1 Has the time for partial upgrading of heavy oil and bitumen arrived? Partial or field upgrading of heavy oil produces transportable synthetic crude oil and eliminates the need for diluents for transportation to refiners JIM Colyar Colyar Consultants Heavy oil and bitumen from the Athabasca region of Alberta, Canada, for instance are too heavy and viscous to be transported via pipeline from the field to refining facilities. Options currently practised include dilution with natural gas condensate to produce DilBit, dilution with synthetic crude oil (SCO) to produce SynBit, or upgrading to produce a bottomless SCO. Currently, only full upgrading of Western Canadian heavy oil and bitumen is applied commercially. Full upgrading produces SCO that resembles highquality light oil and contains very little or no vacuum residue. Partial or field upgrading of heavy oil and bitumen involves the conversion of only a portion of the vacuum residue and the production of a sour SCO containing 5 25% residue. Partial upgrading facilities can be constructed for less than half the cost of full upgrading. Analytical inspections of partially upgraded SCO will resemble those of a DilBit in terms of gravity and sulphur content. This partially upgraded SCO must meet pipeline specifications and be stable to completely eliminate the need for diluent. Due to a low residue content, the largest potential market for partially upgraded SCO is light oil refineries. However, these refineries may need to increase their hydrogenation capacity to process the sour SCO. Partial upgrading has not been commercialised due to the lack of technology that can economically produce a specification SCO, issues related to stability and concerns about adequate pricing of the sour SCO. Thanks to improved technology and the current financial situation, lowercost partial upgrading may now be a viable alternative for exploiting heavy oil and bitumen. This article provides background information on the current methods for delivering heavy oil and bitumen to the market, with an emphasis on Western Canada, and a summary of the most promising partial upgrading technologies, including preliminary economics and a comparison with DilBit production. Heavy oil and bitumen resources Heavy and extra-heavy oils are loosely defined as crude petroleum with API gravities below 20 and 10, respectively. Bitumen is considered a special classification of heavy oil that is associated with tar sands deposits. It has an API gravity of 7 10 and is very viscous (over cps at reservoir conditions). Worldwide, there are vast quantities of heavy oil and bitumen, which are concentrated in Western Canada, with over 1700 billion barrels in place, and Venezuela, with over 1000 billion barrels in place. 1,2 Current economic proven reserves of heavy oil from these two countries are estimated at 173 billion barrels for Canada and 58.2 billion barrels for Venezuela, with each value Production SCO produced Mined * In-situ * Total *Estimated Table 1 Canadian bitumen and SCO production, 000 bpsd representing 10% or less of the oil in place. 3 Current Canadian production of heavy oil and bitumen is approximately 1.4 million barrels per day, with a large percentage exported to the US. The discussion below refers to bitumen, which is a generic term for mined or in-situ bitumen and other heavy oils with an API gravity of less than 20 that require diluent to be transported. Currently, this bitumen is diluted with natural gas condensate (NGC) to produce a DilBit, diluted with SCO to produce a SynBit, or upgraded to produce a bottomless (no vacuum residue) SCO. A breakdown of Canadian bitumen and SCO production 4,5 for 2007 is shown in Table 1. Of the total 1.4 million barrels per day of bitumen produced, approximately 58% is via mining, with the remaining 42% from in-situ operations. The bulk of the mined bitumen is sent to dedicated upgraders, which produce a highquality, fully upgraded SCO. A small portion of the in-situ bitumen is upgraded, while most is blended with diluent to produce a transportable DilBit or SynBit. The total SCO produced was 659 million barrels. Insitu production includes steam assisted gravity drainage (SAGD) and other thermal techniques. Given that the estimated Canadian bitumen reserves are just 20% mineable, and that SAGD recovers a much larger portion of the in-place bitumen, insitu production is expected to be the dominant production technique in the future. Athabasca bitumen is currently produced via mining and the SAGD in-situ method. When oil sands are PTQ Q

2 Figure 1 Ratio of LLB and WTI price mined, the resulting bitumen froth produced from the primary extraction process can be further treated by two broad techniques: using naphtha or using paraffin solvents, including pentane or hexane. With naphtha froth treatment, the bitumen product may contain excess solids (clay fines) and may not meet the Canadian pipeline basic sediment and water (BS&W) specification of less than 0.5 V%. In general, naphtha froth bitumen cannot be diluted and sold as a heavy oil blend and thus is associated with a dedicated upgrader. In the paraffin froth treatment process, the reject streams contain both the clay fines and a portion of the bitumen heavy asphaltenes. The net bitumen product recovery is 5 10% lower than for naphtha froth treatment, but the recovered bitumen is essentially solids free and easier to process, since it contains reduced asphaltene content. With no solids, paraffin froth bitumen can be diluted and sold as a heavy oil blend. Heavy oils such as Cold Lake and Lloydminster are characterised by API Canadian pipeline specifications Specification Gravity, API 7 C, cst BS&W, V% Value 19 min 350 max 0.5 max gravities in the range and viscosities significantly lower than those of Athabasca bitumen. These heavy oils are obtained using thermal techniques including SAGD and cyclic steam stimulation (CSS) and cold heavy oil production with sands (CHOPS). Marketing options Bitumen from mining or in-situ production must be diluted or upgraded to be fluid enough to be transported to refineries for final processing and production of saleable products. In the cases of dilution with light oils or partial upgrading, the blended heavy oil or SCO must meet Canadian and US pipeline specifications to be transported. Canadian specifications are shown in Table 2 and include gravity, viscosity and solids/water values. Bitumen dilution Bitumen is typically diluted with either natural gas condensate (DilBit) or a fully upgraded SCO (SynBit) to meet Canadian pipeline specifications. The quantity of required diluent is normally set by the pipeline viscosity specification. DilBits generally use a natural gas condensate with the following inspections: 62 API, less than 0.1 wt% sulphur and 0.6 cst viscosity at 40 C. Fully upgraded SCO has an approximate 34 API, less than 0.1 wt% sulphur and 3 cst viscosity at 40 C. Typical blending ratios and blended heavy oil inspections (DilBit) are shown in Table 3. For an Athabasca DilBit, 29 V% condensate is required to meet the pipeline viscosity specification. This results in a 21 API blend with 3.8 wt% sulphur and 41 wt% vacuum residue. For the less viscous Cold Lake and Lloydminster heavy oils, less diluent is required; however, as is shown in Table 3, the final DilBit inspections are fairly similar. An Athabasca SynBit will require approximately 50% of fully upgraded SCO in the blend to meet the pipeline viscosity. A SynBit will contain less raw bitumen than a DilBit and will therefore have significantly lower sulphur and vacuum residue contents. Historical pricing data on the market value of Lloydminster DilBit (LLB) are available from the US Energy Information Administration. Based on this database, the LLB value as a fraction of the West Texas Intermediate (WTI) value is shown in Figure 1. There is a high degree of variability, Typical Canadian DilBits Cold Lake Lloydminster Athabasca bitumen Crude inspections Gravity, API C, cst Blend inspections Diluent, V% Gravity, API C, cst ~350 ~350 ~350 Sulphur, wt% Vac. residue content, wt% Approx. blend value, % WTI NA Table 2 Table 3 44 PTQ Q

3 with values from 0.55 to Recent averages are fairly consistent with LLB at 74 75% of WTI (ie, 25 26% discount). Based on a SCO pricing model that incorporates the quality of the DilBit, the value of other heavy oil blends can be estimated. Using this model, the average value of an Athabasca DilBit, as shown in Table 3, is estimated at 73% of WTI. The high variability in the value of DilBits indicates the changing light to heavy oil margins. This variability strongly affects the profitability of DilBit production. For example, with WTI at $50/bbl, an Athabasca DilBit would be priced at $36.50/bbl (using a 27% discount). After deducting the costs of the diluent and transportation, the heavy oil producer would receive about $26.84 per barrel of raw bitumen. This would be used to pay for investment and operating costs, royalties and any profits. With a larger 45% heavy oil discount, the DilBit would be valued at $27.50/bbl, with the producer receiving proceeds of just $14.09 per bbl of bitumen. At this level, the costs of producing the bitumen may not be met. Bitumen upgrading Upgrading involves the processing of heavy crude or bitumen using refining operations, including distillation, coking, thermal cracking, catalytic cracking, hydrocracking, solvent deasphalting and gasification. To upgrade these heavy oils effectively, it is necessary to convert a portion of the heaviest portion of the oil (vacuum residue) to lighter boiling components. There are two general classes of residue conversion/upgrading processes: carbon rejection and hydrogen addition. Carbon rejection processes thermally (with no catalyst) crack the residue and produce a high carbon-containing, typically solid product. The reject material (normally coke) is low in hydrogen, and thus the conversion liquid products have a hydrogen content higher than the residue feedstock. Carbon rejection liquid products are generally unstable and can polymerise to form gums and so on. These products require Figure 2 Typical full upgrading block flow diagram secondary treatment (for instance, addition of hydrogen, removal of sulphur, nitrogen) to be saleable products. Hydrogen addition processes add hydrogen to the residue. This is carried out at high temperature and pressure, and nearly always uses a catalyst. Relative to carbon rejection, hydrogen addition produces a high yield of higher-quality, stable liquids that require less secondary treatment (hydrotreating). These processes do not produce a solid product, but convert less than 100% of the feed residue. Hydrogen addition processes require a high initial investment (high pressure design) and high operating costs due to hydrogen and catalyst usage. Heavy oil upgrading technologies can also be segregated into full and partial techniques. Full upgrading Full upgrading produces either finished, saleable products, such as gasoline or diesel, or a high-quality SCO that contains no vacuum residue. The SCO distillation products are hydrotreated and of a quality at or near that required for final sales. Much of the worldwide activity in heavy oil upgrading/conversion is in Western Canada, where the SCO is either transported to North American refineries for final refining or blended with heavy oil or bitumen to produce a transportable SynBit. A simplistic block flow diagram for a typical full upgrading facility is shown in Figure 2. The selected processing configuration includes both hydrogen addition (ebullated bed) and coking. The ebullated-bed unit converts a portion (50 80%) of the vacuum residue and reduces the Conradson carbon residue (CCR) or coking tendency of the bitumen. The unconverted residue from the ebullated-bed unit is sent to a coker that completes the conversion of the residue and produces additional liquids and byproduct coke. All straight-run, ebullated-bed and cokerderived liquids are hydrotreated to produce a high-quality, fully upgraded SCO. The fully upgraded SCO product is valued at approximately the light oil price. Partial upgrading Partial upgrading produces a SCO that contains 5 30% vacuum residue and distillation products that require additional refining (hydrotreating). Partial upgraders are located at the heavy oil field so no dilution is required. Many partial upgrading technologies and processing configurations target the production of SCO, just meeting the pipeline specifications for gravity and viscosity (that is, they are pumpable). Nearly all of the new technologies investigated were developed to also produce significant excess energy (steam), which can be utilised for resource acquisition (SAGD). A block flow diagram for a generic partial upgrading process configuration is shown in Figure 3. In general, these technologies include 46 PTQ Q

4 Energy input two steps: a low-investment thermal cracking of the whole bitumen, or bitumen residue followed by combustion of the heavy unconverted product, typically coke. There are many variations of the generic processing configuration and some genuinely novel approaches have been developed. These novel techniques, however, may not be Figure 3 Typical partial upgrading block flow diagram scalable or economically feasible. The thermal cracking of the residue is accomplished by various techniques, including the use of heat, ultrasound energy, kinetic energy and irradiation. The largest challenges of the conversion step are to minimise coke production and to operate at conditions that will produce stable and compatible conversion liquids. The combustion of the coke or heavy unconverted product (residue, asphaltenes) can produce steam for the process and all or a portion of that required for SAGD. Sulphur removal is required, and a fluidisedbed combustor with lime/limestone sorbent is specified in many of the processes. The investment in the fluidised-bed boiler may be the largest component of the total plant cost. Besides a lack of commercial experience, the issues that have hindered the implementation of heavy oil partial upgrading the most are: SCO product stability and compatibility Thermally cracked materials tend to be unstable and can form solids when combined with other pipeline or refinery streams. To address this issue, many of the new partial upgrading processes include technologies that claim to minimise the instability of the product. These include lower operating temperatures, short reactor residence times and removal of the feedstock asphaltenes. Stability and 48 PTQ Q

5 compatibility testing of the final SCO product is required to confirm these claims SCO product value Typical partially upgraded SCO has a low API gravity (~20 ) and a fairly high sulphur content, but a relatively low vacuum residue content. There is no current commercially sold SCO with similar inspections; the most similar products are DilBits based on Cold Lake and Lloydminster heavy oils. These DilBits, however, have higher vacuum residue contents than partially upgraded SCO and sell at an approximate 25% discount to WTI. Developers of the new partial upgrading processes have estimated discounts for their SCO of 0 20%, based in part on the benefit of a lower vacuum residue content. The economic viability of a partial upgrading route is obviously highly dependent on the price received for the SCO product, and estimated discounts of 10 15% (below WTI) are required to result in a profitable project Required upgrader investment Relative to full upgrading, partial upgrading requires less investment, thanks to the elimination of hydrogen generation, catalyst handling, product distillation and secondary product treatment facilities. The investment will still be in the range of $ per barrel of installed capacity. There may be industry reluctance to go halfway and invest in a major project which produces a SCO that will require additional treatment and be significantly discounted relative to light oil. To reduce the level of initial investment, developers of partial upgrading technologies have included project elements such as modular construction at sites with attractive labour costs and designs at relatively low feedstock capacities. Partial upgrading technologies With the recent high oil price and oil sands development in Western Canada, the development of new techniques and processes for both the full and partial upgrading of heavy oil and bitumen has been active. A 2009 study report available from Colyar Consultants (ColyarConsult.com) has identified and reviewed 14 partial upgrading processes that are at various stages of development. The study report provides a process description, current level of development, merits and deficiencies, plus a hyperlinked reference and intellectual property list. To highlight the types of technologies being developed and their important characteristics, a subset of these technologies is discussed below. Specific partial upgrading processes Table 4 is a summary of eight of the investigated technologies that have a high potential for producing a transportable SCO product from Western Canadian bitumen, eliminating the need for diluent. The table includes information on the licensor, type of process, estimated SCO yields and quality, and the judged level of additional development required to commercialise the technology for Canadian bitumen. All but one of the listed technologies produce a coke or an asphaltene byproduct that is combusted to produce steam which can be utilised for SAGD. The SCO product yields are in the range of V% of the bitumen feed rate and contain less than 25 V% vacuum residue, with many processes estimated to contain less than 15 V%. Many new licensors have constructed, or are planning to build, large-scale demonstration plants that will lengthen the commercialisation schedule but provide considerable confidence in the technology. The level of additional development required is a subjective estimate of the extent of further process definition, R&D, product evaluations and economic valuations required to bring the technology to commercial readiness. It does not necessarily comment on the technical or economic viability of the process. Four of the most promising and most technically attractive partial upgrading technologies are discussed Summary of selected partial upgrading technologies Process CCU CPJ HTL I Y Q PetroBeam TRU Value Creation Viscositor Licensor UOP Wesco Ivanhoe ETX PetroBeam TRU Value Ellycrack & Energy Energy Systems Oiltech Creation Wescorp Energy Processing steps & type SDA + RFCC Thermal Pyrolysis + Pyrolysis + High energy Visbreaking SDA + Pyrolysis of thermal cracking cracking coking coking electrons + SDA coking + coking Reject product Asphaltenes + coke Coke + residue Coke Coke None Asphaltenes Coke + asphaltenes Coke Disposition of Combustion Combustion Combustion Combustion Combustion Coke: Combustion reject product combustion Asphaltenes: sold Estimated SCO vacuum resid, V% <25 <20 <15 <15 <25 <25 <5 <15 Estimated SCO yield, V% UN Significant export steam Yes Yes Yes Yes No Yes Yes Yes Demonstration size plant No Yes Yes No UC No UN No Level of additional development required Mod Mod Low High High Mod/High None Mod Notes UC = Under construction; SU = In startup; UN = Unknown Table 4 50 PTQ Q

6 below. The selection among the eight processes in Table 4 is not an endorsement of the four technologies. HTL process The Heavy to Light Liquids (HTL) process by Ivanhoe Energy is a thermal pyrolysis/partial coking/ coke combustion technology that produces a sour SCO product and a significant amount of excess energy (steam). HTL process performance is accomplished by conversion of a relatively large portion of the vacuum residue, as in a coking process, with accompanying energy export resulting from the combustion of the coke. The process operates at low pressure and is similar in concept to a FCCU. In the HTL reactor (riser-type), the feed oil mixes with a hot, inert carrier. The oil is quickly raised to a high temperature, where pyrolysis and thermal cracking occur. The residence time in the reactor and cyclone separators is very short and the heavy liquid product is quickly quenched. The rapid heating and short residence time are key aspects of the technology and ensure the reactions are stopped prior to full progression to unstable coking type products. The hot carrier, which is captured in cyclones, will contain coke and other heavy material that are deposited on its surface. This carrier is regenerated to remove the coke and provide a reheated carrier for the HTL reactor. The hydrocarbon light gases produced in the HTL process can also be burned in the regenerator. The flue gas from the regenerator must be treated (with lime/limestone sorbent) before venting to the atmosphere. For a deep reduction in heavy oil viscosity and an improvement in API gravity, it is necessary to recycle the HTL liquid back to the reactor for additional vacuum residue conversion. This mode of operation (high-quality mode) will result in a lower net liquid yield and more excess energy. I Y Q process The I Y Q process by ETX Systems is a new, developing carbon rejection process that utilises a technically advanced cross-flow fluidised-bed reactor. The process produces a sour Bitumen feed rate, bpsd NGC required, bpsd Net blend, bpsd Blend value, $/bbl NGC cost, $/bbl blend Transportation cost, $/bbl blend 2.00 Net, $/bbl blend $/bbl bitumen Revenues to producer, $MM/yr Table 5 Base case: DilBit production SCO and a coke product that can be oxidised to produce steam and/or power. The heart of the I Y Q process is the cross-flow fluidised bed. A bed of inert solids or coke is vertically fluidised by recycle product gas and moves, via gravity, in a horizontal direction. The feed oil is sprayed on the hot solids as they enter the reactor. The oil converts to form vapour (eventually liquids and noncondensable gas) and coke. Solid fines are removed from the reactor vapour via cyclones, and the condensable vapour is recovered as the product oil. The solids exiting the reactor are now coked and routed to a fluidised-bed boiler to burn off the coke (producing steam) and also for reheating the solids before recycling to the reactor. The I Y Q cross-flow fluidised bed has a horizontal flow of solids (inert solids or coke) and a vertical flow of gas. This separates the residence times of the solids and gas. The rates of solid and gas can be optimised for maximum liquids production (and minimum gas and coke) and also allow for operation at a lower reactor temperature. This is claimed to be a significant advantage over fluid coking and competing partial upgrading processes. Recycle of the I Y Q unconverted residue increases the level of vacuum residue conversion Investment, $/bpsd Annual operating time, days/yr 343 Operating costs, $/bbl feed 5 SCO value (from model), $/bbl Credit for steam, $/MM Btu 7.5 Table 6 Partial upgrading: economic assumptions and the API gravity of the net SCO product. TRU process This developing process by TRU Oiltech utilises a combination of visbreaking, solvent deasphalting and fluidised-bed combustion to produce a sour SCO and a significant quantity of steam. The heavy oil plus a proprietary distillable additive are fed to a visbreaker reactor. The thermal reagent may aid in reducing visbreaker severity and olefin production. The visbreaker liquid product is sent to an atmospheric distillation column, where the additive and a naphtha/diesel stream are recovered. The additive is recycled to the visbreaker and the naphtha/diesel product is routed to SCO blending. The distillation column bottoms are routed to the pentane deasphalting unit. Deasphalted oil (DAO) from the deasphalter, plus the distilled naphtha/diesel oil, is blended to produce the final SCO product. The rejected asphaltenes from the process, plus the light hydrocarbon and acid gases from the visbreaker, are routed to a fluidised-bed combustor to produce steam and optional power. The TRU process s SCO product contains an unconverted residue. However, as a result of deasphalting, the SCO vacuum residue contains minimal asphaltenes and reduced CCR, sulphur and contaminant metals. This should be an advantage over competing processes. PetroBeam process This is a novel and developing process from PetroBeam, in which the heavy oil is cracked with a spray of highenergy electrons. The process operates at a low temperature and pressure, and provides low/moderate conversion and HDS and viscosity improvement. Attaining pipeline specification from heavy oil may be difficult, particularly since there is no low hydrogen-containing reject stream. It is a non-catalytic process that does not add hydrogen. However, the irradiation energy may also be claimed to provide hydrogen via disassociation of water. In the PetroBeam process, the heavy PTQ Q

7 Bitumen feed rate, bpsd SCO Yield, V% 81 Gravity, API 21 Sulphur, wt% 4 Excess energy, MM Btu/bbl 1.1 Table 7 Partial upgrading: technical assumptions oil is heated to adequately flow through the PetroBeam reactor. In the reactor, the oil is subject to a highenergy spray of electrons from a linear accelerator (1 5 MV). The energy from the electrons breaks C-C and other bonds. Typically, during this type of treatment, the free radicals formed after bond breakage recombine to form crosslink bonds and even larger molecules than in the feed. In a claim for the PetroBeam process, crosslink bonds are broken or prevented from forming in the first place. The cracked product flows from the reactor and is routed to product separation. Partial upgrading economics Preliminary economics for a generic partial upgrading process have been developed to illustrate its feasibility and identify when partial upgrading is preferred over DilBit production. The selected feedstock is a typical Athabasca bitumen feedstock (API = 9, sulphur = 4.9 wt%) obtained via SAGD at a feed rate of bpsd. The economics assume a WTI value of $60/bbl, although the impact of this light oil price is also investigated. The base case is production of a DilBit utilising NGC (29 bbl NGC/100 bbl of Blend) diluent. The Athabasca DilBit is valued at the average discount discussed above, which is 73% of the light oil (WTI) value. After deducting the cost of the NGC (6% over WTI) and transportation fees ($2/bbl), the netback to the heavy oil producer is $32.77/bbl of raw bitumen. The DilBit economics are summarised in Table 5. The net annual revenues of $337 million are the cash flows to the heavy oil producer, assuming 343 operating days per year. These revenues are utilised for SAGD-related production costs, royalties and profits. The partial upgrading design produces a sour SCO and eliminates the need for diluent. The major technical and economic assumptions related to partial upgrading are shown in Tables 6 and 7. A bpsd partial upgrader is estimated to produce bpsd of sour (4 wt% sulphur), transportable SCO and 33 billion Btu/hr of steam, which can be utilised in the SAGD plant. The estimated investment is $25 000/bpsd of feed capacity, with operating costs assumed at $4/bbl of feed. Based on the SCO inspections, a value of $50.87/bbl or approximately 85% of the $60/bbl WTI price was estimated. The assumed credit for the export steam is $7.50/million Btu or 75% of the $10/million Btu oil cost equivalent. The overall study results are summarised in Table 8. The production of bpsd of partially upgraded SCO is estimated to require a $750 million investment and $41.2 million annual operating costs. The net SCO annual revenues, after deducting transportation charges, are $407.3 million. After deducting the operating costs and including the credit for High light/heavy oil margin Partial upgrading study: results Bitumen feed rate, bpsd SCO production, bpsd Transportation cost, $/bbl SCO 2.00 Cash flows, $MM/yr Revenues from SCO Operating costs 41.2 Credit for steam 82.2 Net revenues to producer Incremental revenue over DilBit, $MM/yr Investment for partial upgrading, $MM 750 Simple payout time for partial upgrading investment, yr 6.8 Table 8 steam to the SAGD facility, the total annual revenues are $448 million. This is an annual $111.1 million in excess of that generated from the DilBit operation (Table 5). Relative to the production of DilBit, the partial upgrading plant will require 6.8 years (750/111.1) to repay the investment for the upgrading facility. This is approximately equivalent to a 14% internal rate of return (IRR). The economic feasibility of DilBit production and partial upgrading is highly dependent on the price received Expected light/heavy oil margin Figure 4 Partial upgrading payout time as a function of WTI price and light-heavy discount PTQ Q

8 for the blend or sour SCO product. To illustrate the sensitivity of the economics of partial upgrading relative to DilBit production, both the light oil price and the light-to-heavy discount were varied in ranges that have been evident in recent years. The DilBit discount below light oil was found to average 27%, resulting in the discount for the Dilbit case described above. As shown in Figure 1, the lightto-heavy oil discount has been as high as 45%, corresponding to a heavy oil price (DilBit) of 55% of WTI. For each WTI price and heavy oil discount examined, the payout time for the incremental investment of a partial upgrading facility was calculated. The results are shown in Figure 4. The study indicates that partial upgrading profitability is strongly related to the light oil price, with acceptable profitability obtained with WTI greater than approximately $60/bbl. With higher light-to-heavy oil discounts, Figure 4 indicates a lower payback time or higher partial upgrading profitability. Partial upgrading is preferred over DilBit production for situations where the light-to-heavy oil price differentials are high. This is a key finding and indicates that partial upgrading can remove a large portion of the economic uncertainty of heavy oil production without incurring the large investment required for full upgrading. Summary and conclusions Given the low oil price and the situation within the financial markets, lowercost partial upgrading may be an important future component of the heavy oil upgrading industry, particularly in Western Canada. Many of the planned full upgrading projects have been placed on hold or cancelled. The concept of partial upgrading is not new. However, there have been significant advances in partial upgrading technology, including novel reactor approaches and synergies with upstream energy demands. The implementation of partial upgrading would effectively distribute the total cost of producing final, saleable products between the heavy oil-producing entity and that taking delivery of the SCO. Partial upgrading facilities can be constructed for less than half of the cost of full upgrading. Partial upgrading also has significantly lower operating costs, since no hydrogen or catalyst is required. Most technologies produce a substantial quantity of lowvalue reject product that is burned to produce energy and can be used for in-situ energy requirements, resulting in savings in natural gas costs. Challenges for the implementation of partial upgrading have included the development of efficient, economic processes, which can produce stable/ compatible SCO, relatively low SCO yields and a sufficiently high SCO price. The value of partially upgraded SCO may be subject to a large introductory discount when a market has been established. Many of the technical challenges have been addressed, and a partial upgrading project using one of the new processes can be projected to be profitable. Besides being an alternative to full upgrading, partial upgrading may eventually displace a portion of the bitumen or heavy oil that is currently diluted with natural gas condensate to produce heavy oil blends. The netback for blend producers is greatly impacted by heavy oil discount and the availability and resultant pricing of the condensate. The implementation of partial upgrading would help to alleviate the large variation that heavy oil producers experience in their margins. References 1 Bauquis P R, What future for extra heavy oil and bitumen: the Orinoco case, 17th Congress of the World Energy Council, Houston, Sept Alberta Government Report, Alberta Oil Sands 2006, available at ab.ca/oilsands/pdfs/osgenbrf.pdf. 3 Radler M, New estimates boost worldwide oil, gas reserves, Oil & Gas Journal, 22 Dec 2008, National Energy Board of Canada, Canadian Energy Overview 2007, Canadian Association of Petroleum Producers, Statistical Handbook for Canada s Upstream Petroleum Industry, January Jim Colyar is President of Colyar Consultants, Pennsylvania. He is an independent technical consultant with over 30 years experience in refining technology, with an emphasis on heavy oil upgrading. Jim@ColyarConsult.com 56 PTQ Q

Feasibility of Partial Upgrading of Athabasca Bitumen. Jim Colyar, Technology Consultant Colyar Consultants October 2010

Feasibility of Partial Upgrading of Athabasca Bitumen. Jim Colyar, Technology Consultant Colyar Consultants October 2010 Feasibility of Partial Upgrading of Athabasca Bitumen Jim Colyar, Technology Consultant October 2010 STUDY OBJECTIVES STUDY OBJECTIVES 2 Study Objectives Develop Relatively Simple, Technically Proven Field

More information

Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuels Products

Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuels Products Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuels Products Technical Paper Expander Energy Inc. Jan Wagner, P.Eng. Steve Kresnyak, P.Eng. Final Issue June 19, 2013 Introduction During

More information

OPTI. October 2002 SHELL GLOBAL SOLUTIONS CANADA INC.

OPTI. October 2002 SHELL GLOBAL SOLUTIONS CANADA INC. SHELL GLOBAL SOLUTIONS October 2002 2 SHELL GLOBAL SOLUTIONS Gasification Technologies 2002 Integrated Oil Development Using OrCrude Upgrading and Shell Gasification Process Jim Arnold Phil Rettger Max

More information

Upgrading with a soft touch

Upgrading with a soft touch Upgrading with a soft touch Canadian Heavy Oil Conference 4 November 2014 Agenda Heavy Oil Industry the market & its challenges Upgrading in Canada Fractal Systems JetShear Technology Commercializing JetShear

More information

Many in situ bitumen producers face a challenge how to recapture

Many in situ bitumen producers face a challenge how to recapture Photo: Ivanhoe Energy Ivanhoe Energy is testing a field upgrading technology in Bakersfield, California. Many in situ bitumen producers face a challenge how to recapture the margin they lose on the price

More information

PERP Program Unconventional Heavy Oils New Report Alert

PERP Program Unconventional Heavy Oils New Report Alert PERP Program Unconventional Heavy Oils New Report Alert December 2005 Nexant s ChemSystems Process Evaluation/Research Planning program has published a new report, Unconventional Heavy Oils (04/05S9).

More information

Ultra-Heavy Oil Production and Upgrading with Gasification

Ultra-Heavy Oil Production and Upgrading with Gasification Ultra-Heavy Oil Production and Upgrading with Gasification Gasification Technologies 2004 Alma Rodarte Manager North America Licensing GE Energy Oil Sands Reserves Source: Overview of Canada s Oil Sands,

More information

Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuels Products

Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuels Products WHOC14-110 Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuels Products STEVE KRESNYAK, P.Eng. JAN WAGNER, P.Eng. Expander Energy Inc. November 2013 This paper has been selected for presentation

More information

Heavy Oil Upgrading from mine to motor

Heavy Oil Upgrading from mine to motor Heavy Oil Upgrading from mine to motor C Fairbridge, J Chen, P Rahimi, E Little Devon, Alberta, Canada August 1, 2011 Heavy Oil Working Group Energy and Climate Partnership of the Americas 1 Targets, mandates,

More information

HEAVY CRUDE UPGRADING: AN OPTION FOR GASIFICATION

HEAVY CRUDE UPGRADING: AN OPTION FOR GASIFICATION / HEAVY CRUDE UPGRADING: AN OPTION FOR GASIFICATION Luigi Bressan Foster Wheeler Italiana Corporation Michael J. McGrath - Foster Wheeler USA Corporation Gasification Technologies Council Conference San

More information

AFTP. Technologies Applicable to Heavy Oil / Bitumen

AFTP. Technologies Applicable to Heavy Oil / Bitumen AFTP Technologies Applicable to Heavy Oil / Bitumen Field - Production/extraction level Midstream - Transportation Level Valorisation - Upgrading level AFTP-Oct-2007 FIELD LEVEL production / extraction

More information

Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuel Products

Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuel Products March 5-7, 2014 NEW ORLEANS, LOUISIANA, USA HYATT REGENCY NEW ORLEANS Bitumen Upgrader Residue Conversion to Incremental Synthetic Fuel Products Steve Kresnyak, P.Eng Jan Wagner, P.Eng WHOC14-110 Organized

More information

Heavy Oil Upgrading. Technology Today Spring 2010 D1M Author illustration; equipment in background is not operating.

Heavy Oil Upgrading. Technology Today Spring 2010 D1M Author illustration; equipment in background is not operating. D1M017427 Heavy Oil Upgrading SwRI installed,commissioned and operates a client s process that exploits an under-used energy source by making solids act like liquids Eloy Flores III, a research scientist

More information

Canada s Oil Sands - A World-Scale Hydrocarbon Resource

Canada s Oil Sands - A World-Scale Hydrocarbon Resource Canada s Oil Sands - A World-Scale Hydrocarbon Resource Prepared by: R.B. (Bob) Dunbar, P. Eng. bob.dunbar@strategywest.com February 2009 www.strategywest.com PO Box 76037; Calgary, Alberta T2Y 2Z9; Phone

More information

Heavy Oil Upgrading Environment Market and Technology

Heavy Oil Upgrading Environment Market and Technology 2008 Rice RGF Global - Heavy E&C Forum Oil Upgrading Environment: Markets & Technology Eleventh Annual Forum Session September 9, 2008 Heavy Oil Upgrading Environment Market and Technology John D. Elliott

More information

Alberta s Oil Sands Resources, Production Growth,Products and Markets

Alberta s Oil Sands Resources, Production Growth,Products and Markets Alberta s Oil Sands Resources, Production Growth,Products and Markets Duke du Plessis. Senior Advisor Alberta Economic Development and Alberta Energy Research Institute Calgary, Alberta, Canada October

More information

North West Sturgeon Refinery Project Overview Carbon Capture Through Innovative Commercial Structuring in the Canadian Oil Sands

North West Sturgeon Refinery Project Overview Carbon Capture Through Innovative Commercial Structuring in the Canadian Oil Sands Available online at www.sciencedirect.com Energy Procedia 37 (2013 ) 7046 7055 GHGT-11 North West Sturgeon Refinery Project Overview Carbon Capture Through Innovative Commercial Structuring in the Canadian

More information

Latest Development of Lurgi s MPG-technology Update on Hydrogen Unit for NWU Project

Latest Development of Lurgi s MPG-technology Update on Hydrogen Unit for NWU Project Latest Development of Lurgi s MPG-technology Update on Unit for NWU Project U. Wolf, H. Schlichting, S. Walter, Lurgi AG J. Quinn, North West Upgrading Inc. Gasification Technologies Conference 2007 October

More information

The Case for Exporting Partially Upgraded Bitumen Offshore. By Jim Hutton MSc. P. Eng.

The Case for Exporting Partially Upgraded Bitumen Offshore. By Jim Hutton MSc. P. Eng. Introduction The Case for Exporting Partially Upgraded Bitumen Offshore By Jim Hutton MSc. P. Eng. The best way to sell our petroleum products to customers other than the United States is to build a pipeline

More information

Reforming is an upgrading process in which low octane gasoline is converted to high octane gasoline.

Reforming is an upgrading process in which low octane gasoline is converted to high octane gasoline. REFORMING Reforming is an upgrading process in which low octane gasoline is converted to high octane gasoline. Catalytic reforming primarily increases the octane of motor gasoline rather than increasing

More information

Gasification...Meeting the Challenges of Oil Sands

Gasification...Meeting the Challenges of Oil Sands GE Energy Gasification...Meeting the Challenges of Oil Sands Alma Rodarte Manager, Gasification Licensing GTC 2006 October 2006 Expected Oil Sands Projects Current production: ~1,000 barrels bitumen per

More information

Changing US Crude Oil Imports are Driving Refinery Upgrades, Creating Opportunities

Changing US Crude Oil Imports are Driving Refinery Upgrades, Creating Opportunities 1 Changing US Crude Oil Imports are Driving Refinery Upgrades, Creating Opportunities Christopher Buehler, Ph.D., P.E. Praveen Gunaseelan, Ph.D. Crude Oil Quality Association October 22, 2009 Meeting Houston,

More information

Delayed Coking Process Design, Operations and Optimization. Canada Coking Conference October 22-26, 2012 Fort McMurray, Alberta

Delayed Coking Process Design, Operations and Optimization. Canada Coking Conference October 22-26, 2012 Fort McMurray, Alberta Delayed Coking Process Design, Operations and Optimization Canada Coking Conference October 22-26, 2012 Fort McMurray, Alberta 2012 KBC Advanced PROPRIETARY Technologies plc. INFORMATION All Rights Reserved.

More information

COQA - Salt Lake City, Utah 9 June 2011

COQA - Salt Lake City, Utah 9 June 2011 Reducing Diluent Required in the Transportation of Heavy Oils and Bitumen COQA - Salt Lake City, Utah 9 June 2011 Company highlights JetShear Technology The company has developed a proprietary technology

More information

The Canadian Oil Sands in the Context of the Global Energy Demand

The Canadian Oil Sands in the Context of the Global Energy Demand Extended Abstract for 17 th Convocation of the International Council of Academies of Engineering and Technological Sciences (CAETS), Tokyo, Japan, October 2007. The Canadian Oil Sands in the Context of

More information

Thrust 2: Utilization of Petroleum Refinery Technology for Biofuel Production. Prof. Chunshan Song, Penn State Douglas C.

Thrust 2: Utilization of Petroleum Refinery Technology for Biofuel Production. Prof. Chunshan Song, Penn State Douglas C. Thrust 2: Utilization of Petroleum Refinery Technology for Biofuel Production Prof. Chunshan Song, Penn State Douglas C. Elliott, PNNL Utilization of Petroleum Refining Technologies for Biofuels Production

More information

EARTH ENERGY RESOURCES INC. Western U.S. Oil Sands Conference. D. Glen Snarr, President & CFO September 21, 2006

EARTH ENERGY RESOURCES INC. Western U.S. Oil Sands Conference. D. Glen Snarr, President & CFO September 21, 2006 EARTH ENERGY RESOURCES INC. Western U.S. Oil Sands Conference D. Glen Snarr, President & CFO glen.snarr@earthenergyresources.com September 21, 2006 ISSUES FACING OIL SAND PRODUCTION Issues Facing Athabasca

More information

SOLUTIONS FOR HEAVY OIL

SOLUTIONS FOR HEAVY OIL SIMPLE FIELD SOLUTIONS FOR HEAVY OIL FRACTAL SYSTEMS About Fractal Systems Fractal Systems Inc. is a private Canadian corporation with offices in Calgary, Alberta and Sherbrooke, Quebec. Fractal Systems

More information

The naphtha hydrotreater

The naphtha hydrotreater Mitigation of heat exchanger fouling Detailed analysis of potential contributors identifies the root cause of fouling in naphtha hydrotreater feed-effluent exchangers BRUCE WRIGHT Baker Hughes Incorporated

More information

Heavy Oil and Bitumen Analytical. Understanding Their Capabilities

Heavy Oil and Bitumen Analytical. Understanding Their Capabilities Heavy Oil and Bitumen Analytical Methods: Understanding Their Capabilities and dlimitationsi i Project Review & Update /COQG Meeting Calgary, Alberta June 24 th, 2008 Project Manager: Bryan Fuhr, ARC (fuhr@arc.ab.ca)

More information

Edwin J. Veith, Fractal Systems USA, Inc.; Michel Chornet, Fractal Systems, Inc. WHOC16-232

Edwin J. Veith, Fractal Systems USA, Inc.; Michel Chornet, Fractal Systems, Inc. WHOC16-232 WHOC16-232 Field Demonstration Results of a Novel Cavitation Technology that Dramatically Reduces Diluent Required for Transportation and Improves Heavy Oil and Bitumen Properties Edwin J. Veith, Fractal

More information

Hydrogen for the NWR Upgrader by Lurgi MPG Technology A challenging Project

Hydrogen for the NWR Upgrader by Lurgi MPG Technology A challenging Project Hydrogen for the NWR Upgrader by Lurgi MPG Technology A challenging Project Washington DC 29.10.2014 l Max-Michael Weiss, Stefan Walter l Air Liquide Global E&C Solutions Germany GmbH, Frankfurt General

More information

Reprinted from November 2015 ENGINEERING HYDROCARBON

Reprinted from November 2015 ENGINEERING HYDROCARBON Shaun Pan, Alexis Shackleford, Robert McGuire Jr., Gary M. Smith and Bilge Yilmaz, BASF Corporation, USA, explain how operators can increase FCC unit profitability using catalysts from boron based technology.

More information

CPC field-specific training

CPC field-specific training CPC field-specific training C10G, C10L1/00-C10L1/08 José Carlos Pardo Torre Examiner, European Patent Office June 2018 Table of contents Introduction What and where to classify Neighbouring fields Specific

More information

SOLUTIONS FOR HEAVY OIL

SOLUTIONS FOR HEAVY OIL SIMPLE FIELD SOLUTIONS FOR HEAVY OIL FRACTAL SYSTEMS About Fractal Systems Fractal Systems Inc. is a private Canadian corporation with offices in Calgary, Alberta and Sherbrooke, Quebec. Fractal Systems

More information

Achieving Process Energy Efficiency via Innovation Honeywell. All rights reserved.

Achieving Process Energy Efficiency via Innovation Honeywell. All rights reserved. Achieving Process Energy Efficiency via Innovation 2010 Honeywell. All rights reserved. Agenda Why focus on Refining/Petrochemical for reducing CO 2? How can innovation help to reduce energy/co 2? Real

More information

GTC TECHNOLOGY. GT-UWC SM How a Uniting Wall Column Maximizes LPG Recovery. Engineered to Innovate WHITE PAPER

GTC TECHNOLOGY. GT-UWC SM How a Uniting Wall Column Maximizes LPG Recovery. Engineered to Innovate WHITE PAPER GTC TECHNOLOGY GT-UWC SM How a Uniting Wall Column Maximizes LPG Recovery WHITE PAPER Engineered to Innovate Maximizing LPG Recovery from Fuel Using a Uniting Wall Column Refiners have a challenge to recover

More information

GT-LPG Max SM. Maximizing LPG Recovery from Fuel Gas Using a Dividing Wall Column. Engineered to Innovate

GT-LPG Max SM. Maximizing LPG Recovery from Fuel Gas Using a Dividing Wall Column. Engineered to Innovate GTC Technology White Paper GT-LPG Max SM Maximizing LPG Recovery from Fuel Using a Dividing Wall Column Engineered to Innovate GT-LPG Max SM Maximizing LPG Recovery from Fuel Using a Dividing Wall Column

More information

Technical Information Paper. (R)FCC Slurry Oil Filtration

Technical Information Paper. (R)FCC Slurry Oil Filtration Technical Information Paper Revision 0, June 2009 INDEX 1. Introduction 1.1 Removing catalyst particles 1.2 Creating value 2. Automatic Gas Assisted Backwash Filtration 2.1 Filter Principles 2.2 Filter

More information

Pyrolysis and Gasification

Pyrolysis and Gasification Pyrolysis and Gasification of Biomass Tony Bridgwater Bioenergy Research Group Aston University, Birmingham B4 7ET, UK Biomass, conversion and products Starch & sugars Residues Biological conversion Ethanol;

More information

AFPM 2018 Operations & Process Technology Summit

AFPM 2018 Operations & Process Technology Summit GASOLINE PROCESSES Alkylation 1 What are the benefits of alumina treating in sulfuric acid alkylation and HF alkylation? Has this technology been proven commercially? 2 What metallurgy works well and does

More information

FT-GTL UNLOCKS VALUE FROM NATURAL GAS

FT-GTL UNLOCKS VALUE FROM NATURAL GAS FT-GTL UNLOCKS VALUE FROM NATURAL GAS Doug Miller Michael Goff Black & Veatch Corporation Ken Agee Emerging Fuels Technology April 2017 Introduction An estimated 147 billion cubic meters of gas was flared

More information

Grading & Guard Materials

Grading & Guard Materials Grading & Guard Materials MAXIMUM CATALYT PRTECTIN AND PTIMUM PREURE DRP MANAGEMENT INTRDUCTIN With the increased levels of heavy and nonconventional crude oils in the refinery diets, state-of the art

More information

SOME RECOMMENDATIONS RELATING TO ALBERTA HEAVY OIL

SOME RECOMMENDATIONS RELATING TO ALBERTA HEAVY OIL SOME RECOMMENDATIONS RELATING TO ALBERTA HEAVY OIL 1. Royalty/Taxation Regime Maurice B Dusseault, PhD, PEng University of Waterloo, Waterloo, ON, Canada Currently, there is a different royalty and taxation

More information

CARE Reporting Definitions Effective for the 2015 Reporting Period Onwards As at February 2015

CARE Reporting Definitions Effective for the 2015 Reporting Period Onwards As at February 2015 CARE Reporting Definitions Effective for the 2015 Reporting Period Onwards As at February 2015 Cleaned Crude Bitumen Density (Cleaned Crude Bitumen) REVENUE REPORTING COVER PAGE Crude bitumen from which

More information

The Use of MPG Gasification for Upgrading Canadian Oil Sands"

The Use of MPG Gasification for Upgrading Canadian Oil Sands The Use of MPG Gasification for Upgrading Canadian Oil Sands" Ulrich Wolf, Holger Schlichting, Stefan Walter, Lurgi AG Jim Quinn, North West Upgrading Inc. 2006 Gasification Technology Conference JW Marriott,

More information

Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency -

Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Oil Sands Development in Canada by SAGD - Further Challenges to Improve Efficiency - Nov-29, 2017 JAPEX (Japan Petroleum Exploration Co., Ltd) Canada Oil Sands Project Dept. Tanetomo (Tom) Izumi Japan

More information

Corrosion Monitoring Solutions for Hydroprocessing Units

Corrosion Monitoring Solutions for Hydroprocessing Units Corrosion Monitoring Solutions for Hydroprocessing Units Hydroprocessing Units Key to Refinery Competitiveness The growing demand for transportation fuels and the shift toward diesel makes hydroprocessing

More information

Hydrogen is a particularly

Hydrogen is a particularly Optimised hydrogen production by steam reforming: part I Modelling optimisation of process and design parameters for minimising natural gas consumption in hydrogen production by steam reforming Sanke Rajyalakshmi,

More information

WSA-DC NEXT GENERATION TOPSØE WSA TECHNOLOGY FOR STRONGER SO 2 GASES AND VERY HIGH CONVERSION. Helge Rosenberg Haldor Topsoe

WSA-DC NEXT GENERATION TOPSØE WSA TECHNOLOGY FOR STRONGER SO 2 GASES AND VERY HIGH CONVERSION. Helge Rosenberg Haldor Topsoe WSA-DC NEXT GENERATION TOPSØE WSA TECHNOLOGY FOR STRONGER SO 2 GASES AND VERY HIGH CONVERSION Helge Rosenberg Haldor Topsoe Up to now, Topsøe WSA (Wet gas Sulphuric Acid) plants have been in operation

More information

Can Biomass Play a Role in Reducing Greenhouse Gas Emissions from Canada s Oil Sands?

Can Biomass Play a Role in Reducing Greenhouse Gas Emissions from Canada s Oil Sands? June 13, 2017 EUBCE 2017 Stockholm, Sweden IBO.12.4 Can Biomass Play a Role in Reducing Greenhouse Gas Emissions from Canada s Oil? Jamie Stephen, PhD Managing Director, TorchLight Bioresources Warren

More information

Acknowledgement & Disclaimer. Notice

Acknowledgement & Disclaimer. Notice i Acknowledgement & Disclaimer NOTICE OF COPYRIGHT & PROPRIETARY RIGHTS 2013, North West Redwater Partnership. All rights reserved. Notice This report was prepared with the financial support of the Global

More information

Questions. Downdraft biomass gasifier. Air. Air. Blower. Air. Syngas line Filter VFD. Gas analyzer(s) (vent)

Questions. Downdraft biomass gasifier. Air. Air. Blower. Air. Syngas line Filter VFD. Gas analyzer(s) (vent) Question 1 Questions Biomass gasification is a process where organic matter liberates flammable gases such as hydrogen (H 2 ) and carbon monoxide (CO) when heated to high temperatures. A gasifier is a

More information

Enabling Unconventional Resources

Enabling Unconventional Resources Enabling Unconventional Resources 8 th U.S. - China Oil and Gas Industry Forum San Francisco, California U.S.A. September 9-11, 2007 ROLE OF UNCONVENTIONAL Increasing contribution by unconventional resources

More information

Geothermic Fuel Cell Applications in Coal Coal Gasification---Coal to Liquids (Summary Highlights)

Geothermic Fuel Cell Applications in Coal Coal Gasification---Coal to Liquids (Summary Highlights) Geothermic Fuel Cell Applications in Coal Coal Gasification---Coal to Liquids (Summary Highlights) Introduction Historically, capital costs of Fischer-Tropsch (FT) coal-to-liquids projects have been high.

More information

Abstract Process Economics Program Report 229 REFINERY RESIDUE GASIFICATION (June 2001)

Abstract Process Economics Program Report 229 REFINERY RESIDUE GASIFICATION (June 2001) Abstract Process Economics Program Report 229 REFINERY RESIDUE GASIFICATION (June 2001) Following an episode of intensive interest during the late 1970s and early 1980s as a means to converting coal to

More information

Taravosh Jam Design & Engineering Co.

Taravosh Jam Design & Engineering Co. Taravosh Jam Design & Engineering Co. Taravosh Jam co. as an Iranian EPC contractor supplies following refinery equipment and facilities based on the know-how and to international standards. 1- The Main

More information

Canadian Oil Sands: Life-Cycle Assessments of Greenhouse Gas Emissions

Canadian Oil Sands: Life-Cycle Assessments of Greenhouse Gas Emissions Canadian Oil Sands: Life-Cycle Assessments of Greenhouse Gas Emissions Richard K. Lattanzio Analyst in Environmental Policy May 15, 2012 CRS Report for Congress Prepared for Members and Committees of Congress

More information

Integrating Biocrudes into Bitumen Upgrading and Petroleum Refining via Co-processing

Integrating Biocrudes into Bitumen Upgrading and Petroleum Refining via Co-processing Integrating Biocrudes into Bitumen Upgrading and Petroleum Refining via Co-processing Jinwen Chen, Anton Alvarez-Majmutov, Rafal Gieleciak CanmetENERGY, Natural Resources Canada One Oil Patch Drive, Devon,

More information

Canadian Energy Research Institute

Canadian Energy Research Institute Relevant Independent Objective Energy and Hydrogen for Alberta s Oil Sands Oil Sands Supply and Infrastructure Conference Bob Dunbar, President Strategy West Inc. bob.dunbar@strategywest.com Former Senior

More information

Canadian Oil Sands: Life-Cycle Assessments of Greenhouse Gas Emissions

Canadian Oil Sands: Life-Cycle Assessments of Greenhouse Gas Emissions Canadian Oil Sands: Life-Cycle Assessments of Greenhouse Gas Emissions Richard K. Lattanzio Analyst in Environmental Policy June 18, 2012 CRS Report for Congress Prepared for Members and Committees of

More information

Approach for a Subset of Petroleum Substances Prioritized during Categorization. Environment and Climate Change Canada Health Canada

Approach for a Subset of Petroleum Substances Prioritized during Categorization. Environment and Climate Change Canada Health Canada Approach for a Subset of Petroleum Substances Prioritized during Categorization Environment and Climate Change Canada Health Canada December 2017 1. Introduction As a part of the Chemicals Management Plan

More information

PILOT PLANT PROGRAM FOR UPGRADING HEAVY OILS BY HYDROPYROLYSIS

PILOT PLANT PROGRAM FOR UPGRADING HEAVY OILS BY HYDROPYROLYSIS Chapter 123 PILOT PLANT PROGRAM FOR UPGRADING HEAVY OILS BY HYDROPYROLYSIS Kent E. Hatfield* and Alex Oblad** The primary separation technique for the production of synthetic fuels from such sources as

More information

GreatPoint Energy International Advanced Coal Technologies Conference June 2010

GreatPoint Energy International Advanced Coal Technologies Conference June 2010 GreatPoint Energy International Advanced Coal Technologies Conference June 2010 GreatPoint Energy is commercializing its proprietary bluegas TM process to convert coal and petroleum residues into low cost

More information

Natural Gas Use in Alberta s Oil Sands Industry. Outline

Natural Gas Use in Alberta s Oil Sands Industry. Outline Natural Gas Use in Alberta s Oil Sands Industry CERI North American Natural Gas Conference March 1, 2004 1 Outline Oil Sands Industry Overview Bitumen and Synthetic Crude Oil Supply Projections Oil Sands

More information

Balancing Hydrogen Demand and Production: Optimising the Lifeblood of a Refinery Luigi Bressan Director of Process and Technology Foster Wheeler

Balancing Hydrogen Demand and Production: Optimising the Lifeblood of a Refinery Luigi Bressan Director of Process and Technology Foster Wheeler Balancing Hydrogen Demand and Production: Optimising the Lifeblood of a Refinery Luigi Bressan Director of Process and Technology Foster Wheeler Italiana Agenda Introduction The refinery hydrogen balance

More information

Electric Power Generation Using Waste Gas

Electric Power Generation Using Waste Gas 9.2.1. Electric Power Generation Using Waste Gas July 31, 2017 Description During production, processing, refining and other oil and gas operations, vast quantities of waste heat are sometimes produced.

More information

Beyond CSS, SAGD and VAPEX. Zhangxin Chen

Beyond CSS, SAGD and VAPEX. Zhangxin Chen Beyond CSS, SAGD and VAPEX Heavy Oil and Oil Sands Reservoir Modeling Zhangxin Chen University of Calgary, NSERC/AERI/CMG Chair Professor Participants Synergia Polygen Ltd Outline Why? Importance of the

More information

Chemistry Resource Kit

Chemistry Resource Kit This is a chapter from the Chemistry Resource Kit The Qenos Chemistry Resource kit has been developed as an information package for secondary students and others who wish to learn about Qenos, plastics

More information

Delivering Growth through Technology. 3D Visualization Room, E&P Division

Delivering Growth through Technology. 3D Visualization Room, E&P Division Delivering Growth through Technology 3D Visualization Room, E&P Division June 2006 Disclaimer This presentation contains forward-looking statements regarding future events and the future results of Eni

More information

Repowering Conventional Coal Plants with Texaco Gasification: The Environmental and Economic Solution

Repowering Conventional Coal Plants with Texaco Gasification: The Environmental and Economic Solution Repowering Conventional Coal Plants with Texaco Gasification: The Environmental and Economic Solution INTRODUCTION Coal fired power plants have been producing a significant amount of power in the United

More information

Extraction Process Design Basis

Extraction Process Design Basis AI Project Update Joslyn North Mine Project 5 Process 5.1 Introduction This section describes the project bitumen extraction process and includes: process description material balance energy balance technology

More information

Available online at Energy Procedia 1 (2009) (2008) GHGT-9. Sandra Heimel a *, Cliff Lowe a

Available online at   Energy Procedia 1 (2009) (2008) GHGT-9. Sandra Heimel a *, Cliff Lowe a Available online at www.sciencedirect.com Energy Procedia 1 (2009) (2008) 4039 4046 000 000 Energy Procedia www.elsevier.com/locate/procedia www.elsevier.com/locate/xxx GHGT-9 Technology Comparison of

More information

Bhusana Premanode PhD (Biomedical Engineering), DIC, PhD (Financial Engineering), DIC, DBA 11/04/14

Bhusana Premanode PhD (Biomedical Engineering), DIC, PhD (Financial Engineering), DIC, DBA 11/04/14 Bhusana Premanode PhD (Biomedical Engineering), DIC, PhD (Financial Engineering), DIC, DBA 11/04/14 Introduction to oil and gas industry Oil formation Upstream & Downstream Life cycle of oil field Petroleum

More information

Combined Cycle Gasification Plant

Combined Cycle Gasification Plant Combined Cycle Gasification Plant Kenneth Jørgensen and Robert Heeb Babcock & Wilcox Vølund A/S Abstract: The gasification technology promises many technological advantages compared to traditional steam

More information

U.S. Liquid Transport Fuels

U.S. Liquid Transport Fuels Coal (and Biomass) to Liquid Fuels James Katzer House Energy Briefing 131 Longworth House Office Bldg 3:, March 18, 9 1 U.S. Liquid Transport Fuels 4% of our total primary energy consumption comes form

More information

Heavy Oil : Current Status and Recovery Methods M.Helmy Sayyouh Cairo University

Heavy Oil : Current Status and Recovery Methods M.Helmy Sayyouh Cairo University Heavy Oil : Current Status and Recovery Methods M.Helmy Sayyouh Cairo University 12/12/2017 Dr. Helmy Sayyouh 1 Topics of Discussion - Introduction - Heavy Oil and Tar Sand Deposits - Current Thermal Recovery

More information

Reducing GHG Intensity of Bitumen and Synthetic Crude Oil using Biomass. Fernando Preto CanmetENERGY-Ottawa Natural Resources Canada

Reducing GHG Intensity of Bitumen and Synthetic Crude Oil using Biomass. Fernando Preto CanmetENERGY-Ottawa Natural Resources Canada 1 Reducing GHG Intensity of Bitumen and Synthetic Crude Oil using Biomass Fernando Preto CanmetENERGY-Ottawa Natural Resources Canada 2 About CanmetENERGY CanmetENERGY is the science and technology branch

More information

Oil shale technology. A company of ThyssenKrupp Polysius. tk Polysius

Oil shale technology. A company of ThyssenKrupp Polysius. tk Polysius Oil shale technology A company of ThyssenKrupp Polysius tk Polysius Future tasks Energy Sources Energy Consumption The increasing demand for energy is a megatrend. All around the world, additional energy

More information

Society of Petroleum Engineers - Paper "Study and Demonstration of a Process to Extract Bitumen from Utah Tar Sands"

Society of Petroleum Engineers - Paper Study and Demonstration of a Process to Extract Bitumen from Utah Tar Sands Servicing the Utah and Athabasca Oil Sands Industries MENU HOME ASPHALT RIDGE - STATUS ASPHALT RIDGE - HISTORY SERVICES KEY PERSONNEL CONTACT US LINKS INTRODUCTION ASPHALT RIDGE - OUR HISTORY & a TECHNOLOGY

More information

Methanol Production by Gasification of Heavy Residues

Methanol Production by Gasification of Heavy Residues Methanol Production by Gasification of Heavy Residues by C. A. A. Higman Presented at the IChemE Conference "Gasification: An Alternative to Natural Gas" London, 22-23 23 November, 1995 Methanol Production

More information

Outlook of Heavy Crude Oil in Arab Countries: Challenges & Opportunities. MEDW & Petchem Arabia 2013

Outlook of Heavy Crude Oil in Arab Countries: Challenges & Opportunities. MEDW & Petchem Arabia 2013 Outlook of Heavy Crude Oil in Arab Countries: Challenges & Opportunities MEDW & Petchem Arabia 2013 1 1. OAPEC in brief 2. Objectives of the presentation 3. Definitions and characteristics of heavy crude

More information

UNIVERSITY OF CALGARY. Life Cycle Assessment of a Catalytic Steam Cracking (CSC) Process for Partial-Upgrading of Heavy Oil.

UNIVERSITY OF CALGARY. Life Cycle Assessment of a Catalytic Steam Cracking (CSC) Process for Partial-Upgrading of Heavy Oil. UNIVERSITY OF CALGARY Life Cycle Assessment of a Catalytic Steam Cracking (CSC) Process for Partial-Upgrading of Heavy Oil by Graeme Marshman A THESIS SUBMITTED TO THE FACULTY OF GRADUATE STUDIES IN PARTIAL

More information

Small Nuclear Steam Generators for Alberta's Bitumen Resources

Small Nuclear Steam Generators for Alberta's Bitumen Resources Small Nuclear Steam Generators for Alberta's Bitumen Resources Dr. Ian J. Potter, Alberta Research Council Dr. Harold F. McFarlane, Idaho National Laboratory Western Focus Seminar 30th Annual Conference

More information

FCC Spent Catalyst Stripper Technology

FCC Spent Catalyst Stripper Technology FCC Spent Catalyst Stripper Technology Paul D. Wendt FCC Technology Manager CB&I Coking and CatCracking Conference New Delhi, October 2013 Spent Catalyst Stripper Technology Big Picture Overview Process

More information

What is InterEnerStat

What is InterEnerStat InterEnerStat: Current status of harmonisation of energy products 5th meeting of the Oslo City Group 1-4 February 2010 Karen Tréanton Head of Energy Balances, Prices and Emissions Section Energy Statistics

More information

Heavy Oil Systems Experience and expertise to enhance productivity

Heavy Oil Systems Experience and expertise to enhance productivity Heavy Oil Systems Experience and expertise to enhance productivity In the emerging and rapidly growing market of heavy oil extraction, production using conventional techniques can be difficult and costly.

More information

Oil Sands, Greenhouse Gases, and US Oil Supply. Getting the Numbers Right SPECIAL REPORT CERA

Oil Sands, Greenhouse Gases, and US Oil Supply. Getting the Numbers Right SPECIAL REPORT CERA Oil Sands, Greenhouse Gases, and US Oil Supply Getting the Numbers Right SPECIAL REPORT CERA We welcome your feedback regarding this IHS CERA report. Please feel free to e-mail us at info@ihscera.com and

More information

Monday March 10, 2008 Afternoon Sessions

Monday March 10, 2008 Afternoon Sessions Monday March 10, 2008 Afternoon Sessions Gasoline AM-08-82 It Is Not Your Grandfather s Gasoline It is not your grandfather's gasoline gives the refining industry credit for reducing automotive emissions

More information

SPE Distinguished Lecturer Program

SPE Distinguished Lecturer Program SPE Distinguished Lecturer Program Primary funding is provided by The SPE Foundation through member donations and a contribution from Offshore Europe The Society is grateful to those companies that allow

More information

Gasification: A Key Technology Platform for Western Canada s Coal and Oil Sands Industries

Gasification: A Key Technology Platform for Western Canada s Coal and Oil Sands Industries Gasification: A Key Technology Platform for Western Canada s Coal and Oil Sands Industries Twenty-Fifth Annual International Pittsburgh Coal Conference Westin Conference Center September 20 October 2,

More information

THE MERITS OF HEAVY RESIDUE GASIFICATION IN TODAY S WORLD

THE MERITS OF HEAVY RESIDUE GASIFICATION IN TODAY S WORLD THE MERITS OF HEAVY RESIDUE GASIFICATION IN TODAY S WORLD Gasification Technologies Conference 2010 Michiel Mak Vice President for Gasification & Clean Coal Energy Copyright of Shell Global Solutions International

More information

AGC NovaPRO Process Gas Chromatograph Refinery Applications

AGC NovaPRO Process Gas Chromatograph Refinery Applications AGC NovaPRO Process Gas Chromatograph Refinery Applications Head Quarters Address: Unit 2, Shannon Free Zone West, Shannon, Co. Clare, Ireland T: +353 61 471632 F: +353 61 471042 E: sales@agc-instruments.com

More information

IGCC Plants : a Practical Pathway for Combined Production of Hydrogen and Power from Fossil Fuels

IGCC Plants : a Practical Pathway for Combined Production of Hydrogen and Power from Fossil Fuels International Hydrogen Energy Congress and Exhibition IHEC 2005 Istanbul, Turkey, 13-15 July 2005 IGCC Plants : a Practical Pathway for Combined Production of Hydrogen and Power from Fossil Fuels Luigi

More information

Cold Lake expansion project

Cold Lake expansion project Cold expansion project Initial project description Plain language summary March 2016 Our commitment Imperial Oil Limited s success depends on our ability to maintain an open dialogue with, and ongoing

More information

Oils Sands and Liquefied Coal. By: Jose Reyes and Alejandro Lozoya

Oils Sands and Liquefied Coal. By: Jose Reyes and Alejandro Lozoya Oils Sands and Liquefied Coal By: Jose Reyes and Alejandro Lozoya What are Oil Sands? Oil sand is a naturally occurring mixture of sand, clay or other minerals, water and bitumen, which is a heavy and

More information

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics

Petroleum Refining. Environmental Guidelines for. Multilateral Investment Guarantee Agency. Industry Description and Practices. Waste Characteristics Multilateral Investment Guarantee Agency Environmental Guidelines for Petroleum Refining Industry Description and Practices The petroleum industry is organized into four broad sectors: exploration and

More information

Canada s oil sands the in situ producers perspective

Canada s oil sands the in situ producers perspective Canada s oil sands the in situ producers perspective February 11, 2010 By: Chris Bloomer (Presented by: Gerald W. Bruce, IOSA member) IOSA Member Petrobank Who is IOSA? In situ Oil Sands Alliance Independent

More information

(12) Patent Application Publication (10) Pub. No.: US 2008/ A1

(12) Patent Application Publication (10) Pub. No.: US 2008/ A1 US 2008.00993.72A1 (19) United States (12) Patent Application Publication (10) Pub. No.: US 2008/0099372 A1 Annamalai et al. (43) Pub. Date: (54) DEASPHALTING TARUSING STRIPPING TOWER (22) Filed: Oct.

More information

Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away

Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away Crude by Rail Lower Cost, Lower Risk, Better Netback, Right Away James Cairns Vice President, Petroleum and Chemicals Upgrading Crude by Rail Capacity Summit February 26-27, 2013 Houston, TX FORWARD-LOOKING

More information