1 APPENDIX D VTM - 10 Virginia Test Method For Determining Percent of Moisture and Density of Soils and Asphalt (Nuclear Method) I. Scope This method covers the procedure to be used in determining the percent of moisture and density of soil embankments, base, subbase, and select materials, and the percent density for asphalt concrete. II. Apparatus The apparatus required shall consist of the following: A. Portable Nuclear Moisture-Density Gauge B. Transport case (blue) C. Charger D. Reference Standard Block E. Transport Documents (Bill of Lading) F. Leveling Plate/Drill Rod Guide G. Drill Rod w/extraction tool H. Hammer (4 lbs.) used for Driving the Pin I. Safety Glasses J. Square-Point Shovel K. No. 4 sieve L. Set Balance Scales M. Drying Apparatus N. Miscellaneous Tools such as Mixing Pans and Spoons III. Procedure There are two different methods to determine percent density and percent moisture using the portable nuclear density gauge. The methods are direct transmission and backscatter. The direct transmission method requires punching a hole into the surface of the material being tested and lowering the source rod to the desired depth of test. This method is used to test soil and aggregate materials. Please note that when testing soils, the backscatter position shall not be used as a means of acceptance for density. In the backscatter method, the source rod is lowered to the first notch below the safe position placing the source and detectors in the same horizontal plane. No hole is required for the probe since it is flush with the bottom of the gauge. This method is used to test aggregate (subbase, and base course) and asphalt materials. This method of testing is performed in accordance with Section 304 of the Road and Bridge Specifications - Constructing Density Control Strips. The Roller Pattern is performed first. The purpose is to determine the number of passes to be made by the roller in various combinations of static and/or vibratory rolls to achieve maximum density for that depth of material using that roller. The data collected from the gauge is entered on the TL-53A form. Properly plotted, this will provide a graphical comparison of the number of roller passes necessary to produce a properly compacted product. Once completed this information is used to establish a Control Strip(s). D-1
2 The Control Strip determines the target values for density that will define the acceptance criteria for the material placed and compacted using the previous determined roller pattern. The values determined by the control strip will not change until a new roller pattern is required. This data collected is to be entered on the TL-54A form. The Control Strip provides an accurate method of evaluating materials, which are relatively uniform and exhibit smooth surfaces. A. Roller Pattern The Roller Pattern is constructed on the same material being placed and once established, will be used for the remainder of the project. The Roller Pattern is 75 feet in length plus some additional area to accommodate the lateral positioning of the roller. The width and depth of the material depends on the projects design. Listed below are the steps used to construct a Roller Pattern: Note: Refer to the Manual of Operations and Instructions if additional information is needed. 1. Establish an area at least 10 feet from any structure, and 33 feet from other radioactive sources (another gauge) to take standard counts. This area can be concrete, asphalt, or a well compacted soil with a minimum density of 100 lb/ft 3. Do not use truck beds, tailgates, tabletops, etc. When using Troxler s model 3440 gauge, turn it on and wait for it to perform its self-test. When completed the gauge will enter the Ready mode. At this time, standard counts can be taken and recorded. Note: A standard count will be taken each day of use. If count fails, refer to the gauges Manual of Operation and Instruction guide for further instructions or call your district materials section for assistance. 2. To prepare a Roller Pattern, place the material on a section of roadway approx. 75 feet in length for the typical application width (an area of at least 100 yd 2 ), and at the proper loose depth before any rolling is started. (The Contractor should be allowed to place 100 feet of material prior to the 75 foot section for plant mix stabilization, adjustment, and compaction purposes, with testing to be conducted at the completion of the roller pattern.) The compaction is to be completed uniformly and in the same manner for the remainder of the job. (It is also recommended that a 50 foot section be placed before and after the roller pattern section for positioning of the roller.) The moisture content of aggregates should be kept as near optimum as possible throughout the rolling operation. Water must be added when needed to maintain optimum moisture in accordance with Section 308 and 309 of the Road and Bridge Specifications during the compaction process. To speed up operations, select the 15-second mode on the read out panel and record the density and moisture readings. When testing the control strip and test section, select the 60 second mode for acceptance. 3. Make two (2) passes (1 pass is counted each time the roller crosses the test site) with the roller over the entire surface of the Roller Pattern. Make sure the previous passes have been completed over the entire surface before the next pass is started. When testing asphalt materials, take a nuclear test for density only, using the Backscatter Method. The above test on aggregates and asphalt materials should be made at three randomly selected D-2
3 points within the area to be tested. Choose points with good surface conditions, and try to spread the 3 tests over most of the 75 foot section, making sure not to place the gauge closer than 18 inches to an unsupported edge. Be sure to mark the exact location where the gauge is placed. (If using spray paint to mark the locations, do not spray the gauge with paint.) The gauge, when in use, shall always be positioned parallel with the roadway, with the source end toward the direction of the paver. Record these results on the Roller Pattern Form TL-53A, and obtain the total and average for both moisture and density. All further tests for the Roller Pattern must be made in the same 3 locations, with the gauges source rod pointing in the same direction as the first test. Plot the average dry density versus the number of roller passes on the graph. 4. Make additional passes with the roller over the entire surface of the Roller Pattern, and again obtain and record the 3 readings for density and moisture in the same location as the previous set of readings. Calculate the average from the readings and record them on the Form TL-53A. Continue the rolling and testing of the section until the Roller Pattern reaches its maximum density before decreasing or the curve levels off. To be certain this is a sufficient degree of compaction, make one additional roll over the entire surface and test again. Note: The number of passes that are indicated do not necessarily have to be set at two (2) each time. It may be found that in some instances one pass would be sufficient between readings and, in other instances, 3 or 4 passes would be required. An accurate count of the required passes should be maintained and may vary, depending on subgrade conditions, roller efficiency, type of materials and moisture content. Note: When testing aggregates, upon completion of the control strip, perform a direct transmission test to validate that compaction has been obtained comparing the result to AASHTO T-99. Refer to Table II for the minimum percent density required. Notes on determination of Maximum Attainable Density with Roller Pattern/Control Strip Technique The Control Strip shall be rolled until maximum dry density for granular materials or maximum density for asphalt materials is obtained. Materials compacted to maximum density provide a solid platform on which to construct pavement. Materials at maximum density increase pavement load carrying capacity and pavement life. Opportunities for future pavement distress will be greatly decreased. In the interest of good construction procedure and practice, the inspector should use these guidelines to the best of his/her ability. (These guidelines should not be considered as an addition to the Specifications.) In brief, the change in density in a typical Roller Pattern, for example, on Aggregate Base Material, Type I, Size 21B, may look as shown below: Number of Passes Change in Density, lb/ft Table I D-3
4 It can be seen from the above that continued rolling after 10 passes resulted in diminishing returns. This is typical for many Roller Patterns. Based on an analysis of this type, the following is recommended as a guideline for granular materials. In the event that the increase in dry density for a Roller Pattern on granular material is less than 1 lb/ft 3 one additional pass shall be required. For asphalt base, the same guidelines as for granular materials should be used, with the exception that after the increase becomes less than 0.5 lb/ft 3 per pass, one additional pass shall be required. If the density does not increase by 1 lb/ft 3 with the additional pass, rolling should be discontinued. Occasionally, there will be instances where a decrease in density rather than a small increase will occur. This usually occurs for two reasons: a false break, where the density levels off well before maximum density is achieved, and over rolling. In this case, consideration should be given to the number of passes already made and the materials involved, making certain that the break occurring in the Roller Pattern curve is not greater than 1.5 lb/ft 3. When the break is greater than the above value, re-compact the material to the maximum dry density based on the peak of the roller pattern. A new roller pattern should be established whenever there are multiple lifts of material or there is a change in the following: Source of material Compaction equipment Visual change in subsurface conditions Gradation or type of material Nuclear Density Gauge Test section readings are significantly above the target values by more than 8 lb/ft 3 Another Control Strip will be established. B. Control Strip 1. To prepare a Control Strip, an additional 300 ft. of roadway is required extending from the Roller Pattern area (same spreaderbox width at the same designed depth). This area is to be rolled the same number of passes from the Roller Pattern. 2. In order to determine the maximum dry density of the Control Strip, 10 readings for density and moisture should be performed and recorded over the entire 300 ft. section. Calculate and enter the data on the TL-54A Form. The Target Values of 98% and 95% of the average dry density can now be determined. The dry density determined from the average of the Control Strip should compare within 3 lb/ft 3 of the roller pattern s maximum dry density. This applies to both aggregate and asphalt materials. Note 1: When testing Asphalt Concrete, the gauge should be programmed to the asphalt mode. Note 2: When testing aggregates a verification test will be performed at the completion of the control strip using the direct transmission method or other methods approved by the Engineer. D-4
5 C. Test Sections 1. To complete a test section, 5 readings are required. Each test section for asphalt concrete will be one quarter mile in length for the full width of the roadway or one half mile in length or half the width of the roadway. Each test section for aggregate base, subbase, and select materials will be one half mile in length per application width. The length of test sections for shoulders will be the same as the mainline. If possible test alternating sides. Five (5) readings will be made on each test section for both density and moisture using the same method of test used on the Roller Pattern and Control Strip. Rolling is continued until none of the 5 readings is less than 95% of the Control Strip density, and the average of the 5 readings is equal to or greater than 98% of the Control Strip density. This does not apply to aggregate shoulder material, which requires an average density of 95 ± 2 percentage points of the control density, with individual densities within 95 ± 5 percentage points of the control density. No other test will be required, unless specified by the Engineer. When test section readings are significantly above or below the target values by more than 8 lb/ft 3 another Control Strip will be established. 2. When testing turn lanes, acceleration lanes, deceleration lanes, and crossovers, take 2 or 3 readings on each, whichever is needed, to complete the full test section. Note: For sections of roadway less than 900 feet, the direct transmission method or other approved testing methods for density determinations may be used. If obvious signs of distress are observed while rolling, cease rolling and evaluate the area of distress. Such signs include cracking, shoving, etc. Structural failures will cause the gauge to give an erroneous reading indicating more compaction is needed, when actually over-compaction is causing the failure. If this situation occurs, it should be brought to the attention of the District Materials Section for an evaluation. Note: When taking tests for Asphalt Concrete only record the wet density from the gauge. D. Direct Transmission Method 1. Establish an area at least 10 feet from any structure and 33 feet from other radioactive sources (another gauge) to take standard counts. This area can be concrete, asphalt, or a well compacted soil with a minimum density of 100 lb/ft 3. Do not use truck beds, tailgates, tabletops, etc. When using VDOT s model 3440, turn it on and wait for it to perform its self-test. When it is completed the gauge will enter the Ready mode. At this time, standard counts can be taken and recorded. 2. When testing soil, level off an area on which to place the device with the leveling plate furnished with the gauge. The surface of this area should be as smooth as possible to obtain an accurate test. Care should be taken not to additionally compact the surface during its preparation. 3. All density tests on embankments and subgrade will be tested using the Direct Transmission Method. a. Place the guide plate on the surface. Make a hole in the material with the driving pin provided, using the guide plate to be sure the hole is straight and vertical. b. Extend the source rod just enough to place it in the hole. Then extend the rod to the desired depth of test making sure the device is sitting flush on the surface and the rod is pulled back tight against the back side of the hole. Take a one-minute count in this position. D-5
6 4. The test is complete and the results recorded on Form TL-124A. If the material tested is represented by a predetermined proctor test the dry unit weight should be entered into the gauge prior to testing. This allows the gauge to calculate the percentage of compaction. When it is apparent that the material being placed is different from the material that is described, such as color, texture, rock size, etc., another proctor may need to be made to compare. Refer to the Manual of Instructions, Section 314 for additional information. 5. In the event the material contains appreciable amounts of material retained on the No. 4 sieve a correction shall be performed to determine the correct Proctor Density. If the material being placed is determined to be rock fill an entry must be recorded on the TL-124A Form, showing location and elevation of rock. Aggregate material shall be compared to the theoretical maximum density as determined in accordance with the requirements of VTM-1. The density shall conform to the following: D-6 % Retained on No. 4 Sieve Minimum % Density Table II 85 Note: Percentages of material will be reported to the nearest whole number. The requirements for percent density referenced above apply only to the direct transmission method for aggregate. E. Background Calculations for Trench and Sidewall Moisture Testing When a 3440 Nuclear Moisture-Density Gauge is operated within 24 inches of a vertical structure, the density and moisture counts will be influenced by the structure. Due to the hydrogen-bearing materials in trench walls, on occasion, a higher moisture reading will be observed when testing backfill materials around pipe, culverts, abutments, etc. It is necessary, therefore, to determine the background effect and apply this correction to the observed moisture count readings. The background correction count should be determined each day of testing and when trench wall conditions (distance from wall, moisture content, material composition, etc.) vary. Moisture in certain soil properties containing high amounts of hydrogen rich compounds such as ash, mica, organics, cement, boron and cadmium, will give inaccurate readings and as a result a moisture offset should be performed. The moisture offset should be a minus for ash, mica, organics and cement and a plus for boron and cadmium. See Page 5-4 in the Operation and Instruction Manual to perform the moisture offset. Other alternative methods to determine moisture content are the speedy moisture tester and hotplate method. The procedure to determine the background effect and apply the necessary correction is as follows: 1. Take a standard count with the gauge on the standard block outside the trench and record these values. 2. Place the gauge on the standard block inside the trench in the testing area and select trench offset. The density and moisture trench offset constants will be calculated and stored. When the gauge is not being used for trench measurements disable the offset.
APPENDIX J PROFICIENCY CHECKLISTS
APPENDIX J PROFICIENCY CHECKLISTS SPEEDY MOISTURE TEST Equipment Needed: Complete speedy kit, No. 4 sieve, speedy chart, and sample of soil. Make sure moisture tester is clean and in good working order.
More informationSPEEDY MOISTURE TEST. Equipment Needed: Complete speedy kit, No. 4 sieve, speedy chart, and sample of soil.
SPEEDY MOISTURE TEST Equipment Needed: Complete speedy kit, No. 4 sieve, speedy chart, and sample of soil. Make sure moisture tester is clean and in good working order. Place three measures of calcium
More informationArlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. - VDOT TEST METHODS MANUAL )
MINIMUM RATE 1. Embankments SOILS AND AGGREGATES (a) Density, 303.04(h) One (1) test per 2500 yd3 or less plus: (a) for fills less than 500 ft. length one (1) test on every other 6-in. layer bottom to
More informationArlington County, VA Materials Testing Specification Reference Guide (8/18/2016) MATERIAL AND TEST (REF. VDOT TEST METHODS MANUAL )
1. Embankments SOILS AND AGGREGATES (a) Density, 303.04(h) One (1) test per 2500 yd3 or less plus: (a) for fills less than 500 ft. length one (1) test on every other 6-in. layer bottom to top of fill starting
More informationMethod of Test for Determining Target Dry Density & In-place Density of Salvaged/Recycled Materials Using the Nuclear Gauge (Test Strip)
Method of Test for Determining Target Dry Density & In-place Density of Salvaged/Recycled Materials Using the Nuclear Gauge (Test Strip) 1. Scope: This test is for determining the target dry density of
More informationATT-58/96 DENSITY TEST, Control Strip Method
ATT-58 1.0 Scope ATT-58/96 DENSITY TEST, Control Strip Method 1.0 SCOPE This test procedure covers the method in determining the apparent maximum density of granular base course materials with approved
More informationMANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL Contractor Quality Control - is replaced with the following:
MANDATORY SUPPLEMENTAL SPECIFICATIONS FOR CONTRACTOR QUALITY CONTROL EFFECTIVE DATE: OCTOBER 14, 2011 200.07 Contractor Quality Control - is replaced with the following: (a) (b) (c) Scope: These requirements
More informationDate: Participant Name: Proctor:
[Type text] Sampling & Density Performance Exam SD-1 Special Requirements Test Method Test Designation Page Standard Practice for Sampling Aggregates AASHTO T2-91 (2015)*/ 2 ASTM D75-14 All technicians
More informationSECTION ASPHALT CONCRETE
SECTION 02740 ASPHALT CONCRETE PART 1. GENERAL 1.01 SECTION INCLUDES A. Work includes but is not limited to the following: 1.02 RELATED SECTIONS 1. Provide all material, labor, and equipment to prepare
More information= Maximum dry laboratory density of minus No. 4 (4.75 mm) material (by AASHTO Designation: T 99), in lb/ft 3 (kg/m 3 )
July 2017 **Virginia Test Method 1** Laboratory Determination of Theoretical Maximum Density Optimum Moisture Content of Soils, Granular Subbase, and Base Materials (Soils Lab)... 1 Virginia Test Method
More informationSECTION 14 EMBANKMENT
SECTION 14 EMBANKMENT 14.1 DESCRIPTION A. General: This work consists of constructing roadway embankments, including preparation of the areas upon which embankments are to be placed; the construction of
More informationCement Stabilized Aggregate Base
Supplemental Technical Specification for October 28, 2015 Cement Stabilized Aggregate Base SCDOT Designation: SC-M-308 (10/15) 1. SCOPE 1.1. Cement Stabilized Aggregate Base (CSAB) consists of aggregate,
More informationMATERIALS DIVISION MEMORANDUM SIGNATURE:
MATERIALS DIVISION MEMORANDUM GENERAL SUBJECT: Revision of Materials MOI Aggregates QA Sections SPECIFIC SUBJECT: Revision of Materials MOI Sections 311 through 314 regarding VDOT s QA Program for Aggregate
More informationSECTION 315 ASPHALT CONCRETE PAVEMENT of the Specifications is amended as follows:
S315HP2-0117 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR DENSITY DETERMINATION January 18, 2017 SECTION 315 ASPHALT CONCRETE PAVEMENT of the Specifications is amended as follows: Section
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING
AFTER NOVEMBER 1, 2008 ITEM 252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous
More informationRECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement)
1.0 DESCRIPTION. RECONSTRUCTION OF DISTRESSED PAVEMENTS Full-Depth Rehabilitation (FDR) (Portland cement) This specification shall govern the process known as Full-Depth Rehabilitation (FDR). FDR consists
More informationTECHNICAL SPECIFICATION
TECHNICAL SPECIFICATION ITEM 00252 IN-PLACE FULL DEPTH COLD FLEXIBLE PAVEMENT RECYCLING 252.1 Description. This work shall consist of a stabilized base course composed of a mixture of the existing bituminous
More informationSECTION ASPHALT PAVING AND SURFACING
SECTION 02500 ASPHALT PAVING AND SURFACING PART 1 - GENERAL 1.01 WORK INCLUDED A. Traffic control as required to divert vehicular and pedestrian traffic around construction. B. Spreading and compacting
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationKU Design Guidelines APPENDIX II PERMEABLE BITUMINOUS PAVEMENT
PERMEABLE BITUMINOUS PAVEMENT PART 1: GENERAL 1.01. RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including Special Requirements General Conditions and Division 1 Specifications Sections,
More informationDescription Intelligent compaction (IC) is a process that uses vibratory rollers equipped with a measurement/documentation system that automatically
INTELLIGENT COMPACTION: (SPECIAL) Description Intelligent compaction (IC) is a process that uses vibratory rollers equipped with a measurement/documentation system that automatically records various critical
More informationSECTION 315 ASPHALT CONCRETE PAVEMENT. Materials shall be furnished by the Contractor in accordance with Section 200.
SECTION 315 ASPHALT CONCRETE PAVEMENT I. GENERAL 1.1. DESCRIPTION OF WORK The Contractor shall furnish all labor, supervision, material (except as herein provided), tools, equipment, supplies, and services;
More informationCement Stabilized Soil (CSS) (Portland cement)
Cement Stabilized Soil (CSS) (Portland cement) 1.0 DESCRIPTION. This specification shall govern the process known as Cement Stabilized Soil (CSS). CSS consists of mixing the existing base, subbase and
More informationOHD L-54 STANDARD METHOD OF TEST FOR MAKING, CURING, AND TESTING CEMENT-TREATED BASE FIELD SAMPLES
STANDARD METHOD OF TEST FOR MAKING, CURING, AND TESTING CEMENT-TREATED BASE FIELD SAMPLES Oklahoma D.O.T. Page 1 of 7 1 SCOPE 1.1 This method covers procedures for making, curing, and testing cylindrical
More informationCement Stabilized Aggregate Base
Supplemental Technical Specification for June 2, 2008 Cement Stabilized Aggregate Base SCDOT Designation: SC-M-308 (06/08) 1. SCOPE 1.1. Cement Stabilized Aggregate Base (CSAB) consists of aggregate, Portland
More informationVIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR EMULSIFIED ASPHALT SLURRY SEAL
S312DM2-1112 VIRGINIA DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR EMULSIFIED ASPHALT SLURRY SEAL September 28, 2012 I. DESCRIPTION This work shall consist of furnishing and applying an emulsified
More informationRehabilitation of the Blue Ridge Parkway with FDR and AC Overlay. Michael Walters FHWA EFLHD October 7, 2014
Rehabilitation of the Blue Ridge Parkway with FDR and AC Overlay Michael Walters FHWA EFLHD October 7, 2014 HISTORY Existing pavement on Parkway very deteriorated Repair options were heavy patching and
More informationCHAPTER 3 CONSTRUCTION AND TESTING OF SUBGRADE
CHAPTER 3 CONSTRUCTION AND TESTING OF SUBGRADE WHAT IS SUBGRADE? SUBGRADE EMBANKMENT FOUNDATION The top surface of an embankment or cut section, shaped to conform to the typical section upon which the
More informationCh. 5 - Compaction Page 1. Learning Objectives. Thursday, February 03, 2011
Ch. 5 - Compaction Page 1 Learning Objectives Ch. 5 - Compaction Page 2 Symbols Ch. 5 - Compaction Page 3 Compaction - Introduction Ch. 5 - Compaction Page 4 Compaction - Introduction (cont.) Ch. 5 - Compaction
More informationSECTION EMBANKMENT
02260-1 of 8 SECTION 02260 EMBANKMENT 02260.01 GENERAL A. Description 1. Embankment shall be formed of suitable material obtained from General, Structure, Borrow, Trench, and other excavations included
More informationSECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.
PART 1 GENERAL 1.1 DESCRIPTION A. The WORK under this Section includes providing all labor, materials, tools and equipment necessary for excavation and embankment construction to the lines, grades and
More informationSECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING
PART 1 GENERAL SECTION 02221 TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING 1.01 SECTION INCLUDES A. Excavation, dewatering and backfilling with compaction of trenches for pipes, conduits, channels
More informationSECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS
SECTION 14 - RESTORATION OF SURFACES TABLE OF CONTENTS Section Page 14-1 GENERAL... 14.1 14-2 PRIVATE ROADS... 14.1 14-3 STREETS AND PARKING LOTS... 14.1 14-3.01 Aggregate Base... 14.1 14-3.02 Asphalt
More informationSELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA
0 0 0 0 SELECTIVE FLEXIBLE PAVEMENT REHABILITATION BASED ON FORENSIC INVESTIGATION AND DEFLECTION ANALYSIS: SEVENTEEN YEARS CASE STUDY IN VIRGINIA Mohamed Elfino, Ph.D., P.E. * Assistant State Materials
More informationWarm Mix Asphalt (WMA) Guide Specification for Highway Construction
Warm Mix Asphalt (WMA) Guide Specification for Highway Construction Division 400 - Asphalt Pavements and Surface Treatments SECTION 4XX - WARM MIX ASPHALT (WMA) PAVEMENT Warm mix asphalt (WMA) is the generic
More informationStanford University Facilities Design Guidelines SECTION STONE FINES PAVING. American Society for Testing and Materials.
SECTION 32 15 40 STONE FINES PAVING PART 1 GENERAL 1.1 RELATED WORK Section 32 11 00: Base Courses 1.2 QUALITY ASSURANCE A. Applicable Standards: Any reference shall mean the current or latest editions
More informationVDOT Pavement Recycling Initiative. Andy Babish, P.E. State Materials Engineer
Andy Babish, P.E. State Materials Engineer Pavement Recycling Initiative Background Goal and Key Components Going Forward 2 Initiative Background - 2008: 3 Full Depth Reclamation trial sections constructed
More informationLANDSCAPE RETAINING WALLS
SUDAS Standard Specifications Division 9 - Site Work and Landscaping Section 9070 - Landscape Retaining Walls LANDSCAPE RETAINING WALLS PART - GENERAL.0 SECTION INCLUDES A. Modular Block Retaining Walls
More information4 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (SSRBC) 2015 STANDARD SPECIFICATIONS
Student Manual Lesson 4 Specifications Lesson 4 STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION (SSRBC) 2015 STANDARD SPECIFICATIONS 4-1 Version 1.0 1/15 4 1 Student Manual Lesson 4 Specifications
More informationNORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PORTLAND CEMENT. Section PORTLAND CEMENT STABILIZED SUBGRADE
PART 1 GENERAL 1.01 SUMMARY Section 02338 PORTLAND CEMENT This Section includes foundation course of Portland cement stabilized natural subgrade material. 1.02 MEASUREMENT AND PAYMENT A. Unit Prices. 1.
More informationLTRC QUALITY CONTROL OF TRENCH BACKFILL AT HIGHWAY CROSS-DRAIN PIPES. Zhongjie Doc Zhang, PhD, P.E. October 2004
QUALITY CONTROL OF TRENCH BACKFILL AT HIGHWAY CROSS-DRAIN PIPES Zhongjie Doc Zhang, PhD, P.E. LTRC October 24 Louisiana Transportation Research Center Purposes of Quality Control Guarantee sufficient surrounding
More informationDraft. Not Yet Approved SECTION 10.1 GENERAL SCOPE DEFINITIONS
SECTION 10.1 GENERAL 10.1.1 SCOPE This part of the Manual covers the structural design and installation of reinforced concrete pipe for railway culverts. Pipe geometry may be circular, arch, or elliptical.
More informationMSCAA /04 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION MATERIALS
219-1.1 ITEM P-219 RECYCLED CONCRETE CRUSHED AGGREGATE BASE COURSE DESCRIPTION This item consists of a base course composed of crushed recycled concrete aggregate, crushed to meet a particular gradation,
More informationCONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL
CONSTRUCTION STANDARDS SECTION CS 3 TRENCH FOUNDATION, BEDDING AND BACKFILL CS 3-01 GENERAL: A. The foundation, bedding and backfill for all trenches shall conform with the requirements of the City Standard
More informationAppendix D Roadway Construction Criteria and Testing Procedures Roadway Construction Criteria
Appendix D Roadway Construction Criteria and Testing Procedures Roadway Construction Criteria 1. All independent testing firm work required by this appendix shall be performed by firms on the current City
More informationSECTION 503 TEMPORARY PAVEMENT RESTORATION
SECTION 503 TEMPORARY PAVEMENT RESTORATION 503-1 DESCRIPTION: This work consists of furnishing, placing, compacting, and maintaining a temporary pavement surface suitable for driving in accordance with
More informationExcavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.
Item Excavation and Backfill for Structures 1. DESCRIPTION 2. MATERIALS Excavate for placement and construction of structures and backfill structures. Cut and restore pavement. Use materials that meet
More informationSTANDARD SPECIFICATIONS JANUARY 2015 S-4 GRANULAR BASE and AGGREGATES TABLE OF CONTENTS
TABLE OF CONTENTS 4.01 SCOPE OF WORK... 1 4.02 RELATED DOCUMENTS AND REFERENCES... 1 4.03 MATERIALS... 1 4.04 GENERAL REQUIREMENTS... 2 4.05 HAULING AND PLACING... 5 4.05. COMPACTION... 5 4.06 COMPACTION
More informationMagnumStone Specifications Gravity
MagnumStone Specifications Gravity SPECIFICATION FOR MAGNUMSTONE GRAVITY MECHANICALLY STABILIZED EARTH SYSTEM PART 1: GENERAL.01Description The work consists of supplying and installing all aspects of
More informationSECTION IV. PIPELINE EXCAVATION AND BACKFILL
SECTION IV. PIPELINE EXCAVATION AND BACKFILL A. Description of Work B. Surface Types C. Backfill D. Surface Restoration A. DESCRIPTION OF WORK 1. Extent: Excavation of trenches for pipelines shall include
More informationSECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS
SECTION 13100 MECHANICALLY STABILIZED EARTH RETAINING WALLS PART 1 -- GENERAL 1.01 THE REQUIREMENT A. Includes all labor, material, equipment, testing and submittals required to design and complete construction
More informationSPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM
CornerStone Specifications Geogrid Reinforced SPECIFICATION FOR CORNERSTONE GEOGRID REINFORCED SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Description The work consists of supplying and installing
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19-1 19-1.01 Exploratory Excavation... 19-1 19-1.02 Trench... 19-1 19-1.02.AStorm Drain Pipe...
More informationItem P-219 Recycled Concrete Aggregate Base Course
Item P-219 Recycled Concrete Aggregate DESCRIPTION 219-1.1 This item consists of a base course composed of recycled concrete aggregate, crushed to meet a particular gradation, constructed on a prepared
More informationCITY OF SAN ANGELO ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)
ITEM 275 CITY OF SAN ANGELO ITEM 275 275.1 DESCRIPTION. This Item shall govern for treating subgrade, new and/or existing base (with or without asphaltic concrete pavement (ACP)), or combinations as shown
More informationState of Nevada Department of Transportation Materials Division
State of Nevada Department of Transportation Materials Division STANDARD METHODS OF SAMPLING STONE, GRAVEL, SAND AND PAVING MIXTURES FOR USE AS HIGHWAY MATERIALS SCOPE This test method is used to obtain
More informationSECTION 10 - TRENCHING AND BACKFILLING
SECTION 10 - TRENCHING AND BACKFILLING 10.1 General A. Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 10.1.1 Related requirements
More informationPublic Works Manual. Revised September Concrete & Asphalt
Public Works Manual Revised September 2015 Concrete & Asphalt Where it must cross domestic it must cross above and with a 1 minimum separation. Nonpotable water tape. 10.00 PORTLAND CEMENT CONCRETE 10.01
More information1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods
SECTION 2000- EARTHWORK PART 1- GENERAL 1.01 SCOPE: This Section covers excavation, fill, and compaction of earth and rock for roadway, embankments, structural foundations, and planted areas. Topics include
More informationSection 25 Aggregate Subbase
Black text from standard FAA spec Strikeout text deletions from FAA standard spec Blue text additions to FAA standard spec Red text notes to the Engineer/won t appear in spec I. DESCRIPTION A. GRANULAR
More informationDIVISION 4100 SITEWORK
DIVISION 4100 SITEWORK SECTION 4115 EARTHWORK PART 1 - GENERAL 1.01 SCOPE This section covers the grading and compaction of excavations, embankments, structural foundations, and planted areas. 1.02 REFERENCES
More informationSECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT SECTION 32 14 13 19 PERMEABLE INTERLOCKING CONCRETE UNIT PAVEMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Permeable Articulating
More informationCONSTRUCTION SPECIFICATION FOR COMPACTING
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS.PROV 501 NOVEMBER 2014 CONSTRUCTION SPECIFICATION FOR COMPACTING TABLE OF CONTENTS 501.01 SCOPE 501.02 REFERENCES 501.03 DEFINITIONS 501.04 DESIGN
More informationSPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI)
1993 Specifications CSJ 0451-02-023, etc. SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI) 1. Description. This Item shall govern for the materials and construction requirements for
More informationCity of Brandon Division 2 Standard Construction Specifications Section January 2000 Page 1 of 10 SOIL CEMENT BASE COURSE PART 1 GENERAL
January 2000 Page 1 of 10 PART 1 GENERAL 1.01 OTHER CONTRACT DOCUMENTS 1.02 DESCRIPTION OF WORK 1.03 RELATED WORK 1.04 APPROVALS PART 2 PRODUCTS 2.01 CEMENT 2.02 WATER The General Conditions of the Contract,
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More informationPennDOT Special Provision Contractor Support of Research Project. SUBGRADE SOILS (Type II)
PennDOT Special Provision Contractor Support of Research Project SUBGRADE SOILS (Type II) Intelligent Compaction Pooled Fund Accelerated Implementation of Intelligent Compaction Technology for Embankment
More informationLight Weight Deflectometer (LWD) Nayyar Siddiki, P.E., Geotech Construction & Tech Support Engineer, INDOT Purdue Road School March 6, 2018
Light Weight Deflectometer (LWD) Nayyar Siddiki, P.E., Geotech Construction & Tech Support Engineer, INDOT Purdue Road School March 6, 2018 LWD Equipment and Testing Procedure, ITM 508 INDOT Standard
More informationBUILDING DEVELOPMENT POLICIES AND PROCEDURES ADMINISTRATIVE/GENERAL
GEOTECHNICAL GUIDELINES FOR THE USE OF LIME DURING CONSTRUCTION Section Page 4-0X0l Applicability and Restrictions 2 4-0X02 Expansive Soil Determination 5 4-0X03 Mixture Design for Lime Stabilization of
More informationSECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS
SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS Section Page 19-1 TRENCH EXCAVATION... 19.1 19-1.01 Exploratory Excavation... 19.1 19-1.02 Trench Width... 19.1 19-1.02.A Storm Drain
More informationIllinois Department of Transportation Bureau of Materials & Physical Research
2012-2013 Illinois Department of Transportation Bureau of Materials & Physical Research CET 026 Nuclear Density Course Manual Revised January 2013 HOT MI ASPHALT - NUCLEAR DENSITY TESTER COURSE Students
More informationAPPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION
APPENDIX "B" ASPHALT CONCRETE PAVEMENT FOR STREET AND DRIVEWAY CONSTRUCTION The work covered by these specifications consists of furnishing all labor, equipment and materials and in performing all operations
More informationSECTION BITUMINOUS CONCRETE PAVING
PART 1 GENERAL 1.1 SECTION INCLUDES: SECTION 02400 BITUMINOUS CONCRETE PAVING A. The intent of this specification section is to provide requirements for materials, equipment, and methods for constructing
More informationSECTION 402 HOT MIX ASPHALT, HMA, PAVEMENT
SECTION 402 HOT MIX ASPHALT, HMA, PAVEMENT 402.01 Description. This work shall consist of one or more courses of HMA base, intermediate, or surface mixtures and miscellaneous courses for rumble strips,
More informationStormTech Construction Guide
A division of StormTech solid end caps and pre-cored end caps StormTech chambers StormTech manifolds and fittings Acceptable fill materials per Table 1 Woven and non-woven geotextiles 80-7 DC REQUIRED
More informationSECTION TRENCHING & BACKFILLING
SECTION 02225 - TRENCHING & BACKFILLING 1.0 GENERAL 1.1 Work included in this Section includes trenching and backfilling for underground pipelines and related structures only. 1.2 Reference Specifications
More informationChapter 5: Designs for Recreational Uses 5-1 Asphalt Pavements for Non-Vehicular Use 5-1 Table 5-1: Thickness Design Chart: Bikeways, Paths, Trails
5-1 Asphalt Pavements for Non-Vehicular Use 5-1 Table 5-1: Thickness Design Chart: Bikeways, Paths, Trails and Walkways 5-3 Table 5-2: Thickness Design Chart: Playgrounds 5-4 Tennis Courts 5-5 Table 5-3:
More informationFULL - DEPTH RECYCLING OF ASPHALT PAVEMENTS WITH PORTLAND CEMENT
FULL - DEPTH RECYCLING OF ASPHALT PAVEMENTS WITH PORTLAND CEMENT Dick Martin Pavement Recycling Specialist Road Recycling Council New England Region What is Full Depth Reclamation? FDR is the rehabilitation
More informationSection LIME-STABILIZED SUBGRADE. A. This Section includes foundation course of lime-stabilized subgrade material.
PART 1 GENERAL 1.01 SUMMARY Section 02336 A. This Section includes foundation course of lime-stabilized subgrade material. 1. Application of lime slurry to subgrade. 2. Mixing, compaction, and curing of
More informationCHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves
CHAPTER 7 PAVEMENT DESIGN 7.0 GENERAL The purpose of this chapter is to define the requirements for design of pavement within proposed and existing roadways for new subdivision streets and secondary roads.
More informationSECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS
SECTION 2200 PAVING CITY OF BLUE SPRINGS, MISSOURI CONSTRUCTION SPECIFICATIONS The City of Blue Springs hereby adopts Section 2200 of the Kansas City Metropolitan Chapter of APWA Construction and Material
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular
More informationITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED)
ITEM 275 PORTLAND CEMENT TREATED MATERIALS (ROAD MIXED) 275.1. Description. This Item shall govern for treating subgrade, new and/or existing base [with or without asphaltic concrete pavement (ACP)], or
More informationSPECIAL SPECIFICATION 2013 Roller Integrated Compaction Monitoring (RICM)
2004 Specifications CSJ 0353-03-059 May be used only with the approval of CST. SPECIAL SPECIFICATION 2013 Roller Integrated Compaction Monitoring (RICM) 1. Description. Construct subgrade soil (treated
More informationSpecial Provisions for Pavement Open Cuts
1. All patches are to be replaced in accordance with the following requirements and as shown in Figure 1. 2. All Excavations or Open Cuts shall comply with OSHA Technical Manual, Chapter 2, Title Excavation:
More information378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE
378-1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION 378 - POND I. SCOPE The work shall consist of constructing an earthfill embankment and appurtenances to the lines, grades,
More informationST. TAMMANY PARISH COUNCIL ORDINANCE
ST. TAMMANY PARISH COUNCIL ORDINANCE ORDINANCE CALENDAR NO: 5563 COUNCIL SPONSOR: DEAN/BRISTER INTRODUCED BY: MR. BELLISARIO ORDINANCE COUNCIL SERIES NO: PROVIDED BY: DEVELOPMENT SECONDED BY: MR. STEFANCIK
More informationStudent Services & Classroom Addition
SECTION 321216 - ASPHALT PAVING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMethod of Test for Determining the In-Place Density of Low Slump Dense Concrete Using the Nuclear Gauge
Method of Test for Determining the In-Place Density of Low Slump Dense Concrete Using the Nuclear Gauge 1. Scope: This test is for determining the in-place density of freshly mixed low slump dense concrete
More informationUnion County Vocational - Technical Schools Scotch Plains, New Jersey
SECTION 02222 - EXCAVATION, BACKFILL, AND COMPACTION FOR UTILITIES PART 1 - GENERAL 1.01 SECTION INCLUDES A. Excavating trenches for the installation of utilities and stormwater detention facilities. B.
More informationSECTION BITUMINOUS CONCRETE PAVEMENT
SECTION 321216 BITUMINOUS CONCRETE PAVEMENT PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationCUT, RE SECTION VI. (Sub-section 290) Cut, Removal, and Replacement of Paved Surfaces. 1. Description Bituminous Pavements thru 290-2
CUT, RE SECTION VI (Sub-section 290) Cut, Removal, and Replacement of Paved Surfaces Article Page 1. Description 290-1 2. Bituminous Pavements 290-1 thru 290-2 3. Concrete Pavements 290-3 thru 290-4 4.
More informationSECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.
SECTION 1100 GRADING 1101 SCOPE. This section covers the performance of all work required for grading the project in coordination with all previous work performed at the locations shown on the contract
More informationTopic #4 Soil Compaction
Topic #4 Soil Compaction What is Compaction? A simple ground improvement technique, where the soil is densified through external compactive effort. Compactive Effort + Water = 2 Compaction and Phase Diagram
More informationCITY OF KANSAS CITY, MISSOURI
KCMO Supplement April 2000 Document No. 000079 CITY OF KANSAS CITY, MISSOURI SUPPLEMENT TO APWA STANDARD SPECIFICATIONS AND DESIGN CRITERIA SECTION 2600 This is the Kansas City, Missouri Supplement to
More information204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)
SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES 204.1 DESCRIPTION Excavate for the structures as shown in the Contract Documents. Unless specified otherwise, backfill the completed structures to the
More information32.02 RESPONSIBILITIES OF THE TESTING AGENCY
32.2 RESPONSIBILITIES OF THE TESTING AGENCY 32.2.1 General All materials and operations shall be tested in accordance with these Specifications and as directed by the Project Manager. Agencies testing
More informationSECTION SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM
SECTION 32 32 23 SPECIFICATION FOR STONEBRIDGE RETAINING WALL SYSTEM PART 1: GENERAL 1.01 Scope Work includes furnishing all materials, labor, equipment, and supervision to install a Stonebridge segmental
More informationReinforced Soil Slopes (RSS)
Supplemental Technical Specification for Reinforced Soil Slopes (RSS) SCDOT Designation: SC-M-206-1 (4/16) 1.0 DESCRIPTION 1.1 Construct a reinforced soil slope in accordance with these specifications,
More information