Translate stakeholder needs into strategy. Governance is about negotiating and deciding amongst different stakeholders value interests.
|
|
- Ashlie O’Brien’
- 6 years ago
- Views:
Transcription
1 Principles Principle 1 - Meeting stakeholder needs The governing body is ultimately responsible for setting the direction of the organisation and needs to account to stakeholders specifically owners or shareholders of the organisation. Translate stakeholder needs into strategy. Governance is about negotiating and deciding amongst different stakeholders value interests. Value creation = Stakeholder needs There are three main governance objectives: Benefits realization Risk optimization Resource optimization (all IT assets including resources and capabilities) Stakeholder drivers Strategy changes Changing business and regulatory environment New technologies Cascade (transform stakeholder needs into an actionable strategy) Stakeholder drivers cascade to Stakeholder needs cascade to Enterprise goals (BSC) cascade t0 IT-related goals (BSC) cascade to Enabler goals (e.g. process goals) Balanced scorecard (BSC) Financial Customer Internal Learning and growth 1
2 Principle 2 - Covering the enterprise end-to-end Components of a governance system Governance enablers (x 7) Governance scope (whole enterprise or part) Identifying responsibilities for governance: Owners and stakeholders (delegate) Governing body (set direction + accountable) Management (instruct and align + monitor) Operations and execution (report) Principle 3 - Applying a single integrated framework Integrated framework Aligns with other relevant standards and frameworks Is complete in enterprise coverage Provides a simple architecture Integrates different ISACA frameworks 2
3 Principle 4 - Enabling a holistic approach Enablers - Resources Principles, policies and frameworks Processes Organizational structures Culture, ethics and behavior Information Services, infrastructure and applications People, skills and competencies Enabler dimensions (allow an entity to manage its complex interactions) Stakeholders Goals Intrinsic quality - The extent to which enablers work accurately, objectively and provide accurate, objective and reputable results Contextual quality - The extent to which enablers and their outcomes are fit for purpose given the context in which they operate. For example, outcomes should be relevant, complete, current, appropriate, consistent, understandable and easy to use. Access and security - The extent to which enablers and their outcomes are accessible and secured, such as: Enablers are available when, and if, needed. Outcomes are secured, i.e., access is restricted to those entitled and needing it. Life cycle Good practices Enabler performance Lag indicators (achievement of goals) Are stakeholder needs addressed? Are enabler goals achieved? Lead indicators (functioning of enabler) Is the enabler lifecycle managed? Are good practices applied? 3
4 Principle 5 - Separating governance from management Governance ensures that stakeholder needs, conditions and options are evaluated to determine balanced, agreed-on enterprise objectives to be achieved; setting direction through prioritization and decision making; and monitoring performance and compliance against agreed-on direction and objectives. Management plans, builds, runs and monitors activities in alignment with the direction set by the governance body to achieve the enterprise objectives. Evaluate - Direct - Plan - Build - Run - Monitor - Monitor - Evaluate 4
5 Enablers Processes Information Organisational structures Principles, policies and frameworks Culture, ethics and behaviour People, skills and competencies Services, infrastructure and applications A distinction is made between governance and management processes, including specific sets of practices and activities for each. Information used for evaluating, directing and monitoring enterprise IT is exchanged between governance and management. Structures can sit in the governance space or the management space. Principles, policies and frameworks are the vehicle by which governance decisions are institutionalised within the enterprise. Is set at the top and is therefore an interaction. Governance and management activities require different skill sets. Services support the governance activities of evaluating, setting direction and monitoring. Enabler 1 - Principles, policies and frameworks Governance should set principles and policies. Principles, policies and frameworks communicate the rules of the enterprise in support of governance objectives and enterprise values. Principles, policies and frameworks are instruments to communicate the rules of the enterprise, in support of the governance objectives and enterprise values, as defined by the board and executive management. Policies should be aligned with the enterprise s risk appetite. Policies are a key component of an enterprise s system of internal control, whose purpose it is to manage and contain risk. As part of risk governance activities, the enterprise s risk appetite is defined, and this risk appetite should be reflected in the policies. A risk-averse enterprise has stricter policies than a risk-aggressive enterprise. Policies need to be revalidated and/or updated at regular intervals. Principles (express the core values of the enterprise) limited in number put in simple language Policies (provide detailed guidance on how to put principles into practice, guide decisions) Policies provide more detailed guidance on how to put principles into practice and they influence how decision making aligns with the principles. Good policies are: Effective - They achieve the stated purpose. Efficient - They ensure that principles are implemented in the most efficient way. Non-intrusive - They appear logical for those who have to comply with them, i.e., they do not create unnecessary resistance. Policy can exist at multiple levels of the organisation. Organisational structures can define and implement policies within their span of control, and their activities are also defined by policies. Frameworks Frameworks are key because they provide a structure to define consistent guidance. For 5
6 example, a policy framework provides the structure in which a consistent set of policies can be created and maintained, and it also provides an easy point of navigation within and between individual policies. Comprehensive Open and flexible Current Accessible for stakeholders Good practice Good practice requires that policies be part of an overall governance and management framework, providing a (hierarchical) structure into which all policies should fit and clearly make the link to the underlying principles. As part of the policy framework, the following items need to be described: Scope and validity Consequences of failing to comply Means for handling exceptions How compliance will be checked (compliance requirements) Generally, recognised governance and management frameworks can provide valuable guidance on the actual statements to be included in policies. Relationships Principles, policies and frameworks reflect the cultures, ethics and values of the enterprise Processes are the most important vehicle for executing policies Organizational structures can define and implement policies Policies are part of information. 6
7 Enabler 2 Processes For each COBIT 5 process, the governance/management practices provide a complete set of high-level requirements for effective and practical governance and management of enterprise IT. They are: Statements of actions to deliver benefits, optimise the level of risk and optimise the use of resources Aligned with relevant generally accepted standards and good practices Generic and therefore needing to be adapted for each enterprise Covering business and IT role players in the process (end-to-end) The enterprise governance body and management need to make choices relative to these governance and management practices by: Selecting those that are applicable and deciding on those that will be implemented Adding and/or adapting practices where required Defining and adding non-it-related practices for integration in business processes Choosing how to implement them (frequency, span, automation, etc.) Accepting the risk of not implementing those that may apply Sample RACI charts in COBIT is the suggested assignment of the type and level of involvement on process practices for specific roles and structures in the organisation. In COBIT, the main actions taken to operate the process are described in activities lactating to each of the practices. They are defined as guidance to achieve management practices for successful governance and management of enterprise IT. The COBIT 5 activities provide the how, why and what to implement for each governance or management practice to improve IT performance and/or address IT solution and service delivery risk. This material is of use to: Management, service providers, end users and IT professionals who need to plan, build, run or monitor enterprise IT Assurance professionals who may be asked for their opinions regarding current or proposed implementations or necessary improvements A complete set of generic and specific activities that provide one approach consisting of all the steps that are necessary and sufficient for achieving the key governance practice (GP)/management practice (MP). They provide high-level guidance, at a level below the GP/MP, for assessing actual performance and for considering potential improvements. For each COBIT process, the governance and management practices provide a complete set of high-level requirements for effective and practical governance and management of enterprise IT. They are statements of actions from governance bodies and management. More details guidance is provided for each practice as a set of activities. Process activities: Describe a set of necessary and sufficient action-oriented implementation steps to achieve a governance or management practice Consider the inputs and outputs of the process Are based on generally accepted standards and good practices Support establishment of clear roles and responsibilities Are non-prescriptive and need to be adapted and developed into specific procedures appropriate for the enterprise When executing a process, artefacts (documents, records, etc.) are created these become useful when evaluation a process. A process is defined as a collection of practices influenced by the enterprise s policies and procedures that takes input from a number of sources, manipulates the inputs and produces outputs. The Process Reference Model Governance Domain The processes in EDM (Evaluate, Direct Monitor) (5) 7
8 EDM01 Ensure Governance Framework Setting and Maintenance EDM02 Ensure Benefits Delivery EDM03 Ensure Risk Optimization EDM04 Ensure Resource Optimization EDM05 Ensure Stakeholder Transparency The process Reference Model Management Domain The processes in APO ( Align, Plan Organize) (13) APO01 Manage the IT Management Framework APO02 Manage Strategy APO03 Manage Enterprise Architecture APO04 Manage Innovation APO05 Manage Portfolio APO06 Manage Budget and Costs APO07 Manage Human Relations APO08 Manage Relationships APO09 Manage Service Agreements APO10 Manage Suppliers APO11 Manage Quality APO12 Manage Risk APO13 Manage Security The processes in BAI ( Build, Acquire and Implement) (10) BAI01 Manage Programs and Projects BAI02 Manage Requirements Definition BAI03 Manage Solutions Identification and Build BAI04 Manage Availability and Capacity BAI05 Manage Organizational Change Enablement BAI06 Manage Changes BAI07 Manage Changes Acceptance and Transitioning BAI08 Manage Knowledge BAI09 Manage Assets BAI10 Manage Configuration The processes in DSS (Deliver, Service and Support) (6) DSS01 Manage Operations DSS02 Manage Service Requests and Incidents DSS03 Manage Problems DSS04 Manage Continuity DSS05 Manage Security Services DSS06 Manage Business Process Controls The processes in MEA (Monitor, Evaluate and Assess) (3) MEA01 Monitor, Evaluate and Assess Performance and Conformance MEA02 Monitor, Evaluate and Asses the System of Internal Control MEA03 Evaluate and Assess Compliance with External Requirements Stakeholders Internal: board, management, staff, business managers, business process owners External: customers, business partners, shareholders, regulators Goals Intrinsic goals: quality of the process, in line with good practice, compliant? Contextual goals: relevancy of the process, understandable, easy to apply? 8
9 Accessibility & Security goals: confidentiality of the process Life cycle (= generic practices for processes) Plan Design Build/acquire/create/implement Use/operate Evaluate/monitor Update/dispose Good practice Management/Governance practices (MP/GP) Statements of actions to deliver benefits Aligned with standards and good practices Generic, needing to be adapted Covering business and IT Activities Describe implementation steps to achieve GP/MP Consider the inputs and outputs of the process Based on standards and good practices Support establishment of clear roles and responsibilities (defined at the GP/MP level) Non-prescriptive Detailed activities: from ITIL, ISO 27000, PRINCE2 etc. Inputs and outputs: Are the process work products/artifacts Defined at the GP/MP level Relationships Processes need information as one form of input Processes need Organizational structure Processes produce and require service capabilities (infrastructure, applications, information..) Processes are dependent on other processes Processes produce and need policies and procedures to ensure consistent implementation. Enabler Process Guide Content Process identification and its components Process description Process purpose statement Goals cascade information Process goals and metrics Overview of process practices RACI Responsible: does the job Accountable: takes the blame Consulted: 2-way communication Informed: 1-way communication 9
10 Enabler 3 - Organizational structures Organisational structures are the key decision-making entities in an enterprise. Good Practice Operating principles - The practical arrangements regarding how the structure will operate, such as frequency of meetings, documentation and housekeeping rules Composition - Structures have members, who are internal or external stakeholders. Span of control - The boundaries of the organizational structure s decision rights, e.g. organisational structures can implement policies within their span of control. Level of authority - The decisions that the structure is authorized to take Delegation of authority - The structure can delegate (a subset of) its decision rights to other structures reporting to it. Escalation procedures -The escalation path for a structure describes the required actions in case of problems in making decisions. The responsibilities and characteristics of the following roles in an organization CIO: responsible for aligning the IT strategy with the business strategy Program and Project Management Office (PMO): responsible for supporting program and project managers 10
11 Enabler 4 - Culture, ethics and behavior Goals Organizational ethics: determined by the values which the enterprise wants to operate Individual ethics: determined by personal values Individual behaviors, which collectively determine the culture of an enterprise. Behavior towards taking risk Behavior towards following policy Behavior towards negative outcomes Good practice Communication of desired behaviors and the underlying corporate values Awareness of desired behavior, strengthened by the example behavior exercised by senior management and other champions Incentives to encourage and deterrents to enforce desired behavior. Rules and norms, which provide more guidance on desired organizational behavior. This links very clearly to the principles and policies that an enterprise puts in place. Relationships Processes can be designed to a level of perfection, but if the stakeholders of the process do not wish to execute the process activities as intended - i.e., if their behavior is one of noncompliance - process outcomes will not be achieved. Organizational structures can be designed and built according to the textbook, but if their decisions are not implemented - for reasons of different personal agendas, lack of incentives, etc. - they will not result in decent governance and management of enterprise IT. Principles and policies are a very important communication mechanism for corporate values and the desired behavior. 11
12 Enabler 5 - Information Information, infrastructure and applications are defined as service capabilities they are leveraged through processes to deliver internal and external services. Information criteria Effectiveness - Information is effective if it meets the needs of the information consumer who uses the information for a specific task. If the information consumer can perform the task with the information, then the information is effective. Efficiency - Whereas effectiveness considers the information as a product, efficiency relates more to the process of obtaining and using information, so it aligns to the information as a service view. If information that meets the needs of the information consumer is obtained and used in an easy way, then the use of information is efficient. This corresponds to the following information quality goals: believability, accessibility, ease of operation, reputation. Integrity - If information has integrity, then it is free of error and complete. Reliability - Reliability is often seen as a synonym of accuracy; however, it can also be said that information is reliable if it is regarded as true and credible. Compared to integrity, reliability is more subjective, more related to perception, and not just factual. Availability - Availability is one of the information quality goals under the accessibility and security heading. Confidentiality - Confidentiality corresponds to restricted access. Compliance - Compliance means that information must conform to specifications. Compliance to regulations is most often a goal or requirement of the use of the information, not so much an inherent quality of information. Information cycle Business and IT processes generate and process Data. Data is transformed into Information. Information is transformed into Knowledge. Knowledge creates Va lue. Value drives Business and IT processes Use of the Information Model (IM) For information specifications (e.g. of a new application or process by using attributes) To determine required protection (e.g. for security professionals by using attributes) To determine ease of data use (e.g. by using the quality criteria) 12
13 Enabler 6 - Services, infrastructure and applications Architecture principles Good practice for service capabilities includes the definition of architecture principles Architecture principles are overall guidelines that govern the implementation and use of IT-related resources within the enterprise. Examples of potential architecture principles are: Reuse - Common components of the architecture should be used when designing and implementing solutions as part of the target or transition architectures. Buy vs. build - Solutions should be purchased unless there is an approved rationale for developing them internally. Simplicity - The enterprise architecture should be designed and maintained to be as simple as possible while still meeting enterprise requirements. Agility - The enterprise architecture should incorporate agility to meet changing business needs in an effective and efficient manner. Openness - The enterprise architecture should leverage open industry standards. Relationships Information is one of the service capabilities, and service capabilities are leveraged through processes to deliver internal and external services. Cultural and behavioral aspects are also relevant when a service-oriented culture needs to be built. Relationships The inputs and outputs of the management processes could include service capabilities, which are required as inputs or delivered as outputs. Service capabilities are leveraged primarily through processes 13
14 Enabler 7 - People, skills and competencies Good practice Defining skill requirements for each role Using other external sources good practices e.g. SFIA Mapping skill categories to the COBIT 5 process domains: The skills in EDM ( Evaluate, Direct, Monitor) Governance of enterprise IT The skills in APO ( Align, Plan Organize) IT policy formulation IT strategy Enterprise architecture Innovation Financial management Portfolio management The skills in BAI ( Build, Acquire and Implement) Business analysis Project management Usability evaluation Requirements definition and management Programming System ergonomics Software decommissioning Capacity management The skills in DSS (Deliver, Service and Support) Availability management Problem management Service desk and incident management Security administration IT operations Database administration The skills in MEA (Monitor, Evaluate and Assess) Compliance review Performance monitoring Controls audit 14
15 Implementation Components of the life cycle model Management of the program Change enablement specifically addressing behavior and cultural aspects Core continual improvement life cycle. Question answered Program Management Change Enablement Continual Improvement 1 What are the drivers? Initiate programme Establish desire to change Recognise need to act 2 Where are we now? Define problems & opportunities Form implementation team Assess current state 3 Where do we want to be? Define road-map Communicate outcome Define target state 4 What needs to be done? Plan programme Identify role players Build improvements 5 How do we get there? Execute plan Operate & use Implement improvements 6 Did we get there? Realise benefits Embed new approaches Operate & measure 7 How do we keep on going? Review effectiveness Sustain Monitor & evaluate Seven phases of implementation Phase 1 starts with recognizing and agreeing to the need for an implementation or improvement initiative. It identifies the current pain points and triggers and creates a desire to change at executive management levels. (what are the drivers?) CE: establish desire to change. Phase 2 is focused on defining the scope of the implementation or improvement initiative using COBIT s mapping of enterprise goals to IT-related goals to the associated IT processes, and considering how risk scenarios could also highlight key processes on which to focus. High-level diagnostics can also be useful for scoping and understanding high-priority areas on which to focus. An assessment of the current state is then performed, and issues or deficiencies are identified by carrying out a process capability assessment. (Where are we now?) CE: form inmplementation team. During phase 3, an improvement target is set, followed by a more detailed analysis leveraging 15
16 COBIT s guidance to identify gaps and potential solutions. Some solutions may be quick wins and others more challenging and longer-term activities. (Where do we want to be?) CE: communicate outcomes. Phase 4 plans practical solutions by defining projects supported by justifiable business cases. A change plan for implementation is also developed. A well-developed business case helps to ensure that the project s benefits are identified and monitored. (What needs to be done?) CE: identify role players. The proposed solutions are implemented into day-to-day practices in phase 5. Measures can be defined and monitoring established, using COBIT s goals and metrics to ensure that business alignment is achieved and maintained and performance can be measured. Success requires the engagement and demonstrated commitment of top management as well as ownership by the affected business and IT stakeholders. (How do we get there?) CE: operate and use. Phase 6 focuses on the sustainable operation of the new or improved enablers and the monitoring of the achievement of expected benefits. (Did we get there?) CE: embed new approaches. During phase 7, the overall success of the initiative is reviewed, further requirements for the governance or management of enterprise IT are identified, and the need for continual improvement is reinforced. (How do we keep the momentum going?) CE: sustain. 16
17 Use of the implementation life cycle The internal and external environment factors as they apply to change management Ethics and culture Applicable laws, regulations and policies Mission, vision and values Governance policies and practices Business plans and strategic intentions Operating Model Management style Risk appetite Capabilities and available resources Industry practices Typical pain points Business frustration with failed IT initiatives resulting in increased costs & low business return on investment Outsourcing service delivery problems Duplicate projects Continuous poor audit findings Board members and senior management reluctant to engage with IT Typical Trigger Events Changes in an enterprises internal or external environments are seen as triggers examples are: Mergers, acquisitions and divestments New regulatory or compliance requirements A shift in the market demand for the company s products Significant technology change Business case Tool guiding the creation of business value Ongoing view of the viability of a program Contents of a good business case The business benefits that will be realized The business changes required The investments needed The on-going IT operating costs Constraints and dependencies derived from the risk assessment Roles, responsibilities and accountabilities relative to the initiative How the investment will be monitored 17
18 Process capability Assessment Model (PAM) Process capability assessments enables governance bodies to set process benchmarks and assist in measurement and monitoring capabilities. Based on this information improvement planning can be done that is supported by evidence and justifiable. Process capability assessments is not measuring performance or compliance. Terms and concepts of the PAM The COBIT Assessment Model includes: COBIT Assessor s Guide using COBIT 5.0 providing detailed guidance on how to do assessments using PAM, and COBIT Self Assessment Guide Using COBIT 5.0 explaining a simplified method that can easily be used for self-assessment The six Capability Levels based on ISO Level 0 Incomplete Process Level 1 Performed process - achieves its purpose Level 2 Managed process - managed implementation, work products managed Level 3 - Established Process - implemented using a defined process Level 4 - Predictable Process - operates within defined limits Level 5 Optimized Process - continuously improved The nine Attributes based on ISO PA 1.1 Process performance PA 2.1 Performance management PA 2.2 Work product management PA 3.1 Process definition PA 3.2 Process deployment PA 4.1 Process management PA 4.2 Process control PA 5.1 Process innovation PA 5.2 Process optimization The Rating Scale based on ISO N Not achieved 0 to 15% achievement - There is little or no evidence of achievement of the defined attribute in the assessed process. P Partially achieved 15% to 50% achievement - There is evidence of a sound systematic approach to an achievement of the defined attribute in the assessment approach L Largely achieved 50% to 85% achievement - There is evidence of a sound, systematic approach to the significant achievement of the defined attribute in the assessment F Fully achieved 85% to 100% achievement - There is evidence of a complete and systematic approach to and full achievement of the defined attribute in the assessed approach. To achieve a pass for a certain level, a process must be rated L Largely or F Fully at that level, and be rated F- Fully on the lower levels. To be able to move onto another capability level all Process Attributes must be F fully for that process (if not achieved, the organization needs to improve that particular process attribute to have a F rating before moving on) The definition of the following ISO terms A Process Purpose: high level objectives of performing the process and likely outcomes of successful implementation. A Process Outcome: observable result of a process (artifact, change of state, meeting of constraints) 18
19 A Base Practice: activities that contribute to achieving the process purpose. A Work Product: an artifact associated with the execution of the process (inputs and outputs) Understanding the PCM The Reasons for carrying out a Process Capability Assessment ISO identifies the purpose as an activity that can be performed either as a process assessment or as a process improvement initiative To continuously improve the enterprise s effectiveness To identify the strengths and weaknesses of selected processes based on business need To provide a logical, understandable, repeatable, reliable and robust methodology for assessing the capability of IT-related processes. The purpose of the 3 guides The Process Assessment Model (PAM) The Assessor Guide The Self-Assessment Guide: can also be used as preparation for a formal assessment The differences between a Maturity and a Capability Assessment A Process Assessment is one that examines the processes used by an organization to determine whether they are effective in achieving their goals. The assessment characterizes the current practice within an organizational unit in terms of the capability of the selected processes. Organizational maturity is an expression of the extent to which an organization consistently implements processes within a defined scope that contributes to the achievement of its business goals (current or projected). The purpose of a Process Reference Model Provides the basis for one or more Process Assessment Models Related the PAM to the measurement framework (ISO 15504) Provides the basis for the process dimension The differences between the two dimensions The capability dimension as outlined by the 6 capability levels A process dimension which deals specifically with the 37 specific COBIT processes outlined in the Process Reference Model (PRM) The differences between the Generic and Specific attributes. Base Practices (1) & Generic Base Practices (2-5) Specific Work Products (1) & Generic Work Products (2-5) The benefits of the COBIT Capability Assessment approach Improved reliability and repeatability Compliance with generally accepted standard Increased usability Is summary process performance indicators being useful in measuring level 1 whilst generic capability indicators apply to all levels of the PAM. 19
Braindumps COBIT5 50q
Braindumps COBIT5 50q Number: COBIT5 Passing Score: 800 Time Limit: 120 min File Version: 16.5 http://www.gratisexam.com/ Isaca COBIT 5 COBIT 5 Foundation I have correct many of questions answers. If there
More informationSelftestengine COBIT5 36q
Selftestengine COBIT5 36q Number: COBIT5 Passing Score: 800 Time Limit: 120 min File Version: 16.5 http://www.gratisexam.com/ Isaca COBIT 5 COBIT 5 Foundation I have correct many of questions answers.
More informationCOBIT 5. COBIT 5 Online Collaborative Environment
COBIT 5 Product Family COBIT 5 Enabler Guides : Enabling es : Enabling Information Other Enabler Guides COBIT 5 Professional Guides Implementation for Information for Assurance for Risk Other Professional
More informationCOBIT 5 Foundation Exam
COBIT 5 Foundation Exam Sample Paper Multiple Choice Instructions 1. All 50 questions should be attempted. 2. All answers are to be marked on the answer sheet provided. 3. Please use a pencil and NOT ink
More informationISACA All Rights Reserved.
Tichaona Zororo CIA, CISA, CISM, CRISC, CRMA, CGEIT, COBIT 5 Certified Assessor B.Sc. Honours Information Systems, PGD Computer Auditing Accredited COBIT 5 Trainer ISACA 2016. Business Value Value
More informationCOBIT 5. COBIT 5 Online Collaborative Environment
COBIT 5 Product Family COBIT 5 COBIT 5 Enabler Guides COBIT 5: Enabling es COBIT 5: Enabling Information Other Enabler Guides COBIT 5 Professional Guides COBIT 5 Implementation COBIT 5 for Information
More informationSeptember 17, 2012 Pittsburgh ISACA Chapter
September 17, 2012 Pittsburgh ISACA Chapter What is COBIT? Control Objectives for Information and related Technologies ISACA s guidance on the enterprise governance and management of IT. Builds on more
More informationCOBIT 5. COBIT 5 Online Collaborative Environment
COBIT 5 Product Family COBIT 5 COBIT 5 Enabler Guides COBIT 5: Enabling es COBIT 5: Enabling Information Other Enabler Guides COBIT 5 Professional Guides COBIT 5 Implementation COBIT 5 for Information
More informationCOBIT 5. COBIT 5 Online Collaborative Environment
COBIT 5 Product Family COBIT 5 Enabler Guides COBIT 5 COBIT 5: Enabling es COBIT 5: Enabling Information Other Enabler Guides COBIT 5 Professional Guides COBIT 5 Implementation COBIT 5 for Information
More informationIf It s not a Business Initiative, It s not COBIT 5
If It s not a Business Initiative, It s not COBIT 5 Steve Romero CISSP PMP CPM Romero Consulting Core Competencies C22 CRISC CGEIT CISM CISA 1 9/13/2013 1 COBIT Page 11 COBIT 5 product family 2 COBIT Page
More informationCGEIT Certification Job Practice
CGEIT Certification Job Practice Job Practice A job practice serves as the basis for the exam and the experience requirements to earn the CGEIT certification. This job practice consists of task and knowledge
More informationand COBIT 5 ISACA STRATEGIC ADVISORY BOARD VICE PRESIDENT STRATEGY & INNOVATION CA TECHNOLOGIES 2012 ISACA. All Rights Reserved.
Comparing COBIT4.1 and COBIT 5 ROBERT E STROUD CGEIT CRISC ISACA STRATEGIC ADVISORY BOARD VICE PRESIDENT STRATEGY & INNOVATION CA TECHNOLOGIES 1 2012 ISACA. All Rights Reserved. Comparing COBIT 4.1 and
More informationChanges Reviewed by Date. JO Technology Manager - Samer Huwwari JO Manager, Risk & Control Technology: Issa Laty. CIO, Jordan- Mohammad Aburoub
Governance and Management of Information and Related Technologies Guide 2017 Revision History Changes Reviewed by Date Version Author JO Technology Manager - Samer Huwwari JO Manager, Risk & Control Technology:
More informationAnnex 1 (Integrated frameworks on Business/IT alignment) Annex 2 Goals Cascade, adapted from COBIT5
Annex (Integrated frameworks on Business/IT alignment) Annex 2 Goals Cascade, adapted from COBIT5 Annex 2 RACI chart for EDM0, Retrieved from COBIT5 Description: R Responsible The one(s) who performs the
More informationGovernance and Management of Information and Related Technologies Guide. Prepared for Jordan Ahli Bank
Governance and Management of Information and Related Technologies Guide Prepared for Jordan Ahli Bank 2017 Revision History Changes Reviewed by Approval Date Version Author ISACA Peter Tessin Feb 2017
More informationGovernance, COBIT and the Cloud a match made in the sky! Robert E Stroud CGEIT International Vice President ISACA Treasurer, Director Audit,
Governance, COBIT and the Cloud a match made in the sky! Robert E Stroud CGEIT International Vice President ISACA Treasurer, Director Audit, Standards & Compliance itsmf Intl. Service Management and Governance
More informationInformation and Technology. Governance. System for
2019 strategy goals size Role of IT Sourcing model for IT Compliance requirements Etc. Design Factors SME Risk DevOps Etc. Priority governance management objectives Specific guidance from focus areas Target
More informationIT Management & Governance Tool Assess the importance and effectiveness of your core IT processes
IT & Governance Tool Assess the importance and effectiveness of your core IT processes STRATEGY& GOVERNANCE IT & Governance Framework APPS EDM01 ITRG04 DATA &BI ITRG06 IT Governance Application Portfolio
More informationIntroduction to COBIT 5
Introduction to COBIT 5 Executive Summary Information is a key resource for all enterprises, and from the time that information is created to the moment that it is destroyed, technology plays a significant
More informationEnterprise Governance of IT
Enterprise Governance of IT Prof. dr. Wim Van Grembergen University of Antwerp (UA) Antwerp Management School (AMS) IT Alignment and Governance Research Institute (ITAG) wim.vangrembergen@ua.ac.be What
More informationCITIBANK N.A JORDAN. Governance and Management of Information and Related Technologies Guide
CITIBANK N.A JORDAN Governance and Management of Information and Related Technologies Guide 2018 Table of Contents 1. OVERVIEW... 2 2. Governance of Enterprise IT... 3 3. Principles of Governance of Enterprise
More informationCOBIT 5 for Information Security. Dr. Derek J. Oliver Co-Chair, COBIT 5 Task Force
COBIT 5 for Information Security Dr. Derek J. Oliver Co-Chair, COBIT 5 Task Force First, a bit of background Just to level the playing field COBIT 5 Objectives o ISACA Board of Directors: tie together
More informationIT and Security Governance. Jacqueline Johnson
IT and Security Governance Jacqueline Johnson Background Control Objectives for Information and related Technology Developed by IT Governance Institute (ITGI) Not incremental High level standard 5 principles
More informationAssessment of IT Operations. Frameworks* An Overview
Assessment of IT Operations Leveraging Industry Standard Frameworks* An Overview *COBIT 5, ITIL,CMM,other SPEAKER BIOGRAPHY Sameer Gupta is a director in KPMG's Consulting Practice and has over 25 years
More informationCOBIT 5. Isaca - COBIT 5 COBIT 5 Foundation Version: 4.0
Isaca - COBIT 5 COBIT 5 Foundation Version: 4.0 1 QUESTION: 1 Which principle is key for the governance and management of enterprise IT? A. ManagingIT Operations B. InsureResourceOptimization C. Enabling
More informationISACA. The recognized global leader in IT governance, control, security and assurance
ISACA The recognized global leader in IT governance, control, security and assurance High-level session overview 1. CRISC background information 2. Part I The Big Picture CRISC Background information About
More information6. IT Governance 2006
6. IT Governance 2006 Introduction The Emerging Enterprise Model 3 p IT is an integral part of the business p IT governance is an integral part of corporate governance 4 Challenges for the IT IT gets more
More informationService Strategy Quick Reference Guide
Service Strategy Quick Reference Guide To enable service providers to think and act in a strategic manner to achieve strategic goals or objectives through the use of strategic assets Value Creation through
More informationGovernance SPICE. Using COSO and COBIT Process Assessment Models BPM GOSPEL
Governance SPICE Using COSO and COBIT Process Assessment Models Linking Governance to Sustainable Value Creation BPM GOSPEL (LLP-LDV-TOI-2010-HU-001) This project has been funded with support from the
More information2012 ISACA. All rights reserved. No part of this publication may be used, copied, reproduced, modified, distributed, displayed, stored in a retrieval
Presented by 2012 ISACA. All rights reserved. No part of this publication may be used, copied, reproduced, modified, distributed, displayed, stored in a retrieval system or transmitted in any form by any
More informationToolbox for Architecture Framework Discussions at The Open Group. SKF Group, February 2018
Toolbox for Architecture Framework Discussions at The Open Group SKF Group, February 2018 Toolbox Overview Components in our Enterprise Architecture Management: APPROACH FRAMEWORK CONTENT TOOLBOX Architecture
More informationIT Audit Process. Prof. Mike Romeu. February 13, IT Audit Process. Prof. Mike Romeu
February 13, 2017 1 IT Assurance and COBIT 5 Enablers Enablers are factors that, individually and collectively, influence whether something will work. 2. Processes 3. Organizational Structures 4. Culture,
More informationAchieving Business/IT Alignment through COBIT 5
Achieving Business/IT Alignment through COBIT 5 Prof. dr. Wim Van Grembergen University of Antwerp Antwerp Management School wim.vangrembergen@ua.ac.be Intro: EGIT and COBIT 5 Definition of EGIT Enterprise
More informationInternational Civil Aviation Organization FIRST INFORMATION MANAGEMENT PANEL (IMP/1) Montreal, Canada January, 25 30, 2015
International Civil Aviation Organization WORKING PAPER 15/01/2015 rev. 0 FIRST INFORMATION MANAGEMENT PANEL (IMP/1) Montreal, Canada January, 25 30, 2015 Agenda Item 5: Review and elaborate on concepts,
More informationLog of Changes Implemented to the COBIT 5 Product Family
Log of Changes Implemented to the COBIT 5 Product Family All of the edits detailed below up to were available to all downloaders as of. Anyone receiving the pdf files on or after already have the corrections
More informationTechnology s Role in Enterprise Risk Management
FEATURE Technology s Role in Enterprise Risk Management www.isaca.org/currentissue The new COSO ERM framework document, Enterprise Risk Management Integrating With Strategy and, 1 is expected to have a
More informationISACA Systems Implementation Assurance February 2009
ISACA Pressures Today Pressure to increase realization of value from IT spending Pressure to deliver on IT projects at a time when resources/budgets are constrained Pressure from risk of technology-based
More informationAchieving Organisational Goals. Accomplishing Strategic Initiatives. Implementation of Organisational Objectives. Stakeholder Management
Achieving Organisational Goals Accomplishing Strategic Initiatives Implementation of Organisational Objectives High Quality Training Courses presented by Internationally Recognised Expert Speakers Stakeholder
More informationCSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting
Introduction CSR / Sustainability Governance and Management Assessment By Coro Strandberg President, Strandberg Consulting www.corostrandberg.com November 2015 Companies which adopt CSR or sustainability
More informationCOBIT 5 for Business Benefits Realization: A Preview. Sushil Chatterji, CGEIT
COBIT 5 for Business Benefits Realization: A Preview Sushil Chatterji, CGEIT AGENDA About the Publication Business Benefits: Why the time is NOW Short primer on Enterprise and IT Strategic Planning Business
More informationManaging Successful Programmes 2011 Glossary of Terms and Definitions
Version 2, November 2011 This glossary: is subject to terms and conditions agreed to by downloading the glossary, uses international English which has been adopted to reflect and facilitate the international
More informationISO/IEC Process Mapping to COBIT 4.1 to Derive a Balanced Scorecard for IT Governance
DISCUSS THIS ARTICLE ISO/IEC 27001 Process Mapping to COBIT 4.1 to Derive a Balanced Scorecard for IT Governance By Christopher Oparaugo, CISM, CGEIT, CRISC COBIT Focus 14 December 2015 The balanced scorecard
More informationPortfolio, Program and Project Management Using COBIT 5
DISCUSS THIS ARTICLE Portfolio, Program and Project Using COBIT 5 By Sunil Bakshi, CISA, CRISC, CISM, CGEIT, ABCI, AMIIB, BS 25999 LI, CEH, CISSP, ISO 27001 LA, MCA, PMP COBIT Focus 11 September 2017 Many
More informationCatching Fraud During a Recession Through Superior Internal Controls. FICPA s 25 th Annual Accounting Show. J. Stephen Nouss September 29, 2010
Catching Fraud During a Recession Through Superior Internal Controls FICPA s 25 th Annual Accounting Show J. Stephen Nouss September 29, 2010 1 Session Objectives Fraud Facts (2008 Association of Certified
More informationGovernance for GIS Esri International User Conference 2018
Governance for GIS Esri International User Conference 2018 Matthew Lewin Practice Manager, Management Consulting Esri Canada July 2018 What is Governance? Governance refers to an organization s system
More informationActive Essex Risk Management Strategy
Active Essex Risk Management Strategy 2017-2021 November 2017 Contents 1. Policy Statement 2. Statement of Commitment 3. Risk Management Framework 4. Risk Appetite 5. Risk Maturity 6. Risk Management Levels
More informationDeveloping a successful governance strategy. By Muhammad Iqbal Hanafri, S.Pi., M.Kom. IT GOVERNANCE STMIK BINA SARANA GLOBAL
Developing a successful governance strategy By Muhammad Iqbal Hanafri, S.Pi., M.Kom. IT GOVERNANCE STMIK BINA SARANA GLOBAL it governance By NATIONAL COMPUTING CENTRE The effective use of information technology
More informationECQA Certified Profession. Governance SPICE Model. Internal Financial Control Assessor Training Programme
ECQA Certified Profession Governance SPICE Model used by the Internal Financial Control Assessor Training Programme Contact: János Ivanyos Memolux Ltd. +36 1 467403 ivanyos@memolux.hu www.training.ia-manager.org
More informationUnderstanding the Challenge and Incredible Potential of IT Governance
Understanding the Challenge and Incredible Potential of IT Governance REALIZING THE MOST VALUE FROM TECHNOLOGY THROUGH BUSINESS GOV ERNANC E O F IT Governance defined gov er nance noun (ˈgə-vər-nən(t)s)
More information1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General
1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General The organization s management with executive The commitment and involvement of the responsibility shall define, document
More informationCOBIT 5.0: Capability Level of Information Technology Directorate General of Treasury
COBIT 5.0: Capability Level of Information Technology Directorate General of Treasury Dian Utami Setya 1, Wella 2 Department of Information System, Faculty of Engineering and Informatics, Universitas Multimedia
More informationCOBIT 5: IT is complicated. IT governance does not have to be
COBIT 5: IT is complicated. IT governance does not have to be ค ณวรางคณา ม ส กะส งข - นายกสมาคมผ ตรวจสอบและควบค มระบบสารสนเทศภาคพ น กร งเทพฯ และ Director, Assurance RCS PricewaterhouseCoopers ABAS Ltd.
More informationT E A L C O N S U L T I N G L T D I S O A G U I D E
T E A L C O N S U L T I N G L T D I S O 4 4 0 0 1 A G U I D E W H A T I S I S O 4 4 0 0 1? There is much talk about collaboration but for many the concept seems ad hoc and without a clear perspective as
More informationITIL Intermediate Lifecycle Stream:
ITIL Intermediate Lifecycle Stream: SERVICE TRANSITION CERTIFICATE Sample Paper 2, version 6.1 Gradient Style, Complex Multiple Choice QUESTION BOOKLET Gradient Style Multiple Choice 90 minute paper Eight
More information1. You should attempt all 40 questions. Each question is worth one mark. 3. The pass mark for this exam is 26 out of 40 (65%).
The ITIL Foundation Examination Sample Paper D Question Booklet Multiple Choice Examination Duration: 60 minutes Instructions 1. You should attempt all 40 questions. Each question is worth one mark. 2.
More informationContents An Introductory Overview of ITIL Service Lifecycle: concept and overview...3 I. Service strategy...6 The 4 P's of ITIL Service
ITIL 2011 Notes Contents An Introductory Overview of ITIL 2011...3 Service Lifecycle: concept and overview...3 I. Service strategy...6 II. The 4 P's of ITIL Service Strategy...6 Key processes and activities...7
More informationLeveraging ERM to meet. and create business value. Management Flora Do, Senior Manager, Enterprise Risk Management
Leveraging ERM to meet regulatory requirements and create business value Susan Hwang, National Leader, Enterprise Risk Management Flora Do, Senior Manager, Enterprise Risk Management March 27, 2012 With
More informationIT Governance Overview
IT Governance Overview Contents Executive Summary... 3 What is IT Governance?... 4 Strategic Vision and IT Guiding Principles... 4 Campus-Wide IT Strategic Vision... 4 IT Guiding Principles... 4 The Scope
More informationIRM s Professional Standards in Risk Management PART 1 Consultation: Functional Standards
IRM s Professional Standards in Risk PART 1 Consultation: Functional Standards Setting standards Building capability Championing learning and development Raising the risk profession s profile Supporting
More informationBCBS 239 Alignment with DCAM (Data Management Implications related to the Principles of Risk Data Aggregation) July 2015
BCBS 239 Alignment with DCAM 1.2.2 ( Management Implications related to the Principles of Risk Aggregation) July 2015 Principle 1: Governance Paragraph Summary Component Capability/Sub- Capability 27 Management
More informationLevel 5 NVQ Diploma in Management and Leadership Complete
Learner Achievement Portfolio Level 5 NVQ Diploma in Management and Leadership Complete Qualification Accreditation Number: 601/3550/5 Version AIQ004461 Active IQ wishes to emphasise that whilst every
More informationAdvisory Services Governance, Risk & Compliance
Advisory Services Governance, Risk & Compliance Caribbean Association of Audit Committee Members Inc. 2010 Conference Caretakers of Integrity and Accountability: The Role of Internal Audit in Corporate
More informationSan Francisco Chapter. Presented by Scott Perry - Slalom Consulting
Presented by Scott Perry - Slalom Consulting Introductions Session Objectives Overview of Enterprise Risk Management The Role Of IT IT Governance Model IT Risk Assessment How IT Auditors Add Value Key
More informationEmbedding Operational Risk
Embedding Operational Risk Banking & Payments Federation Ireland Angela Calapa, Risk & Regulatory Director Areas of Challenge for Embedding Operational Risk Most banks face a significant number of challenges
More informationCGEIT QAE ITEM DEVELOPMENT GUIDE
CGEIT QAE ITEM DEVELOPMENT GUIDE TABLE OF CONTENTS PURPOSE OF THE CGEIT ITEM DEVELOPMENT GUIDE 3 PURPOSE OF THE CGEIT QAE... 3 CGEIT EXAM STRUCTURE... 3 WRITING QUALITY ITEMS... 3 MULTIPLE-CHOICE ITEMS...
More informationImplementation of Service Integration in a Multiprovider Environment Using COBIT 5
Knowledge. Proficiency. Implementation Implementation of Service Integration in a Multiprovider Environment Using COBIT 5 MARTIN ANDENMATTEN / CISA, CGEIT, CRISC, ITIL Master Published in COBIT Focus 28
More informationThe ITIL v.3. Foundation Examination
The ITIL v.3. Foundation Examination ITIL v. 3 Foundation Examination: Sample Paper 3, version 3.0 Multiple Choice Instructions 1. All 40 questions should be attempted. 2. There are no trick questions.
More informationIntroduction to IT Governance. IT Governance CEN 667
Introduction to IT Governance IT Governance CEN 667 1 Lectures Schedule Week Topic Week 1 Introduction to IT governance Overwiev of Information Security standards - ISO 27000 series of standards Week 2
More informationPassit4Sure.OG Questions. TOGAF 9 Combined Part 1 and Part 2
Passit4Sure.OG0-093.221Questions Number: OG0-093 Passing Score: 800 Time Limit: 120 min File Version: 7.1 TOGAF 9 Combined Part 1 and Part 2 One of the great thing about pass4sure is that is saves our
More informationGUIDANCE NOTE FOR DEPOSIT TAKERS (Class 1(1) and Class 1(2))
GUIDANCE NOTE FOR DEPOSIT TAKERS (Class 1(1) and Class 1(2)) Operational Risk Management MARCH 2017 STATUS OF GUIDANCE The Isle of Man Financial Services Authority ( the Authority ) issues guidance for
More informationISO Your implementation guide
ISO 55001 Your implementation guide Optimize the value from your assets with ISO 55001 Don t let the management of costly and complex assets become a burden to your organization.. ISO 55001 can help you
More informationCGEIT ITEM DEVELOPMENT GUIDE
CGEIT ITEM DEVELOPMENT GUIDE Updated March 2017 TABLE OF CONTENTS Content Page Purpose of the CGEIT Item Development Guide 3 CGEIT Exam Structure 3 Writing Quality Items 3 Multiple-Choice Items 4 Steps
More informationSarbanes-Oxley: Company Case Study - Viacom Inc. IT General Controls - Sustaining Compliance Efforts. Anthony Noble VP, IT Internal Audit
Sarbanes-Oxley: A Focus on IT Controls Company Case Study - Viacom Inc. IT General Controls - Sustaining Compliance Efforts Anthony Noble VP, IT Internal Audit Today s Agenda Introduction Viacom Methodology
More informationBusiness Context of ISO conform Internal Financial Control Assessment
Business Context of ISO 15504 conform Internal Financial Control Assessment By János Ivanyos, Memolux Ltd. (H), IIA Hungary Introduction In this paper the business context of the ISO/IEC 15504 [1] conformant
More informationBusiness Benefits by Aligning IT best practices
Business Benefits by Aligning IT best practices Executive Summary Since the Sarbanes-Oxley Act (Sarbanes-Oxley or SOX) was signed into law in 2002, many companies have adopted some IT practices to comply
More informationIT Assurance Services And Role Of CA In BPO-KPO. IT Enabled Services And Emerging Technologies
IT Assurance Services And Role Of CA In BPO-KPO IT Enabled Services And Emerging Technologies Chapter 2: Facilitated e-learning Part 1 of 2 CA M S Mehta, FCA 1 IT Assurance Services and Role of CA in BPO-KPO
More informationDeveloping a successful governance strategy. By Muhammad Iqbal Hanafri, S.Pi., M.Kom. IT GOVERNANCE STMIK BINA SARANA GLOBAL
Developing a successful governance strategy By Muhammad Iqbal Hanafri, S.Pi., M.Kom. IT GOVERNANCE STMIK BINA SARANA GLOBAL it governance By NATIONAL COMPUTING CENTRE The effective use of information technology
More informationCORROSION MANAGEMENT MATURITY MODEL
CORROSION MANAGEMENT MATURITY MODEL CMMM Model Definition AUTHOR Jeff Varney Executive Director APQC Page 1 of 35 TABLE OF CONTENTS OVERVIEW... 5 I. INTRODUCTION... 6 1.1 The Need... 6 1.2 The Corrosion
More informationCOBIT 5 and ITIL Adaptation at a Saudi Municipality
DISCUSS THIS ARTICLE COBIT 5 and ITIL Adaptation at a Saudi Municipality By Govind Kulkarni, COBIT 5, CSQA, ITIL Expert, PMP COBIT Focus 25 May 2015 Arabic English French Italian Portuguese Spanish The
More informationCascading the BSC Using the Nine Steps to Success
Cascading the BSC Using the Nine Steps to Success The Balanced Scorecard Institute uses a proven, disciplined framework, Nine Steps to Success, to systematically develop, implement, and sustain a strategic
More informationSTATEMENT ON RISK MANAGEMENT AND INTERNAL CONTROL
STATEMENT ON RISK MANAGEMENT AND INTERNAL CONTROL Pursuant to the Main Market Listing Requirements of Bursa Malaysia Securities Berhad ( Bursa Malaysia ) ( Listing Requirements ), Practice Note 9 issued
More informationISO/IEC JTC 1 N 10998
ISO/IEC JTC 1 N 10998 ISO/IEC JTC 1 Information technology Secretariat: ANSI (USA) Document type: Title: Status: Text for PDTR ballot or comment Text of 2nd PDTR 38502, Governance of IT - Framework and
More informationEXIN ITIL Exam Questions & Answers
EXIN ITIL Exam Questions & Answers Number: ITIL Passing Score: 800 Time Limit: 120 min File Version: 37.4 http://www.gratisexam.com/ EXIN ITIL Exam Questions & Answers Exam Name: ITIL V3 Foundation Exam
More informationEmbed with SFIA Secrets from the missing Framework
the missing Framework Simon Roller Reviewed January 2016 Why is value so hard to sustain? What is the secret to making best practice stick? How do you make process improvement and good governance last
More informationBest Practice Requirements for Successful Metrics Initiatives
Best Practice Requirements for Successful Metrics Initiatives A sound enterprise security initiative requires integration of the right products, processes, policies, and practices throughout an organization.
More informationGaining and Maintaining IT & Business Alignment. presented by Robert Sheesley for PMI Pittsburgh Chapter
Gaining and Maintaining IT & Alignment presented by Robert Sheesley for PMI Pittsburgh Chapter Agenda The Dynamics: Not an Accidental Love Triangle The Problem: The Vicious Cycle of Alignment Aligning
More informationPPM Assessment. Analyze Your PPM Practices In-Depth for Systematic Improvement
Assessment Analyze Your Practices In-Depth for Systematic Improvement Your Journey Starts Here. Understand Your Strengths & Weaknesses Evaluate Performance and Required Next Steps by Area Build a Improvement
More informationCobit 5! Not just for your Auditor!! Fusion (Cobit as an approach to Business & IT Alignment)! Integra(on
Cobit 5! Not just for your Auditor!! Fusion (Cobit as an approach to Business & IT Alignment)! Integra(on Cobit 5! John Krogh Twitter: @jakrogh Blog: www.johnakrogh.com! proven experience proven tactics
More informationCGMA Competency Framework
CGMA Competency Framework Technical skills CGMA Competency Framework 1 Technical skills : This requires a basic understanding of the business structures, operations and financial performance, and includes
More informationD ENABLE. Dimension 4 competence title and generic description level 1 level 2 level 3 level 4 level 5 knowledge skills
Dim 1 Dimension 2 Dimension 3 Dimension 4 competence title and generic description level 1 level 2 level 3 level 4 level 5 knowledge skills D ENABLE D.1 Information Security Strategy Development Defines
More informationPRM - IT IBM Process Reference Model for IT
PRM-IT V3 Reference Library - A1 Governance and Management Sysem PRM-IT Version 3.0 April, 2008 PRM - IT IBM Process Reference Model for IT Sequencing the DNA of IT Management Copyright Notice Copyright
More informationProject Management Assessment. Apply an In-Depth Approach to Project Management to Achieve Systematic Success
Management Assessment Apply an In-Depth Approach to Management to Achieve Systematic Success Your Journey Starts Here. Understand Your PM Strengths & Weaknesses Evaluate Performance and Required Next Steps
More informationEXIN ITIL Exam Questions & Answers
EXIN ITIL Exam Questions & Answers Number: ITIL Passing Score: 800 Time Limit: 120 min File Version: 37.4 http://www.gratisexam.com/ EXIN ITIL Exam Questions & Answers Exam Name: ITIL V3 Foundation Exam
More informationGovernance in a Multi-Supplier Environment
Governance in a Multi-Supplier Environment This paper provides advice and guidance for organisations faced with governing a multi-supplier environment. 1. The Need for Governance ISACA, the global IT governance
More informationA comparison of the ValueMetrics Performance Measurement System (VPMS) and the Balanced Scorecard (BSC)
Postal address: PO Box 1049, North Sydney NSW 2059. Phone +61 2 9922 1623 Mobile +61 407 017 016 E-mail nif@valuemetrics.com.au URL www.valuemetrics.com.au A comparison of the ValueMetrics Performance
More informationImplementation of the CO BIT -3 Maturity Model in Royal Philips Electronics
Implementation of the CO BIT -3 Maturity Model in Royal Philips Electronics Alfred C.E. van Gils Philips International BV Corporate Information Technology Eindhoven, The Netherlands Abstract: Philips has
More informationTOGAF Foundation. Part I: Basic Concepts 1 /
TOGAF Foundation Part I: Basic Concepts 1 / Enterprise and Enterprise Architecture An Enterprise is any collection of organizations that has a common set of goals, for example: Government agency Whole
More informationInternal Audit of ICT Governance in WFP. Office of the Inspector General Internal Audit Report AR/15/11
Fighting Hunger Worldwide Internal Audit of ICT Governance in WFP Office of the Inspector General Internal Audit Report AR/15/11 Contents Page I. Executive summary 3 II. Context and scope 5 III. Results
More information