection Act 1Z7

Ontario Ministry of the Environment - Record of Site Condition # Record of Site Condition Under Part XV.1 of the Environment Protection Act 1Z7 Ontario Ministry of the Environment - Record of Site Condition # 208386 Record of Site Condition Under Part XV.1 of the Environment Protection Act Summary Record of Site Condition Number 208386 Date Filed

More information

Ontario Ministry of the Environment and Climate Change - Record of Site Condition #

Ontario Ministry of the Environment and Climate Change - Record of Site Condition # Ontario Ministry of the Environment and Climate Change - Record of Site Condition # 219426 Record of Site Condition Under Part XV.1 of the Environment Protection Act Summary Record of Site Condition Number

More information

PAHs in Surface Water by PDA and Fluorescence Detection

PAHs in Surface Water by PDA and Fluorescence Detection A P P L I C AT I O N N O T E Liquid Chromatography Authors: Catharine Layton Wilhad M. Reuter PerkinElmer, Inc. Shelton, CT PAHs in Surface Water by PDA and Fluorescence Detection Introduction Heightened

More information

April 10, Ms. Lynn Dittmer Metropolitan Area Planning Agency 2222 Cuming Street Omaha, NE 68102

April 10, Ms. Lynn Dittmer Metropolitan Area Planning Agency 2222 Cuming Street Omaha, NE 68102 April 10, 2014 Ms. Lynn Dittmer Metropolitan Area Planning Agency 2222 Cuming Street Omaha, NE 68102 Re: South Omaha Brownfields Coalition Assessment Grant Phase II ESA Report Vacant Warehouse 2630 'N'

More information