Contact Details: Phone Fax . Work Description: New Building Extensions Refurbishment Change of Use. Yes No Method:

Size: px
Start display at page:

Download "Contact Details: Phone Fax . Work Description: New Building Extensions Refurbishment Change of Use. Yes No Method:"

Transcription

1 BCA Section J- Energy Efficiency Deemed- to- Satisfy Provisions Assessment Sheet 1. Project Overview Client Name: Address: Contact Person: Contact Details: Phone Fax Project: Work Description: New Building Extensions Refurbishment Change of Use Municipality: Relevant Building Surveyor: Class of Building: Rise in Storeys: Climate Zone: Conditioned Space: Alternate Solutions Verification Method used: Method:

2 Alternate Solution Verification Method Report provided: Expertise of Author: ABCB Protocol Details: Alternative Solutions (other than verification method used): Method Proposed: List designs variation from Deemed to Satisfy Provisions: Alternative Solution (other than Verification Method report provided: Expertise of author Alternate Solution- Performance Criteria Satisfied: Report conditions noted on building permit: Maintenance Conditions stated on occupancy permit: 2. Compliance Data Checklist Item Description Provided Comment General 1. Architectural Drawings (Including plan views, elevations etc) 2. Orientation shown on architectural drawings 3. Room and area use 2

3 specified on architectural drawings 4: Floor Area of Building and Areas Specified 5: Façade area of building/ envelope specified 6: Building frame and construction 7. Specifications Part J1- Fabric 8. Envelope Defined 9. Insulation Type 10. Insulation design depth 11. Insulation product report 12. Insulation location 13. Roof Type/ covering defined 14. Roof Roof lights not exceed 1.5%of floor area of any storey servedclimate zone 7&8 15. Roof- Thermal break required Details: 16: Roof- Direction of R Value Up Down 3

4 17: Roof- Total R Value Compliance 18. Wall material/type/covering defined 19. External Wall- Table J1.5 option proposed to be achieved: 20. External Wall- Material product report 21. External Wall- Total R Value Compliance? Other compliance demonstrated 22. External Wall- Is glazing energy index option B to be utilised If yes, carry forward to glazing section 23. Internal Wall- Is it part of envelope If no, move to item 26 24: Internal Wall- Material product report 25: Internal Wall- total R Value Compliance 26: Floor- Suspended Floor with unenclosed Perimeter If yes, insulation required in accordance with Table J1.6 27: Floor- Suspended Floor with in slab heating or cooling If yes, insulation required with an insulation R value of not less than R.0 28: Floor- Concrete slab on ground with in ground heating; OR, in climate zone 8 If yes, insulation required with and insulation R value of not less than R1.0 4

5 29: Floor- Insulation required 30: Floor- total R value compliance achieved Part J1.3- Roof lights (including tube lights and any other opening in the roof) 31: Roof Light Manufacturer 32: Roof light Schedule 33: Floor area of room or area served by roof lights 34: Roof Shaft Length (including dimensions) 35: Roof light translucent or clear element (including type, thickness) 36: Frame Type (aluminium, thermally improved or timber) 37: Solar Heat gain Co- Efficient of Roof Light 38: Total U-Value of Roof Light 39: Compliance Achieved Part J2 Glazing (windows and doors that include glass) 40: Glazing Manufacturer 41: Window Schedule (including dimensions) 5

6 42: Glass (including type, thickness) 43: Window frame type (aluminium, thermally improved or timber etc) 44: Glazing- Solar Heat Gain Co-Efficient. 45: Glazing Total U-Value 46: Type, extent, and location of any shading devices. 47: Shading Protection 48: Shading height above glazing head 49: Glazing Energy Index Option B to be Utilised 50: Glass calculations provided to confirm compliance, Part J3- Sealing Item Description Provided Comment 51: Size of entrance foyer/ conditioned space 52: Entrance door operation 53: Sealing of external doors and windows 6

7 54: Cafe, restaurant, open shop front- restriction on placement of mechanical air grilles and seals to back of house doors If yes, carry forward to review on mechanical drawings/ condition of building permit 55. Exhaust fan/ range hoods seals 56. Roof Light Seals 57. Specification Provided 58. Compliance Achieved Part J4- Air Movement 59. Class 4 building (Vic Variation) 60. Air movement required 61. External opening sizes and locations 62. Internal opening sizes 63. Length of breeze paths 64. Ceiling fans and evaporative coolers 65. Compliance Achieved Part J5 Heating, Ventilation, and Air Conditioning 66. Heating, Ventilation and Air Conditioning Plans 7

8 67. Switching and Zoning location for HVAC system 68. Thermostat location for HVAC 69. Time switch required and provided 70. HVAC Specification 71. Manufacturers Detail of HVAC system 72. AC air flow greater than 1,000 l/s 73. Mechanical- max fan motor power to air flow rate ratio 74. HVSC- efficiency 75. Miscellaneous exhaust 76. Compliance achieved Part J6- Lighting Item Description Provided Comment 77. Reflected ceiling plan showing lighting details 78. Floor area of each room 79. Ceiling height of each room 8

9 80. Height of lighting above floor level/work area 81. Lamp power density (Class 2, 3, or 9c ) 82. Location of activation switches 84. Location of dimmer switches 85. Location of movement switches 86. Wattage of Lighting 87. Location of each light 88. Compliance achieved Part J7- Hot Water Supply 89. Vic Variation- Deleted Section Part J8- Maintenance 90. Details of access design 91. Design performance levels of Section J systems detailed 92. Maintenance period stated for each section J service 93. Condition of Building and or Occupancy Permit 9