Klickitat County Shoreline Master Plan Update. Open House November 15, 2017

Size: px
Start display at page:

Download "Klickitat County Shoreline Master Plan Update. Open House November 15, 2017"

Transcription

1 Klickitat County Shoreline Master Plan Update Open House November 15, 2017

2 Agenda 6:00 6:10 Welcome 6:10 6:40 Presentation SMP Process Recap SMP Update Overview Next Steps 6:40 8:00 Open House

3 What is an SMP? A comprehensive shoreline land-use plan that includes policies and regulations for the use and development of the shoreline

4 Shoreline Management Act (SMA) Purpose: Balance Shoreline Priorities 1. Preferred uses Water dependent Water enjoyment Single Family Development 2. Promote public access 3. Protection of natural environment

5 An SMP will not: Retroactively apply to past actions. Require modifications to existing land uses or developments. Alter ongoing agricultural activities

6 Shoreline Master Plan Includes Goals Policies Shoreline designations Regulations

7 Regulatory Content Public Access Shoreline Uses and Modifications Vegetation Conservation In-water Activities Upland Activities

8 New Requirements No Net Loss requirement Maintain baseline condition Utilize mitigation sequencing Critical Areas integration Restoration Plan

9 We are here Determine Preliminary Jurisdiction Inventory & Analysis SMP - Environment Designations - Goals - Policies - Regulations Cumulative Impacts Analysis Local Adoption Open Open House House Restoration Plan Ecology Review and Adoption

10

11 Waters Shoreline Jurisdiction Streams & rivers with mean annual flow of 20 cfs or greater Lakes 20 acres or larger Shorelands Upland areas 200 feet from OHWM Associated wetlands (within 100-year floodplain or with hydrologic connection) FEMA floodway and up to 200 feet landward of the floodway when within the 100 year floodplain.

12 SMP Outline Section 1 Introduction Section 2 Shoreline Master Plan Elements Section 3 Shoreline Environment Designations Section 4 Shoreline Use and Modification Policies and Regulations o o Including Use and Modifications Matrix Including Development Standards Table Section 5 Administration, Permits, and Enforcement Glossary

13 Section 1: Introduction Relationship to the SMA Purpose and Intent Goals and Objectives Plan Scope (i.e. Jurisdiction)

14 Shoreline Waterbodies Bowman Creek Buck Creek Camas Ditch and Outlet Creek Cave Creek Chamberlain Lake Columbia River* Dead Canyon Creek Dry Creek Frasier Creek Gilmer Creek Holmes Creek Horsethief Lake Klickitat River* Little Klickitat River Major Creek Major Creek, West Fork Mill Creek Mill Pond Paterson Slough Rattlesnake Creek Rowland Lake Snyder Canyon Creek Summit Creek Swale Creek Trout Creek Trout Lake Creek* White Creek White Salmon River* Little White Salmon River

15 Shoreline Waterbodies new areas Bowman Creek Major Creek, West Fork Buck Creek Mill Creek Camas Ditch and Outlet Creek Mill Pond Cave Creek Paterson Slough Chamberlain Lake Rattlesnake Creek Columbia River* Rowland Lake Dead Canyon Creek Snyder Canyon Creek Dry Creek Summit Creek Frasier Creek Swale Creek Gilmer Creek Trout Creek Holmes Creek Trout Lake Creek* Horsethief Lake White Creek Klickitat River* White Salmon River* Little Klickitat River Little White Salmon River Major Creek

16 Shoreline Waterbodies removed Buck Creek 4,900 linear feet removed Little Klickitat River 13,500 linear feet removed Rock Creek all areas removed except Paterson Slough Locke Lake less than 20 acres Spearfish Lake less than 20 acres

17 Section 2: Master Plan Elements Economic Development Public Access Circulation Recreation Historical/Cultural Conservation Residential Shoreline use Private Property Rights

18 Section 3: Environment Designations Natural Conservancy Rural Community Urban/Industrial Aquatic (NEW)

19 Natural Ex. Lower White Salmon R. Purpose: to preserve and restore natural resource systems which are relatively free of human influence. Criteria: areas of unique and valuable wildlife habitat, undisturbed natural areas, and lowintensity recreational use Key Policies: very limited uses allowed Ex. Upper Klickitat R.

20 Conservancy Ex. Columbia R. Purpose: to protect, conserve, and manage natural resources and provide recreational opportunities. Criteria: areas of low-intensity land uses primarily related to resource use and diffused recreation. Key Policies: uses limited to those which sustain the area s physical and biological resources. Ex. Little Klickitat R.

21 Rural Ex. White Salmon R. near Trout Lake Purpose: to protect agricultural land from urban expansion, but may include low-density residential and moderate intensity recreational uses. Criteria: areas of intensive agriculture or recreational use. Key Policies: promote agricultural activities and limit other uses which are not compatible with the rural character. Ex. White Salmon R. near BZ Corner.

22 Community Purpose: to accommodate residential development while also providing appropriate public access and recreational uses. Ex. White Salmon R. at Hussum Ex. Columbia R. at Lyle. Criteria: areas of moderate to intense land use, including residential, commercial, and recreational development. Particularly suited for planned expansion. Key Policies: subdivisions and recreational development should provide public access. Commercial development allowed consistent with underlying zoning.

23 Urban/Industrial Purpose: to ensure optimal utilization of industrial shoreline areas by providing for manufacturing, commercial, high-density residential and industrial uses. Ex. Columbia R. at Wishram Ex. Columbia R. near Bingen. Criteria: areas characterized by high intensity and diverse land uses. Key Policies: Fully utilize existing industrial areas and altered lands before further expansion is allowed. Public access required on public lands and encouraged elsewhere, with limitations based on site conditions or use conflicts.

24 Aquatic Purpose: to protect, restore and manage areas waterward of the ordinary high water mark. Ex. Trout Lake Creek Criteria: all areas waterward of the ordinary high water mark. Key Policies: new overwater structures should be for water-dependent uses only. All uses and modifications should be designed to minimize impacts, including impacts to navigation. Ex. Columbia R. at Horsethief Lake.

25 Environment Designations other changes Replacement of 50-foot Natural Buffer Zone and 200-foot Type-S buffer with shoreline environment designation (SED) specific buffers. Review of minor changes to SED mapping: Alignment with parcel boundaries Consistency with underlying zoning, land use, and environmental condition

26 Environment Designation Maps

27 Designation Changes - sample Waterbody Description of Changes Environment Designation(s) Bowman Creek Buck Creek Camas Ditch and Outlet Creek Cave Creek Upstream area of Bowman Creek was added to shoreline jurisdiction New area was designated Conservancy based on the adjacent existing SED as well as zoning and underlying land use Existing areas designated Natural are unchanged A portion of upstream area was removed from shoreline jurisdiction Extensive wetland area added, designated Conservancy based on land use and zoning The break between the existing Natural and Conservancy designations was moved to align with a parcel boundary Added to shoreline jurisdiction New areas designated Conservancy, Community or Rural based on zoning and underlying land use Conservancy, Natural Conservancy Conservancy, Natural Conservancy, Community, Natural Chamberlain Lake No change Conservancy

28 Section 4: Use and Modifications Shoreline Use and Modifications Matrix Summarizes which uses and modifications are permitted, conditionally permitted, and prohibited in each environment designation Concisely summarizes and interprets development regulations from the body of the SMP In the event of a conflict between the table and the body text of the SMP, text controls Footnotes are used to describe special circumstances Provides a snapshot tool for comparing environment designations

29

30 Section 4.3: Dimensional Standards River frontage for residential use carried forward from current SMP Building heights 35 ft, with exceptions for utilities, bridges, and approved industrial uses Building setbacks recommended 10 feet Impervious surface specific limit only required for residential use in Conservancy designation Shoreline buffers recommend moving to environment specific buffer approach, allowing 0 buffer for waterdependent uses.

31 Shoreline Buffers* Natural 150 feet Conservancy 150 feet Community Rural 100 feet 50 feet Urban/Industrial 50 feet * Water-dependent uses would require a 0 buffer and no building setback Supporting rationale: (1) See existing setbacks for Residential Use, including a 100-foot buffer for residential use in the Rural SED. (2) A 50 ft Natural Buffer Zone currently exists across all areas (3) The existing CAO lists a 200-foot buffer for all Shorelines (4) Existing science supports a minimum of 150 foot buffer for fish bearing waterbodies. (5) A 50-foot buffer for Community and Urban/Industrial SED is consistent with the existing development patterns.

32 Section 4.4 General Policies and Regs Ecological Protection and Critical Areas No Net Loss emphasized throughout SMP Mitigation Sequencing Updated CAO, including buffer reduction/averaging Archeological Areas and Historic Sites Updated for WAC consistency Public Access Updated for WAC consistency regarding new residential development and subdivision of land

33 Section 4.4 General Policies and Regs Water Quality, Storm Water, and Nonpoint Pollution Added for WAC consistency Vegetation Conservation Added for WAC consistency Includes tree retention and mitigation standards Emphasis on minimization of site impacts Flood Hazard Reduction Added for WAC consistency excerpts from Shoreline Alteration section

34 Section 4.5 Resource Based Activities Agricultural Practices See suggested simplified version from Walla Walla County Aquaculture Forest Management See suggested simplified version from Walla Walla County Mining

35 Section 4.6 Development Activities Commercial Development In-stream Structures Added for WAC consistency Marinas and Boating Facilities Outdoor Advertising and Signs Piers and Docks Emphasis on joint-use Port and Industrial Development Limitations on nonwater oriented industrial development

36 Section 4.7 Modification Activities General Modification Requirements New section, applies to all modification activities Only allowed where demonstrated necessary Breakwaters, Jetties, Groins, and Weirs Combined these provisions due to consistency Dredging Updated for WAC consistency regarding new development Added clarification of when dredging or maintenance dredging should be allowed

37 Section 4.7 Modification Activities Fill Clarified term Clarified per WAC, when is fill in water allowed Clearing and Grading Removed clearing and grading limits for SSWS and rely on mitigation sequencing and vegetation conservation stds Shoreline Stabilization Incorporated former Bulkhead section Added some clarity for WAC consistency

38 Section 4.7 Modification Activities Habitat and Natural Systems Enhancement Projects Added for WAC consistency

39 Section 5.0 Administration, Permits, and Enforcement Exemptions Removed and referenced WAC Non-conforming Standards Added allowance for legally established residential structures

40 Appendix: Glossary Agricultural activities Buffers Building setback Hard/Soft stabilization Policies Qualified professional

41 Next Steps Complete Open House Meet with Planning Commission in 2018 to finalize supporting documents Restoration Plan Cumulative Impacts Analysis No Net Loss Report Public Hearings and Local Adoption in 2018

42 Contact Information Mo-chi Lindblad Planning Director Klickitat County (509) Website

Frequently Asked Questions

Frequently Asked Questions Frequently Asked Questions Chelan County Shoreline Master Program Update July 2009 What is an SMP? Shoreline Master Programs (SMP) are a combination of rules and comprehensive planning that are prepared

More information

City of Lakewood Grant No. G Shoreline Master Program Environment Designations, Policies, and Regulations. Prepared by:

City of Lakewood Grant No. G Shoreline Master Program Environment Designations, Policies, and Regulations. Prepared by: City of Lakewood Grant No. G1000045 Shoreline Master Program Environment Designations, Policies, and Regulations Prepared by: AHBL 1200 6th Avenue Suite 1620 Seattle, WA 98101 With: Otak, Inc. 10230 NE

More information

TOPIC BILL FORMAT CHANGES (underline = additions; strikethrough = deletions) RATIONALE

TOPIC BILL FORMAT CHANGES (underline = additions; strikethrough = deletions) RATIONALE Attachment B: Ecology Required Changes: Camas Shoreline Master Program, Ordinance No. 2643, adopted March 5, 2012. The following changes are required to comply with the SMA (RCW 90.58) and the SMP Guidelines

More information

Exhibit B Shoreline Checklist & Statement of Exemption Form for Ensuring Consistency with SMP Policies and Regulations and No Net Loss Policy

Exhibit B Shoreline Checklist & Statement of Exemption Form for Ensuring Consistency with SMP Policies and Regulations and No Net Loss Policy CLALLAM COUNTY Department of Community Development 223 East 4th Street, Suite 5 Port Angeles Washington 98362 360-417-2420 Exhibit B Shoreline Checklist & Statement of Exemption Form for Ensuring Consistency

More information

CLALLAM COUNTY. Preliminary Draft Committee Review. Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP

CLALLAM COUNTY. Preliminary Draft Committee Review. Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP Preliminary Draft Committee Review CLALLAM COUNTY Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP Note to Reviewers: This is a preliminary draft of the proposed revisions

More information

Clallam County Shoreline Master Program (SMP) Update

Clallam County Shoreline Master Program (SMP) Update Title Level 1 Title Level 2 Clallam County Shoreline Master Program (SMP) Update Clallam County Board of County Commissioners October 30, 2017 Clallam County Shoreline Master Program: In effect for Over

More information

THURSTON COUNTY SHORELINE MASTER PROGRAM UPDATE DRAFT SHORELINE ENVIRONMENT DESIGNATIONS

THURSTON COUNTY SHORELINE MASTER PROGRAM UPDATE DRAFT SHORELINE ENVIRONMENT DESIGNATIONS THURSTON COUNTY SHORELINE MASTER PROGRAM UPDATE DRAFT SHORELINE ENVIRONMENT DESIGNATIONS PREPARED BY THURSTON COUNTY PLANNING DEPARTMENT BUILDING # 1, 2ND FLOOR 2000 LAKERIDGE DRIVE SW OLYMPIA, WA 98502-6045

More information

CITY OF LONGVIEW SHORELINE MASTER PROGRAM

CITY OF LONGVIEW SHORELINE MASTER PROGRAM CITY OF LONGVIEW SHORELINE MASTER PROGRAM - 2015 1 City of Longview Shoreline Master Program Table of Contents CITY OF LONGVIEW SHORELINE MASTER PROGRAM... 2 I. INTRODUCTION... 4 II. SHORELINE MASTER PROGRAM

More information

SHORELINE MASTER PROGRAM

SHORELINE MASTER PROGRAM PRELIMINARY DRAFT GRAYS HARBOR COUNTY SHORELINE MASTER PROGRAM Please note that this draft is currently under review by the Shoreline Planning Committee and further changes should be expected. January

More information

FinalDraft Shoreline Master Program. City of Enumclaw. Enumclaw, Washington. City of Enumclaw Griffin Avenue Enumclaw, Washington 98022

FinalDraft Shoreline Master Program. City of Enumclaw. Enumclaw, Washington. City of Enumclaw Griffin Avenue Enumclaw, Washington 98022 FinalDraft Shoreline Master Program City of Enumclaw Enumclaw, Washington DOE APPROVED May 07, 2012MARCH 2019 Prepared for City of Enumclaw 1339 Griffin Avenue Enumclaw, Washington 98022 130 2nd Avenue

More information

DRAFT - CLALLAM COUNTY SHORELINE MASTER PROGRAM (SMP)

DRAFT - CLALLAM COUNTY SHORELINE MASTER PROGRAM (SMP) Planning Commission Review Draft August 2014 DRAFT - CLALLAM COUNTY SHORELINE MASTER PROGRAM (SMP) Note to Reviewers: The Clallam County Shoreline Master Program (SMP) was adopted in 1976, and last amended

More information

Draft Shoreline Master Program

Draft Shoreline Master Program September 0 PREPARED FOR: STEVENS COUNTY AND THE CTY OF KETTLE FALLS, TOWN OF MARCUS, AND TOWN OF NORTHPORT Shoreline Master Program Stevens County Partnership Shoreline Master Program Update Prepared

More information

CLALLAM COUNTY. Final Draft. Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP

CLALLAM COUNTY. Final Draft. Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP Final Draft CLALLAM COUNTY Shoreline Master Program (SMP) Proposed Update to the 1992 Clallam County SMP Note to Reviewers: This is a revised draft of the proposed revisions to the County s Shoreline Master

More information

CHAPTER 1: INTRODUCTION. Background: Shoreline Management in Washington State

CHAPTER 1: INTRODUCTION. Background: Shoreline Management in Washington State September 19, 2007 CHAPTER 1: INTRODUCTION Background: Shoreline Management in Washington State The Shoreline Management Act In 1971, the Washington State Legislature, in response to a citizens initiative,

More information

Shoreline Master Program VISIONING OVERVIEW

Shoreline Master Program VISIONING OVERVIEW Shoreline Master Program VISIONING OVERVIEW DATE: December 5, 2012 TO: FROM: City of Kalama Panning Commission David Sherrard, Parametrix, Project Manager Jennifer Hughes, Parametrix, Planner SUBJECT:

More information

ECOLOGY MAY 25, 2011 PUBLIC HEARING COMMENT SUMMARY MATRIX CITY OF BELLINGHAM SHORELINE MASTER PROGRAM

ECOLOGY MAY 25, 2011 PUBLIC HEARING COMMENT SUMMARY MATRIX CITY OF BELLINGHAM SHORELINE MASTER PROGRAM 1. Inventory Characterization Inventory is out-of-date and under reports fish, wildlife and habitat occurring in reaches. Update the inventory and establish the correct baseline for determining no-net-loss

More information

Clallam County Shoreline Master Program (SMP) Update

Clallam County Shoreline Master Program (SMP) Update Title Level 1 Title Level 2 Clallam County Shoreline Master Program (SMP) Update Sekiu-Clallam Bay Regional Forum November 2, 2017 Clallam County Shoreline Master Program: In effect for Over 40 years,

More information

Final Draft Shoreline Master Program

Final Draft Shoreline Master Program Planning Commission Review Draft: BOCC Review: Adopted: Approved: Effective: //0 /0/0 /0/0 0//0 //0 February 0 PREPARED FOR: FRANKLIN COUNTY Shoreline Master Program Update Prepared by: 0 W. Grandridge

More information

CHAPTER 7: SHORELINE DESIGNATIONS

CHAPTER 7: SHORELINE DESIGNATIONS CHAPTER 7: SHORELINE S Introduction Shoreline Designations are intended to encourage uses and activities that will protect or enhance the present or desired character of a shoreline and allow appropriate

More information

The following changes are recommended to ensure compliance with the SMA (RCW 90.58) and the SMP Guidelines (WAC , Part III):

The following changes are recommended to ensure compliance with the SMA (RCW 90.58) and the SMP Guidelines (WAC , Part III): ATTACHMENT C-REVISED DEPARTMENT OF ECOLOGY RECOMMENDED CHANGES TO THE CITY OF BLACK DIAMONDS COMPREHENSIVE SMP AMENDMENT The following changes are recommended to ensure compliance with the SMA (RCW 90.58)

More information

Community Workshops Summary Prepared February 2016

Community Workshops Summary Prepared February 2016 Community Workshops Summary Prepared February 2016 Introduction Stevens County is preparing an updated Shoreline Master Program (SMP), and the City of Kettle Falls and the towns of Marcus and Northport

More information

Planning & Development Services

Planning & Development Services Planning & Development Services 1 8 0 0 C o n t i n e n t a l P l a c e M o u n t V e r n o n, W a s h i n g t o n 9 8 2 7 3 o f f i c e 3 6 0-4 1 6-1 3 2 0 p d s @ c o. s k a g i t. w a. u s w w w. s

More information

Clallam County Shoreline Master Program (SMP) Update

Clallam County Shoreline Master Program (SMP) Update Title Level 1 Title Level 2 Clallam County Shoreline Master Program (SMP) Update Port Angeles Public Forum November 8, 2017 Clallam County Shoreline Master Program: In effect for Over 40 years, with nine

More information

2.1 Basis of the Designations

2.1 Basis of the Designations Chapter 2 Environment Designations Note to Users: Each segment (or reach) of the shoreline has an environment designation that reflects its existing ecological condition, land use pattern, zoning, the

More information

City of Tacoma Planning and Development Services

City of Tacoma Planning and Development Services Agenda Item D-1 To: From: Subject: City of Tacoma Planning and Development Services Planning Commission Meeting Date: December 5, 2018 Memo Date: November 28, 2018 Elliott Barnett, Planning Services Division

More information

BOTHELL SHORELINE MASTER PROGRAM UPDATE

BOTHELL SHORELINE MASTER PROGRAM UPDATE CITY COUNCIL APPROVED BOTHELL SHORELINE MASTER PROGRAM UPDATE Community Development Department 9654 NE 182nd Street Bothell, WA 98011 ACKNOWLEDGEMENTS Prepared by the Bothell Shorelines Board: Adam Brauch

More information

STAFF REPORT WASHINGTON STATE PARKS AND RECREATION COMMISSION COVERED SHELTERS AND BIKE RACKS

STAFF REPORT WASHINGTON STATE PARKS AND RECREATION COMMISSION COVERED SHELTERS AND BIKE RACKS STAFF REPORT WASHINGTON STATE PARKS AND RECREATION COMMISSION COVERED SHELTERS AND BIKE RACKS TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE: SP-2019-02 DATE: April 8,

More information

CITY OF CHELAN SHORELINE MASTER PROGRAM

CITY OF CHELAN SHORELINE MASTER PROGRAM CHELAN COUNTY GRANT NO. G0800231 City Council Authorized CITY OF CHELAN SHORELINE MASTER PROGRAM Prepared for: City of Chelan 135 E. Johnson Chelan, WA 98816 Prepared by: 2025 First Avenue, Suite 800 750

More information

Cumulative Impacts Analysis for City of Anacortes Shorelines: Puget Sound Waters, Cranberry Lake, Heart Lake, Whistle Lake and Lake Erie

Cumulative Impacts Analysis for City of Anacortes Shorelines: Puget Sound Waters, Cranberry Lake, Heart Lake, Whistle Lake and Lake Erie FINAL Cumulative Impacts Analysis for City of Anacortes Shorelines: Puget Sound Waters, Cranberry Lake, Heart Lake, Whistle Lake and Lake Erie Prepared for: City of Anacortes Grant No. G1000072 Planning

More information

(NAME)... ERROR! BOOKMARK NOT DEFINED.

(NAME)... ERROR! BOOKMARK NOT DEFINED. SHORELINE MASTER PROGRAM SUBMITTAL CHECKLIST THIS CHECKLIST IS FOR USE BY LOCAL GOVERNMENTS TO SATISFY THE REQUIREMENTS OF WAC 173-26- 201(3)(A), RELATING TO SUBMITTAL OF SHORELINE MASTER PROGRAMS (SMPS)

More information

Ecology Required Changes Revised July 6, Additional changes are underlined in bold.

Ecology Required Changes Revised July 6, Additional changes are underlined in bold. ATTACHMENT B: Snohomish County SMP adopted October 13, 2010 Ecology Required Changes Revised July 6, 2012. Additional changes are underlined in bold. The following changes are required to comply with the

More information

Sustainable Natural Environment Fish Habitat

Sustainable Natural Environment Fish Habitat Town of Huntsville Official Plan Review - POLICY BACKGROUND PAPER Sustainable Natural Environment Fish Habitat BACKGROUND: Lakes, rivers, streams, ponds and many wetlands provide fish habitat. Intermittent

More information

dpd Seattle Permits CAM Environmentally Critical Areas: Wetlands and Fish & Wildlife Habitat Conservation Areas

dpd Seattle Permits CAM  Environmentally Critical Areas: Wetlands and Fish & Wildlife Habitat Conservation Areas dpd Department of Planning and Seattle Permits CAM Client Assistance Memo 326 part of a multi-departmental City of Seattle series on getting a permit Environmentally Critical Areas: Wetlands and Fish &

More information

Exhibit #16. Additional SHO Recommendations June 13, 2011

Exhibit #16. Additional SHO Recommendations June 13, 2011 3 Critical Areas 25.01.070 Pages 7. Critical Areas Integration The Provisions of the Sammamish Critical Areas Ordinance codified in SMC 21A.50 exclusive of SMC 21A.50.050 (Complete exemptions), SMC 21A.50.060

More information

CITY OF CHELAN SHORELINE MASTER PROGRAM

CITY OF CHELAN SHORELINE MASTER PROGRAM CHELAN COUNTY GRANT NO. G0800231 Revisions to Planning Commission Hearing Draft: Reformat and Text Reductions and Responses to Comments CITY OF CHELAN SHORELINE MASTER PROGRAM Prepared for: City of Chelan

More information

Pennichuck Brook Watershed Buildout Analysis December 2003

Pennichuck Brook Watershed Buildout Analysis December 2003 INTRODUCTION The Pennichuck Brook watershed (Figure 1) includes approximately 17,700 acres within the communities of Amherst, Hollis, Merrimack, Milford and Nashua and is the primary drinking water supply

More information

Shoreline Master Program

Shoreline Master Program Ocean Shores Shoreline Master Program Update Shoreline Master Program Environment Designations, Policies, & Regulations Prepared by: 2215 North 30 th Street, Suite 300 2200 Sixth Avenue, Suite 1100 Tacoma,

More information

Regulatory Programs Administered by Indiana DNR, Division of Water presented by George Bowman

Regulatory Programs Administered by Indiana DNR, Division of Water presented by George Bowman Regulatory Programs Administered by Indiana DNR, Division of Water presented by George Bowman Presentation Overview Division of Water s role in DNR Regulatory Statutes and Rules Floodplain, Floodway, and

More information

Prepared by The Watershed Company, BERK, Chelan County Natural Resource Department and Chelan County Community Development Department

Prepared by The Watershed Company, BERK, Chelan County Natural Resource Department and Chelan County Community Development Department Prepared by The Watershed Company, BERK, Chelan County Natural Resource Department and Chelan County Community Development Department Chelan County Shoreline Master Program Page 1 of 164 Twin Lakes (1),

More information

Trails Permitting Process

Trails Permitting Process Appendix H: Trail Permitting Process A PPENDIX H: T RAIL P ERMITTING P ROCESS Trails Permitting Process The permitting process is a critical component in the successful development of a trail network.

More information

SHORELINE MASTER PROGRAM

SHORELINE MASTER PROGRAM SHORELINE MASTER PROGRAM CITY OF PORT ORCHARD CITY OF PORT ORCHARD ADOPTED BY ORDINANCE 005-13, MARCH 2013 AMENDED: ORDINANCE 132-16, OCTOBER 2016 AMENDED: ORDINANCE 011-17, MARCH 2017 Page 2 ACKNOWLEDGEMENTS

More information

U.S. Army Corps of Engineers Regulatory Program Our Mission, Authority, Jurisdiction, and Permitting

U.S. Army Corps of Engineers Regulatory Program Our Mission, Authority, Jurisdiction, and Permitting U.S. Army Corps of Engineers Regulatory Program Our Mission, Authority, Jurisdiction, and Permitting Laban C. Lindley Team Leader Indianapolis Regulatory Office Louisville District January 9, 2018 US Army

More information

ORDINANCE NO WHEREAS, the State Department of Ecology approved the SMP Update on July 21, 2010, with certain modifications; and

ORDINANCE NO WHEREAS, the State Department of Ecology approved the SMP Update on July 21, 2010, with certain modifications; and ORDINANCE NO. 4251 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF KIRKLAND ADOPTING THE DEPARTMENT OF ECOLOGY APPROVED KIRKLAND SHORELINE MASTER PROGRAM UPDATE, INCLUDING THE NEW SHORELINE ENVIRONMENT

More information

NOTICE OF DECISION BEFORE THE SKAGIT COUNTY HEARING EXAMINER Worline Road Bow, WA Collins Road Sedro Woolley, WA 98284

NOTICE OF DECISION BEFORE THE SKAGIT COUNTY HEARING EXAMINER Worline Road Bow, WA Collins Road Sedro Woolley, WA 98284 NOTICE OF DECISION BEFORE THE SKAGIT COUNTY HEARING EXAMINER Applicant: Contact: Request: Location: Shoreline Designation: Zoning Designation: Summary of Proposal: SEPA Compliance: Public Hearing: Decision:

More information

SECTION 10: WETLANDS PROTECTION

SECTION 10: WETLANDS PROTECTION SECTION 10: WETLANDS PROTECTION 10-1 INTENT AND PURPOSE A. Intent 1. The City finds that wetlands serve a variety of beneficial functions. Wetlands maintain water quality, reduce flooding and erosion,

More information

SEDs. Comments from Skokomish Tribe

SEDs. Comments from Skokomish Tribe Contents SEDs... 1 Comments from Skokomish Tribe... 1 Comments on Lake Cushman... 2 Page 50 table 17.50.040-A, Shoreline stabilization... 3 Page 57 Section A #8, Monitoring... 3 Page 69 Section G #1, Archaeological

More information

615 W Alder St. Community Services Department Shelton, WA Planning Division (360)

615 W Alder St. Community Services Department Shelton, WA Planning Division (360) www.co.mason.wa.us MASON COUNTY 615 W Alder St. Community Services Department Shelton, WA 98584 Planning Division (360) 427-9670 TO: Mason County Planning Advisory Commission & Public FROM: Rebecca Hersha,

More information

Meacham Creek Restoration Project

Meacham Creek Restoration Project Meacham Creek Restoration Project Meacham Creek Restoration Project Umatilla National Forest Walla Walla Ranger District Michael Rassbach, District Ranger Public Scoping Document Proposal Summary The Walla

More information

SHORELINE INVENTORY AND RESTORATION PLANNING

SHORELINE INVENTORY AND RESTORATION PLANNING CHAPTER 3 SHORELINE INVENTORY AND RESTORATION PLANNING A. PURPOSE OF THE SHORELINE INVENTORY AND CHARACTERIZATION A first step in the comprehensive Master Program update process is development of a shoreline

More information

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW

Will County Site Development Permit Submittal Checklist TAB 1 PROJECT OVERVIEW Applicant: Reviewer: Permit No.: The following tables contain a checklist of the requirements before a review for a Site Development Permit submittal will be accepted. Not all requirements pertain to every

More information

Clallam County Shoreline Master Program

Clallam County Shoreline Master Program Clallam County Shoreline Master Program Bogachiel, Miller Peninsula Sol Duc, and Quillayute Rivers, 2007 Presented to the Dungeness River Management Team March 2010 Shoreline Master Program applies: To

More information

The following changes are required to comply with the SMA (RCW 90.58) and the SMP guidelines (WAC , Part III);

The following changes are required to comply with the SMA (RCW 90.58) and the SMP guidelines (WAC , Part III); ATTACHMENT B - DEPARTMENT OF ECOLOGY REQUIRED CHANGES TO THE CITY OF PUYALLUP, NOVEMBER 2014 SMP - ORDINANCE NO. 3076 The following changes are required to comply with the SMA (RCW 90.58) and the SMP guidelines

More information

Minnesota s Alternative Shoreland Management Standards

Minnesota s Alternative Shoreland Management Standards Minnesota s Shoreland Management Standards In summary, the Standards include, but are not limited to: Multiple shoreland lake classifications on a single lake, for example, a natural environment bay of

More information

CITY OF AUSTIN'S REGULATORY FRAMEWORK FOR CREEK PROTECTION

CITY OF AUSTIN'S REGULATORY FRAMEWORK FOR CREEK PROTECTION CITY OF AUSTIN'S REGULATORY FRAMEWORK FOR CREEK PROTECTION Liz Johnston, Watershed Protection Department Urban Riparian Symposium February 15 17, 2017 Houston, TX Valuable Resource Drinking Water Intake

More information

ENVIRONMENTAL RESOURCE PERMIT APPLICATION

ENVIRONMENTAL RESOURCE PERMIT APPLICATION ENVIRONMENTAL RESOURCE PERMIT APPLICATION SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT 2379 BROAD STREET, BROOKSVILLE, FL 34604-6899 (352) 796-7211 OR FLORIDA WATS 1 (800) 423-1476 SECTION E INFORMATION

More information

Shoreline Master Program

Shoreline Master Program Project Summary Shoreline Master Program Planning Scope and and Development Assessment Services Report: 2019 Amendment City of Tacoma, Washington Peter Huffman, The Shoreline Director Management Act (SMA)

More information

Lake Stevens 2013 Shoreline Master Program Ecology Approved May 31, 2013

Lake Stevens 2013 Shoreline Master Program Ecology Approved May 31, 2013 Lake Stevens 2013 Shoreline Master Program Ecology Approved May 31, 2013 Prepared for: Prepared by: Ordinances No. 856 & 889 City of Lake Stevens Planning and Community Development Department 1812 Main

More information

SHORELINE MASTER PROGRAM 2013

SHORELINE MASTER PROGRAM 2013 SHORELINE MASTER PROGRAM 2013 CITY OF PORT ORCHARD CITY OF PORT ORCHARD ADOPTED BY ORDINANCE 005-13 MARCH 2013 Page 2 City of Port Orchard Shoreline Master Program Ordinance 005 13 March 2013 ACKNOWLEDGEMENTS

More information

Clallam County Shoreline Master Program Update

Clallam County Shoreline Master Program Update Clallam County Shoreline Master Program Update Board of Commissioners Work Session November 13, 2017 Topics Buffers Channel Migrations Zones (CMZs) Mitigation and No Net Loss Importance of Buffers Provide

More information

Shoreline Master Program

Shoreline Master Program CITY OF ANACORTES Shoreline Master Program SEPTEMBER 2010 CITY OF ANACORTES SHORELINE MASTER PROGRAM September 2010 TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 1 1.1 Requirements of the Shoreline Management

More information

STORMWATER, IMPERVIOUS SURFACE AREA, AND LOW IMPACT DEVELOPMENT (LID)

STORMWATER, IMPERVIOUS SURFACE AREA, AND LOW IMPACT DEVELOPMENT (LID) STORMWATER, IMPERVIOUS SURFACE AREA, AND LOW IMPACT DEVELOPMENT (LID) 1 Jeanie (2/6/2018) Index #103 12.10.150 (previously 03.10.150) 46 1 Your section on Stormwater 03.10.150 will not protect the shoreline.

More information

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas

BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas BMP 5.4.2: Protect /Conserve/Enhance Riparian Areas The Executive Council of the Chesapeake Bay Program defines a Riparian Forest Buffer as "an area of trees, usually accompanied by shrubs and other vegetation,

More information

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN

PRESENTERS. Contact Information: RW Armstrong Union Station, 300 S. Meridian St. Indianapolis, IN 1 PRESENTERS David Bourff, Director of Environmental Planning Simon Davies, LEED AP, Environmental Scientist Summer O Brien, PWS, Senior Environmental Scientist Contact Information: RW Armstrong Union

More information

CONSERVATION & COASTAL MANAGEMENT

CONSERVATION & COASTAL MANAGEMENT CONSERVATION & COASTAL MANAGEMENT City of St. Augustine Comprehensive Plan EAR-Based Amendments Conservation and Coastal Management Element Conservation Goal Protect and conserve natural areas, environmentally

More information

Navigating Section 404 Clean Water Act Permitting

Navigating Section 404 Clean Water Act Permitting Navigating Section 404 Clean Water Act Permitting 2012 Salt Lake Countywide Watershed Symposium September 26, 2012 US Army Corps of Engineers What does this percentile represent? a) Percentage of wetlands

More information

Subject: Introduction to the Preliminary Draft Clallam County Shoreline Master Program

Subject: Introduction to the Preliminary Draft Clallam County Shoreline Master Program CLALLAM COUNTY Department of Community Development County Courthouse 223 E. 4th St., Suite 5 Port Angeles, WA 98362-3015 Phone: (360) 417-2321 Fax: (360) 417-2443 Sheila roark miller, director March 5,

More information

STAFF REPORT CHELAN COUNTY PUD DAROGA DOMESTIC WATER SYSTEM

STAFF REPORT CHELAN COUNTY PUD DAROGA DOMESTIC WATER SYSTEM STAFF REPORT CHELAN COUNTY PUD DAROGA DOMESTIC WATER SYSTEM TO: Douglas County Hearing Examiner FROM: Douglas County Land Services Staff RE: Chelan County PUD, SCUP-12-01 DATE: July 5, 2012 I. GENERAL

More information

SHO Recommendations June 16, Exhibit #11

SHO Recommendations June 16, Exhibit #11 ITEM SMP PROVISION TOPIC BILL FORMAT CHANGES [underline-additions; strikethrough-deletions] SHO - DISCUSSION/RATIONAL/PROPOSED CHANGES 25 25.06.020 (9) (a) [new] i. iv. Page 40. Shoreline Setback VEA Property

More information

Chapter 516 Shoreland Districts

Chapter 516 Shoreland Districts Chapter 516 Shoreland Districts 516.01 Statutory Authorization The State of Minnesota in Minnesota Statutes, Chapter 103F, has defined shoreland areas and described limitations on uses and locations of

More information

Shoreland Protection Innovative Model Ordinance

Shoreland Protection Innovative Model Ordinance Shoreland Protection Innovative Model Ordinance Southern New Hampshire Planning Commission September 14, 2007 Innovative Land Use Guide Training Presented By: Jack Munn, Senior Planner, SNHPC For Questions

More information

SHORELINE MASTER PROGRAM SUBMITTAL CHECKLIST

SHORELINE MASTER PROGRAM SUBMITTAL CHECKLIST SHORELINE MASTER PROGRAM SUBMITTAL CHECKLIST This checklist is for use by local governments to satisfy the requirements of WAC 173-26-201(3)(a), relating to submittal of Shoreline Master Programs (SMPs)

More information

IDEM Wetlands and Streams Regulatory Overview. An overview of IDEM permitting for work in Waters of the State

IDEM Wetlands and Streams Regulatory Overview. An overview of IDEM permitting for work in Waters of the State IDEM Wetlands and Streams Regulatory Overview An overview of IDEM permitting for work in Waters of the State Who Has Jurisdiction? Adjacent wetland: USACE & IDEM Stream > 1 sq. mile drainage: IDNR, USACE

More information

MODEL LAND USE REGULATIONS

MODEL LAND USE REGULATIONS A REVIEW OF " MODEL LAND USE REGULATIONS prepared for ~ississippi HeadwaterS Board prepared by National Park Service Midwest Region Rivers and Trails Conservation Assistance Program !,- A REVIEW OF MODEL

More information

Public Notice ISSUED: March 18, 2016 EXPIRES: April 18, 2016

Public Notice ISSUED: March 18, 2016 EXPIRES: April 18, 2016 APPLICANT: REFER TO: Mattamy Homes 2005-04142-PRH Public Notice ISSUED: March 18, 2016 EXPIRES: April 18, 2016 SECTION: 404 - Clean Water Act 1. APPLICATION FOR PERMIT to discharge dredged and fill material

More information

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac) Permit Application No.: 17-181 Rules: Erosion Control, Wetland Protection, and Waterbody Crossings & Structures Applicant: Hennepin County Received: 4/27/17 Project: CSAH 112 Phase II Complete: 9/5/17

More information

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that

Project Information. Pursuant to Section 404 of the Clean Water Act (33 U.S. Code 1344), notice is hereby given that US ARMY Corps Of Engineers Little Rock District JOINT PUBLIC NOTICE CORPS OF ENGINEERS STATE OF MISSOURI Application Number: SWL 2013-00260 Date: April 15, 2014 Comments Due: May 6, 2014 TO WHOM IT MAY

More information

Skagit County Planning Development Services

Skagit County Planning Development Services Skagit County Planning Development Services & DALE PERNULA, AICP Director Memorandum To: Planning Commission From: Betsy Stevenson Date: April 23, 2014 Re: Updates to draft for review on May 6 JACK MOORE,

More information

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors Adverse effects as used in this section of the SOP means any adverse ecological effect on wetlands or areas of open water. Those effects, or impacts, include filling, excavating, flooding, draining, clearing,

More information

RIPARIAN PROTECTION Questions & Answers

RIPARIAN PROTECTION Questions & Answers RIPARIAN PROTECTION Questions & Answers 1. What is a riparian corridor and why is it important? Answer: A riparian corridor is a space on both sides of a stream or around a lake or wetland. The corridor

More information

Contiguous Lots, Relationships & Special Topics Fall Darrin Hoverson Area Hydrologist

Contiguous Lots, Relationships & Special Topics Fall Darrin Hoverson Area Hydrologist Contiguous Lots, Relationships & Special Topics Fall 2018 Darrin Hoverson Area Hydrologist 1. Nonconforming Lots 2. SL Model Ordinance Update 3. New Review Process 4. Website Resources Regs & Administration

More information

Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014

Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014 APPLICANT: Kinghorn Company / Scannell Properties Public Notice ISSUED: 5/6/2014 EXPIRES: 6/5/2014 REFER TO: 2014-00724-MMJ SECTION:404 - Clean Water Act 1. APPLICATION FOR PERMIT TO discharge fill material

More information

DOUGLAS COUNTY TRANSPORTATION & LAND SERVICES

DOUGLAS COUNTY TRANSPORTATION & LAND SERVICES DOUGLAS COUNTY TRANSPORTATION & LAND SERVICES 140 19TH STREET NW, SUITE A EAST WENATCHEE, WA 98802 PHONE: 509/884-7173 FAX: 509/886-3954 www.douglascountywa.net STAFF REPORT VANDIVER BOATLIFT TO: Douglas

More information

SECONDARY WETLAND IMPACTS ANALYSIS

SECONDARY WETLAND IMPACTS ANALYSIS SECONDARY WETLAND IMPACTS ANALYSIS USACE File. SWG-2012-00153 During the development of the Grand Parkway (State Highway 99) Segments H and I-1 from United States Highway 59/Interstate Highway 69 N to

More information

2.4 Description of the No Action and Action Alternatives

2.4 Description of the No Action and Action Alternatives 2.4 Description of the No Action and Action Alternatives The alternatives described below represent a range of scenarios that could be implemented at Eufaula Lake to revise shoreline allocations and MP

More information

16.1 Significant and Unavoidable Impacts

16.1 Significant and Unavoidable Impacts Chapter 16 NEPA requires an EIS and CEQA requires an EIR to evaluate a number of other types of environmental impacts in addition to those already addressed in the resource chapters. The analysis required

More information

Hydrology and Flooding

Hydrology and Flooding Hydrology and Flooding Background The 1996 flood Between February 4, 1996 and February 9, 1996 the Nehalem reporting station received 28.9 inches of rain. Approximately 14 inches fell in one 48 hour period.

More information

FINDINGS, CONCLUSIONS AND DECISION

FINDINGS, CONCLUSIONS AND DECISION FINDINGS, CONCLUSIONS AND DECISION Applicant: Agent: File No: Request: Location: Parcel No.s: Shoreline Designation: Summary of Proposal: Public Hearing: Decision: Walla Walla University Rosario Beach

More information

Maryland s s Critical Area Program

Maryland s s Critical Area Program Maryland s s Critical Area Program Overview of the Critical Area Program Highlights of 2008 Legislative Session Cecil County Land Use Alliance May 29, 2008 What Is the Critical Area Program? Based on Chesapeake

More information

SHORELINE MANAGEMENT MASTER PROGRAM for the City of Snohomish

SHORELINE MANAGEMENT MASTER PROGRAM for the City of Snohomish SHORELINE MANAGEMENT MASTER PROGRAM for the Adopted by Resolution 425 December 7, 1976 Amended by Resolution 427 December 21, 1976 Map Amended by Resolution 428 December 21, 1976 Map Amended by Resolution

More information

Cumulative Impacts Analysis Component of the Shoreline Master Program Update for the City of Lake Forest Park

Cumulative Impacts Analysis Component of the Shoreline Master Program Update for the City of Lake Forest Park City of Lake Forest Park Grant No. G00600133 FINAL Cumulative Impacts Analysis Component of the Shoreline Master Program Update for the City of Lake Forest Park Project Title: Shoreline Master Program

More information

Model Riparian Buffer Ordinance.

Model Riparian Buffer Ordinance. Model Riparian Buffer Ordinance. This is a sample riparian buffer ordinance written as an amendment to an existing zoning ordinance. This ordinance complies with the state minimum standards for river corridor

More information

PERMIT GUIDE PROPERTY OWNER S EM M E T CO U N T Y

PERMIT GUIDE PROPERTY OWNER S EM M E T CO U N T Y EM M E T CO U N T Y PROPERTY OWNER S PERMIT GUIDE Permit Guide Covers: Wetlands Inland Lakes and Streams Great Lakes & Connecting Waters Floodplains Shoreline Management High Risk Erosion Areas Soil Erosion

More information

SECTION 11: REGULATORY FLOODWAYS

SECTION 11: REGULATORY FLOODWAYS SECTION 11: REGULATORY FLOODWAYS Contents 11.1. The Floodway... 11-2 11.1.1. The floodway concept... 11-2 11.1.2. Floodway map... 11-2 11.1.3. Floodway permitting... 11-3 11.1.4. Changing the floodway...

More information

SUBJECT: WASHINGTON DEPARTMENT OF FISH AND WILDLIFE COMMENTS ON THE CITY OF MOSES LAKE DRAFT SHORELINE MASTER PROGRAM

SUBJECT: WASHINGTON DEPARTMENT OF FISH AND WILDLIFE COMMENTS ON THE CITY OF MOSES LAKE DRAFT SHORELINE MASTER PROGRAM State of Washington Department of Fish and Wildlife Mailing Address: 1550 Alder St. NW, Ephrata, WA 98823 Main Office Location: Natural Resources Building, 1111 Washington St. SE Olympia WA July 9, 2014

More information

Public Notice ISSUED: 18 December 2015 EXPIRES: 04 January 2016

Public Notice ISSUED: 18 December 2015 EXPIRES: 04 January 2016 APPLICANT: Minnesota Department of Transportation Public Notice ISSUED: 18 December 2015 EXPIRES: 04 January 2016 REFER TO: 2005-00073-DJS SECTION: 404 - Clean Water Act SECTION: 10 - Rivers and Harbors

More information

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES

ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES ANCR INDIVIDUAL RESPONSES SUMMARY: 2/11/04 WATER RESOURCES GOALS AND OBJECTIVES Goal 1: Protect the health and safety of the Dane County population. a. Prevent development that may have an adverse effect

More information

Appendix E : Guidelines for Riparian Buffer Areas

Appendix E : Guidelines for Riparian Buffer Areas Appendix E : Guidelines for Riparian Buffer Areas This document should be read in conjunction with the CRCA Planning Policy. 1.0 PURPOSE The purpose of this document is to summarize the recommendations

More information

City of Albany, Oregon. Willamette Basin TMDL Implementation Plan

City of Albany, Oregon. Willamette Basin TMDL Implementation Plan City of Albany, Oregon Willamette Basin TMDL Implementation Plan July 1, 2013 - June 30, 2018 TABLE OF CONTENTS BACKGROUND... 1 LOCATION IN THE WATERSHED... 1 SCOPE AND SUMMARY OF TMDL IMPLEMENTATION PLAN...

More information

Franklin County Shoreline Master Program Update

Franklin County Shoreline Master Program Update February 2014 PREPARED FOR: FRANKLIN COUNTY Franklin County Shoreline Master Program Update Draft Shoreline Inventory, Analysis, and Characterization Report Prepared by Anchor QEA, LLC 8033 W. Grandridge

More information

Pend Oreille County Regional Partnership Updated Shoreline Master Program October 30, 2015

Pend Oreille County Regional Partnership Updated Shoreline Master Program October 30, 2015 Project Lead Agency: Project Co-Sponsors: Participating Local Governments: Supporting Agencies: Pend Oreille County Kalispel Tribe Pend Oreille Public Utility District #1 Town of Cusick Town of Ione Town

More information