National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

Size: px
Start display at page:

Download "National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:"

Transcription

1 National Fire Protection Association 1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M TO: FROM: NFPA Technical Committee on Detention and Correctional Occupancies Linda MacKay DATE: October 25, 2010 SUBJECT: NFPA 101 ROC TC Letter Ballot (A 2011 Cycle) The ROC letter ballot for NFPA 101 is attached. The ballot is for formally voting on whether or not you concur with the committee s actions on the comments. Reasons must accompany all negative and abstention ballots. Please do not vote negatively because of editorial errors. However, please bring such errors to my attention for action. Please complete and return your ballot as soon as possible but no later than Thursday, November 4, As noted on the ballot form, please return the ballot to Linda MacKay either via to lmackay@nfpa.org or via fax to You may also mail your ballot to the attention of Linda MacKay at NFPA, 1 Batterymarch Park, Quincy, MA The return of ballots is required by the Regulations Governing Committee Projects. Attachments: Comments

2 101-5 Log #11 SAF-DET Technical Correlating Committee on Safety to Life, Make any needed editorial changes to assure that the moved and renumbered text is correlated with the remainder of the chapter. The action taken at the ROP stage by SAF-HEA will provide correlation among occupancy chapters, but may need to be correlated within each occupancy chapter. No further action required. The editorial reformatting made at the ROP stage is an improvement. No new problems were introduced and nothing got lost. 1

3 Log #57 SAF-DET Marcelo M. Hirschler, GBH International Revise text to read as follows: ASTM Publications. ASTM International, 100 Barr Harbor Drive, P.O. Box C700, West Conshohocken, PA ASTM D 1929, Standard Test Method for Determining Ignition Temperatures of Plastic,1996 (2001 e1) ASTM D 2859, Standard Test Method for Ignition Characteristics of Finished Textile Floor Covering Materials, ASTM D 2898, Standard Test Methods for Accelerated Weathering of Fire-Retardant-Treated Wood for Fire Testing, (e1). ASTM E 84, Standard Test Method for Surface Burning Characteristics of Building Materials, a. ASTM E 108, Standard Test Methods for Fire Tests of Roof Coverings, 2010a 2007a. ASTM E 119, Standard Test Methods for Fire Tests of Building Construction and Materials, 2009c 2008a. ASTM E 136, Standard Test Method for Behavior of Materials in a Vertical Tube Furnace at 750 Degrees C, 2009b ASTM E 648, Standard Test Method for Critical Radiant Flux of Floor Covering Systems Using a Radiant Heat Energy Source, a. ASTM E 814, Standard Test Method for Fire Tests of Through-Penetration Fire Stops, a. ASTM E 1352, Standard Test Method for Cigarette Ignition Resistance of Mock-Up Upholstered Furniture Assemblies, 2008a. ASTM E 1353, Standard Test Methods for Cigarette Ignition Resistance of Components of Upholstered Furniture, 2008a (e1). ASTM E 1537, Standard Test Method for Fire Testing of Upholstered Furniture, ASTM E 1590, Standard Test Method for Fire Testing of Mattresses, ASTM E 1591, Standard Guide for Obtaining Data for Deterministic Fire Models, ASTM E 1966, Standard Test Method for Fire-Resistive Joint Systems, ASTM E 2073, Standard Test Method for Photopic Luminance of Photoluminescent (Phosphorescent) Markings, ASTM E 2307, Standard Test Method for Determining Fire Resistance of Perimeter Fire Barrier Systems Using Intermediate-Scale, Multi-Story Test Apparatus, e1. ASTM F 851, Standard Test Method for Self-Rising Seat Mechanisms, 1987 (2005). ASTM F 1577, Standard Test Methods for Detention Locks for Swinging Doors, ASTM G 155, Standard Practice for Operating Xenon Arc Light Apparatus for Exposure of Non-Metallic Materials, 2005a. ASTM standards update, per ASTM web site August The commenter requests that NFPA staff checks the most recent editions at the time of the code going to print. Make the changes requested by the submitter. Additionally, update the edition date of ASTM E 119 from 2009c to 2010b. The action does what the submitter requested and also further updates the ASTM E 119 publication date to reflect the edition current at the time of the committee's ROC meeting. Further, SAF-DET notes that the submitter's request that further updates be made prior to publication of NFPA cannot be honored. The ASTM publication dates - as shown in the Recommendation field, and as approved by SAF-DET at its ROC meeting - is as far as NFPA can go with updating the publication dates. 2

4 Log #27 SAF-DET Technical Correlating Committee on Safety to Life, c Review the TC s occupancy chapter provisions applicable to smoke barriers and, if it is the TC s desire, revise text so as to specifically exempt latching in the appropriate locations. The occupancy chapters might need to be correlated with the change made to See Comment a (Log #CC700). The referenced comment makes changes to and to preserve the status quo relative to the latching of sliding doors in smoke barriers in detention and correctional occupancies a Log #CC700 SAF-DET Technical Committee on Detention and Correctional Occupancies, c Revise as follows: Doors in smoke barriers shall be as follows: (1) The doors shall provide resistance to the passage of smoke. (2) Swinging doors shall be self-latching, or the opening resistance of the door shall be not less than 5 lbf (22 N). (3) Sliding doors shall be exempt from the latching requirement of Doors in smoke barriers shall be as follows: (1) The doors shall provide resistance to the passage of smoke. (2) Swinging doors shall be self-latching, or the opening resistance of the door shall be not less than 5 lbf (22 N). (3) Sliding doors shall be exempt from the latching requirement of (4) The Such doors shall not be required to swing in the direction of egress travel. ROP Proposal c revised the Section 8.5 provisions for smoke barriers so as to require smoke barrier doors to latch unless exempted by another provision of the Code. The text shown in the recommendation field adds item (3) to preserve the current requirement that sliding doors need not be latching. The other changes made are editorial reformatting for compliance with the Manual of Style by not having multiple requirements in one paragraph. 3

5 Log #75 SAF-DET Marcelo M. Hirschler, GBH International / Rep. American Fire Safety Council Revise text to read as follows: Combustible decorations shall be prohibited in any detention or correctional occupancy unless flame retardant one of the following criteria is met: (1)* The decorations are considered by the authority having jurisdiction to exhibit acceptable fire performance (2) The decorations meet the requirements of NFPA 701, Standard Methods of Fire Tests for Flame Propagation of Textiles and Films (3) The decorations exhibit a heat release rate not exceeding 100 kw when tested in accordance with NFPA 289, Standard Method of Fire Test for Individual Fuel Packages, using the 20 kw ignition source (4) The decorations are present in such limited quantities that a hazard of fire development or spread is minimal. It is important that combustible decorations exhibit adequate fire performance. The requirement that a decoration be flame retardant is not enforceable as such. However, the AHJ may be able to make a judgment of adequate fire performance without requiring testing of the decoration. The AHJ may also require a fire test method different from NFPA 701 or NFPA 289, as some decorations may not be effectively tested by NFPA 701. Examples of approaches that can be taken by the AHJ include information on the composition of the decoration or evidence of its treatment with fire retardants or coatings. This comment understands the opinion of the technical committee that it may not always be possible or necessary to conduct fire tests and that the AHJ needs to be given the option of accepting a decoration without testing. The replacement of the phrase flame retardant by the recommended phrase accomplishes the committee s intent while avoiding the use of an unenforceable requirement. The annex note clarifies without introducing new requirements. The submitter's proposed items (1) and (4) will make it more difficult for the AHJ to enforce the provision. "Fire performance" includes many more considerations than a judgment related to the current requirement for "flame retardancy." Fire performance considerations involve all the material's characteristics that relate to fire. The committee refers the submitter to its Committee Statement for the rejection of ROP Proposal : decorations are typically quite minimal in detention and correctional occupancies; judgment of "flame retardancy" is being done effectively by the AHJ without the need for specific testing; the current text affords the AHJ needed leeway Log #CC3 SAF-DET Technical Committee on Fundamentals, Revise text of footnote c as follows: Any building of Type I, Type II(222), or Type II(111) construction is permitted to include roofing systems involving combustible or steel supports, decking, or roofing, provided that all of the following are met: (1) The roof covering meets not less than Class C requirements in accordance with NFPA 256, ASTM E 108,, or ANSI/UL 790,. (2) The roof is separated from all occupied portions of the building by a noncombustible floor assembly that includes not less than 2½ in. (64 mm) of concrete or gypsum fill, and the attic or other space so developed meets one of the following requirements: (a) It is unoccupied. (b) It is protected throughout by an approved automatic sprinkler system. NFPA 256 was withdrawn and is no longer published. ASTM E 108 and ANSI/UL 790 are the applicable test standards. 4

6 Log #149c SAF-DET Robert J. Davidson, Davidson Code Concepts, LLC Keying on the current language in and for existing wired glass installations, revise as follows for clarification: Notes: (1) Doors in openings in partitions required to be fire rated (FR) in accordance with Table , in other than required enclosures of exits or hazardous areas, are required to be substantial doors of construction that resists fire for a minimum of 20 minutes. Vision panels with existing installations of wired glass or glass with not less than 45-minute fire-rated glazing are permitted. Latches and door closers are not required on cell doors. In response to the Committee Statement the following changes were made to the proposal. The sections relating to existing installations are proposed to be modified by adding language clarifying that application of these sections is limited to existing wired glass installations and not intened to allow new installations. The language proposed for addition was obtained by review of existing language found at sections subsection (2) and subsection (4)(c) included below. This proposal will provide for improved correlation of various sections relating to existing installations of wired glass.. An exit passageway shall be separated from other parts of the building as specified in , and the following alternatives shall be permitted: (1) Fire windows in accordance with shall be permitted to be installed in the separation in a building protected throughout by an approved, supervised automatic sprinkler system in accordance with Section 9.7. (2) fixed wired glass panels in steel sash shall be permitted to be in the separation in buildings protected throughout by an approved, supervised automatic sprinkler system in accordance with Section Any vertical opening shall be enclosed or protected in accordance with Section 8.6, unless otherwise permitted by the following: (1)* Stairs or ramps shall be permitted to be unenclosed between balconies or mezzanines and main assembly areas located below, provided that the balcony or mezzanine is open to the main assembly area. (2) Exit access stairs from lighting and access catwalks, galleries, and gridirons shall not be required to be enclosed. (3) Assembly occupancies protected by an approved, supervised automatic sprinkler system in accordance with Section 9.7 shall be permitted to have unprotected vertical openings in accordance with (4) Use of the following alternative materials shall be permitted where assemblies constructed of such materials are in good repair and free of any condition that would diminish their original fire resistance characteristics: (a) Existing wood lath and plaster (b) Existing 1/2 in. (13 mm) gypsum wallboard (c) of ¼ in. (6.3 mm) thick wired glass that are, or are rendered, inoperative and fixed in the closed position (d) Other existing materials having similar fire resistance capabilities The building codes permit new wired glass to be installed in new construction in areas where safety glass is not required. The submitter has not justified why the Code should not be more stringent where wired glass is to be installed in an existing frame. 5

7 Log #76 SAF-DET Marcelo M. Hirschler, GBH International / Rep. American Fire Safety Council Revise text to read as follows: Combustible decorations shall be prohibited in any detention or correctional occupancy unless flame retardant one of the following criteria is met: (1)* The decorations are considered by the authority having jurisdiction to exhibit acceptable fire performance (2) The decorations meet the requirements of NFPA 701, Standard Methods of Fire Tests for Flame Propagation of Textiles and Films (3) The decorations exhibit a heat release rate not exceeding 100 kw when tested in accordance with NFPA 289, Standard Method of Fire Test for Individual Fuel Packages, using the 20 kw ignition source (4) The decorations are present in such limited quantities that a hazard of fire development or spread is minimal. It is important that combustible decorations exhibit adequate fire performance. The requirement that a decoration be flame retardant is not enforceable as such. However, the AHJ may be able to make a judgment of adequate fire performance without requiring testing of the decoration. The AHJ may also require a fire test method different from NFPA 701 or NFPA 289, as some decorations may not be effectively tested by NFPA 701. Examples of approaches that can be taken by the AHJ include information on the composition of the decoration or evidence of its treatment with fire retardants or coatings. This comment understands the opinion of the technical committee that it may not always be possible or necessary to conduct fire tests and that the AHJ needs to be given the option of accepting a decoration without testing. The replacement of the phrase flame retardant by the recommended phrase accomplishes the committee s intent while avoiding the use of an unenforceable requirement. The annex note clarifies without introducing new requirements. The submitter's proposed items (1) and (4) will make it more difficult for the AHJ to enforce the provision. "Fire performance" includes many more considerations than a judgment related to the current requirement for "flame retardancy." Fire performance considerations involve all the material's characteristics that relate to fire. The committee refers the submitter to its Committee Statement for the rejection of ROP Proposal : decorations are typically quite minimal in detention and correctional occupancies; judgment of "flame retardancy" is being done effectively by the AHJ without the need for specific testing; the current text affords the AHJ needed leeway. 6

NFPA TECHNICAL COMMITTEE ON BUILDING CONSTRUCTION M E M O R A N D U M

NFPA TECHNICAL COMMITTEE ON BUILDING CONSTRUCTION M E M O R A N D U M National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org NFPA TECHNICAL COMMITTEE ON BUILDING CONSTRUCTION M E M O R A N D U M

More information

NFPA Committee on Fire Tests

NFPA Committee on Fire Tests NFPA Committee on Fire Tests M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Linda MacKay DATE: September 21, 2009 SUBJECT: NFPA 251, 253, 262, 265, 285, 286 ROP Letter Ballot Final

More information

Code Review for Theaters and Props

Code Review for Theaters and Props Code Review for Theaters and Props I. INTRODUCTION Fire- and Life-Safety Group (FLS) This document was prepared to list the requirements for theaters and props. These requirements are based on the 2007

More information

First Revision No NFPA [ Section No ]

First Revision No NFPA [ Section No ] National Fire Protection Association Report of 17 http://submittals.nfpa.org/terraviewweb/contentfetcher?commentpara... 10/21/2015 9:28 AM First Revision No. 4502-NFPA 101-2015 [ Section No. 3.3.92.4 ]

More information

9/20/2016 4:01 PM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement

9/20/2016 4:01 PM. Second Revision No NFPA [ New Section after ] Submitter Information Verification. Committee Statement of 28 9/20/2016 4:01 PM Second Revision No. 5502-NFPA 101-2016 [ New Section after 36.2.1.5 ] 36.2.1.6 Grab Bars for Bathtubs, Bathtub-Shower Combinations, and Showers. 36.2.1.6.1 Where bathtubs, bathtub-shower

More information

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and &

&02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections & and & &01 GENERAL To be developed. All of the exceptions have to be coordinated. &02 SPECIAL USE AND OCCUPANCY &02.1. Level 3 Alterations. Level 3 Alterations shall comply with Sections &02.1.1 and &02.1.2.

More information

First Revision No NFPA [ Section No ]

First Revision No NFPA [ Section No ] National Fire Protection Association Report of 13 http://submittals.nfpa.org/terraviewweb/contentfetcher?commentpara... 10/28/2015 10:35 AM First Revision No. 5501-NFPA 5000-2015 [ Section No. 3.3.220.4

More information

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code)

Company Overview. Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code) Significant Code Changes Massachusetts State Building Code 9 th Edition (2015 International Code) Company Overview R.W. Sullivan Engineering (RWS) was established in 1945 and currently has 95 employees.

More information

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

WOOD USE IN NONCOMBUSTIBLE BUILDINGS INTRODUCTION The National Building Code of Canada (NBCC) 1 requires that some buildings be of noncombustible construction under its prescriptive requirements. Its use in certain types of buildings such

More information

Public Input No. 1-NFPA [ Chapter 2 ]

Public Input No. 1-NFPA [ Chapter 2 ] Public Input No. 1-NFPA 703-2015 [ Chapter 2 ] Chapter 2 Referenced Publications 2.1 General. The documents or portions thereof listed in this chapter are referenced within this standard and shall be considered

More information

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS CHAPTER 8 INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS SECTION 801 GENERAL 801.1 Scope. The provisions of this chapter shall govern interior finish, interior trim, furniture, furnishings, decorative

More information

Report on First Revision June 2014 NFPA 5000

Report on First Revision June 2014 NFPA 5000 5000 FR520 BLD-FUR (10.1 and 10.2) 10.1* General. 10.1.1 Application. Interior finish for buildings shall comply with this chapter. 10.1.2 Automatic Sprinkler Systems. Where another provision of this chapter

More information

NEWS LETTER MARCH 27, 2009

NEWS LETTER MARCH 27, 2009 PLANNING, BUILDING & DEVELOPMENT SERVICES DEPARTMENT 580-1 Street S.E. Medicine Hat, Alberta T1A 8E6 Telephone: 529-8374 FAX 502-8038 1 NEWS LETTER MARCH 27, 2009 GENERAL As you are probably aware there

More information

Responsibilities: Effective Date: November Revision Date: January 27, VP, Facilities and Construction Management

Responsibilities: Effective Date: November Revision Date: January 27, VP, Facilities and Construction Management Title: Fire Safety Requirements for Interior Finish Materials Procedure Effective Date: November 2005 Revision Date: January 27, 2017 Issuing Authority: Responsible Officer: VP, Facilities and Construction

More information

INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8 CHAPTER 8 INTERIOR FINISHES SECTION 801 GENERAL 801.1 Scope. Provisions of this chapter shall govern the use of materials used as interior finishes, trim and decorative materials. 801.1.1 Interior finishes.

More information

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD.

Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Following contains common verbiage found in major model building codes and has been edited for the purpose of inclusion on this CD. Included are selected sections of codes taken directly from: 1997 Uniform

More information

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS CHAPTER 8 INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS SECTION 801 GENERAL 801.1 Scope. The provisions of this chapter shall govern interior finish, interior trim, furniture, furnishings, decorative

More information

SECTION R327.3 STANDARDS OF QUALITY

SECTION R327.3 STANDARDS OF QUALITY California Residential Code Section R327 Conformance Checklist Per CRC R327.1.4 The local building official shall, prior to construction, provide the owner or applicant a certification that the building

More information

FS , 712, 713, 714

FS , 712, 713, 714 VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL JUNE 28-29, 2012 PUBLIC COMMENTS CTC Code Change Proposal FS50-12 was Approved as Modified as shown below - No public comments for the Group

More information

Exception: All layers of single and multilayer reflective plastic core foil insulation shall comply with Section 2604.

Exception: All layers of single and multilayer reflective plastic core foil insulation shall comply with Section 2604. 1. Fiberboard insulation shall comply with Chapter 23. 2. Foam plastic insulation shall comply with Chapter 26. 3. Duct and pipe insulation and duct and pipe coverings and linings in plenums shall comply

More information

Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting and

Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting and BCAC MOE Work Group Summary with Files Revised 11-20-2017 with meeting notes Report of project list/proposed changes for Dec. 5 and 6, 2017 BCAC face-to-face committee meeting ITEM Topic SECTION Notes

More information

INTERIOR FINISHES CHAPTER 8 SECTION 801 GENERAL

INTERIOR FINISHES CHAPTER 8 SECTION 801 GENERAL CHAPTER 8 INTERIOR FINISHES SECTION 801 GENERAL 801.1 Scope. Provisions of this chapter shall govern the use of materials used as interior finishes, trim and decorative materials. 801.1.1 Interior finishes.

More information

SOUTH AFRICAN NATIONAL STANDARD

SOUTH AFRICAN NATIONAL STANDARD ISBN 978-0-626-29899-9 Edition 1 ASTM E 108:2011 Edition 13 SOUTH AFRICAN NATIONAL STANDARD Fire testing of materials, components and elements used in buildings Part 12: Test methods for fire tests of

More information

NFPA Committee on Fire Tests

NFPA Committee on Fire Tests NFPA Committee on Fire Tests M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fire Tests Linda MacKay DATE: September 21, 2009 SUBJECT: NFPA 251, 253, 262, 265, 285, 286 ROP Letter Ballot Final

More information

INTERNATIONAL CODE INTERPRETATIONS

INTERNATIONAL CODE INTERPRETATIONS 2012 INTERNATIONAL CODE INTERPRETATIONS PREFACE The 2012 International Codes promulgated by the International Code Council (ICC ) comprise a comprehensive set of model regulations for the construction

More information

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS CHAPTER 8 INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS SECTION 801 GENERAL 801.1 Scope. The provisions of this chapter shall govern furniture and furnishings, interior finishes, interior trim,

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Means of Egress

More information

PROPOSAL BALLOT DUE BY: Wednesday, September 2, 2009

PROPOSAL BALLOT DUE BY: Wednesday, September 2, 2009 PROPOSL BLLOT DUE BY: Wednesday, September 2, 2009 NFP 265 FIZ- Standard Methods of Fire Tests for Evaluating Room Fire Growth Contribution of Textile Coverings on Full Height Panels and Walls Staff Liaison:

More information

CITY SECTION 701A 702A. of this chapter. Protection

CITY SECTION 701A 702A. of this chapter. Protection CITY OF BIG BEAR LAKE BUILDING CODE CHAPTER 7A MATERIALS AND CONSTRUCTION METHODS FOR EXTERIOR WILDFIRE EXPOSURE SECTION 701A SCOPE, PURPOSE AND APPLICATION 701A.1 Scope. This chapter applies to building

More information

VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES

VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES VERTICAL OPENINGS STUDY GROUP REPORT TO CTC MEETNG CHICAGO, IL - OCTOBER 13-14, 2011 CODE CHANGES The following is the Study Group report that was considered by the CTC at its October 13-14, 2011 meeting.

More information

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS CHAPTER 8 INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS SECTION 801 GENERAL 801.1 Scope. The provisions of this chapter shall govern furniture and furnishings, interior finishes, interior trim,

More information

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS

INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS CHAPTER 8 INTERIOR FINISH, DECORATIVE MATERIALS AND FURNISHINGS SECTION 801 GENERAL 801.1 Scope. The provisions of this chapter shall govern furniture and furnishings, interior finishes, interior trim,

More information

Butte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530)

Butte County Fire Department Fire Prevention Bureau 176 Nelson Avenue Oroville, CA Office (530) 2016 CBC Chapter 7A and CRC Section R337 (The use of paints, coatings, stains, or other surface treatments are not an approved method of protection as required in this chapter.) The Wildland Urban Interface

More information

INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8 CHAPTER 8 INTERIOR FINISHES SECTION 801 GENERAL 801.1 Scope. Provisions of this chapter shall govern the use of materials used as interior finishes, trim and decorative materials. 801.2 Interior wall and

More information

Building Codes and Ordinances ARC 227

Building Codes and Ordinances ARC 227 Building Codes and Ordinances ARC 227 Week 6 Fire Resistive Construction 03.02.10 Instructor: Rick Staub, AIA Email: staub@pointonearchitects.com Phone: 860-434-7707 Fire Resistive Construction Passive

More information

Chapter 4 Test. Directions: Write the correct letter on the blank before each question.

Chapter 4 Test. Directions: Write the correct letter on the blank before each question. Chapter 4 Test Name: Date: Directions: Write the correct letter on the blank before each question. Objective 1: Describe the impact of fire on common building materials. 1. Which of the following is the

More information

A Review of Thermal and Ignition Barrier Requirements for Spray Foam Insulation

A Review of Thermal and Ignition Barrier Requirements for Spray Foam Insulation A Review of Thermal and Ignition Barrier Requirements for Spray Foam Insulation Agenda Why Do Codes Require Thermal or Ignition Barriers? What is a Thermal Barrier? Where is it required? What is an Ignition

More information

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M

1 Batterymarch Park, Quincy, MA Phone: Fax: M E M O R A N D U M National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Wood and Cellulosic

More information

INTERIOR FINISHES CHAPTER 8

INTERIOR FINISHES CHAPTER 8 CHAPTER 8 INTERIOR FINISHES SECTION 801 GENERAL 801.1 Scope. Provisions of this chapter shall govern the use of materials used as interior finishes, trim and decorative materials. 801.2 Interior wall and

More information

Minnesota Health Care Engineers Association

Minnesota Health Care Engineers Association Minnesota Health Care Engineers Association Life Safety Code Potpourri Friday, May 1, 2015 Presenter: Bob Dehler, P.E., Engineering Program Manager, Minnesota Department of Health Minnesota Department

More information

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II

Fire Inspection and Code Enforcement, 7 th Edition. Chapter 6 Building Construction: Components Inspector II Fire Inspection and Code Enforcement, 7 th Edition Chapter 6 Building Construction: Components Today we will Discuss fire walls, party walls, fire partitions, and curtain walls Discuss roof types and coverings

More information

Combustible Exterior Wall Cladding Systems: An ICC Perspective

Combustible Exterior Wall Cladding Systems: An ICC Perspective Combustible Exterior Wall Cladding Systems: An ICC Perspective The tragic Grenfell Tower fire in London brought extensive public focus on combustible exterior wall systems, often called cladding, prompting

More information

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST

COMMERCIAL BUILDING PLAN REVIEW CHECKLIST Department of Urban Planning & Codes Enforcement City of Coatesville - 1 City Hall Place - Coatesville, Pennsylvania 19320 Phone: 610.384.0300 Fax: 610.384.6051 COMMERCIAL BUILDING PLAN REVIEW CHECKLIST

More information

Fire Considerations. Combustible Cladding and Components Of Exterior Walls and Curtain Walls. APEGBC/BCBEC Seminar, April

Fire Considerations. Combustible Cladding and Components Of Exterior Walls and Curtain Walls. APEGBC/BCBEC Seminar, April Fire Considerations Combustible Cladding and Components Of Exterior Walls and Curtain Walls APEGBC/BCBEC Seminar, April 21 2016 Andrew Harmsworth M Eng, P Eng, PE, CP Jun H. Kim, BASc, EIT Email: ah@ghl.ca/

More information

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date

Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date BUILDING AND SAFETY Tenant Improvement Checklist Project Address Applicant: (Please Print) Plan review Engineer: Phone: Date APPLICATION The following items will be required at the permit counter before

More information

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE 301

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC CALIFORNIA BUILDING CODE 301 CALIFORNIA BUILDING CODE MATRIX ADOPTION TABLE CHAPTER 8 INTERIOR FINISHES (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority and

More information

2021 ICC Group A National Model Codes: Online Voting Guide

2021 ICC Group A National Model Codes: Online Voting Guide BACKGROUNDER NOVEMBER 2018 2021 ICC Group A National Model Codes: Online Voting Guide About NMHC Based in Washington, DC, the National Multifamily Housing Council (NMHC) is a national association representing

More information

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax:

National Fire Protection Association. 1 Batterymarch Park, Quincy, MA Phone: Fax: National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org M E M O R A N D U M TO: FROM: NFPA Technical Committee on Fundamentals

More information

FIRE-RESISTANCE-RATED CONSTRUCTION

FIRE-RESISTANCE-RATED CONSTRUCTION CHAPTER 7 FIRE-RESISTANCE-RATED CONSTRUCTION SECTION BC 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials and assemblies used for structural fire resistance and fire-resistance-rated

More information

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION BC 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic

More information

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY

SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,

More information

E?? , , , , , , , , , , , , Table ,

E?? , , , , , , , , , , , , Table , CTC to BCAC Unenclosed Exits 2015 Group A Code Change Cycle Copyright 2014 International Code Council, Inc. IBC 10-31 E?? 15 202, 1005.3.2, 1009.3, 1009.4, 1019.3, 1029.6, 1029.6.3, 1029.7, 1029.8, 1029.8.1,

More information

INTERNATIONAL EXISTING BUILDING CODE

INTERNATIONAL EXISTING BUILDING CODE INTERNATIONAL EXISTING BUILDING CODE EB10-09/10, Part I IEBC 605.1, 705.2, 706.1, 805.4 (New), 805.4.1 (New), 912.4.1, 912.4.2, 912.8.2, 1004.1(New), 1005.1, 1103.3, 1105.6; IBC 3411.4, 3411.4.1, 3411.4.2,

More information

Report to: Plumberex Specialty Products, Inc. Pipe Insulation and Fire Safety

Report to: Plumberex Specialty Products, Inc. Pipe Insulation and Fire Safety GBH International 2 Friar's Lane, Mill Valley, CA, 94941 Telephone: (415) 388-8278 FAX: (415) 388-5546 e-mail: gbhint@aol.com Web site: www.gbhinternational.com Report to: Plumberex Specialty Products,

More information

Municipal Code of Chicago CHAPTER EXIT REQUIREMENTS

Municipal Code of Chicago CHAPTER EXIT REQUIREMENTS Municipal Code of Chicago CHAPTER 13-160 EXIT REQUIREMENTS 13-160-010 General provisions. 13-160-020 Definitions. 13-160-030 Exit types - Requirements. 13-160-040 Exit types - Above or below grade. 13-160-050

More information

http://submittals.nfpa.org/terraviewweb/contentfetcher?contentid=703... 1 of 1 5/6/2014 4:26 PM NFPA STANDARDS DEVELOPMENT SITE SECOND DRAFT REPORT Closing Date: January 03, 2014 NOTE: All Public Comment

More information

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Comparison of the life safety elements of the 1997 UBC and the IBC 2000. Introduction The Building Performance Research Institute s mission is primarily one of education on building safety and performance.

More information

PLASTIC CHAPTER 26. SECTION 2602 DEFINITIONS Definitions. The following terms are defined in Chapter

PLASTIC CHAPTER 26. SECTION 2602 DEFINITIONS Definitions. The following terms are defined in Chapter CHAPTER 26 PLASTIC SECTION 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic veneer,

More information

Essentials of Fire Fighting

Essentials of Fire Fighting Essentials of Fire Fighting 6 th Edition Firefighter I Chapter 4 Building Construction Learning Objective 1 Describe the impact of fire on common building materials. Replace with manual graphic on slide

More information

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council Copyright This presentation is protected

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

2.0 Definitions: For the purpose of this section, certain terms are defined as follows:

2.0 Definitions: For the purpose of this section, certain terms are defined as follows: BCMC REPORT ON STAGES, PLATFORMS AND SOUND STAGES NOTICE OF A PUBLIC HEARING MAY 5, 1992 AT THE DAYS INN INNER HARBOR, BALTIMORE, MARYLAND WITH DRAFT COMMENTARY The Council of American Building Officials'

More information

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board Perimeter Relief and Control Joints in Fire-Rated Gypsum Board In multi-family residential construction, involving fire-rated assemblies stress relief in the firerated assemblies is important, but often

More information

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings. John Buddy Showalter, PE VP, Technology Transfer American Wood Council Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings John Buddy Showalter, PE VP, Technology Transfer American Wood Council Copyright This presentation is protected by US and International

More information

F , , , , , (New)

F , , , , , (New) CTC Meeting #26 April 8-9, 2013 BFP-Vertical Openings The following 2013 Group B changes have been compiled for the above noted CTC Area of Study. Code changes with an (*) indicate CTC sponsored code changes.

More information

2012 IBC Inspection of Fire-resistance Rated Walls

2012 IBC Inspection of Fire-resistance Rated Walls Accreditation 2012 IBC Inspection of Fire-resistance Rated Walls Based on the 2012 International Building Code (IBC ) The International Code Council has been accredited as an Authorized Provider by the

More information

Public Input No. 4-NFPA [ Global Input ]

Public Input No. 4-NFPA [ Global Input ] of 18 7/28/2014 12:10 PM Public Input No. 4-NFPA 32-2013 [ Global Input ] Note: This Proposal originates from Tentative Interim Amendment 32-11-1 (TIA 999) issued by the Standards Council on October 20,

More information

International Code INTERPRETATIONS

International Code INTERPRETATIONS 2015 International Code INTERPRETATIONS 2015 International Code Interpretations First Printing: June 2016 ISBN#978-1-60983-666.5 Copyright 2016 by International Code Council ALL RIGHTS RESERVED. This 2015

More information

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot Final Result s

M E M O R A N D U M. NFPA 5000 A2011 ROP Letter Ballot Final Result s M E M O R A N D U M TO: FROM: NFPA Technical Committee on Furnishings and Contents (BLD-FUR) Kristin Collette, Staff Liaison DATE: October 29, 2009 SUBJECT: NFPA 5000 A2011 ROP Letter Ballot Final Result

More information

LIFE SAFETY 101. Architecture Interior Design Planning Sustainable Design

LIFE SAFETY 101. Architecture Interior Design Planning Sustainable Design LIFE SAFETY 101 Drew Underwood, AIA, ACHA Senior Healthcare Principal TMPartners, PLLC 211 Franklin Road, Suite 200 Brentwood, TN 37027 615-523-5234 aunderwood@tmpartners.com Architecture Interior Design

More information

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3%

CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE 01. GENERAL ADMINISTRATION 3 % Project Administration 3% CALIFORNIA BUILDING PLANS EXAMINER CONTENT OUTLINE EXAM ID: I6 80 multiple-choice questions 3-1/2-hour time limit Open book 01. GENERAL ADMINISTRATION 3 % 0101. Project Administration 3% Verify that plans,

More information

Fire Safety with Concrete Products

Fire Safety with Concrete Products Fire Safety with Concrete Products by Bill McHugh & Rich Walke representing National Concrete Masonry Association May 12, 2014 FCIA TJC ASHE UL Barrier Management Symposium King of Prussia, PA Referenced

More information

WILDLAND URBAN INTERFACE (WUI) PRODUCTS

WILDLAND URBAN INTERFACE (WUI) PRODUCTS CALIFORNIA DEPARTMENT of FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL WILDLAND URBAN INTERFACE (WUI) PRODUCTS Published by CAL-FIRE WILDLAND FIRE PREVENTION ENGINEERING Revised 12/17/07

More information

WUIC Proponent: Jason Thompson, National Concrete Masonry Association representing Masonry Alliance for Codes and Standards

WUIC Proponent: Jason Thompson, National Concrete Masonry Association representing Masonry Alliance for Codes and Standards WUIC1 13 501.3 Proponent: Jason Thompson, National Concrete Masonry Association representing Masonry Alliance for Codes and Standards 501.3 Fire-resistance-rated construction. Where this code requires

More information

Knowledge Objectives (3 of 3)

Knowledge Objectives (3 of 3) Building Systems Knowledge Objectives (1 of 3) Identify construction types in commercial and residential structures. Explain fire behavior as it relates to the method of construction. Discuss the structural

More information

Code Change No: FS43-06/07

Code Change No: FS43-06/07 CODE CHANGES RESOURCE COLLECTION INTERNATIONAL MECHANICAL CODE PART III IBC MEANS OF EGRESS Approved as Submitted Committee Reason: The revised language in Sections 1021.3 and 1022.2. would provide consistency

More information

(Statute, Rule, FBC, Industry) FBC 406.3, see also FBC No provisions in FBC or FS

(Statute, Rule, FBC, Industry) FBC 406.3, see also FBC No provisions in FBC or FS Florida Specific Amendment Code Reference NFPA 101 Open Parking Structure. A parking structure that, at each parking level, has wall openings open to the atmosphere, for an area of not less than 1.4 ft2

More information

Façade Particulars of the UAE Code Windows, Doors & Facades Conf. 2017

Façade Particulars of the UAE Code Windows, Doors & Facades Conf. 2017 Façade Particulars of the UAE Code Windows, Doors & Facades Conf. 2017 Andy Dean FCIOB, FSFE Head of Façades Learning objectives 1. Overview of the new code layout 2. Awareness of some of the particulars

More information

2015 IBC Update. Copyright 2014 International Code Council #1000PDF15 1

2015 IBC Update. Copyright 2014 International Code Council #1000PDF15 1 Goal 2015 IBC Update Based on the International Building Code (IBC ) The goal is to familiarize building officials, fire officials, plans examiners, inspectors, design professionals, contractors, and others

More information

CHAPTER 6 TYPES OF CONSTRUCTION

CHAPTER 6 TYPES OF CONSTRUCTION CHAPTER 6 TYPES OF CONSTRUCTION SECTION 61 GENERAL 61.1 Scope. The provisions of this chapter shall control the classification of buildings as to type of construction. SECTION 62 CONSTRUCTION CLASSIFICATION

More information

CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY DRAFT. FLORIDA BUILDING CODE BUILDING, 5th EDITION (2014) 4.1

CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY DRAFT. FLORIDA BUILDING CODE BUILDING, 5th EDITION (2014) 4.1 CHAPTER 4 SPECIAL DETAILED REQUIREMENTS BASED ON USE AND OCCUPANCY SECTION 401 SCOPE 401.1 Detailed use and occupancy requirements. In addition to the occupancy and construction requirements in this code,

More information

Only required in new home construction

Only required in new home construction Fire Protection of Lightweight Floor Systems Options & questions to consider y p q August 9, 2011 1:00 PM Presented by Bryan Heitzmann Training & Education Development Specialist, PHRC Act 1 of 2011 /

More information

Changes to California s Building Code for Construction in Wildfire Prone Areas: Impact on Wood and Wood-based Materials

Changes to California s Building Code for Construction in Wildfire Prone Areas: Impact on Wood and Wood-based Materials Changes to California s Building Code for Construction in Wildfire Prone Areas: Impact on Wood and Wood-based Materials Stephen L. Quarles, Ph.D. University of California Cooperative Extension Richmond,

More information

Excerpts from the Uniform Building Code. (UBC) For The US

Excerpts from the Uniform Building Code. (UBC) For The US Excerpts from the Uniform Building Code (UBC) For The US Index 4301 FIRE-RESISTIVE STANDARDS 1. Section 4301(a) Standards of Quality 2. Section 4301(b) Definitions 4304 WALLS AND PARTITIONS 1. Sec.4304(a)

More information

Overview of Revised School Regulation

Overview of Revised School Regulation Office of the State Fire Marshal Overview of Revised School Regulation By: Timothee Rodrique Director, OSFM October, 2003 Training Effective Fire Prevention through Public Education Introduction! Purpose

More information

General Building Information

General Building Information Software Module s Description Page 1 General Building Information BUILDING AREA AND HEIGHT - This module designed to determine the height and area of buildings on the basis of occupancy group classification

More information

IBC FIRE SAFETY. Code Change No: FS1-07/08. Original Proposal SECTION 702 DEFINITIONS

IBC FIRE SAFETY. Code Change No: FS1-07/08. Original Proposal SECTION 702 DEFINITIONS DOCUMENTATION IBC FIRE SAFETY Code Change No: FS1-07/08 Sections: 702.1, 704.8.2, 706.7 Proponent: Philip Brazil, PE, Reid Middleton, Inc., representing himself SECTION 702 DEFINITIONS 702.1 Definitions.

More information

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings

Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Code Compliance for Fire Resistance-Rated Assemblies in Light-Frame Buildings Michelle Kam-Biron, PE, SE, SECB Senior Director, Education American Wood Council Copyright This presentation is protected

More information

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION

CHAPTER 26 PLASTIC SECTION 2601 SECTION 2603 GENERAL FOAM PLASTIC INSULATION CHAPTER 26 PLASTIC SECTION 2601 GENERAL 2601.1 Scope. These provisions shall govern the materials, design, application, construction and installation of foam plastic, foam plastic insulation, plastic veneer,

More information

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition

Balloting Version First Draft NFPA 101 Life Safety Code Proposed 2015 Edition Copyright National Fire Protection Association 2013. All rights reserved. This copy is solely for your personal, noncommercial use in connection with participation in the NFPA Standards Development Process.

More information

Technical Topics. Wood I-Joist Floors, Firefighters and Fire

Technical Topics. Wood I-Joist Floors, Firefighters and Fire Technical Topics TT-015G January 2016 Wood I-Joist Floors, Firefighters and Fire Prefabricated wood I-joists are used in approximately 50 percent of new raised-floor wood-frame construction. When compared

More information

2009 IBC/IFC Photoluminescent Signs & Pathway Marking Systems Frequently Asked Questions

2009 IBC/IFC Photoluminescent Signs & Pathway Marking Systems Frequently Asked Questions 2009 IBC/IFC Photoluminescent Signs & Pathway Marking Systems Frequently Asked Questions 1. What is the difference between IBC & IFC? a. IBC International Building Code covers new construction b. IFC International

More information

IBC MEANS OF EGRESS. Code Change No: E5-07/08. Original Proposal

IBC MEANS OF EGRESS. Code Change No: E5-07/08. Original Proposal DOCUMENTATION IBC MEANS OF EGRESS Code Change No: E5-07/08 Sections: 1002.1 (IFC [B] 1002.1) Proponent: Gerard Hathaway, New York State Department of State Building Codes Division, representing himself

More information

9/19/2018. Session: 2018 IEBC Essentials - History

9/19/2018. Session: 2018 IEBC Essentials - History 9/19/2018 Session: 2018 IEBC Essentials - History 1 2018 IEBC Essentials Part 1 Based on the International Existing Building Code (IEBC ) Introductions Instructor Provided assistance to: New Jersey HUD

More information

FCIA Barrier Management Series. Barrier Management Policies

FCIA Barrier Management Series. Barrier Management Policies FCIA Barrier Management Series Barrier Management Policies Objective Keep Buildings Safe Barriers are for Safety DIIM Properly Designed and Specified Tested and Listed Systems Directories, Tables Specified

More information

SPECIAL CONSTRUCTION

SPECIAL CONSTRUCTION CHAPTER 31 SPECIAL CONSTRUCTION SECTION 3101 GENERAL 3101.1 Scope. The provisions of this chapter shall govern special building construction including membrane structures, temporary structures, pedestrian

More information

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes

Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Analysis of Changes for the 5 th Edition (2014) of the Florida Codes Changes to the Florida Building Code, Existing Building This Analysis of Changes for the 5 th Edition (2014) of the Florida Codes is

More information

Choosing Between Fire Retardant and Standard Core Metal Composite Material (MCM)

Choosing Between Fire Retardant and Standard Core Metal Composite Material (MCM) WHITE PAPER Choosing Between Fire Retardant and Standard Core Metal Composite Material (MCM) WHITE PAPER UPDATE 7/18 As a proactive response to the events involving MCM assemblies around the world, the

More information

CODE ACTION AMENDMENTS

CODE ACTION AMENDMENTS UCC Review and Advisory Council OFFICIAL Record of 2015 I-Code Review May 1, 2018 CODE ACTION AMENDMENTS 2015 ADMIN ADOPT None 2015 IWUIC ADOPT None 2015 IFC ADOPT None 2015 IBC ADOPT Delete Section 913.2.2

More information

MEMORANDUM. NFPA Technical Committee on Fire Doors and Windows (FDW-AAA) Subject: NFPA 80 Proposed Tentative Interim Amendment (TIA) No.

MEMORANDUM. NFPA Technical Committee on Fire Doors and Windows (FDW-AAA) Subject: NFPA 80 Proposed Tentative Interim Amendment (TIA) No. National Fire Protection Association 1 Batterymarch Park, Quincy, MA 02169-7471 Phone: 617-770-3000 Fax: 617-770-0700 www.nfpa.org MEMORANDUM To: From: NFPA Technical Committee on Fire Doors and Windows

More information