Engineered to be rugged and reliable. Designed to eliminate cover plate noise. Quick, easy installation.

Size: px
Start display at page:

Download "Engineered to be rugged and reliable. Designed to eliminate cover plate noise. Quick, easy installation."

Transcription

1 Heavy duty. Redefined. Engineered to be rugged and reliable. Designed to eliminate cover plate noise. Quick, easy installation. Wabo BusTuff heavy duty expansion joint system wbacorp.com

2 Features and Benefits Not your average plate joint system. Features Design Longevity Unique Anchorage System Sound Attenuation Easy Install Benefits Structural elements designed for infinite fatigue life. Maintenance free, structural steel components Fastening system engineered to secure cover plate under any conditions, displacements and rotations Engineered to completely eliminate cover plate noise through our QuietRide TM technology Lane-by-lane installation of plates promotes simple process Wabo BusTuff (BTS) Heavy duty expansion joint system Designed and proven to accommodate high load, high speed, high daily traffic count parking deck challenges. This system has also been designed and tested to withstand the most demanding seismic events, resulting in the most fully functional expansion joint system in the marketplace. Successful seismic testing of the BusTuff system was conducted in 2012 at the Pacific Earthquake Engineering Research (PEER) Center, University of California, Berkeley. This system will effectively handle up to a Magnitude 8 seismic event, allowing for continuous use during and following significant seismic activity. Specify Serious loading capabilities. The Wabo BusTuff system absorbs impact and carries axle loads up to and including 40,000 pounds Handles 30% horizontal impact forces created by large vehicles traveling at high speeds across the system Accommodates slab movements in all directions while eliminating failure modes most often associated with plate-type systems Wabo BusTuff Recommended applications. Fly-in/elevated bridge structures at Public Transportation facilities Airport Terminal Pickup Locations in proximity to buses New construction and staged construction rehabilitation projects Horizontal use, high speed, high vehicle weight, and high daily traffic count applications Wabo BusTuff (BTS) System with QuietRide Technology Steel Cover Plate w/ Factory applied Slip Resistant Coating QuietRide Technology Steel Edge Members wbacorp.com Compression Anchor Springs

3 Technical System Data Each Wabo BusTuff expansion control system is specifically designed to suit individual project conditions. Considerations for use are high loads (vehicles higher in weight than passenger vehicles and pickup trucks i.e. oscillating buses), vehicles traveling at speeds in excess of 20 miles per hour, transitions in elevation across opposing decks, and locations where large vehicle count-per-day exists. For Best Results Tips to do it right. Install when concrete substrate is clean, sound, dry, and cured Do not allow any of the Wabo Crete II elastomeric concrete components to freeze prior to installation. Store all components out of direct sunlight in a clean, dry location between 50 F (10 C) and 90 F (32 C) Shelf life of chemical components is 1 year Periodically inspect bolt hole filler and edge void sealant and repair localized areas as needed For water management, minimize drain trough (optional) splice points by installing it in longest possible continuous lengths Our technical staff can provide the highly skilled engineering services required to transform design considerations, joint opening(s), and thermal and/or seismic movements into a maintenance-free system built to last. In fact, each BusTuff system developed is analyzed with Finite Element Analysis (FEA) as part of the standard engineering process. Preassembly and shorter sized panels allow for quick lane-by-lane installation on retrofit applications. Physical System Properties QuietRide TM Technology ensures no plate slap of metal to substrate due to repeated heavy loading. Factory poured high density polyurethane pads are kept in constant contact to the adjacent structure by pre-tensioning the system s hardware which are installed to a specified torque. Specially designed non-metallic compression springs maintain specified hardware tension throughout the expansion joint s service life. Wabo Crete II Elastomeric Header a key component to QuietRide TM Technology, this elastomeric header absorbs traffic impact loads and evenly disperses them into the deck slab, while allowing the system to flex with deck loads. Steel Edge Members all steel members and cover plates are manufactured from structural steel, and are designed by WBA Engineering staff to properly carry loads, limit deflection, and account for infinite fatigue life. Slip Resistant Coating high coefficient of friction slip resistant epoxy coating factory applied to ensure years of service under the most aggressive environments. wbacorp.com

4 Wabo BusTuff Heavy-Duty Expansion Joint System Patent No. 8,267,617 Product data sheet rev Top 4 reasons to use Wabo BusTuff (BTS) Features Design Longevity Unique Anchorage System Sound Attenuation Easy Install Benefits Structural elements are designed for infinite fatigue life Maintenance free structural steel components Fastening system designed and engineered to secure cover plate under any conditions, displacements and rotations Using our QuietRide TM Technology, this system has been engineered to completely eliminate cover plate noise Lane-by-lane installation of plates promotes simple process DESCRIPTION: The Wabo BusTuff is a rugged and reliable expansion joint system specifically designed to accommodate high load, high speed, high daily traffic count parking deck challenges. The system absorbs impact, can carry axle loads up to and including 40,000 pounds, handle 30% horizontal impact forces created by vehicles traveling at high speeds across the system, and accommodate slab movements in all directions while eliminating failure modes most often associated with plate-type systems in high daily traffic count locations. This system has also been designed and tested to withstand the most demanding seismic events resulting in the most fully functional expansion joint system in the marketplace. RECOMMENDED FOR: Fly-in/elevated bridge structures at Public Transportation facilities Airport Terminal Pickup Locations in proximity to buses New construction and staged construction rehabilitation projects Horizontal use, high speed, high vehicle weight, and high daily traffic count applications PACKAGING/COVERAGE: Steel cover plates and system components packaged as kits for easy installation Optional drain trough can be shipped in continuous lengths up to 50-0 Bolt Hole cavities are sealed with Wabo Crete II Elastomeric Concrete Wabo Crete II: Part A 1/2 gal container Part B 1 gal container Part C 60 lb aggregate A+B+C = 1 unit = 0.6 ft 3 (1030 in 3 ) bts technical data: Each Wabo BusTuff expansion control system is specifically designed to suit individual project conditions. Considerations for use are high loads (vehicles higher in weight than passenger vehicles and pickup trucks i.e. oscillating buses), vehicles traveling at speeds in excess of 20 miles per hour, transitions in elevation across opposing decks, and locations where large vehicle count-per-day exists. Our technical staff can provide the highly skilled engineering services required to transform design considerations, joint opening(s), and thermal and/or seismic movements into a maintenance-free system built to last. In fact, each BusTuff system developed is analyzed with Finite Element Analysis (FEA) as part of the standard engineering process. Preassembly and shorter sized panels allow for quick lane-by-lane installation on retrofit applications. Watson Bowman Acme Corp. 95 Pineview Drive Amherst, NY (p) (f) wbacorp.com

5 Wabo BusTuff Heavy-Duty Expansion Joint System Patent No. 8,267,617 product data sheet pg 2 of 2 For our most current information, please visit our wbacorp.com Wabo BusTuff (BTS) System rev APPLICATION: Installation summary: For newly placed concrete, the joint interface must be dry and clean (free of dirt, coatings, rust, grease, oil, and other contaminants), sound and durable. New concrete must be cured (minimum of 14 days). Prepare blockout to proper dimensions and grade. The bottom of the blockout shall be parallel with the plane of the roadway (true and flat). Position base steel angles with exposed structural steel threaded studs starting at a curb line and work across joint location. Anchor steel angles onto the concrete substructure using Wabo Crete II elastomeric concrete. Align and connect structural steel cover plate to cast in angles by use of structural steel anchor nuts. Tighten anchor nuts to specified torque using a torque wrench. Re-torque all nuts after one (1) hour or installation of one (1) stage is complete. Fill bolt hole cavities with Wabo Crete II Elastomeric Concrete. Fill edge voids with Silicone Sealant on anchored side of cover plate (material by others). Additional requirements/equipment: Sandblast blockout surfaces prior to installation Calibrated torque wrench to tighten anchors Pry bar to move/position panels For best results: Install when concrete substrate is clean, sound, dry, and cured (14 day minimum). Do not allow any of the Wabo Crete II elastomeric concrete components to freeze prior to installation. Store all components out of direct sunlight in a dry location between 50 F (10 C) and 90 F (32 C). Shelf life of components is approximately 1 year. Periodically inspect the bolt hole filler and edge void sealant and repair localized areas as needed. Consult a Watson Bowman Acme representative for additional information. Make certain the most current version of the product data sheet is being used. Please consult our website wbacorp.com or contact a customer service representative at Proper application is the responsibility of the user. Field visits by Watson Bowman Acme personnel are for the purpose of making technical recommendations only and not for supervising or providing quality control on the jobsite. Related documents: Material Safety Data Sheets Wabo BusTuff Specifications Wabo BusTuff Sales Drawings LIMITED WARRANTY: Watson Bowman Acme Corp. warrants that this product conforms to its current applicable specifications. WATSON BOWMAN ACME CORP. MAKES NO OTHER WARRANTY, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE. The sole and exclusive remedy of Purchaser for any claim concerning this product, including, but not limited to, claims alleging breach of warranty, negligence, strict liability or otherwise, is the replacement of product or refund of the purchase price, at the sole option of Watson Bowman Acme Corp. Any claims concerning this product shall be submitted in writing within one year of the delivery date of this product to Purchaser and any claims not presented within that period are waived by Purchaser. IN NO EVENT SHALL WATSON BOWMAN ACME CORP. BE LIABLE FOR ANY SPECIAL, INCIDENTAL, CONSEQUENTIAL (INCLUDES LOSS OF PROFITS) OR PUNITIVE DAMAGES. Other warranties may be available when the product is installed by a factory trained installer. Contact your local Watson Bowman Acme representative for details. The data expressed herein is true and accurate to the best of our knowledge at the time published; it is, however, subject to change without notice 2013 Watson Bowman Acme Corporation. Watson Bowman Acme Corp. 95 Pineview Drive Amherst, NY (p) (f) wbacorp.com

6 INSTALLATION PROCEDURE rev PRODUCT INFORMATION Manufacturer: Watson Bowman Acme Corp 95 Pineview Drive Amherst, NY (p) (f) wbacorp.com Product Name: Wabo BusTuff (BTS) Before Installation 1. Inspect all materials for missing or damaged components. If any material is damaged, contact WBA at (800) , with WBA order number and invoice for prompt assistance. Receipt of shipping document(s) indicating products or components were signed for by contractor as damaged upon arrival is required prior to processing any replacement materials. 2. All materials shall be stored as recommended by WBA, including but not limited to, temperature and humidity ranges as outlined in WBA literature that will not affect proper performance of any system or component. Components shown below will vary in size depending on system model. Cover plate Jam nuts The following installation procedure provides a basic guideline for proper placement of the expansion control system described above. This procedure should be used in conjunction with approved shop drawings (if required), contract plans, project specification, and recommendations by the manufacturer. To ensure proper installation and performance of the expansion control system, the following steps shall be completed by contractors with staff having appropriate skills to execute stated installation requirements. Deviation from or failure to abide by this procedure will affect product warranty unless changes are agreed to in writing by Watson Bowman Acme (WBA). 3. Contact WBA technical services department, (800) , if site conditions vary from requirements identified in this procedure. 4. Inspect all adjacent construction prior to commencement of work, and report any damage, deficiencies, or unacceptable conditions to the Authority having Jurisdiction for resolution. Please Note: Cover plates and anchor assemblies are match marked and drilled and can not be intermixed. Disassembly of the system should take place at time of setting anchor device assembly. Contractor should become familiar with location of all cover plate and anchor device assembly piece marks to ensure proper installation. Anchor device assembly

7 APPLICATION pg 2 of formwork (not supplied by WBA) wood shims anchor device assembly The blockout shall be constructed to the dimensions shown in shop drawings. The concrete substrate must be clean (free of dirt, coatings, rust, grease, oil and other contaminants), sound and durable. New concrete must be cured (minimum of 14 days) and all latinance removed. Suitable preparation methods include sandblasting, chipping and scarification. Position anchor device assembly in blockout and align so assembly is recessed to allow for installation of cover plate. Reference shop drawing for overall plate thickness including polyurethane pad. install formwork in blockout for Wabo Crete II infill material. Install Wabo Crete II per installation guide remove formwork After Wabo Crete II has fully cured, remove formwork in blockout. Place cover plate by aligning over threaded studs from anchor assembly. Use provided Jam nuts to secure plate and tighten to torque as specified on shop drawings. 7 8 Re-torque all nuts after one (1) hour or installation of one (1) stage is complete. Trim off excess threaded stud after nuts are re-torqued. Fill bolt holes with Wabo Crete II or epoxy per project specification. Fill vertical gap with silicone or sealant per project specification (not provided by WBA). For our most current information, please visit our wbacorp.com Wabo BusTuff (BTS) System rev LIMITED WARRANTY: Watson Bowman Acme Corp. warrants that this product conforms to its current applicable specifications. WATSON BOWMAN ACME CORP. MAKES NO OTHER WARRANTY, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE. The sole and exclusive remedy of Purchaser for any claim concerning this product, including, but not limited to, claims alleging breach of warranty, negligence, strict liability or otherwise, is the replacement of product or refund of the purchase price, at the sole option of Watson Bowman Acme Corp. Any claims concerning this product shall be submitted in writing within one year of the delivery date of this product to Purchaser and any claims not presented within that period are waived by Purchaser. IN NO EVENT SHALL WATSON BOWMAN ACME CORP. BE LIABLE FOR ANY SPECIAL, INCIDENTAL, CONSEQUENTIAL (INCLUDES LOSS OF PROFITS) OR PUNITIVE DAMAGES. Other warranties may be available when the product is installed by a factory trained installer. Contact your local Watson Bowman Acme representative for details. The data expressed herein is true and accurate to the best of our knowledge at the time published; it is, however, subject to change without notice 2013 Watson Bowman Acme Corporation.

8 SPECIFICATION rev PRODUCT INFORMATION Manufacturer: Watson Bowman Acme Corp 95 Pineview Drive Amherst, NY (p) (f) wbacorp.com Product Name: Wabo BusTuff (BTS) Product Description: The Wabo BusTuff is a rugged and reliable expansion joint system specifically designed to accommodate high load, high speed, high daily traffic count parking deck challenges. This system is designed and has been tested to withstand the most demanding seismic events resulting in the most fully functional, robust expansion joint system for parking structures. Intended Use: High loading (carry axle loads up to and including 40,000 lbs), high speeds (up to 20 mph) and high daily traffic count parking deck scenarios. SECTION EXPANSION CONTROL General The work shall consist of furnishing and installing expansion control systems in accordance with the details shown on the contract plans, and the requirements of these specifications. Wabo BusTuff is a proprietary product designed to meet high load, high speed, high daily traffic count vehicle requirements for the Project. In the event of any discrepancy between the contract plans and these specifications, the specification shall govern. Related Work 1. Cast-in-place concrete 2. Sealants and caulking Related Documents Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. Submittals A. Product Data: Provide the following for each system specified: 1. Product data sheet describing capabilities of expansion control system. 2. Information and data as outlined in Section 1.4.C of this specification. B. Shop Drawings: Provide the following for each system specified: 1. Placement Drawings: Include line diagrams showing plans, elevations, sections, details, splices, blockout requirement, entire route of each system, and attachments to other work. C. Product Test Reports: Material test reports confirming all structural steel materials conform to the specified and designed type, and previous test report(s) executed by an independent qualified testing agency for seismic performance suitability. D. Manufacturer certification: Provide certificates validating that the manufacturer of the expansion control system is certified to the most current version of an AISC Bridge Fabrication standard, and ISO 9001 Quality Management System. Performance and Design Criteria A. Design of vehicular and bus loading expansion systems shall meet the performance criteria listed on the contract documents, and shall be designed in accordance with requirements of AASHTO LRFD Design Specifications with modifications and exceptions listed below. Fabrication of load bearing elements shall be in accordance with AASHTO LRFD Bridge Construction Specifications. B. Unless otherwise indicated, wheel load of 16,000 pounds (bus with dual tire) shall be used. C. Prior to fabrication, expansion joint supplier shall submit the following information for review and approval:

9 SPECIFICATION 1. Summary of design criteria used in analysis and design. 2. Engineering calculations and finite element analysis (FEA), stamped by a registered professional engineer under the manufacturer s direct employ, of load carrying members to validate expansion control system s ability to transfer all imposed loads to the supporting structure. 3. Consideration for limit states of collapse, serviceability, and fatigue shall be provided in analysis and design. D. Design Criteria: 1. Fatigue: 25% lower than design wheel load. Fatigue resistance shall be established using the mean SN curve (50% failure rate) for the materials. 2. Serviceability: 25% higher than design wheel load. 3. Collapse: 50% higher than serviceability design wheel load. 4. Horizontal loads of at least 5 % of vertical load shall be included for serviceability and fatigue limit states unless otherwise indicated. Friction due to vehicular loading shall not be relied upon to provide horizontal load resistance of dynamic loads. A maximum of 33 percent of the friction due to pre-tensioning elements may be considered to resist horizontal loads. 5. FEA shall use a joint gap of not less than the joint s maximum service gap position, or 20 percent larger than midrange joint opening, whichever is larger. 6. Stress risers including but not limited to recesses and bolt holes shall be accounted for in the fatigue FEA case only. 7. FEA analysis shall verify stresses are below design limit states. Maximum allowable deflections are inches for fatigue and inches for serviceability. 8. Designated expansion control systems shall be designed such that the system will remain in place after a seismic event as described within the contract documents. 9. Noise prevention components shall be designed for a minimum design life of ten (10) years, and be justified by previous testing, installation, or analysis. Use of rubber sheets, dowels or blocks of any kind shall not be permitted. Quality Assurance Manufacturer shall have a minimum ten (10) years experience specializing in the design and manufacture of expansion control systems for use in vehicular bridges. Manufacturer shall be certified to an AISC Bridge Fabrication standard, and ISO-9001 Quality Management System. Manufacturer shall have a registered professional engineer under its direct employ with a demonstrated history of designing expansion control systems used in vehicular bridges where high load, high speed, high daily traffic count, and fatigue are considerations for design. 1. The following manufacturer is known to have a pre-qualified expansion control system design by completing and conforming to all requirements described herein: a. Watson Bowman Acme Corp. 95 Pineview Drive Amherst, NY Tel: (800) Fax: (716) Web: B. Installer Qualifications: The specified expansion control system shall be installed by an employer of workers that have completed the manufacturer s factory trained installer certification. Factory field technical service shall be required by any installer who has not successfully completed a minimum of two (2) installations of the specified materials. C. Source Limitations: Obtain expansion control systems through one (1) source from a single manufacturer. D. Warranty: The expansion control system shall be warranted for a period of three (3) years when installed by the manufacturer s factory trained installer. Installation shall be in strict accordance with manufacturer s technical specifications, details, installation instructions and general procedures in effect for normal intended usage and suitable applications under specified design movements and loading conditions. pg 2 of 4 Product Delivery Storage and Handling A. Deliver products in manufacturer s original, intact, labeled containers, and store under cover in a dry location until installed. Store off the ground, protect from weather and construction activities. Product Provide Wabo BusTuff utilizing QuietRide Technology that includes all materials as described in this Section; specifically, structural steel components designed and fabricated to meet requirements for the Project, non-elastomer sound attenuating materials between the expansion control system and the substructure, a specially manufactured, non-metallic, non-elastomer spring material to ensure the system is in full contact with the substructure as vehicles travel across the expansion control system, and an elastomeric concrete header. Components of the system shall not be substituted. Materials A. Steel plates and shapes: Supply materials in conformance to ASTM A 588, or as directed by the manufacturer. Non-load bearing steel materials shall be as recommended by the manufacturer. Use of aluminum for any component is prohibited. B. Headed concrete anchor studs shall conform to ASTM A 108 grades 1010 through C. Structural steel hardware: Bolts, studs, and nuts shall conform to or meet mechanical properties of ASTM A 325 or ASTM A 449. All hardware shall be protected from corrosion by means of hot dip galvanizing in conformance to ASTM A 153.

10 SPECIFICATION pg 3 of 4 D. Cover plate sound attenuating material Cover plates shall contain a dovetail cut on the bottom surface to accept a high density urethane material that is hot poured into the dovetail joints. Application of pre-formed urethane pads to cover plates through use of adhesive(s) is prohibited. Use of rubber sheet, dowels, blocks, or cross section of any kind is prohibited. E. Spring material: Manufacturer shall specify material properties, geometry, and compression deflection criteria required for precompression springs in order to ensure the sound attenuating pads are in complete and constant contact throughout a wheel load cycle. Material shall be designed to minimize compression set for a design life of at least one million vehicles. Use of steel or elastomer materials is prohibited. F. Elastomeric Header: Material shall be an ambient cure, 100% solids, two component liquid with pregraded aggregate exhibiting the minimum physical properties: 1. Cured binder shall meet the following physical properties: PHYSICAL PROPERTY TEST METHOD REQUIREMENT Tensile strength ASTM D min., psi break ASTM D % Hardness, Durometer D ASTM D Compression Set, 158 F ASTM D395 Method B 50 % max Tear Resistance, min, lb/in ASTM D Water Absorption ASTM D570 3% max Heat shrinkage, % ASTM D % max Oven 158 F for 72 hr tensile ASTM D Elongation ASTM D % min 2. Elastomeric cured binder shall meet the following properties: PHYSICAL PROPERTY TEST METHOD REQUIREMENT Compressive Strength ASTM D psi min. 5% deflection ASTM D695 90% min Impact Resistance ASTM 32 F (0 -20 F ( F (70 C) no cracks no cracks no cracks 3. Bonding Agent: Provide manufacturers two component, 100% solids bonding agent. Apply bonding agent to the sides and base of the preformed concrete blockout prior to placement of the elastomeric concrete. Store, mix and apply in accordance with manufacturer s system data sheet. G. Corrosion Protection: All exterior facing structural steel surfaces shall be protected against corrosion by PPG Amercoat 137 epoxy primer. Riding surface of structural steel cover plates shall be further protected from corrosion and provide skid resistance by application of PPG Amercoat 138G nonskid epoxy top coat. Color shall be gray. H. (Optional) Neoprene Trough and Drainage System: Areas shown on contract plans that require diversion of water shall incorporate a trough and downspout system. Neoprene trough material shall exhibit the following physical properties: PROPERTY REQUIREMENTS Fabric Type 4 ounce polyester cloth Temperature Range - 30º F + 200º F Hardness Shore A 70 +/-5 Tensile, PSI 1000 Elongation, % 250 Tear, Die C, PPI 150 Fabrication Expansion control system assemblies shall be fabricated in minimum three (3) foot long sections, and to suit staged construction. The entire system shall be preassembled prior to shipment to ensure proper fit prior to installation. All welds shall conform to AWS D 1.1, and welders shall be qualified in all procedures incorporated into the work. Examination A. Contractor shall examine adjacent road and bridge surfaces, and blockouts where expansion control systems will be installed to verify adjacent construction is within acceptable tolerance affecting performance of work. Proceed with installation only after unsatisfactory conditions have been corrected, and substructure geometry is agreed upon by Architect, General Contractor, and manufacturer. Preparation A. Comply with manufacturer s written instructions for storing and handling expansion control systems and materials unless more stringent requirements are indicated. B. Prepare substrates according to approved shop plans. C. Repair concrete slabs and blockouts using manufacturer s recommended repair grout of compressive strength adequate for anticipated structural loadings. D. Contractor shall measure joint opening, obtain adjacent deck temperature, and compare this information to the joint setting temperature table located on the approved shop plans.

11 SPECIFICATION pg 4 of 4 Contractor shall notify Architect and manufacturer of any discrepancy between actual and theoretical joint opening prior to proceeding. Protection A. Contractor shall exercise care at all times to protect each expansion control system from damage. Contractor shall protect concrete blockouts and supporting systems from damage and construction traffic prior to installation of the expansion control systems. B. Remove and properly store cover plates and install temporary protection over joints where necessary if heavy construction traffic wheel loads exceed design criteria established for the expansion control system. Reinstall cover plates prior to Substantial Completion of the Work if required. Installation A. Each expansion control system shall be installed in strict accordance with the manufacturer s approved shop plans and installation instructions. B. Care shall be taken during installation to ensure riding surface elevations are as shown on the approved shop plans, and there is no elevation differentiation between adjacent cover plates. C. (Optional) Water Barrier Drainage System: Provide neoprene trough where called for on contract documents or manufacturer s shop plans. Provide drainage fittings at a maximum of 50 feet or where indicated. For our most current information, please visit our wbacorp.com Wabo BusTuff (BTS) System rev LIMITED WARRANTY: Watson Bowman Acme Corp. warrants that this product conforms to its current applicable specifications. WATSON BOWMAN ACME CORP. MAKES NO OTHER WARRANTY, EXPRESS OR IMPLIED, INCLUDING ANY WARRANTY OF MERCHANTABILITY OR WARRANTY OF FITNESS FOR A PARTICULAR PURPOSE. The sole and exclusive remedy of Purchaser for any claim concerning this product, including, but not limited to, claims alleging breach of warranty, negligence, strict liability or otherwise, is the replacement of product or refund of the purchase price, at the sole option of Watson Bowman Acme Corp. Any claims concerning this product shall be submitted in writing within one year of the delivery date of this product to Purchaser and any claims not presented within that period are waived by Purchaser. IN NO EVENT SHALL WATSON BOWMAN ACME CORP. BE LIABLE FOR ANY SPECIAL, INCIDENTAL, CONSEQUENTIAL (INCLUDES LOSS OF PROFITS) OR PUNITIVE DAMAGES. Other warranties may be available when the product is installed by a factory trained installer. Contact your local Watson Bowman Acme representative for details. The data expressed herein is true and accurate to the best of our knowledge at the time published; it is, however, subject to change without notice 2013 Watson Bowman Acme Corporation.

12 SYSTEM DETAIL rev Wabo BusTuff (BTS) System Slab to Slab Condition Not to Scale Notes: 1. Please refer to the Installation Guide for information on splices, terminations, transitions and additional details concerning adjacent construction. 2. The system and all mechanical components are supplied to accommodate entire length. If required, please consult with a WBA representative for the types and quantities of any chemical components needed for proper Installation. For our most current information, please visit our wbacorp.com Wabo BusTuff (BTS) System rev Drawing Date

13 Wabo BusTuff BTS heavy duty expansion joint system Technical Expertise More than 60 years of practical experience and knowledge in the Expansion Control industry allows WBA to develop solutions and make recommendations for the right product choice for your application. Innovation Offering the broadest range of products and services in the construction industry, we are the only company servicing the entire portfolio of Bridge and Highway, Architectural, Parking and Stadium markets. We support these markets with a fully qualified team of professional engineers and designers backed by strong relationships with national testing labs and universities. Custom Solutions WBA provides more than just technical expertise - we supply engineered solutions that make good sense. We offer a growing range of high performance Wabo products and systems to provide long lasting solutions to difficult repair problems. We are fully resourced to deliver results and exceed the expectations of our customers. Quality WBA is dedicated in providing the highest quality products and services to our customers. Our professional operations team employs the principles of lean manufacturing, and enterprise resource planning tools, all supported by our formal ISO 9001:2008, RC and AISC quality management systems. Interested in BusTuff? Learn even more! Find your local sales representative wbacorp.com/contact-us/local-rep WBA (4922) wbacorp.com Watson Bowman Acme Corp. 95 Pineview Drive Amherst, NY WBA (4922) wabo-cs@basf.com Backed by BASF - The Chemical Company BASF is a leader in the construction industry. With more than 600 products serving 75 construction product categories, we offer the broadest portfolio of products used directly on construction sites or integrated into pther products, to increase energy efficiency and life expectancy, offer faster construction processes and improve health, safety and comfort. We also enable high performance with less material, energy consumption, waste and emissions. BASF materials, processes and solutions respect local economic requirements, and support the creation of higher living standards. At BASF, we create chemistry for a sustainable future Watson Bowman Acme Corp. All rights reserved / Printed in USA

Dual Purpose. Sustainable. Sound Attenuation

Dual Purpose. Sustainable. Sound Attenuation Wabo SafetyGuard Parking Series Heavy Duty Expansion Control and Traffic Calming System Molded panels manufactured using 100% post-consumer passenger and truck tires Features Benefits Dual Purpose Sustainable

More information

Wabo ElastoFlex Bridge Series Continuous Membrane Sealing System

Wabo ElastoFlex Bridge Series Continuous Membrane Sealing System Wabo ElastoFlex Bridge Series Continuous Membrane Sealing System Features Benefits Non- Metallic Versatile Skid Resistant DESCRIPTION: With the anchor blocks and membrane both produced from high quality

More information

Wabo Crete StripSeal Parking Series Armored joint and elastomeric concrete expansion joint system

Wabo Crete StripSeal Parking Series Armored joint and elastomeric concrete expansion joint system Wabo Crete StripSeal Parking Series Armored joint and elastomeric concrete expansion joint system Features Benefits Flexible applications Versatile movement Heavy duty Watertight DESCRIPTION: Variable

More information

Wabo Modular STM and D Series Large movement expansion joint system

Wabo Modular STM and D Series Large movement expansion joint system Wabo Modular STM and D Series Large movement expansion joint system Features Benefits Watertight Durable Versatile DESCRIPTION: The continuous elastomeric gland prevents runoff water from passing through

More information

Wabo InverSeal Bridge Series A preformed flexible closed cell neoprene joint seal

Wabo InverSeal Bridge Series A preformed flexible closed cell neoprene joint seal Wabo InverSeal Bridge Series A preformed flexible closed cell neoprene joint seal Features Benefits Versatile movement Profile design Ease of installation Material composition DESCRIPTION: Can accommodate

More information

Wabo XPE Preformed impermeable UV stable gray foam joint seal

Wabo XPE Preformed impermeable UV stable gray foam joint seal Wabo XPE Preformed impermeable UV stable gray foam joint seal Features Simplicity Benefits Minimal components and flexibility of seal allows for quick joint repairs and short traffic closures. Versatile

More information

Caltrans G Bonded Joint Seals

Caltrans G Bonded Joint Seals Caltrans 51-2.02G Bonded Joint Seals Wabo SPS Joint System Preformed Silicone Seal Joint Sealing System DESCRIPTION: The Wabo SPS Joint System is approved for use under Caltrans Section 51-2.02G Bonded

More information

Jeene Multi-Directional Structural Sealing Joint System

Jeene Multi-Directional Structural Sealing Joint System Jeene Multi-Directional Structural Sealing Joint System Features Benefits Unique Design Air Inflation Process Versatile Movement Capacity Neoprene Extruded Material DESCRIPTION: Assures that profile will

More information

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE DECKS, APPROACHES, RAILS AND PARAPETS PROJECT NUMBER, JP NO.

OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE DECKS, APPROACHES, RAILS AND PARAPETS PROJECT NUMBER, JP NO. 504-1(a-i) 09 OKLAHOMA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR BRIDGE DECKS, APPROACHES, RAILS AND PARAPETS PROJECT NUMBER, JP NO. 00000(04), COUNTY These Special Provisions amend and where

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

Expansion Joint Covers (079513)

Expansion Joint Covers (079513) Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

Expansion Joint Covers

Expansion Joint Covers Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

Wabo ElastoFlex - EFJ/EFJ-C Horizontal Expansion Joint System

Wabo ElastoFlex - EFJ/EFJ-C Horizontal Expansion Joint System Installation Procedure Last Updated: May 16 th, 2018 Wabo ElastoFlex - EFJ/EFJ-C Horizontal Expansion Joint System The following installation procedure is very important and must be fully understood prior

More information

1. Cast-in-place concrete is specified in Section

1. Cast-in-place concrete is specified in Section SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record

More information

CONTRACT SPECIFICATIONS DISK BEARINGS

CONTRACT SPECIFICATIONS DISK BEARINGS 1.0 DESIGN CONTRACT SPECIFICATIONS DISK BEARINGS 1.1 Scope of Work 1.1.1 This work shall consist of furnishing Multi-Rotational, High Load Disk Bearings and installing Disk Bearing Assemblies at the locations

More information

SECTION STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK

SECTION STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK SECTION 06610 STRUCTURAL REINFORCED POLYMER COMPOSITE PEDESTRIAN BRIDGE DECK PART 1 GENERAL 1.1 SUMMARY A. A. This Section includes the requirements for furnishing and installing all Structural Reinforced

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary

More information

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase)

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) Project: Substitution Request Number: From: To: Date: A/E Project Number: Re: Contract For: Specification Title: Section: Page: Description: Article/Paragraph:

More information

SECTION EXPANSION CONTROL

SECTION EXPANSION CONTROL SECTION 07 95 00 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply

More information

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.

1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns. PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,

More information

ALADIN (formerly known as Jeene Joint)

ALADIN (formerly known as Jeene Joint) Structural Sealing Expansion Joint System DESCRIPTION ALADIN is a structural sealing joint system comprised of a neoprene profile, which is air-pressurized and bonded in place with a specially formulated

More information

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1 Louis Armstrong New Orleans International Airport NOAB Project # 8910-01233 PART 1 - GENERAL SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS 1.1 RELATED DOCUMENTS A. Drawings and general provisions

More information

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017 SECTION 22 0548 - PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

SECTION STRUCTURAL STEEL

SECTION STRUCTURAL STEEL SECTION 05120 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

INSTALLATION PROCEDURE

INSTALLATION PROCEDURE INSTALLATION PROCEDURE Wabo FS Bridge Seal Expansion Control Systems Information provided herein, including but not limited to, any drawing, design, photograph, graphic, or statement(s) \'Materialsft)

More information

2004 Specifications CSJ SPECIAL SPECIFICATION DIRECT FIXATION TRACK CONSTRUCTION

2004 Specifications CSJ SPECIAL SPECIFICATION DIRECT FIXATION TRACK CONSTRUCTION 2004 Specifications CSJ 0920-38-250 SPECIAL SPECIFICATION 7660 DIRECT FIXATION TRACK CONSTRUCTION 1. Description. This section specifies the construction of direct fixation (DF) track to the lines and

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MODULAR EXPANSION JOINT SYSTEM. CFS:JSW 1 of 8 APPR:EMB:DBP: FHWA:APPR:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MODULAR EXPANSION JOINT SYSTEM. CFS:JSW 1 of 8 APPR:EMB:DBP: FHWA:APPR: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MODULAR EXPANSION JOINT SYSTEM CFS:JSW 1 of 8 APPR:EMB:DBP:04-27-11 FHWA:APPR:06-01-11 a. Description. This work consists of providing all designs,

More information

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR PLUMBING PIPING AND EQUIPMENT Page 220548-1 SECTION 220548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

NATIONWIDE SAN ANTONIO SALES & SERVICE CENTER

NATIONWIDE SAN ANTONIO SALES & SERVICE CENTER SECTION 21 05 31 SEISMIC CONTROLS AND WIND RESTRAINTS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Not Applicable 1.02 SUMMARY A. This section includes the design, application and installation of seismic and

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 260548 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Isolation pads. 2. Spring isolators. 3. Restrained spring isolators. 4. Channel

More information

Wabo CorridorWrap, CWFF & CWFF-C Interior Floor Expansion Joint System

Wabo CorridorWrap, CWFF & CWFF-C Interior Floor Expansion Joint System Installation Procedure Last Updated: April 11 th, 2018 Wabo CorridorWrap, CWFF & CWFF-C Interior Floor Expansion Joint System The following installation procedure is very important and must be fully understood

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT Page 230548-1 SECTION 230548 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,

More information

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions, apply to this Section. 1.2 SUMMARY A. This Section includes the

More information

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM

SECTION LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM Page 1 of 6 SECTION 08 32 20 LAGUNA SERIES TOP HUNG SLIDING DOOR SYSTEM USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS SLIDING DOORS. SECTION INCLUDES OVERHEAD SLIDING TUBE ASSEMBLY, MOUNTING

More information

Mezzanines By Design Page 1

Mezzanines By Design Page 1 SECTION 05120 STRUCTURAL STEEL PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 1 apply to this Section. 1.2 SUMMARY

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

Student Services & Classroom Addition SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Student Services & Classroom Addition SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS SECTION 26 05 48 - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Isolation pads. 2. Spring isolators. 3. Restrained spring isolators. 4. Channel

More information

Specialty Expansion Joint Systems

Specialty Expansion Joint Systems www.dsbrown.com Specialty Expansion Joint Systems Bridges Expansion Joint Systems for Architectural, Parking Garage and Bridge Applications Bridge the World with Leading Infrastructure Solutions Corporate

More information

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system.

SECTION METAL FRAMED SKYLIGHT. A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. SECTION 08625 METAL FRAMED SKYLIGHT PART 1 GENERAL 1.01 SECTION INCLUDES: A. Engineering, preparation of fabrication drawings and structural calculations for the entire skylight system. B. Fabrication

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083919 WATERTIGHT DOORS **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your specific project

More information

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase)

SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) SUBSTITUTION REQUEST (After the Bidding/Negotiating Phase) Project: Substitution Request Number: From: To: Date: A/E Project Number: Re: Contract For: Specification Title: Section: Page: Description: Article/Paragraph:

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 1 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of

More information

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.

A. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein. SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division

More information

STRUCTURAL STEEL FRAMING

STRUCTURAL STEEL FRAMING SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical

More information

SECTION STRUCTURE MOUNT RAILING SYSTEM

SECTION STRUCTURE MOUNT RAILING SYSTEM SECTION 05520 STRUCTURE MOUNT RAILING SYSTEM Peak Fall Protection specializes in the design, engineering, fabrication, installation, and certification of fall protection safety systems. Our team of safety

More information

Wabo Allure, AFJ Interior Floor Seismic Expansion Control System

Wabo Allure, AFJ Interior Floor Seismic Expansion Control System Installation Procedure Last Updated: February 28 th, 2018 Wabo Allure, AFJ 100-400 Interior Floor Seismic Expansion Control System The following installation procedure is very important and must be fully

More information

Union County Vocational - Technical Schools Scotch Plains, New Jersey

Union County Vocational - Technical Schools Scotch Plains, New Jersey SECTION 096623 - RESINOUS MATRIX TERRAZZO FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14

Facility Repairs - MCAS Cherry Point - Tank Farm A SECTION STRUCTURAL STEEL 05/14 SECTION 05 12 00 STRUCTURAL STEEL 05/14 PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the

More information

SECTION STRUCTURAL METAL FRAMING

SECTION STRUCTURAL METAL FRAMING SECTION 05100 STRUCTURAL METAL FRAMING PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Structural steel framing including lintels, shelf angles, bearing plates, anchor bolts and other items as shown on

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports.

SECTION HANDRAILS AND RAILINGS. A. Section Metal Fabrications: Associated metal supports. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Handrails and guardrails B. Guardrails for hatches and openings. C. Safety barriers. D. Roof edge protection. 1.2 RELATED SECTIONS

More information

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN

SECTION MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN SECTION 08350 MANUAL FOUR FOLD DOORS MODEL 38 DECORATIVE PANEL DESIGN PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

SECTION A. Manufacturer's data sheets on each product to be used, including:

SECTION A. Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 084239 PRESSURE-RESISTANT ENTRANCES **Note to Specifier** This specification contains component and configuration options. Where indicated choose the appropriate choice for your specific

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:09-29-18 FHWA:APPR:10-01-18 a. Description. This work consists of

More information

SECTION COLD-FORMED METAL TRUSSES

SECTION COLD-FORMED METAL TRUSSES SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.

SECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate. SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.

More information

Tnemec 394 Proprietary Long Form Coatings Schedule

Tnemec 394 Proprietary Long Form Coatings Schedule 1.1 PRIMER Tnemec 394 Proprietary Long Form Coatings Schedule A. Primer: Tnemec Series 394 PerimePrime Aromatic Polyurethane Mio/Zinc filled Primer applied @ 2.5-3.5 mils DFT and conforming to the following

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR PREFABRICATED STEEL PEDESTRIAN BRIDGE, TYPE 2 OFS:MJF 1 of 10 APPR:JAB:POJ:07-07-17 FHWA:APPR:07-11-17 a. Description. This work consists of

More information

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS SECTION 08 32 20 CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

***************************************************************************************************************

*************************************************************************************************************** 03365 POST-TENSIONED CONCRETE *************************************************************************************************************** SPECIFIER: CSI MasterFormat 2004 number 03 38 00. ***************************************************************************************************************

More information

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Molded Grating and Treads Products and Fabrications REVISED 11.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Molded Grating and Treads Products and Fabrications REVISED 11. FRP Specifications Section 06 74 13 Fiberglass Reinforced Polymer (FRP) Molded Grating and Treads Products and Fabrications REVISED 11.2016 BRISTOL FACILITY 400 Commonwealth Ave., P. O. Box 580, Bristol,

More information

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11. FRP Specifications Section 06 70 00 Fiberglass Reinforced Polymer (FRP) Baffle Wall Panel Products and Fabrications REVISED 11.2016 BRISTOL FACILITY 400 Commonwealth Ave., P. O. Box 580, Bristol, VA 24203-0580

More information

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric Sealant

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric Sealant EZ Spec Component: SC-071NSEZ-03/10 Sikaflex-2c NS Part 1 - General DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07900 Joint Sealers Elastomeric and non-elastomeric Sealant 1.01 Summary A. This

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification -- FloroCryl Shop MMA (Methyl Methacrylate) - Silica Sand Single Broadcast 1/16 (1.59 mm) Flooring System Part 1: General 1.01 System Description A. Roller-applied penetrating

More information

SECTION MANUFACTURED ROOF EXPANSION JOINTS

SECTION MANUFACTURED ROOF EXPANSION JOINTS SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION CONCRETE REINFORCEMENT

SECTION CONCRETE REINFORCEMENT PART 1 GENERAL 1.01 DESCRIPTION SECTION 03200 CONCRETE REINFORCEMENT A. The work specified in this Section consists of furnishing and installing reinforcement for concrete structures. All reinforcement

More information

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant Spec Component: SC-073-03/11 Sikadur Combiflex SG Part 1 - General DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07900 Joint Sealers Elastomeric and non-elastomeric sealant 1.01 Summary A. This

More information

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1.

ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART GENERAL 1. 07555 - ROOF BALLAST MATERIALS ARCHITECTURAL CONCRETE PAVING SLABS SRS LEVELING BLOCK SYSTEM INSTALLATION PART 1.00 - GENERAL 1.01 SUMMARY: A. The work of this section consists of furnishing and installing

More information

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system.

SECTION WELDED STEEL PICKET FENCE. 1. Fusion welded and rackable ornamental steel picket fence system. PART 1 - GENERAL 1.1 SUMMARY A. Section includes: 1. Fusion welded and rackable ornamental steel picket fence system. B. Related sections: 1. Section 03310 Concrete Work for post support. 2. Section 09960

More information

Installation Procedure

Installation Procedure Installation Procedure Information provided herein, including but not limited to, any drawing, design, photograph, graphic, or statement(s) ("Materials") are proprietary and the property of Watson Bowman

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 8 SECTION 083921 PEDESTRIAN FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for your

More information

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant

DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section Joint Sealers Elastomeric and non-elastomeric sealant Spec Component: SC-070-03/10 Sikaflex- 15LM Part 1 - General DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07900 Joint Sealers Elastomeric and non-elastomeric sealant 1.01 Summary A. This specification

More information

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651

SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 SERIES STB30 STEEL FIXED THERMAL BREAK DETENTION WINDOWS SECTION 08651 PART 1 GENERAL 1.1 DESCRIPTION A. Work Included: 1. Furnish all labor and materials to complete the fabrication of detention windows

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification FloroBuild XT Extreme Impact & Abrasion Resistant Resurfacing System Part 1: General 1.01 System Description A. Roller applied 100% solids epoxy primer, followed by an extreme

More information

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders

SPECIFICATION SECTION 05515: LADDERS O Keeffe s Aluminum Ladders Welcome to the O Keeffe s Guide Specification System prepared as an aid to specify in preparing written construction documents. For specification assistance with specific product applications, please contact

More information

SPECIFICATIONS FOR AluSystems Aluminum Composite Panels Series 20 Dry Joint 1.00 GENERAL 1.01 RANGE OF WORK Section includes: Laminated panels and attachment systems for use as exterior cladding. A. Provide

More information

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels.

SECTION EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE. A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels. SECTION 03460 EMBEDDED CMU/SPLIT FACE ARCHITECTURAL PRECAST/SITECAST CONCRETE PART 1 GENERAL 1.1 SECTION INCLUDES A. Site Cast or Tilt-Up CMU/Split Face Concrete Panels. B. Shop/Plant Cast CMU/Split Face

More information

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT

SECTION VIBRATION CONTROLS FOR HVAC PIPING AND EQUIPMENT SECTION 230548 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Elastomeric Isolation pads. 2. Elastomeric Isolation mounts. 3. [Freestanding] [Restrained] [Freestanding and restrained]

More information

CON-DEK ICC-ES ESR-2097 SYSTEM

CON-DEK ICC-ES ESR-2097 SYSTEM CON-DEK ICC-ES ESR-2097 SYSTEM Manufacturer Specifications Waterproof Deck Coating for Above Grade Concrete PART I. GENERAL 1.01 Scope A. Provide all labor, materials and equipment necessary to apply the

More information

MRXL4 CR6 Surface Requirements: XNS, NS, M, S; Special Requirements: NO PART 1 : GENERAL

MRXL4 CR6 Surface Requirements: XNS, NS, M, S; Special Requirements: NO PART 1 : GENERAL PART 1 : GENERAL 1.01 DESCRIPTION A. WORK INCLUDED: All labor, materials, appliances, tools, equipment, facilities, transportation and services necessary for and incidental to performing all operations

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Part 1: General Florock Seamless Flooring Systems Architectural Specification FloroQuartz BC Epoxy - Colored Quartz 1/8 (0.125 mm) Double Broadcast Flooring System 1.01 System Description A. Roller-applied

More information

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including:

SECTION A. Product Data: Manufacturer's data sheets on each product to be used, including: Page 1 of 7 SECTION 083925 MECHANICAL ROOM FLOOD DOORS AND FRAMES **Note to Specifier** This specification contains component and configuration options. Where indicated, choose the appropriate choice for

More information

FIVE STAR PRODUCTS, INC. (800)

FIVE STAR PRODUCTS, INC.  (800) FIVE STAR PRODUCTS, INC. www.fivestarproducts.com (800) 243-2206 Page 1 of 11 DESIGN-A-SPEC GUIDELINES FIVE STAR RS ANCHOR GEL CONTENTS PART A - GENERAL CONDITIONS PART B - MATERIAL SPECIFICATIONS PART

More information

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Architectural Decking panels and Fabrications REVISED 11.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Architectural Decking panels and Fabrications REVISED 11. FRP Specifications Section 06 73 13 Fiberglass Reinforced Polymer (FRP) Architectural Decking panels and Fabrications REVISED 11.2016 BRISTOL FACILITY 400 Commonwealth Ave., P. O. Box 580, Bristol, VA

More information

Commission No Section

Commission No Section Commission No. 1511 Section 05120-1 PART ONE - GENERAL 1.1 DESCRIPTION A. Work Included: Structural steel and grout. Furnish, fabricate, mark for erection identification, pack, crate, or otherwise properly

More information

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Hollow Core Building Panels Products and Fabrications REVISED 11.

FRP Specifications. Section Fiberglass Reinforced Polymer (FRP) Hollow Core Building Panels Products and Fabrications REVISED 11. FRP Specifications Section 06 70 00 Fiberglass Reinforced Polymer (FRP) Hollow Core Building Panels Products and Fabrications REVISED 11.2016 BRISTOL FACILITY 400 Commonwealth Ave., P. O. Box 580, Bristol,

More information

PREFABRICATED STEEL TRUSS SPECIFICATIONS

PREFABRICATED STEEL TRUSS SPECIFICATIONS PREFABRICATED STEEL TRUSS SPECIFICATIONS 1. GENERAL 1.1 Scope All engineering design and related detailing of the bridge(s) shall be provided by the supplier. The design and detailing shall conform to

More information

SECTION ALUMINUM CURTAIN WALL PART 1 - GENERAL

SECTION ALUMINUM CURTAIN WALL PART 1 - GENERAL SECTION 08921 - ALUMINUM CURTAIN WALL PART 1 - GENERAL 1.01 DESCRIPTION A. Work of this section is subject to requirements of the Contract Documents including the General Conditions and Supplementary Conditions

More information

SECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing.

SECTION ARCHITECTURAL PRECAST CONCRETE. C. Section Joint Sealers: Perimeter joints with sealant and backing. SECTION 03451 ARCHITECTURAL PRECAST CONCRETE PART 1 GENERAL 1.01 SECTION INCLUDES A. Architectural precast concrete wall panels; with integral insulation. B. Supports, anchors, and attachments. C. Intermediate

More information

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS SECTION 32 16 13 CONCRETE CURBS, GUTTERS AND SIDEWALKS PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. CONTRACTOR shall provide all labor, materials, equipment, and incidentals as shown, specified, and required

More information

NRM-7000 Guide Specifications

NRM-7000 Guide Specifications NRM-7000 Guide Specifications MANUFACTURER www.nuraymetals.com sales@nuraymetals.com 800-700-7228 SECTION 07 411 PREFORMED ROOF & WALL PANELS PART 1 - GENERAL 1.1 SUMMARY A. Section includes complete system

More information

SECTION DECORATIVE METAL FENCES AND GATES

SECTION DECORATIVE METAL FENCES AND GATES Specification 32 31 19 BASTEEL PERIMETER SYSTEMS Citadel Security Fence System SECTION 32 31 19 DECORATIVE METAL FENCES AND GATES EDIT NOTE: This Document has been prepared by BASTEEL Perimeter Systems

More information

SECTION DECORATIVE METAL FENCES AND GATES

SECTION DECORATIVE METAL FENCES AND GATES Specification 32 31 19 BASTEEL PERIMETER SYSTEMS Defiant Security Fence System SECTION 32 31 19 DECORATIVE METAL FENCES AND GATES EDIT NOTE: This Document has been prepared by BASTEEL Perimeter Systems

More information

Student Services & Classroom Addition

Student Services & Classroom Addition SECTION 055113 - METAL PAN STAIRS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information