CAMS Mechanical Engineering Assessment Planning Assignment 1 - Site & Development Engineer
|
|
- Gregory Leonard Fields
- 5 years ago
- Views:
Transcription
1 Mechanical Engineering Unit Rotating Equipment ME1.1 Turbines including types and Supporting Systems - Steam; Gas; Control System; Governing System; Hydraulic System; Lubrication System and Lube Oil Analysis; Fuel System and Analysis; Air Filtration. Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (P) - Provide observation evidence that you have visited the Gas Turbines used at your Site/Project with Production, Operations or Maintenance or Rotating Equipment supervisors and discussed the basic operating principles of a Gas Turbine with them. During your site visit, identify the main components and auxiliary systems of the turbines and explain the basic purpose of each component and system. Also discuss the manufacturer, model, and power ratings of the turbines at your Site/Project. During your visit, discuss the classification of the types of Gas Turbine based on the industrial applications. (Q) At your Assessment discuss your site visit in detail and also discuss the design differences between the Gas Turbine types. (O) Provide observation evidence that you have worked with Maintenance or Operations personnel to record the daily and weekly checks being performed on an operating Gas Turbine. (P) -Write a short handwritten report to your Line Manager discussing these checks and explaining their importance. (O) - Provide Observation evidence that you have met and explained to a relevant Maintenance Supervisor why turbine inspection is necessary and which inspection procedures are used at your site. Page 1 of 38
2 ME1.1 Turbines including types and Supporting Systems - Steam; Gas; Control System; Governing System; Hydraulic System; Lubrication System and Lube Oil Analysis; Fuel System and Analysis; Air Filtration. Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (O) Provide observation evidence that you have met the authorized Operations & Maintenance Staff for Gas Turbines at your site. Be sure to include the name and title of these individuals. (Q) Using a copy of the basic operating data you have collected with the Operating and Maintenance Personnel at your site, explain the importance of these data items in monitoring the performance of and to protect Gas Turbines. (Q) - At your Assessment, discuss how a loaded Gas Turbine is controlled if it is driving an Alternator or Pump or Compressor unit. (O) - Provide observation evidence that you can locate the Operations and Maintenance. Manuals and Maintenance Procedures for Gas Turbine equipment at your site. (Q) - At your Assessment, be prepared to verbally explain the applicable Gas Turbine Logging & Reporting. (P) - Prepare a short memo to your Supervisor identifying and discussing the three most important variables required to specify a turbine on your site or Project. This discussion should also address the types of pollution which might be produced due to Gas Turbine operations and should explain how this pollution can be monitored and reduced.. Page 2 of 38
3 ME1.2 Compressors - Covering types and supporting Systems (Rotodynamic; Positive Displacement; Surge Control; Hydraulic System; Lubrication System and Lube Oil Analysis; Sealing System; Rider Ring Wear Monitoring) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (O) - Provide observation evidence that you have visited the locations of major compressors units at your Site or Project with relevant Operations, Production, Maintenance or Rotating Equipment supervisor personnel and discussed the basic principles of the operation of each type of compressor at your Site or Project. (Q) - At your Assessment, be prepared to explain these principles. (O) - Provide observation evidence that you have met the technical and operating authorities responsible (include names and titles) for the main compression equipment at your Site or Project. (O) - Provide observation evidence that you can retrieve the operating and the maintenance manuals for the main compression equipment at your Site or Project. (O) - Provide observation evidence that you have met the technical and operating authorities responsible (include names and titles) for the main compression equipment at your Site or Project. (O) - Provide observation evidence that you can retrieve the operating and the maintenance manuals for the main compression equipment at your Site or Project. Page 3 of 38
4 ME1.2 Compressors - Covering types and supporting Systems (Rotodynamic; Positive Displacement; Surge Control; Hydraulic System; Lubrication System and Lube Oil Analysis; Sealing System; Rider Ring Wear Monitoring) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (O) - Provide observation evidence that you have visited the locations of major compressors units at your Site or Project with relevant Operations, Production, Maintenance or Rotating Equipment supervisor personnel and discussed the basic principles of the operation of each type of compressor at your Site or Project. (Q) - At your Assessment, be prepared to explain these principles. (O) - Provide observation evidence that you have participated in collecting the basic operating data required to monitor the performance the main compressors at your site or Project. (P) - At your Assessment, using the operating data you have collected, explain how this information is obtained and its significance. (P & Q) - At your Assessment, using your hand drawn sketch of a block diagram of the main parts of a centrifugal compressor, explain the function of each part at a main compressor operating at your site or Project. (P & Q) - At your Assessment, using your hand drawn sketch of a block diagram of two compressors in series and parallel, explain the purpose of installing compresso Page 4 of 38
5 ME1.2 Compressors - Covering types and supporting Systems (Rotodynamic; Positive Displacement; Surge Control; Hydraulic System; Lubrication System and Lube Oil Analysis; Sealing System; Rider Ring Wear Monitoring) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (P) - Hand draw a sketch of a typical compressor impeller and a typical axial compressor stage and label the parts. (Q) - Discuss the relationship between the number of impellers and efficiency of a centrifugal compressor. (Q) Define Compressor Availability & Reliability. Explain the factors which maximize the Availability & Reliability. Page 5 of 38
6 ME1.3 Pumps (Centrifugal, Positive Displacement; Multi-Phase Pumps; Pump Selection Based on Application; Sealing System; Lubrication System and Lube Oil Analysis; Alignment; Performance Characteristics & Evaluation; Condition Monitoring; Cavitation; Balancing) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (O) - Provide Observation evidence that you have visited the location of each type of pump installed at your site or Project with relevant Production, Operations, Maintenance or Senior Engineering personnel. During these visits, discuss the basic principles of the operation of this equipment. (Q) At your Assessment, discuss why each type of pump is used for its respective service at your site or Project. (O) Provide observation evidence that you have met the technical and operating authorities responsible for this equipment (include names and titles) and that you have shown them where the operating or maintenance manuals for this equipment can be found (Q) During your Assessment, be prepared to explain the essential elements of pump operating procedure and the significance of these elements (Q) - Using the Approved Vendor list for centrifugal pumps for your OPCO, indicate which ones have pumps installed at your site or have been selected for your Project. Page 6 of 38
7 ME1.3 Pumps (Centrifugal, Positive Displacement; Multi-Phase Pumps; Pump Selection Based on Application; Sealing System; Lubrication System and Lube Oil Analysis; Alignment; Performance Characteristics & Evaluation; Condition Monitoring; Cavitation; Balancing) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (P) Write a list which contains the following information for pumps used at your site or Project: 1. types of centrifugal pumps; 2. elements of centrifugal pumps; 3. auxiliaries & control elements for centrifugal pumps; 4. types of positive displacement pumps; 5. types of mechanical seals; 6. types of seal faces & their uses; 7. impeller types & main elements; 8. types of bearings & materials; 9. types of couplings; 10. pump-motor alignment data. (O) - Provide observation evidence that your have accompanied operators or maintenance to witness the daily and weekly checks required for the main process pumps used at your site. (O) - Provide observation evidence that you have explained why these checks are carried out to the Operating Authority (name and title) at your site. (O) Provide observation evidence that you have met with a Senior Process or Mechanical Engineer and discussed what cavitation is and what causes it including a description of the relationship of pump operating parameters to cavitation. (Q) - During your Assessment, discuss what is meant by NPSH and explain how NPSH is determined and why it is important in pump design & selection. Page 7 of 38
8 ME1.3 Pumps (Centrifugal, Positive Displacement; Multi-Phase Pumps; Pump Selection Based on Application; Sealing System; Lubrication System and Lube Oil Analysis; Alignment; Performance Characteristics & Evaluation; Condition Monitoring; Cavitation; Balancing) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (Q) During your Assessment describe the relationship between the pump operating parameters which are essential for condition monitoring and what the most common pump bearing failure modes are. (O) Provide observation evidence that you have worked with operators or maintenance personnel to gather daily and weekly performance data which will monitor the performance of a main pump installed at your site. (Q) At your Assessment, use the operating data you have gathered to discuss the basic operating data required to monitor the performance of a pump.. Page 8 of 38
9 ME1.4 Gearboxes (Types) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (O) Provide observation evidence that you have had a discussion with a Rotating Equipment Supervisor about gearboxes. From your discussions, prepare a hand drawn diagram of a simple gearbox for your Assessment. (Q) During your Assessment, using hand drawn sketches, describe a gearbox, discuss the function of a gearbox; describe the main components and the different shapes of teeth used in a gearbox (Chevron, straight, helical) and their respective advantages. Page 9 of 38
10 ME1.5 Internal Combustion Engines (Diesel & Gasoline) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (O) Provide observation evidence of your discussions with a Senior Rotating Equipment Engineer that you have discussed the basic operating principles of internal combustion engines used at your site or Project. (Q) During your Assessment, explain the basic operating principles of internal combustion engines. (Q) Discuss down the main differences between a gasoline and diesel engine. (Q) Discuss the different methods of starting a diesel engine. (Q) - Where are the stationary diesel or gasoline engines used on your site or Project? Discuss why engines were selected for these areas (Q) - Explain standby/emergency/intermittent and continuous duty for this equipment. (Q) - Discuss how often this equipment is tested and why.. (O) - Provide observation evidence that you have participated with Operation or Maintenance personnel in gathering the basic operating data required to monitor the performance of the engines at your site or Project. (Q) - Discuss why this information is obtained. Page 10 of 38
11 ME1.6 Fans & Blowers Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection. (Q) Discuss: 1. Types of fans installed at your site. 2. Elements of fans 3. Fan volume control devices 4. Preventive maintenance of fans at your site 5. Checks performed prior to starting/or commissioning fans 6. Discuss stable/unstable fan system performance. Page 11 of 38
12 ME1.7 Condition Monitoring Understands the principles. Can draft design specifications and comment on specifications and procedures (Q) Discuss the main parameters for condition monitoring of rotating machines and explain the effect of these parameters on the rotating machines. (Q) - Discuss the equipment used and data resources required for condition monitoring at your site. Explain the equipment and how it is used. (Q) - Define the following terms: Equipment reliability Equipment availability Mean Time Before Failure Lubricant Viscosity Viscosity Index Pour Point Flash Point (Q) - What types of lube oil are typically used at your site or Project and why were they selected? Page 12 of 38
13 Mechanical Engineering Unit Static Equipment ME2.1 Utilities (Steam Generation; Heaters & Boilers; Air Compression; Water Treatment; Water Desalination; N2 Production; Drain System; Sewage System; HVAC Systems; Firefighting System) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (P) - Hand sketch a block diagram of each of the utility systems in use at your site or Project including (as appropriate). 1. Air 2. HVAC 3. Nitrogen 4. Power 5. Steam Generation 6. Potable and Process Water 7. Drains & Waste 8. Firefighting (Q) - Discuss the purpose of the utility equipment and discuss the function of each equipment type and application. (P & Q) - Prepare a hand sketch of a typical fired heater or boiler, and describe the operating principles. Page 13 of 38
14 ME2.2 Valves (Classes (pressure / temp); Specifications & Material Selection; Types (ball, butterfly, globe, gate, NRV, choke & relief); ESD; Blowdown; Control (pressure, temperature, level & flow) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can troubleshoot, problem solve and prepare design data sheets and design work packages (O) Provide observation evidence that you have discussed the basic principles of the operation of each type of valve used on you site or Project with a Maintenance Supervisor or Senior Mechanical Engineer (include name and title). (O) - Using drawings, photos or sketches, explain these principles to your Supervisor (include name and title). (O) - Provide observation evidence that you have met the design or technical or operating authorities responsible for this equipment (names and titles). (O) Provide observation evidence that you have shown where the operating manuals for this equipment can be found to a Maintenance Supervisor or Senior Mechanical Engineer (name and title). (Q) - At you Assessment, explain the function of each type of valve; and explain the different types of valve end connections used in valves at your site or Project. Use examples (including tag number) to illustrate the location and application of each type of valve at your site. Include a discussion which defines the different types of PSVs used at your site or Project. (O) Provide observation evidence that you have discus the basic operating data required to monitor the performance of main valves with a Maintenance Supervisor or Process Engineer.. (O) Provide observation evidence that you have accompanied operators or maintenance personnel in obtaining daily and weekly data to confirm proper operation of the valves at your site. Page 14 of 38
15 ME2.2 Valves (Classes (pressure / temp); Specifications & Material Selection; Types (ball, butterfly, globe, gate, NRV, choke & relief); ESD; Blowdown; Control (pressure, temperature, level & flow) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can troubleshoot, problem solve and prepare design data sheets and design work package. (O) Discuss the applications for manual, gear operated and actuated valves at your site with a Maintenance Supervisor (name and title). (O) - Explain to your supervisor why these valves are specified for these applications. (P) - Draw a cross sectional sketch of a typical safety valve and have it reviewed by a Maintenance Supervisor or Process Engineer. (Q) At your Assessment, describe the operating principle, maintenance and testing requirements for a safety valve. Page 15 of 38
16 ME2.3 (O) - Provide Observation evidence that you have Piping & Fittings (Classes (pressure / temp); witnessed a flanged connection being made up at your Thermal Expansion (loops & joints); Surge site or Project. Write down the bolt tightening sequence Analysis & Control; Vents, Drains and and torque values and the type of gasket used including Thermal Relief Points; Welding Procedures; materials of construction. Heat Treatment; Pipe Supports; Hot (Q) - At your Assessment discuss the types and Tapping; Painting & Insulation; Corrosion & functions of flanged connections. Include a discussion Erosion Protection; Coating Techniques) of the types of gaskets used in flanged connections. Understands the principles of operation, (Q) - At your Assessment, discuss the definition of hazards and controls, condition monitoring, process piping and utility piping. maintenance, inspection and performance (Q) At your Assessment discuss why piping has testing. Can draft design data sheets and different wall thickness. comment on specifications, procedures and (Q) At your Assessment discuss the different types of material selection. pipe supports and discuss where the different types are used Page 16 of 38
17 ME2.4 (O) Provide observation evidence that you have Pressure Vessels & Internals (Classes (low / discussed the basic principles of the operation of the high pressure and temp); Columns; Knock main pressure vessels on your site or Project with a Out Drums; Filters; Separators; Reactors; Senior Process Engineer and explained these principles Baffles, Deflectors, Trays, Packing, to a Maintenance Supervisor or Senior Equipment Scrubbers, Demisters; Corrosion & Erosion Engineer during a tour of your plant or Project site. Protection; Coatings & Overlay; Preparation (Q) - Discuss the purpose of a packed column. for Safe Maintenance; Earthing for Static (O) - Provide observation evidence that you have met Electricity; Welding Procedures). the technical and operating authorities responsible for Understands the principles of operation, this equipment. hazards and controls, condition monitoring, (O) - Provide observation evidence that you can locate maintenance, inspection and performance the vendor data books for this equipment. testing. Can draft design data sheets and comment on specifications, procedures and material selection Page 17 of 38
18 ME2.5 (O) Provide observation evidence that you have Heat Exchangers (Liquid; Gas; Galvanic discussed the operating principles of heat exchangers Corrosion; Corrosion & Erosion Protection; at your site or Project with a Senior Process Engineer. Tube Fitting Techniques; Coatings; Cleaning (P) - Provide your hand drawing of a typical process Techniques; Welding Procedure) heat exchanger at your site or Project. Understands the principles of operation, (Q) - At your Assessment, using your drawing of a heat Hazards and controls, condition monitoring, exchanger discuss the basic definition of a heat maintenance, inspection and performance exchanger. testing. Can draft design data sheets and comment on specifications, procedures and material selection Page 18 of 38
19 ME2.6 Storage Tanks (Fixed Roof; Floating Roof; Spheres; Tank Stability (following construction); Vacuum Protection; Earthing; Corrosion Protection; Draining; Flushing; Purging; Venting & Air Blowing; Gas Testing; Welding Procedures) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection (O) - Provide observation evidence that you have reviewed storage tank operating procedures with the Operating Authority for this equipment during a site visit to a tank farm.. (P & Q) At your Assessment, using your hand sketches discuss the difference between a pressure vessel and a storage tank. Page 19 of 38
20 ME2.7 Loading Facilities (Loading Arms and SPM) Understands the principles of operation (Q) At your Assessment, discuss the principles of operation of loading arms and the SPM System. (Q) - Discuss the components of the SPM system used in your OPCO. Page 20 of 38
21 ME2.8 Mechanical Workshop (Machines & Equipment; Measurement Equipment e.g. Caliper, Micrometer) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can draft design data sheets and comment on specifications, procedures and material selection. (O) Provide observation evidence that you have met the Mechanical Workshop Supervisor at your site and discussed the tasks that are performed in this workshop and what machinery you would expect to find in a mechanical workshop. (P) Hand sketch the layout of the Mechanical Workshop at your site. Page 21 of 38
22 ME2.9 Pressure Testing (Test Pressure Limits (Based on Class); Test Procedure; Hydrostatic; Pneumatic; Relief Valves; Control Valves; Barrier Limits (Workshop & Plant); Special Test Area (Workshop)) Understands the principles and hazards & controls. Can troubleshoot, problem solve and prepare design data sheets and work packages (O) Provide observation evidence that you have discussed pressure testing at your site with a Senior Mechanical Engineer and the Mechanical Workshop Supervisor at your site. (Q) Discuss the following at your Assessment: 1. What is the purpose of the pressure testing? 2. What are the different types of pressure testing? 3. Can you test the Valves on their locations? Why or why not? Page 22 of 38
23 ME2.10 Lifting Equipment & Operation (Static: Mobile; Colour Coding) Understands the principles of operation, hazards and controls, condition monitoring, maintenance, inspection and performance testing. Can troubleshoot, problem solve and prepare design data sheets and design work packages (O) Provide observation evidence that you have met the Mechanical Workshop Supervisor and discussed the types of lifting equipment; types of lifting gear; and wire rope specifications used at your site. (Q) At your Assessment, discuss the following: 1. what us the significance of colour coding of lifting tackle? 2. Define and explain SWL. 3. What is the normal certification period for lifting tackle at your site and why is certification used? 4. What are the requirements for crane operation at your site? 5. When and why are fiber rope slings used? 6. What is the proper storage procedure for wire rope? Page 23 of 38
24 Section B - Support Competencies Unit ENG 1.0 HSE ENG 1.01 Health and Safety Continued HSE Management System; Expectations: Tool Box Talks; Plant Inspections & Audits; Health and Safety Procedures; Isolations; Basic Fire fighting (Q) - Describe the main Elements of the HSE Management System. (Q) - Describe the following, 1. The basic purpose of the HSE Management System. 2. The purpose of a toolbox talk 3. Why we have safety procedures and how are they prepared. (Q) - State the basic elements that need to be present for a fire to start (Q) - State the meaning of occupational hygiene (OH) (Q) - State why we have site inspections. (Q) - List examples and discuss the safety procedures used in this discipline. ENG 1.02 Environmental Emissions monitoring, assessment and control; Procedures, hazards and controls required for Waste Disposal (Q) - State the purpose of an environmental assessment. (Q) - State the key messages included in the Company waste disposal policy. (Q) - List the different hazardous wastes produced in your discipline (Q) - State why we monitor emissions. Page 24 of 38
25 Unit ENG 2.0 Standards & Integrity Management ENG 2.01 Engineering Codes & (O) - Identify the content of your Company equipment Standards and Design Guidelines specifications (in general). (Q) - State the difference between an Industry Standard and a Company Standard. (Q) - State the difference between standards, codes and practices; Identify where to find copies of these standards. (Q) - List the main operating procedures and standing instructions that apply to this discipline. ENG 2.02 Hazardous Areas (O) - Identify where to find the hazardous area drawings and who is responsible for ensuring they are accurate. Hazardous area classifications, Hazardous area classification drawings; installation of equipment in hazardous areas (P) - Draw a sketch of the hazardous areas for the main process plant. State any observations about these hazardous areas. (Q) - State what procedure and authorisation is necessary before equipment can be maintained on site. Page 25 of 38
26 ENG 2.03 Incident Investigation (Q) - State the reasons we analyse near misses. Is this a leading or lagging indicator in risk management? Incident Investigation Procedure; Analysis of Near Miss Reports; Incident investigations; Identification of root causes; Recommendations for improvement ENG 2.04 Permit to Work PTW System, Types and purpose of different permits used in operations; Identification of hazards and the necessary controls (Q) - Discuss the purpose of the permit to work system. (Q) - State where permits are needed to perform work. (Q) - State who is responsible for controlling work in process areas and workshops. Also describe operating hazards and give some examples. (Q) - State the definition of hot and cold work. Page 26 of 38
27 ENG 2.05 Hazard Evaluation Task Risk Assessments; Hazard Evaluations in Normal and Abnormal Operations; HAZOP Principles; HSE Studies; Purpose and requirements of Safety Cases (Q) - State the different methods and tools used to assess operational hazards. (Q) - State why operational hazards are assessed. (Q) - State the basic purpose of a HAZOP (Q) - List the different HSE studies that are performed for new projects. (Q) - State why safety cases are produced and list of the main elements of a safety case. ENG 2.06 Management of Change (P) - Draw a block diagram showing the steps needed to produce a construction 'Work Package'. Modifications / Management of Change Procedure; Approval Process; Specifications and data sheets for defined process conditions; Statement of Requirements for modifications; Design and Construction Packages (Q) - State what qualifies as a change that must be covered by the MoC procedure. (Q) - State why we have a management of change procedure and approval process. (Q) - State why we need design and construction packages before installation of equipment at sites? (Q) - State what is an equipment specification and when do we need to prepare one. (Q) - Describe where Statement of Requirements (SOR's) are used and why. ENG 2.07 Mechanical Integrity Basic principles of how mechanical integrity is achieved through material selection criteria, corrosion mechanisms / mitigation and erosion causes (Q) - State how mechanical integrity is achieved for pipes and electrical cables. (Q) - State the difference between corrosion and erosion. (Q) - State why we inspect plant and equipment Page 27 of 38
28 ENG 2.08 Protective Systems Equipment performance standards that define the role of the equipment; The functional performance and reliability of equipment or systems; Listing of safety related devices and why safety devices are tested and inspected at regular intervals (Q) - List the reasons why we have equipment performance standards. (Q) - State why we have a listing of safety related devices. (Q) - State why we need to test safety devices at regular intervals. ENG 2.09 Competence Assurance Management System Requirements of the Competence Assurance and Progression Policies and the Competence Assurance Management System (Q) - State the elements included in the competence assurance and progression policies. Describe the requirements of these policies. (Q) - State the main elements and requirements of the Competence Assurance Management System. ENG 2.10 Emergency Response Purpose of emergency management; Escape & evacuation; Drills & exercises. (Q) - List the key personnel involved in controlling an emergency situation on the Plant and their responsibilities. (Q) - State the role of the emergency response team during a major emergency. (Q) - List the drills and exercises planned for your site in one year. (Q) - State why we have drills and exercises and who should be involved in the different drills. Page 28 of 38
29 ENG 2.11 Maintenance Management & Reliability Requirements and procedures of the maintenance management system; Why we have a system; Methods to initiate maintenance work (Q) - State how we plan major tasks such as shutdowns and overhauls. (Q) - State your understanding of the meaning of maintenance reliability and equipment criticality. (Q) - State the main elements of the material management procedure. (Q) - State the meaning of maximum and minimum stock levels. (Q) - State why we have material handling procedures. (Q) - State what purchase and low value purchase requests are and when are they used. ENG 2.12 Material & Spares Management (Q) - Write down and discuss the factors that need to be considered in material selection. Basic requirements and procedures for material and spares management; Stock (Q) - State the financial limits for a purchase and low value purchase order. levels; Material handling procedures; Purchase requests Page 29 of 38
30 ENG 2.13 Documentation & Engineering (P) - Compile a package of the main Company Drawings drawings used in this discipline. Engineering documentation, Drawings; Vendor Drawings; Data sheets, Operations and maintenance manuals; PFD's; P&ID's; Schematic, block diagrams and drawings; Documentation control process (Q) - State the answers to the following, 1. What data sheets are and where are they used? 2. What engineering manuals are and how are they used? 3. What PFD's are and what data is included? 4. What P&ID's are and how are they used? 5. What schematics and block diagrams are and how are they used? (Q) - State the contents of the main engineering manuals that relate to equipment in your discipline. (Q) - State why we need a document control system and procedure. ENG 2.15 Planning & Scheduling (P) - Prepare a flowchart showing the work planning process. Purpose of planning work, Work plans for maintenance, Modifications and Studies (Q) - State the purpose of work planning. (Q) - Describe the process, milestones and approving authorities. (Q) - Write down and discuss how far we need to look ahead and why. ENG 2.16 Budget and Cost Control (P) - Prepare a flowchart showing the budget cycle. Purpose of an operating budget, budgets and cost estimates for new or replacement equipment; Cost control of the operating budget Page 30 of 38
31 (Q) - State the purpose and requirements of an operating budget. (Q) - List the main elements of an operating budget (Q) - Describe the process, milestones and approving authorities (Q) - Describe the procedure used for estimating the cost of a new item of plant equipment and where the cost data is obtained. Page 31 of 38
32 Unit ENG 3.0 Project Engineering ENG 3.11 Construction Tie-ins and Plant Integration; Equipment installation / alignment; Coatings and Insulation; Pressure testing / hydrostatic (O/Q) - Participate in site construction. Describe your contribution. (Q) - State the key procedures and method statements related to the elements testing; Electrical power system installation / (Q) List the main elements of construction support termination; Control system installation and required by the construction contractor e.g. lay down, termination; System Checking & Witnessing; utilities. Punch Listing; Mechanical Completion (Q) - State the importance of local regulations related to construction ENG 3.12 Pre-Commissioning, Commissioning And Start Up (O/Q) - Demonstrate your participation in precommissioning or commissioning activities. Describe your tasks and state why they were necessary. Planning; Pre-commissioning; Cold commissioning; Hot commissioning Facility performance envelope; Documentation; Performance testing; Performance verification; Handover (Q) - State the split of roles and responsibilities between Company and Contractor, Vendors Rep and Certifying Authorities (Q) - State the different phases of the pre commissioning and commissioning of utilities, process plant and other facilities. (Q) - List and discuss the main documentation required for the pre commissioning and commissioning phases as included in the tender document and required from other parties. ENG 3.18 Management of Studies & (Q) - Describe the controls necessary for the Engineering Coordination management of studies. Page 32 of 38
33 Unit ENG 4.0 Engineering Disciplines ENG 4.08 Oil & Gas Operations (Q) - List the production operations facilities installed at your site. State the basic operation of the equipment. Surface Facilities: Production Equipment; Systems; Product Quality; Plant Operation& Control Page 33 of 38
34 C. General Competencies Unit (1) HSE 1. AWARENESS Y N E T C1.1 Group Company HSE Policy and HSE Management System. (Q) - Identify 3 commitments from your Company s HSE Commitment & Policy and 3 measures of how these commitments should be achieved. (P/Q) - State the 8 key elements of the Company s HSE Management System Guidelines. C1.2 Near Miss and Incident Reporting, Investigation and Analysis. (Q) - Define LTI and Near Miss. (Q) - State 3 reasons why we analyse near misses. (Q) - Define Unsafe acts / Unsafe conditions C1.3 Hazard Identification, Risk Assessment and Risk reduction (Q) Define Hazard and Risk (Q) Describe the purposes of the Regulations for Control of Major Accident Hazards (COMAH)? (Q) Define what is meant by ALARP Page 34 of 38
35 Unit (1) HSE 1. AWARENESS Y N E T C1.4 Environmental Protection (Q) - Identify the main emissions, effluents and wastes produced at your site. (Q) - State the impact of the main emissions, effluents and wastes produced at your site on the environment. (Q) - Describe what the purpose of an environmental impact assessment is. C1.5 Occupational Health and Safety. (Q) Define Occupational Health & Safety. (Q) What is the purpose of a desert travel planning system? (Q) Identify the locations of the following safety related equipment at your site - fire/smoke detectors, fire (Q) alarms, Name fire the fighting main personal equipment, protective fire blankets. equipment for head, ears, eyes, lungs, hands and feet. What are the hazards (Q) - Identify they common are meant health to protect hazards against? your office and site environments. Unit (1) HSE 1. AWARENESS Y N E T C1.6 Emergency Response (Q) Using reference material, describe the main elements of the emergency response procedure. (Q) - State the roles of the emergency response team during a major emergency. (Q) Describe your role according to the emergency response procedure. (Q) - State why we have drills and exercises. (Q) Identify the escape routes which are available for you and where you should muster. Page 35 of 38
36 Unit (2) Corporate, Business, Finance & Commercial 1. AWARENESS Y N E T C2.1 Corporate Values (Q) - Describe what is meant by ethical business practice. (Q) - Describe the reasons why responsible companies, such as the ADNOC group, have a policy on ethical business practice. Unit (2) Corporate, Business, Finance & Commercial C2.2 Business Products and transportation 1. AWARENESS Y N E T (Q) - Name three of the main products produced by the ADNOC group of companies. (Q) - State the main uses of products listed above. (Q) - Identify producers of the listed items. (Q) - Name the key customers for products of your own company (Q) - Identify the basic means of transportation of the various products. Page 36 of 38
37 D. Personal Behavioural Competencies D. Personal/Behavioural Competencies D1. 1: Team Work Contribute to effective Team Performance 1. AWARENESS Y N E T (Q) Name 3 key elements of effective team behaviour. (Q) - Describe 3 objectives for your team. (Q) Describe your own role in the team. D1.2 Team Work Participate in Team Meetings D1.3 Team Work Work in a Multi-Disciplinary Environment D. Personal/Behavioural Competencies D2.1 Communication Listen actively to others D 2.2 Communication Use verbal communication effectively (Q) Name 3 key elements of effective team meetings. (Q) State 4 reasons for having meetings. (Q) - Name the other disciplines you work with in your work place. (Q) - Describe two examples of sharing ideas across disciplines. 1. AWARENESS Y N E T (P/Q) Write down the differences between listening and hearing. (Q) - State the basic features of active listening. (Q) Explain the benefits of active listening. (Q) - State 5 basic features of effective verbal communication (Q) - Describe aids for effective verbal communication. D. Personal/Behavioural Competencies D2.4 Communication Use written communication effectively D2.5 Communication Use electronic communication ( , fax, text messages, radio, telephone, etc.) 1. AWARENESS Y N E T (Q) - State the basic features of written communication. (Q) - Name four written communication formats. (Q) - Name 4 different electronic communication systems. Page 37 of 38
38 D. Personal/Behavioural Competencies D3.1 Manage Self & Others Manage time D3.2 Manage Self & Others Develop and assess self 1. AWARENESS Y N E T (Q) - Describe 3 important job related reasons for proper time management. (Q) Describe the process and benefits of priority setting. (Q) - Identify 3 self development tools. (Q) Name 3 learning & development resources available in the organization. Page 38 of 38
PROCESS OPERATIONS. Introduction to Operations. Diagrams for the Operating Unit. Revised 11/30/18 1
TOPIC Introduction to Operations Diagrams for the Operating Unit OBJECTIVES 1. Discuss the importance of this course as a capstone experience in the Process Technology program and how the material learned
More information100 Safety and Soft 114 Fall Protection 150 Environmental Skills Awareness 116 Compressed Gas 101 Personal Protective Cylinder Safety
100 and Soft Skills 101 Personal Protective Equipment (PPE) 101-01 Personal Protective Equipment 101-02 Hearing and Noise 101-03 Respiratory Protection Program 102 Worksite 102-01 Slip, Trip, and Fall
More informationBuilding Operator 5th Class Level 2
Building Operator 5th Class Level 2 Comp. # Competency Type Competency Statement Competency Details 43663 Safety Provide evidence of WHMIS Certification 43670 Safety Discuss the need for company policies
More informationOUTCOME 1 TUTORIAL 1 PLANT OPERATIONS
UNIT 47: Engineering Plant Technology Unit code: F/601/1433 QCF level: 5 Credit value: 15 OUTCOME 1 TUTORIAL 1 PLANT OPERATIONS 1. Understand procedures for safe and effective operation and testing of
More informationMechanical Technologist Grade I
Mechanical Technologist Grade I 101. Assist in fabrication used to maintain plant facilities and equipment using the following methods: horizontal welding with acetylene and arc welders heating and cutting
More informationPROCESS & PRODUCTION ENGINEERING DIRECTORY
PROCESS & PRODUCTION ENGINEERING DIRECTORY INDEX 1.0 INTRODUCTION 4 2.0 PROCESS & PRODUCTION ENGINEERING SERVICES 5 2.1 Operating manuals and SOP/POG 5 2.2 Commissioning & start-up procedures 8 2.3 Simulation
More informationBrazosport College. Syllabus for PTAC Process Technology I Equipment
Brazosport College Syllabus for PTAC 1410 - Process Technology I Equipment Instructor: Gregg Curry Office Phone: N/A Alt. Phone: 979.230.3618 Office: N/A email: gregg.curry@brazosport.edu I. COURSE DESCRIPTION
More informationMechatronics Courses by School Period
Mechatronics Courses by School Period Year One P1 P1 P2 P3 P3 P3 P4 P4 P4 Integrated Systems Industrial Math (Geometry, Trig, Algebra,) Blueprint Reading Machine Tool I (Hand tools-measuring-saws & Drill
More informationTechnical Summary. 1. Purpose
1. Purpose Technical Summary The purpose of this procurement is to establish a contract to provide mechanical and electrical plant installation works in the following areas on the ITER Site in Saint-Paul
More informationDeliverables list for Projects in the fertilizer industry
Deliverables list for s in the fertilizer industry Document Development Guidance Department: s / Engineering Revision 1 August 2018 Doc. No: AKH01-GUI-ENG-LST-001 Contents 1. Synopsis... 2 2. Why develop
More informationOWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)
Company Name: Written Description of QMS Title and Rev. Status: Person who is responsible for preparing the owner s QMS written description: Name: Title: Telephone No.: ( ) Fax No.: ( ) Cell No.: ( ) E-Mail:
More informationQUALITY ASSURANCE PROTOCOL (QAP)
PREFACE This Standard details the level of documentation that PVT.LTD (IET) will provide during a contract for fabricating tank(s) or portable equipment s. Extensive documentation is required for this
More informationTraining Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING
Training Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING Training Duration 5 days Training Duration & Venue REF ME032 Pumps & Compressors- Design, Operation, Maintenance
More informationTraining Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING
Training Title PUMPS AND COMPRESSORS: DESIGN, OPERATION, MAINTENANCE AND TROUBLESHOOTING Training Duration 5 days Training Duration & Venue REF ME035 Pumps & Compressors- Design, Operation, Maintenance
More informationPreventative Maintenance Program
2012 Preventative Maintenance Program Chinook Drilling 8/10/2012 2 3 Table of Contents 117.0 Preventative Maintenance Program...4 118.0 Mission Statement...5 119.0 Overall Objectives...5 120.0 Manufactures
More informationCOMPRESSOR DESIGN, OPERATION & MAINTENANCE Hosted by Technology Support Limited Presented by Carmagen Engineering, Inc.
Hosted by On September 18-20, Technology Support will be hosting the Compressor Design, Operation and Maintenance seminar. This remains in keeping with our strategy to maintain Technology Support s philosophy
More informationENSA ENWESA SERVICES INDEX
ENSA ENWESA SERVICES INDEX 1. ENGINEERING, DESIGN AND TECHNOLOGY SERVICES (Ensa / ENWESA) Ensa has extensive experience designing nuclear components and pressure vessels since 1973 according to international
More informationRUWAIS HOUSING COMPLEX PHASE IV CIVIL & ELECTROMECHANICAL WORKS
AL NASR SCOPE OF WORKS: Construction of water storage tank consisting of: 3 Water storage tanks 2,641,721 gal of 42 m diameter and 7.65 m each 2300 m³ of concrete 2450 m² of water proofing external 4300
More informationM.C.C.S.INTERNATIONAL
M.C.C.S.INTERNATIONAL Mechanical Completion and Commissioning Services Ltd. Formed in 1994 To fill a niche market in the area of Mechanical Completion and Commissioning M.C.C.S. Worldwide Ltd. Formed 2000
More informationSUPERVISING FOOD PRODUCTION EQUIPMENT TECHNICIAN
PERSONNEL COMMISSION Class Code: 0499 Salary Range: 38 (S1) JOB SUMMARY SUPERVISING FOOD PRODUCTION EQUIPMENT TECHNICIAN Under general supervision, to organize, supervise and participate in the highly
More information4th Class Power Engineering (PEN) Curriculum Mapping
Curriculum Mapping Program Curriculum A collection of 25 CTS courses have been developed to align with the revised (2017) 4th Class Power Engineering course outline. These courses, when combined, cover
More informationELEC / ELEX COMMITTEE Fiber Optic Component; remove, relocate, repair, and install Electronic Equipment; repair Rotating
ELEC / ELEX COMMITTEE 009-123 Fiber Optic Component; remove, relocate, repair, and install 009-16 Electronic Equipment; repair 009-17 Rotating Electrical Equipment; repair 009-33 Rotating Electrical Equipment;
More informationCITY OF REEDLEY. Water Systems Specialist I. Water Systems Specialist II
CITY OF REEDLEY WATER SYSTEMS SPECIALIST I WATER SYSTEMS SPECIALIST IT DEFINITION Under immediate supervision (Water Systems Specialist I) or general supervision (Water Systems Specialist II), to perform
More informationOPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES
Training Title OPERATION SKILLS ENHANCEMENT-MEASUREMENT & INSTRUMENT FOR PROCESS VARIABLES Training Duration 5 days Training Venue and Dates REF PE015 Operation Skills Enhancement -Measurement & Instrument
More informationPreface to the First Edition Preface to the Second Edition. Acknowledgment
Dedication Preface to the First Edition Preface to the Second Edition Forewords Acknowledgment iii xiii xv xvii xix Chapter 1 Introduction to Pipeline Systems 1 1.1 Introduction 1 1.2 Liquid Pipelines
More informationNAVSEA STANDARD ITEM NUMERICAL INDEX
NAVSEA STANDARD ITEM NUMERICAL INDEX FY-18(CH-2) ITEM NO. 009-01 General Criteria; 009-02 Environmental Compliance Report for Material Usage at Naval Facility; 009-03 Toxic and Hazardous Substance; control
More informationCHAPTER 51 MACHINIST'S MATE (MM) NAVPERS F CH-70
CHAPTER 51 MACHINIST'S MATE (MM) NAVPERS 18068-51F CH-70 Updated: April 2017 TABLE OF CONTENTS MACHINIST'S MATE, NUCLEAR POWER (MMN) SCOPE OF RATING GENERAL INFORMATION PROPULSION PLANT MECHANICAL OPERATOR
More informationSENIOR PLANT OPERATOR
DECEMBER 2018 FLSA: NON-EXEMPT SENIOR PLANT OPERATOR This class specification indicates, in general terms, the type and level of work performed as well as the responsibilities of employees in this classification.
More informationINDUSTRIAL MECHANIC (MILLWRIGHT)
To qualify to challenge certification in this trade or be granted authority to supervise and sign-off on apprentices in this trade, individuals must have: worked a minimum of 9,540 hours performing the
More informationCENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS
Training Title CENTRIFUGAL COMPRESSORS MAINTENANCE & FAILURE ANALYSIS Training Duration 5 days Training Dates & Venue Centrifugal Compressors Maintenance & Failure Analysis 5 14 18 Apr $3,750 Riyadh, KSA
More informationR&E Petroleum Co. Plants Commissioning and Starting Up Your Partner In Success
1 R&E Petroleum Co. Plants Commissioning and Starting Up Your Partner In Success Introduction Contents R&E Evolution Business Lines Business Sectors In house Support Services Clint's Location R&E Evolution
More informationBuilding Operator Level 3 Introduction to Building Operations
Comp # Type Competency Statement Competency Detail 43659 Safety Describe basic lock out/tag out procedures 43660 Safety 43661 Safety 43662 Safety Building Operator Level 3 Introduction to Building Operations
More informationUC Davis - Facilities O&M Cogeneration Plant Bid Package October, 2007
UC Davis - Facilities O&M Cogeneration Plant Bid Package October, 2007 I. Cogeneration Plant Overview The University has owned and operated a cogeneration system since 1981, though nearly all of the original
More informationVAAL UNIVERSITY OF TECHNOLOGY FACULTY OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING EXPERIENTIAL LEARNING FUNDAMENTAL LEARNING
VAAL UNIVERSITY OF TECHNOLOGY FACULTY OF ENGINEERING DEPARTMENT OF MECHANICAL ENGINEERING EXPERIENTIAL LEARNING To fulfil the requirements of the National Diploma, a student must complete at least one
More informationPUMPING TECHNOLOGY TRAINING COURSES GUIDE
PUMPING TECHNOLOGY TRAINING COURSES GUIDE Pumping Fundamentals I Pump Selection I Pump Testing I Pump Systems I Pump Hydraulics PUMPING TECHNOLOGY PUMPING TECHNOLOGY TRAINING COURSES INFORMATION w w w.
More informationFUNDAMENTALS OF PROCESS & MECHANICAL ENGINEERING
Training Title FUNDAMENTALS OF PROCESS & MECHANICAL ENGINEERING Training Duration 5 days Training Date Fundamentals Of Process & Mechanical Engineering 5 03 07 May $4,250 Dubai, UAE In any of the 5 star
More informationSEA Certified Piping Design Engineer
SEA Certified Piping Design Engineer Certification Course Course Title Eligibility Criteria : SEA CERTIFIED PIPING DESIGN ENGINEER : Mechanical Engineer, Chemical & Petroleum Engineer Duration of Course
More information-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION. -Module Number Session
-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION -Module Number- 3251013 -Session-1993-94 -Superclass- XH -Title- MATERIALS HANDLING 2 -DESCRIPTION-
More informationMVV ENVIRONMENT DEVONPORT SEPTEMBER 2017 OUTAGE MECHANICAL WORKS SPECIFICATION.
MVV ENVIRONMENT DEVONPORT SEPTEMBER 2017 OUTAGE MECHANICAL WORKS SPECIFICATION. SCOPE OF MECHANICAL WORK The following list of works details the mechanical works intended to be carried out on the plant
More informationAppendix B. Glossary of Steam Turbine Terms
Operator s Guide to General Purpose Steam Turbines: An Overview of Operating Principles, Construction, Best Practices, and Troubleshooting. Robert X. Perez and David W. Lawhon. 2016 Scrivener Publishing
More informationOman LNG L.L.C. Pre-Qualification of Tenderers. QEN : General Maintenance Services. General Maintenance Services Page 1 of 9 30/08/17
Oman LNG L.L.C. Pre-Qualification of Tenderers QEN-17-865: General Maintenance Services General Maintenance Services Page 1 of 9 30/08/17 GUIDELINES Response to this questionnaire shall be completed in
More informationYour partner for the right solution
Your partner for the right solution Project engineering of power stations Environment protection in energy sector Equipment supplying Supervision of installation of the equipment supplied Commissioning
More informationHydraulic systems Quality without cutting corners
Hydraulic systems Quality without cutting corners HYDRAULIC SYSTEMS Hydraulics: Large forces in a small space Movements in plant and machinery need the advantages of hydraulics: Large forces in a small
More informationMARKET PRODUCT APPLICATION CUSTOMISATION LOGISTICS INFRASTRUCTURE. All the PUMP Know-How you need.
MARKET PRODUCT APPLICATION CUSTOMISATION LOGISTICS INFRASTRUCTURE All the PUMP Know-How you need. Distribution with a difference Why should you work with ERIKS? More leading brands, more products, more
More informationLifting Appliances of Ships and Offshore Installations
CCS Rule Change Notice For: Lifting Appliances of Ships and Offshore Installations Version: May, 2016. RCN No.1 Effective date: 19 May, 2016 Beijing CONTENTS Chapter 3 CRANES, LIFTS, RAMPS AND SELF-LOADING
More informationPTAC 1302 INTRODUCTION TO PROCESS TECHNOLOGY
Course Overview History of the Process Industry Green Technologies and Related Industries (Optional) Your Career as a Process Technician 1. Describe the following components (aspects) of the PTAC Program:
More informationMECHANIC/SENIOR MECHANIC
DECEMBER 2018 FLSA: NON-EXEMPT MECHANIC/SENIOR MECHANIC This class specification indicates, in general terms, the type and level of work performed as well as the responsibilities of employees in this classification.
More informationCOMPUTER SKILLS : Windows, MS Office, Internet : EMPAC (Enterprise Maintenance Planning and Control) System
493-ME-CMSG-E-1987 Senior Mechanical Engineer Holds a B. Sc. in Mechanical Power Engineering and a Diploma in Thermal Engineering. Has over 23 years supervision and management experience in 627/312MW fossil
More informationProviding customised solutions for development of Oil & Gas personnel.
Providing customised solutions for development of Oil & Gas personnel www.tracezglobal.com Vision Introduction TraceZ "Training & Consultancy services" is an organisation providing customised solutions
More information1. Refinery Operations 1 2. Mechanical Maintenance and Inspection 3. Instrumentation and Electrical Maintenance 4. Refinery Management
Content LONG DURATION PROGRAMMES Page No. 1. Refinery Operations 1 2. Mechanical Maintenance and Inspection 3. Instrumentation and Electrical Maintenance 4. Refinery Management SHORT DURATION PROGRAMMES
More informationJOB DESCRIPTION Head of Maintenance Support
Position Description: Position Title: Directorate: Operations Department: Operation Support Location: Head Office Section: Maintenance Support Job Level: Middle Management Reports to: Operation Support
More informationServices. Engineering Inspection and Laboratories SERVICES - 1 -
Engineering Inspection and Laboratories SERVICES - 1 - Our objective is to verify that the product furnished by the supplier is in full compliance with our client's purchase order's specifications and
More informationNUCLEAR POWER CORPORATION OF INDIA LTD TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 REV NO : 0 DATA SHEET A
TECHNICAL SPECIFICATION ON SUBMERSIBLE PUMPS PAGE NO: 1 OF 4 DATA SHEET A ANNEXURE - A Sr. Item Description Sr. Item Description A. GENERAL DATA B. PUMP DUTY PARAMETERS 1. System Name 1. Rated capacity,
More informationOAİB PRODUCT CONFORMANCE SPECIFICATIONS -PUMPS- e - m a i l : i n f t u r q u m. c o m
PRODUCT CONFORMANCE SPECIFICATIONS -PUMPS- M a h a t m a G a n d h i C a d. N o : 1 0 3 G. O. P. 0 6 7 0 0 A N K A R A P h o n e : 9 0-3 1 2-4 4 7 2 7 4 0 F a x : 9 0-3 1 2-4 4 7 0 1 8 0-4 4 6 9 6 0 5
More informationSAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES
SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES SECTION: SFPUC INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURE NO: 018 TITLE: SYSTEM TESTING AND START-UP APPROVED:
More informationMEC-CM-E-2004 Head Section Maintenance Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
100304-MEC-CM-E-2004 Head Section Maintenance Engineer Holds a B. Sc. in Mechanical Power Engineering and has over 13 years hands-on experience. He can analyze and carry out installation, commissioning,
More informationShort Term Training Program for year
National Power Training Institute Badarpur New Delhi Short Term Training Program for year 2013-14 NPTI NR Badarpur New Delhi announces Short Term Training Program for year 2013-14 as per following details
More informationCUP-CVP CONCRETE VOLUTE COOLING WATER PUMP
CUP-CVP CONCRETE VOLUTE COOLING WATER PUMP SPX - An introduction SPX is a Fortune 500 multi-industry manufacturing leader, headquartered in Charlotte, North Carolina. SPX manufactures and markets products,
More information195LiquidsCatalog.
195LiquidsCatalog www.energyu.org www.midwestenergy.org 195 Abnormal Operating Conditions... 3 195-0060 General Abnormal Operating Conditions (CT60)... 3 195-0000 Documentation & Reporting... 3 195-0403
More informationA. The purpose of this section is to specify Division 23 responsibilities in the commissioning process.
SECTION 23 99 50 - (ADD#4) PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationDW Module 10: General Maintenance Answer Key
DW Module 10: General Maintenance Answer Key What are some factors that impact the availability of equipment? (What causes downtime?) Human Error Acts of God or Nature Product Defects Planned Service Work
More informationGOOD PRACTICE GUIDELINES FOR CONTROLLING NOISE ON OFFSHORE INSTALLATIONS
GOOD PRACTICE GUIDELINES FOR CONTROLLING NOISE ON OFFSHORE INSTALLATIONS Graham McPherson (CMFOH) OH2017 Harrogate International Centre 24 27 April 2017 Introduction UK Noise Regulations also apply in
More informationProgram Description MECHATRONIC SYSTEMS TECHNICIAN ACADEMY
Program Description MECHATRONIC SYSTEMS TECHNICIAN ACADEMY 7107 Elm Valley Drive Kalamazoo, MI 49009 Phone: 269.353.1282 Fax: 269.353.1580 careeracademies@kvcc.edu www.kvcc.edu/training MECHATRONIC SYSTEMS
More informationISO INTERNATIONAL STANDARD. Petroleum and natural gas industries Packaged reciprocating gas compressors
INTERNATIONAL STANDARD ISO 13631 First edition 2002-08-01 Petroleum and natural gas industries Packaged reciprocating gas compressors Industries du pétrole et du gaz naturel Unités de compresseurs alternatifs
More informationMECHANICAL AND ELECTRICAL SEMINARS
INDUSTRIAL TRAINERS OF AMERICA, INC. 2016 COURSE CATALOG MECHANICAL AND ELECTRICAL SEMINARS Hands-on Training Mechanical Skills Training Electrical Skills Training Fluid Power Training HVAC Training EPA
More informationRJ Engineering Systems, Inc. Company Profile
RJ Engineering Systems, Inc. Company Profile about us Specialists in system design, engineering, procurement & manufacturing RJ Engineering Systems, Inc (RJES) is a manufacturer of custom engineered equipment
More informationSECTION HVAC PUMPS. A. Provide centrifugal HVAC pumps, called for in drawing schedule, and as needed for a complete and proper installation.
PART 1 - GENERAL 1.01 DESCRIPTION OF WORK SECTION 15540 HVAC PUMPS A. Provide centrifugal HVAC pumps, called for in drawing schedule, and as needed for a complete and proper installation. B. Provide variable
More informationELECTRICAL MOTOR MAINTENANCE AND MANAGEMENT KPI S Electrical Maintenance
Electrical Maintenance 1. Drawings (Check all that apply) a. Do updated as-built drawings exist and are they available? (3pts) b. Are all relevant equipment instruction manuals available? (3pts) c. Is
More informationTraining Program for Urea Engineers. Tailor Made to Your Wishes
Training Program for Urea Engineers Tailor Made to Your Wishes v6 Choose the Modules of Your Interest and Compose your Preferred Training Program ü Highly awarded by all previous participants ü Covering
More information1DIVISION 15- MECHANICAL Section Fire Pumps. A. Single Stage, Double Suction, 9100 Series Horizontal Splitcase Fire Pump (Base Mounted)
1DIVISION 15- MECHANICAL Section 15320 Fire Pumps 1.00 PART 1 -GENERAL 1.01 DESCRIPTION OF WORK: A. Provide pumps for fire suppression. 1.02 SECTION INCLUDES: A. Single Stage, Double Suction, 9100 Series
More informationTalwandi Sabo Power Limited Tender document for Design & Engineering, Supply and Erection of Slurry pumping system from Plant to Ash Dyke
Techno commercial offers are invited from the competitive bidders for the EPC contract i.e. Design, Engineering, Manufacture/Supply, Civil and Structural, Erection, Testing, Commissioning, Demonstration
More informationSAFETY DIGEST PART - B INDEX
SAFETY DIGEST PART - B INDEX STATUTORY REGULATIONS REGARDING SAFETY 1 FACTORY ACTS - 1 Approval of Factory 1 Section - 6 Approval, Licencing and Registration of Factories Rule - 3 Approval of Plans Rule-3C
More informationURGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS
URGENTLY REQUIRED FOR SUDAN Oil Exploration - Operation & Maintenance (O&M) JOBS SCOPE OF WORK. Introduction The SCOPE OF WORK as minimum will be carried out within the client oil exploration and development
More informationTHE CALIFORNIA STATE UNIVERSITY Office of the Chancellor 401 Golden Shore Long Beach, CA (562) Date: May 3, 2005 Code: HR
THE CALIFORNIA STATE UNIVERSITY Office of the Chancellor 401 Golden Shore Long Beach, CA 90802-4210 (562) 951-4425 Date: May 3, 2005 Code: HR 2005-20 To: From: Subject: CSU Presidents Jackie R. McClain
More informationIndustrial Mechanic (Millwright) Level 3
Level 3 C1 Shaft Alignment II Duration: 10 hours 3 hours 7 hours This unit is designed to introduce knowledge of the procedures for shaft alignment using the reverse dial method. It is also designed to
More informationDownsizing a Claus Sulfur Recovery Unit
INFRASTRUCTURE MINING & METALS NUCLEAR, SECURITY & ENVIRONMENTAL Downsizing a Claus Sulfur Recovery Unit OIL, GAS & CHEMICALS By Charles L. Kimtantas and Martin A. Taylor ckimtant@bechtel.com & mataylo1@bechtel.com
More informationRead Only Copy Not For Distribution. Chapter 17. Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.2 QUANTITY OF WATER REQUIRED
Chapter 17 Private Potable Water Supply Systems 17.1 GENERAL REGULATIONS 17.1.1 Applicability The regulations in this chapter apply to any private potable water supply system where plumbing fixtures are
More informationSubj: WEIGHT HANDLING EQUIPMENT THIRD PARTY CERTIFICATIONS; PREPARATION FOR
DEPARTMENT OF THE NAVY NAVY CRANE CENTER NAVAL FACILITIES ENGINEERING COMMAND NORFOLK NAVAL SHIPYARD, BUILDING 491 PORTSMOUTH, VIRGINIA 23709-5000. IN REPLY REFER TO NAVCRANECENINST 11200.35A 09O 5 January
More informationOPERATIONS AND MAINTENANCE TECHNICIAN IV (MECHANICAL) (JOURNEY)
OPERATIONS AND MAINTENANCE TECHNICIAN IV (MECHANICAL) (JOURNEY) Group-Section: Water System Operations - Various FLSA Status: Non-Exempt Bargaining Unit: AFSCME Classification: Operations and Maintenance
More informationSECTION COMMON WORK RESULTS FOR FIRE SUPPRESSION
Page 210500-1 SECTION 210500 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections,
More informationMaintenance Program Guideline for Owners of Ammonia Plants
Maintenance Program Guideline for Owners of Ammonia Plants Contents Maintenance Program Guideline for Owners of Ammonia Plants... 0 a) Title Page, owner/operator, the plant location.... 4 b) Contents Page...
More informationBEST PRACTICES FOR AN EFFECTIVE OIL ANALYSIS PROGRAM
BEST PRACTICES FOR AN EFFECTIVE OIL ANALYSIS PROGRAM STLE HOUSTON OCTOBER 14, 2016 RAY THIBAULT/MARK KAVANAUGH MAINTENANCE PROGRAMS EQUIPMENT MAINTENANCE STRATEGIES Maintenance Strategy Activity Strategy
More informationJULY 2012 FLSA: NON-EXEMPT
JULY 2012 FLSA: NON-EXEMPT LEAD MECHANIC This class specification indicates, in general terms, the type and level of work performed as well as the responsibilities of employees in this classification.
More informationREGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER QUESTION AND ANSWER BOOKLET. Time allowed THREE hours
Affix label with Candidate Code Number here. If no label, enter candidate Number if known No. 9192 REGISTRATION EXAMINATION, JUNE 2013 LICENSED PLUMBER INSTRUCTIONS QUESTION AND ANSWER BOOKLET Time allowed
More informationHalliburton. All rights reserved. Flange Integrity Management
Flange Integrity Management Flange Integrity Management Why? North America Pressure Vessel Research Council found that each process facility in North America experienced 180 leaks per year, six of which
More informationMEC-MOS-E-2004 Gas Turbine Maintenance Engineer PERSONAL DATA EDUCATION LANGUAGES COMPUTER SKILLS TRAINING COURSES AND CERTIFICATIONS
100771-MEC-MOS-E-2004 Gas Turbine Maintenance Engineer Holds a B. Sc. and M. Sc. in Mechanical Power Engineering. Has about 11 years hands-on experience in power plant projects including installation for
More informationTerms and Conditions for Job Descriptions
Terms and Conditions for Job Descriptions Job Descriptions at HospitalityLawyer.com are provided as informational, educational, and illustrative purposes only. HospitalityLawyer.com does not render legal
More informationNeed-to-Know Criteria Water Treatment Operator Class I
2017 Need-to-Know Criteria Water Treatment Operator Class I A Need-to-Know Guide when preparing for the ABC Water Treatment Operator Class I Certification Exam Before You Dive In What is ABC s Need-to-Know
More informationApache / Contractor X. Contractor/Vendor Bridging Document
Operator Contractor/Vendor Operator Apache Contractor Contractor X Address Phone 2000 Post Oak Blvd., Suite 100 Houston, TX 056 Phone: (13)296-6000 Toll free: (00)22-2434 Address Phone *** Phone: Fax:
More informationAgricultural Mechanization CIP Task Grid
1 Secondary Task List 100 SUPERVISED AGRICULTURAL EXPERIENCE 101 Develop short-, mid- and long-term project plans. 102 Develop a Supervised Agricultural Experience (SAE) based upon individual interests/career
More informationMANUFACTURING MECHANICAL. Twist Drills, Reamers, and Rotary Cutting Devices. Bearing Identification. Fasteners and Screw Threads
Twist Drills, Reamers, and Rotary Cutting Devices Bearing Identification MANUFACTURING The objective of this course is to provide the student with an expanded understanding of the use, design, construction,
More informationTable 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006
Table 4.7.2(II) BREF Document on Best Available Techniques on Emissions from Storage, July 2006 With respect to the Conclusions on BAT for this horizontal BREF, the details of applicability and status
More informationHYDROPOWER INDUSTRY SOLUTIONS
HYDROPOWER INDUSTRY SOLUTIONS Solutions That Increase Reliability and Reduce Costs Chesterton is a global manufacturer of industrial fluid sealing systems, industrial coatings, lubricants, and maintenance
More informationEXPRESSION OF INTEREST (EOI) FOR. Mechanical Works
EXPRESSION OF INTEREST (EOI) FOR Mechanical Works KWtE-03-PR-EO-ACC-0 Rev01 15 Version: Date: Prepared by: Approved: 01 7/11/18 VMC AMN Page 1 OF 6 1 Project overview ACCIONA s Engineering, Procuring &
More informationSwivel and Marine Systems. Swivel stack and fluid transfer systems for multiple applications
Swivel and Marine Systems Swivel stack and fluid transfer systems for multiple applications Swivel Stack Systems The swivel stack is the heart of the turret mooring and fluid transfer system (FTS). Reliability,
More informationREGULATOR SPECIALIST. Position Summary
Position Summary Outlined in this document is the position description for the Regulator Specialist and various responsibilities. Job attributes and performance expectations are also defined. (Detailed
More informationNatural Gas Processing
Natural Gas Processing Technology and Engineering Design Alireza Bahadori, Ph.D. School of Environment, Science and Engineering, Southern Cross University, Lismore, NSW, Australia AMSTERDAM BOSTON HEIDELBERG
More informationIndustry Learning & Outreach Quarterly Webinar. December 5, 2017
Industry Learning & Outreach Quarterly Webinar December 5, 2017 1 Purpose of Industry Learning & Outreach Quarterly Webinars To update participants on recent learnings stemming from the AFPM/API Advancing
More informationApache / Contractor X. Contractor/Vendor Bridging Document
Operator Contractor/Vendor Operator Apache Contractor Contractor X Address Phone 2000 Post Oak Drive. Suite 100 Houston, TX 056 Phone: (13)296-6000 Toll free: (00)22-2434 Address Phone *** Phone: Fax:
More informationSECTION FUEL-FIRED UNIT HEATERS
SECTION 23 55 33 PART 1 - GENERAL 1.1 DESCRIPTION A. This Section includes gas-fired unit heaters. SPEC WRITER NOTES: 1. Use this section only for NCA projects. 2. Delete between // // if not applicable
More information