Green public procurement for biomass (wood pellets) in Valka
|
|
- Rosamond George
- 6 years ago
- Views:
Transcription
1 Green public procurement for biomass (wood pellets) in Valka Organisation: Latvian Environmental Investment Fund and Valka Municipality Purchasing higher quality pellets from known origins for better performance of combustion equipment and lower emissions Standard product / conventional tender Lower price with potentially lower energy efficiency Pellets from wood with unknown origin GPP (PRIMES) tender Higher energy efficiency Lower emissions Results Estimated capture of CO 2 by 328 t instead of fossil fuels If origin of pellets is unknown, no guarantee for quality and forest management This template is developed by GPP 2020 and modified by PRIMES. For more information about GPP 2020 check out
2 2 PRIMES case study Introduction to case 1.1 PITCH-TALK SUMMARY The Municipality of Valka decided to apply principles of green public procurement to the purchase of wood pellets for heating up buildings (biomass). Besides applying green principles, the municipality wanted to avoid the increase of costs. By help of the PRIMES Task Force team the municipality developed procurement documents to find the most economically advantageous offer. 1.3 CASE CONTENT AND ISSUE 2 The biomass traditionally is regarded as a green solution, but this is not always the case: the intensive production of wood biomass can lead to deforestation, the high use of fossil fuel during production of pellets means no real reduction of CO 2 emissions, and low quality wood fuel can cause high emissions as well as damage combustion facilities. The transportation of wood pellets also causes emissions and load to road infrastructure. 1.4 SOLUTIONS APPLIED The procurer decided to include green criteria in the procurement process. Via consultation with market participants, Latvian Biomass association and interested parties (NGO s), municipality decided to apply criteria from voluntary ENplus certification scheme for wooded pellets developed by European Biomass association. This certificate requires pellets from known sources, limits carbon footprint from pellets production during whole life cycle, and guarantees higher quality. The procurer also preferred pellets with lower transportation distance. Tender features Subject matter: Wood pellet delivery for Valka municipality Value of the contract: VAT Type of procedure: Open tender Type of contract: Supply contract Nature of contract: Direct contract Division in lots: no
3 PRIMES case study on Green public procurement for the renovation of an old municipal building in Liepaja Procurement objectives The objective of the tender was to purchase high quality wood pellets. Procurement approach Selection criteria: Bidder must hold a valid ENplus certificate, or equivalent, and it is registered in a publicly accessible register: http: // (wood pellet manufacturers); http: // (wood pellet traders); or an equivalent register. 3 The technical specifications: Pellet quality requirements pellets must comply with requirements according ENplus A1 class pellet standard: the geometric size: 6-8 mm in diameter, 3,15-40mm length density kg per cubic meter dry (relative humidity <10%) no chemical impurities clean, free of foreign matter (including bark and sawdust) net calorific value 4.6 kwh / kg ash content < 0.7% of the weight burned Verification: Test result issued by ENplus inspection authority or comparable document The samples of pellets provided by bidder are selected by inspector acknowledged by ENplus or equivalently certified expert in accordance with the standard EN Award criteria: Price (70%) Ash content (15%) Distance to production place (10%)
4 4 PRIMES case study Calorific value (5%) Since there were 5 different places of delivery of pellets, the medium distance was calculated proportionally to estimated tonnage of pellets to be delivered. 4 Contract performance clauses The quality of supplied pellets shall correspond to the technical specification and offer of the bidder; the recipient is not accepting pellets that do not correspond to the quality agreed. The supplier shall bear all the losses caused to the recipient, if the quality of the delivered pellets does not meet the requirements of the technical specification. In case of the delays of supply the contractor (Valka municipality) apply fine 0,1% for each delayed day but not more than 10%. Criteria development Since there are no common EU criteria for wood pellets, PRIMES team helped municipality to organise a workshop with market participants, Latvian Biomass association and environmental NGOs. There was a consensus among participants that ENplus standard (a voluntary certification scheme developed by European Biomass association) is a good starting point for criteria development. However, this standard is not complying with sustainable forest management schemes and this shall be addressed additionally, but there are intentions to incorporate in future.
5 PRIMES case study on Green public procurement for the renovation of an old municipal building in Liepaja Results 4 bidders participated; the bidder with best price offered also offered lowest ash content (0,4 %) and 2 nd best calorific value (5 kwh per kg). GPP tender, t /annually CO 2 emissions of wood combustion, t CO 2 emissions from production of pellets CO 2 capture by forest The calculations are based on carbon content of wood pellets and life cycle data about carbon footprint 1. Unfortunately after first supplies Valka city received complaints from their combustion operators that pellets are low quality, and there are suspicions, that supplier does not supply ENplus certified pellets. The case is under investigation now, that municipality prepares documentation for termination of contract and filling complaint to certification body of pellets. 1
6 6 PRIMES case study Lessons learned 6 The prior market consultation with market participants, association and NGOs was very helpful in designing the green criteria. It seems, that compliance with ENplus standard shall be taken as a minimum green requirement for wood pellets, and there are many market participants ready to deliver such pellets. The green procurement is not preventing from fraudulent supplies but clear quality criteria help to insist on improvements or termination of the contract. Proper formulations of contract performance clauses therefore are very important. Training for recipients of pellets on quality control and monitoring could help more advanced identification of the supply problems identify. Despite caution, there was no price increase due to green criteria e.g. the final price per ton was 3% lower then previous year. On the other hand, the winner seems not to follow the agreements, and a new procurement might be started. To green the procurement, in future pellets from sustainable forestry sources (corresponding with FSC or PEFC standard) shall be acquired; however, the experience from Valka shows that known origin of the pellets and ENplus certification shall be a minimums requirement. Next step shall be inclusion criterion on carbon footprint of pellets: all producers complying with ENplus standard have such information (not required in this tender). Contact: zane.bilzena@lvif.gov.lv ; jana.simanovska@lvif.gov.lv
7 PRIMES case study on Green public procurement for the renovation of an old municipal building in Liepaja About PRIMES Across six countries in Europe; Denmark, Sweden, Latvia, Croatia, France and Italy, PRIMES project seeks to help municipalities overcome barriers in GPP processes, many of which lack capacity and knowledge. PRIMES aims to develop basic skills and provide hands-on support for public purchasing organisations in order to overcome barriers and implement Green Public Purchasing. This will consequently result in energy savings and CO 2 reductions 7 About GPP 2020 GPP 2020 aims to mainstream low-carbon procurement across Europe in support of the EU s goals to achieve a 20% reduction in greenhouse gas emissions, a 20% increase in the share of renewable energy and a 20% increase in energy efficiency by To this end, GPP 2020 will implement more than 100 low-carbon tenders, which will directly result in substantial CO 2 savings. Moreover, GPP 2020 is running a capacity building programme that includes trainings and exchange.
8 8 PRIMES case study 8 The sole responsibility for the content of this case study lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither the EACI nor the European Commission are responsible for any use that may be made of the information contained therein. Disclaimer The above text contains general information on the referred procurement procedure. This information is for general guidance only and shall not be treated as legal advice. In case you have any questions related to the procedure please contact the partner as indicated in this document.
Public lighting system renovation
Public lighting system Municipality of Varese Ligure Ordinary maintenance agreement update Energy efficiency interventions for innovative LED technology equipment. Acquisition of the property of replaced
More informationSPP TENDER MODEL. Green Electricity. Joint procurement of 700 GWh green electricity in Catalonia
SPP TENDER MODEL Green Electricity Joint procurement of 700 GWh green electricity in Catalonia Contracting authority: Contract: Catalan Association of Towns and Counties Framework agreement for the supply
More informationRenovation of a cycle path in Apeldoorn Municipality of Apeldoorn, The Netherlands
Renovation of a cycle path in Apeldoorn Municipality of Apeldoorn, The Netherlands New tendering process to enable the use of less polluting concrete 475 t CO 2 e saved with ca. 9.3 km and 3, 082 m³ pavement
More informationThe Enplus certification GHG calculation for wood pellets
www.aebiom.org The Enplus certification GHG calculation for wood pellets Cristina Calderon calderon@aebiom.org Heidelberg, 23 October 2012 Biograce II Content AEBIOM EPC EnPlus certification ENPlus sustainability
More informationEU Energy Winter Package (RED Recast) and Future of Forest Biomass Piotr Borkowski, EUSTAFOR s Executive Director
EU Energy Winter Package (RED Recast) and Future of Forest Biomass Piotr Borkowski, EUSTAFOR s Executive Director Conference: The Need for Sectoral Education on the European path of B&H 9-10/2/2017, Kupres,
More informationHOFOR S SUSTAINABLE BIOMASS PROGRAMME
HOFOR S SUSTAINABLE BIOMASS PROGRAMME 1 SUSTAINABLE BIOMASS It is essential for HOFOR that the biomass feedstock for the Amagerværket combined heat and power (CHP) plant is sustainable and that the sustainability
More informationInspection according ENplus
Audit and Test Report: Date: 2015-10-12 BEA2015127 Inspection according ENplus Client: Velpel d.o.o. Attn.: Industrijska bb 10310 Ivanić Grad Croatia Subject: Wood pellets production Velpel d.o.o. plant
More informationwood chips and wood pellets
D O N G E ne r g y P r og r a m m e f o r S u s ta i n a b l e B i o m a ss S o u r c i ng (DPSB) wood chips and wood pellets Version 1.0. December 2014 Contents SUMMARY...3 NEW AND GREENER LIFE FOR DONG
More informationEU GPP Criteria for Sanitary Tapware
EU GPP Criteria for Sanitary Tapware Green Public Procurement (GPP) is a voluntary instrument. This document provides the EU GPP criteria developed for the sanitary tapware product group. The accompanying
More informationCorporate Procurement. Sustainable Timber Procurement Policy
Corporate Procurement Sustainable Timber Procurement Policy Release: Final Draft 1 Document Control Date Version Description Author Position 12.12.08 0.01 First Draft Peter Faill (PAF) Head of Strategic
More informationComparison of EU Public Timber Procurement Policies 2007
Comparison of EU Public Timber Procurement Policies 2007 Belgium Denmark France Germany Netherlands UK Type of product Wood products only. Paper products are covered in another policy. Rough, semi-finished
More informationENplus Handbook, Part 2 - Certification Procedure. ENplus. Quality Certification Scheme For Wood Pellets. ENplus Handbook.
ENplus Quality Certification Scheme For Wood Pellets ENplus Handbook (Master-Handbook) Part 2: Certification Procedure Version 3.0, August 2015 1 Publisher: European Pellet Council (EPC) c/o AEBIOM - European
More informationENplus challenges in establishing a worldwide certification of pellets quality and sustainability, Christian Rakos
ENplus challenges in establishing a worldwide certification of pellets quality and sustainability, Christian Rakos ENplus a certification scheme for pellets for residential use Established to achieve uniform
More informationOverview on the implementation of EPC databases in EU 28: status quo and future needs with regard to effective compliance and control
QUALICHeCk Webinar 5 th July 2016 Overview on the implementation of EPC databases in EU 28: status quo and future needs with regard to effective compliance and control Aleksandra Arcipowska Project Manager
More informationENplus. ENplus Handbook. Quality Certification Program For Wood Pellets. Version 3.0 First Draft
ENplus Quality Certification Program For Wood Pellets ENplus Handbook Version 3.0 First Draft December 2014 ENplus-Handbook (Version 3.0) - First Draft Publisher: European Pellet Council (EPC) c/o AEBIOM
More informationANNEXES. to the. Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
EUROPEAN COMMISSION Brussels, 20.7.2016 COM(2016) 479 final ANNEXES 1 to 6 ANNEXES to the Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL on the inclusion of greenhouse gas emissions
More informationProgramme for sustainable biomass sourcing (ØPSB)
Programme for sustainable biomass sourcing (ØPSB) Wood chips and wood pellets Version 1.0. December 2014 Ørsted Policy 1 Ørsted Policy Sustainable biomass sourcing Contents 03 Summary 04 New and greener
More informationD2.5 Country Report on Recommendations for Action for Development of EPC Markets
D2.5 Country Report on Recommendations for Action for Development of EPC Markets NORWAY Transparense project This document has been conducted within the framework of project Transparense Increasing Transparency
More informationCurrent developments & potential of pellets from a European perspective. Christian Rakos, propellets Austria
Current developments & potential of pellets from a European perspective Christian Rakos, propellets Austria 3 focal points of pellet market development (heat) Sweden, Denmark: large scale use & pellet
More informationTat Smith. University of Toronto & IEA Bioenergy Task 43 Biomass Feedstocks for Energy Markets
Welcome from IEA Bioenergy & Reflections on what has transpired in the year since the Quebec event in October 2012 Tat Smith University of Toronto & IEA Bioenergy Task 43 Biomass Feedstocks for Energy
More information1st ENplus workshop. Austria. Location: Ökohotel Spes, Schlierbach, OÖ
1st ENplus workshop Austria Date: May 16, 2012 Time: 11:40 13:10 Location: Ökohotel Spes, Schlierbach, OÖ The sole responsibility for the content of this publication lies with the authors. It does not
More information3rd ENplus auditors training
3rd ENplus auditors training Vienna, 11/12 October 2012 October 2012 Author: Peter Rechberger AEBIOM The sole responsibility for the content of this publication lies with the authors. It does not necessarily
More informationD6.4 Market plan GREECE
D6.4 Market plan GREECE Transparense project This document has been conducted within the framework of project Transparense Increasing Transparency of Energy Service Markets supported by the EU program
More informationApprentices KPIs In Public Contracts. Daniel Milnes Head of Business Law Forbes 2012
Apprentices KPIs In Public Contracts Daniel Milnes Head of Business Law Forbes 2012 Legal Notice Your Attention Is Directed To This Note These materials are supplied as general illustrations of legal issues
More informationDetermining Carbon Footprint of a Waste Wood Burning Power Plant
Determining Carbon Footprint of a Waste Wood Burning Power Plant Arto Huuskonen Metso Corporation / MW Power Renewable Energy World Europe 2012 Determining Carbon Footprint of a Waste Wood Burning Power
More informationSupport for setting up a Smart Readiness Indicator for buildings and related impact assessment - Background paper for stakeholder meeting 7 June 2017
Support for setting up a Smart Readiness Indicator for buildings and related impact assessment - Background paper for stakeholder meeting 7 June 2017 VITO: Stijn Verbeke, Yixiao Ma, Sarah Bogaert Ecofys:
More informationSustainability criteria for solid and gaseous biomass
27 May 2011 AEBIOM and EBA position paper Sustainability criteria for solid and gaseous biomass Sustainably produced biomass will play a major role in the EU s transition from a fossil-fuel based unsustainable
More informationConsultation on the Review of Directive 2012/27/EU on Energy Efficiency
Case Id: 3773168f-3457-475b-8788-bada2532ce9d Date: 29/01/2016 16:15:46 Consultation on the Review of Directive 2012/27/EU on Energy Efficiency Fields marked with * are mandatory. Introduction This consultation
More informationEuropean Panel Federation
European Panel Federation viewpoint on wood energy policies Eva Janssens (Economic Adviser) European Panel Federation Members in 23 countries Particleboard 32.1 million m³ MDF 10.5 million m³ OSB 2.1 million
More informationWood Fuel Quality. Opportunities for the Wood fuel Sector. Presented by: John O Brien, Tel:
Wood Fuel Quality Opportunities for the Wood fuel Sector Presented by: John O Brien, Email: john.obrien@ecowood.ie Tel: 086 7954665 074 9364777 Presentation Format Introduction Woodfuel Industry overview
More informationA preliminary comparative assessment of the climate impact of firewood supply from Belgium and Eastern Europe to the Belgian market
A preliminary comparative assessment of the climate impact of firewood supply from Belgium and Eastern Europe to the Belgian market Introduction Lampiris Wood is a 100% Belgian and independent supplier
More informationEuropean public procurement policies for timber products and impacts on the market for certified products
European public procurement policies for timber products and impacts on the market for certified products Sofie Tind Nielsen, CPET UK Central Point of Expertise on Timber Forest Governance & Sustainability
More informationGuidelines. on imports of organic products into the European Union
EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR AGRICULTURE AND RURAL DEVELOPMENT Directorate H. Sustainability and quality of agriculture and rural development H.3. Organic farming 15.12.2008 Guidelines on
More informationExport & import possibilities and fuel prices
AFB-net V Targeted actions in bioenergy network Export & import possibilities and fuel prices Task 2 Country report of FRANCE CONTENTS 1 INTRODUCTION...3 2 BIOMASS RESOURCES...3 3 CURRENT ENERGY USE OF
More informationCountry profiles: Finland
Country profiles: Finland Last updated: 20/02/2014 1 Implementation of Tracking Systems 1.1 Electricity Disclosure Electricity disclosure in Finland is implemented by the law Laki sähkön alkuperän varmentamisesta
More informationAnnex I : Description of the Project Development Services and the planned Investment Programme
: Description of the Project Development Services and the planned Investment Programme Location of the Project Development Services Province of Bergamo, Italy. 1. Location Main purposes of the Project
More informationELANBiz: Government Procurement in Chile
DISCLAIMER The positions expressed are those of the authors and do not necessarily reflect the official opinion of the European Union. Neither the European Union nor any person acting on behalf of the
More informationW O O D É N E R G Y P R O G R A M M E. Activity Report for S U M M A R Y
Activity Report for 000-00 S U M M A R Y P R O G R A M M E W O O D É N E R G Y 000-006 The whole document is available at www.ademe.fr contact: boisenergie@ademe.fr B O I S É N E R G I E Stakes The 000-006
More informationD2.8 4 th National workshop summaries: minutes and highlights
greengain project Grant Agreement n 646443 D2.8 4 th National workshop summaries: minutes and highlights 11.08.2017 This project has received funding from the European Union s Horizon 2020 research and
More informationOverview about different certification systems
Overview about different certification systems Berlin, Germany 12th March 2010 Agency for Renewable Resources (FNR) Aino Martikainen Elements of a certification system Principle, Criteria, Indicators Chain
More informationPolicies and measures to promote sustainable bioenergy production and use in the Baltic Sea Region
Policies and measures to promote sustainable bioenergy production and use in the Baltic Sea Region Michael Krug Freie Universität Berlin Environmental Policy Research Centre 18th REFORM Group Meeting Salzburg
More informationGermany-Frankfurt-on-Main: ECB - Provision of translation services from Estonian, Finnish and Latvian into English 2017/S
1 / 7 This notice in TED website: http://ted.europa.eu/udl?uri=ted:notice:367815-2017:text:en:html Germany-Frankfurt-on-Main: ECB - Provision of translation services from Estonian, Finnish and Latvian
More informationRenewable energy in Europe. E-turn 21 workshop Cologne, 10 May 2006
Renewable energy in Europe E-turn 21 workshop Cologne, 10 May 2006 Content 1. Introduction to Essent 2. EU policy 3. Support for renewable energy 4. Success factors 5. Outlook and recommendations Content
More informationLiberia Development Forestry Sector Management Project
Questions & Answers Q1: What has been the World Bank s role in the Liberia forestry sector and what has been the impact of the Liberia Development Forestry Sector Management Project? Since 2004, the Bank
More informationNEPCon Evaluation of Tylöskog AB Compliance with the SBP Framework: Public Summary Report
NEPCon Evaluation of Tylöskog AB Compliance with the SBP Framework: Public Summary Report www.sustainablebiomasspartnership.org Completed in accordance with the CB Public Summary Report Template Version
More informationStora Enso s approach to combat illegal logging Yokohama 3 December Pirjetta Soikkeli Communications Director Wood Supply, Sustainability
Stora Enso s approach to combat illegal logging Yokohama 3 December 2007 Pirjetta Soikkeli Communications Director Wood Supply, Sustainability Outline Stora Enso in brief Sustainable forestry Traceability
More informationBarriers and opportunities for achieving compliance and enforcement: application to transmission aspects Peter Wouters
Barriers and opportunities for achieving compliance and enforcement: application to transmission aspects Peter Wouters INIVE EEIG Robust Details Update after 900,000 homes Not able t Not possible to have
More informationSample Social Clauses to Encourage Community Benefits from Waste
Sample Social Clauses to Encourage Community Benefits from Waste What are social clauses and community benefits? 1 The UK Sustainable Development Strategy has set the challenge of making the UK an EU leader
More informationNuts and bolts of Carbon Footprint Management certification
Nuts and bolts of Carbon Footprint Management certification 1 NEPCon Nuts and client bolts guide of CFM certification December 2013 Version 1 December 2013 Introduction to this guide This guide provides
More information-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES
-SUBMISSION BY MEXICO REDUCING GREENHOUSE GAS EMISSIONS FROM DEFORESTATION IN DEVELOPING COUNTRIES I. Mandate The Subsidiary Body for Scientific and Technological Advice (SBSTA), at its twenty-fifth session
More informationConsip s Approach to Promote Energy Efficiency
Consip s Approach to Promote Energy Efficiency Marco Dellomonaco Energy Category Manager Consip S.p.A. Rīga, March 25 th, 2015 1 Consip Corporate profile Consip S.p.A. is a public stock company set up
More informationThe Energy Efficiency Watch Survey
The Energy Efficiency Watch Survey Christiane Egger OÖ Energiesparverband christiane.egger@esv.or.at, www.esv-en.at www.energy-efficiency-watch.org The Energy Efficiency Watch 2 Project: Reality check
More informationMarket Effects of Public Procurement Policies for Wood and Paper Products in the UNECE Region
Market Effects of Public Procurement Policies for Wood and Paper Products in the UNECE Region A study by the Team of Specialists on Forest Products Markets and Marketing for the UNECE and FAO Policy Forum
More informationPEFC certification and the combat against illegal logging
PEFC certification and the combat against illegal logging PEFC s Standard for the Avoidance of Controversial Sources: Technical Document Annex 4 - Appendix 7 Promoting Sustainable Forest Management for
More informationThe Land Use, Land Use Change and Forestry (LULUCF) sector in the EU
The Land Use, Land Use Change and Forestry (LULUCF) sector in the EU Giacomo Grassi Viorel Blujdea, Raul Abad Viñas European Commission, Joint Research Centre, Institute for Environment and Sustainability,
More informationThe Cancun Agreements: Land use, land-use change and forestry
Decision 2/CMP.6 The Cancun Agreements: Land use, land-use change and forestry The Conference of the Parties serving as the meeting of the Parties to the Kyoto Protocol, Affirming that the implementation
More informationAn overview of legality verification systems
An overview of legality verification systems Briefing note February 2011 There are several legality verification systems operating; these systems are not approved forest certification schemes like the
More informationInspection according ENplus
Audit and Test Report: Date: 2016-04-01 BEA 2016025 k Replaces report BEA 2016025 from 2016-03-24 Inspection according ENplus Client: R.Y.L Greenwood Energy LTD 20 Hachashmal St. Karmiel Israel Subject:
More informationThis document is a preview generated by EVS
TECHNICAL REPORT RAPPORT TECHNIQUE TECHNISCHER BERICHT CEN/CLC/ETSI TR 101 552 March 2014 ICS 03.100.10, 13.180, 33.020, 35.020 English version Guidance for the application of conformity assessment to
More informationCountry profile: Austria
Country profile: Austria Last updated: 23/04/2015 1 Implementation of Tracking Systems As electricity tracking system Austria uses electricity disclosure, which provides consumers with details about the
More information4-Day Study Tour Injection of biomethane into natural gas grids IEE-project GreenGasGrids
4-day Study Tour, supported by the Intelligent Energy Europe (IEE) program 4-Day Study Tour Injection of biomethane into natural gas grids IEE-project GreenGasGrids 25 th to 28 th June 2012 South Germany
More informationReport Global Aspects of Bioenergy Imports
Report 2008-056 Global Aspects of Bioenergy Imports ECON Pöyry-Report no. 2008-056, Project no. 53160 ISSN: 0803-5113, ISBN 82-7645-976-0 MZA/JAB/KSK/MRÖ/GDH, abe, 10. July 2008 Public Global Aspects of
More informationCOGENERATION THE SMART DECISION! Why and how cogeneration can make your company more profitable and energy efficient?
Cogeneration Observatory and Dissemination Europe Why and how cogeneration can make your company more profitable and energy efficient? COGENERATION THE SMART DECISION! Table of contents 1 WHY COGENERATION
More information4-Day Study Tour Injection of biomethane into natural gas grids IEE-project GreenGasGrids
4-day Study Tour, supported by the Intelligent Energy Europe (IEE) program 4-Day Study Tour Injection of biomethane into natural gas grids IEE-project GreenGasGrids 25 th to 28 th June 2012 South Germany
More informationScandinavian Forest Economics No. 44, 2012
ScandinavianForestEconomics No.44,2012 ProceedingsoftheBiennialMeetingofthe ScandinavianSocietyofForestEconomics Hyytiälä,Finland,May2012 AnneToppinen,HeimoKarppinenKatiKleemola(eds.) 4 Short overview
More informationRoundtable on. Competition Policy and Public Procurement
Intergovernmental Group of Experts on Competition Law and Policy Geneva, 9 11 July 2012 Roundtable on Competition Policy and Public Procurement Written contribution by Lithuania The views expressed are
More informationRegulation for Scheme Owners requesting acceptance by ACCREDIA of new Conformity Assessment Schemes and their revisions
Title Reference Regulation for Scheme Owners requesting acceptance by ACCREDIA of new Conformity Assessment Schemes and their revisions RG-19 Revision 00 Date 10-10-2017 NOTE: The present document represents
More informationCouncil of the European Union Brussels, 8 December 2017 (OR. en)
Council of the European Union Brussels, 8 December 2017 (OR. en) 14866/17 LEGISLATIVE ACTS AND OTHER INSTRUMTS Subject: CORLX 548 CFSP/PESC 1063 CSDP/PSDC 667 FIN 752 COUNCIL DECISION establishing Permanent
More informationCasework Technical Support (Social Welfare - Project Management)
Casework Technical Support (Social Welfare - Project Management) Request for Tenders for Services to MABS NATIONAL DEVELOPMENT The latest date for receipt of tenders is 09 June 2017 Commercial House Westend
More informationCountry profiles: Sweden
Country profiles: Sweden Last updated: 20/02/2014 1 Implementation of Tracking Systems 1.1 Electricity Disclosure Electricity disclosure in Sweden is implemented by the law Ellag - Electricity Act (1997:857).
More informationSurvey among private forest owners on the European Union Timber Regulation (EUTR) implementation
SYNTHESIS REPORT Survey among private forest owners on the European Union Timber Regulation (EUTR) implementation Prepared by: Alex Pra Confederation of European Forest Owners (CEPF) Brussels, January
More informationConsultation on the Review of Directive 2012/27/EU on Energy Efficiency
Consultation on the Review of Directive 2012/27/EU on Energy Efficiency Introduction This consultation is launched to collect views and suggestions from different stakeholders and citizens in view of the
More informationSustainable Packaging
Sustainable Packaging Sustainable Packages The better food products are protected and kept from spoiling, the more effectively precious resources can be preserved. This is why we place great emphasis on
More informationHow to address a scattered market? The case of Italy
How to address a scattered market? The case of Italy Bruxelles, 13 TH MAY 2014 Annalisa Paniz Contents Who is AIEL? Is the ENplus certification supported by the Italian companies? What is the Pellet market
More informationConsultation on the Review of Directive 2012/27/EU on Energy Efficiency
Case Id: 6bb20ac8-9018-4974-8993-f60df3af751c Date: 27/01/2016 12:23:44 Consultation on the Review of Directive 2012/27/EU on Energy Efficiency Fields marked with * are mandatory. Introduction This consultation
More informationFIBER PROCUREMENT. Final Version 6/30/2009. Policy Statement. It is the policy of Kimberly-Clark
Final Version 6/30/2009 FIBER PROCUREMENT Policy Statement It is the policy of Kimberly-Clark to conduct its businesses with a sincere and proper regard for the need to sustain natural resources used in
More informationQuality certification frameworks for Energy Efficiency services to scale up responsible investment in the building sector
Quality certification frameworks for Energy Efficiency services to scale up responsible investment in the building sector Project Coordinator: Stefan Amann This project receives funding from the European
More informationConsolidated performance data
Sustainable development report 2017 101 Financial performance millions unless otherwise stated 2013 2014 2015 2016 2017 Group revenue 6,476 6,402 6,819 6,662 7,096 Underlying operating profit 699 767 957
More informationRevision of Directive 2008/98/EC on waste (Waste Framework Directive) and of Directive 1999/31/EC on landfill of waste. A EURELECTRIC position paper
Revision of Directive 2008/98/EC on waste (Waste Framework Directive) and of Directive 1999/31/EC on landfill of waste A EURELECTRIC position paper January 2017 EURELECTRIC is the voice of the electricity
More informationBuy Smart+ Green Procurement in Europe. Purchasing Green Electricity: Legal characteristics and good practice
Buy Smart+ Green Procurement in Europe Purchasing Green Electricity: Legal characteristics and good practice EcoProcura 19.09.2012 Vanessa Schmidt, Berlin Energy Agency BEA Facts and Figures Established
More information1. Sinopse do Pedido de Cotação
1. Sinopse do Pedido de Cotação DAI, implementer of the USAID funded SPEED+, invites qualified vendors (companies or individuals) to submit quotations to supply and deliver Photography Services, as follows:
More informationATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES
Date: 16 August 2017 ATTACHMENT 1 COVER LETTER AND INSTRUCTIONS ON TENDERING PROCEDURES CPG/2123/2017 A Political Economy Analysis (PEA) of Colombia s Rail Sector Colombia Prosperity Fund Programme 2017-2022
More informationRealizing the Flexibility Potential of Industrial Electricity Demand: Overview of the H2020 Project IndustRE
EMART Energy 2017: Commercial and Industrial Energy Users Amsterdam, 4 th October 2017 Realizing the Flexibility Potential of Industrial Electricity Demand: Overview of the H2020 Project IndustRE Dimitrios
More informationSpecimen. Contract award notice Results of the procurement procedure. Section I: Contracting authority
Supplement to the Official Journal of the European Union Info and online forms: http://simap.ted.europa.eu Section I: Contracting authority I.1) Name and addresses 1 (please identify all contracting authorities
More information10/1/18 Proposed revision of section 10 (Wood Pellets) of TG1 Solid Wood Fuel Classification Guidelines
WOOD PELLETS 1 Wood pellets are produced from high quality wood residues and their production is standardised to specific standards according to the wood feedstock used. Pellets are typically used in three
More informationProposal for a Directive of the European Parliament and of the Council on the promotion of the use of energy from renewable sources (recast)
Proposal for a Directive of the European Parliament and of the Council on the promotion of the use of energy from renewable sources (recast) EURELECTRIC voting recommendations (ENVI Committee) September
More informationPurchasing green electricity in Europe
DEEP project Purchasing green electricity in Europe Barcelona, 21 September 2006 Peter Defranceschi ICLEI, Sustainable Procurement team The DEEP Project DEEP: Dissemination of Energy Efficiency Measures
More informationGENERAL ANNOUNCEMENTS
GENERAL ANNOUNCEMENTS PUBLIC CONSULTATION FOR SUSTAINABLE BUILDINGS (DEADLINE OCTOBER 1) The European Commission wants to gather viewpoints and additional information about the possible introduction of
More informationCertification & Legality Verification
Certification & Legality Verification Rachel Butler Independent Technical Advisor to the European Timber Trade Federation European Timber Trade Federation Founded in 2009 after a merger of the established
More informationOutlook Green Public Procurement in the European Union and Germany
Outlook Green Public Procurement in the European Union and Germany Overview, legal framework, targets and process (Day 1) Tobias Schleicher Jakarta, February 2014 Overview 1 2 3 4 5 Definition & Legal
More informationSubmission by Hungary and the European Commission on behalf of the European Union and its Member States
Submission by Hungary and the European Commission on behalf of the European Union and its Member States Budapest, 17 May 2011 Subject: Submission of information on forest management reference levels by
More informationResource efficiency in Europe
Resource efficiency in Europe Overview of polices and approaches to resource efficiency in European countries Paweł Kaźmierczyk 1st DYNAMIX Policy Platform meeting: Exploring Opportunities and Challenges
More informationThe WWF Paper Scorecard Manual
The WWF Paper Scorecard Manual The WWF Paper Scorecard is designed as a userfriendly tool for paper purchasers to evaluate their footprint on the environment and to channel paper consumption towards alternatives
More informationGoals and objectives in the most recent action plan; The Copenhagen Climate Plan
1. Local contribution to global climate change Present details of the original and/or most recent Action Plan, including any relevant disadvantages or constraints resulting from historical and/or geographical
More informationCOMMISSION OF THE EUROPEAN COMMUNITIES COMMISSION INTERPRETATIVE COMMUNICATION
EN EN EN COMMISSION OF THE EUROPEAN COMMUNITIES Brussels, 05.02.2008 C(2007)6661 COMMISSION INTERPRETATIVE COMMUNICATION on the application of Community law on Public Procurement and Concessions to Institutionalised
More informationNordic Structures Revised February 28, 2018
Nordic X-Lam GR-L306 Nordic Structures Revised February 28, 2018 Products: Nordic X-Lam Nordic Structures 1100 Avenue des Canadiens-de-Montréal, Suite 504 Montreal, Québec, Canada H3B 2S2 (514) 871-8526
More informationCANplus Quality Control System Certification For Wood Pellets. CANplus Handbook. Part 2: Certification Procedure. Version 3.
CANplus Quality Control System Certification For Wood Pellets TM CANplus Handbook Part 2: Certification Procedure Version 3.0, May 2016 Handbook Owner / Trademark Licensor: Wood Pellet Association of Canada
More informationCARBON FOOTPRINT CALCULATORS FOR PUBLIC PROCUREMENT OF SIX PRODUCT GROUPS. Maija Mattinen and Ari Nissinen *
CARBON FOOTPRINT CALCULATORS FOR PUBLIC PROCUREMENT OF SIX PRODUCT GROUPS 1 CARBON FOOTPRINT CALCULATORS FOR PUBLIC PROCUREMENT OF SIX PRODUCT GROUPS Maija Mattinen and Ari Nissinen * ABSTRACT. There is
More informationGuidance on the Application. of ISO / IEC Accreditation International Association for Certifying Bodies
Accreditation International Association for Certifying Bodies Guidance on the Application of ISO / IEC 17020 Guidance on the Application of ISO/IEC 17020 Page 1 of 16 Introduction This guidance document
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS International Republican Institute 1225 Eye St. NW, Suite 800 Washington, DC 20005 (202) 408-9450 (202) 408-9462 fax www.iri.org @IRIGlobal Procurement Number: ASIA2017BRM03o Open
More information