PREFEASIBILITY REPORT

Size: px
Start display at page:

Download "PREFEASIBILITY REPORT"

Transcription

1 PREFEASIBILITY REPORT For EC FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL At Indian Oil Corporation Limited (IOCL), Panipat marketing Complex, Village-Baholi, P.O.-Panipat Refinery, Tehsil Panipat, District Panipat, Haryana. By M/s. INDIAN OIL CORPORATION LIMITED, PANIPAT July, 2018 Project Proponent: INDIAN OIL CORPORATION LIMITED MD, Panipat Marketing Complex, Village Baholi, District Panipat, Haryana Environmental Consultants: ECO CHEM SALES & SERVICES Office Floor, Ashoka Pavilon-A, New Civil Road, Surat

2

3 CONTENTS 1 EXECUTIVE SUMMARY PLANT FEATURES ENVIRONMENT CONCLUSION INTRODUCTION OF THE PROJECT IDENTIFICATION OF PROJECT AND PROJECT PROPONENT Brief description of nature of the project NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION DEMAND SUPPLY GAP IMPORTS VS. INDIGENOUS PRODUCTION EXPORT POSSIBILITY DOMESTIC/EXPORT MARKETS EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT PROJECT DESCRIPTION TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECT, IF ANY LOCATION WITH CO-ORDINATES Site location Project Co-ordinates DETAILS OF ALTERNATE SITES CONSIDERED SIZE OR MAGNITUDE OF THE OPERATIONS PROJECT DESCRIPTION WITH PROCESS DETAILS Activities at Terminal Way to Operate/Operating Culture Culture of Safety RAW MATERIALS & FINAL PRODUCTS RESOURCE OPTIMIZATION/RECYCLING AND REUSE ENVISAGED IN THE PROJECT AVAILABILITY OF WATER RESOURCES, ENERGY/POWER REQUIREMENT AND SOURCE Power Requirement Fuel Requirement Water Requirement QUANTITY OF WASTES TO BE GENERATED AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL Waste Water Generation and Disposal Solid and Hazardous Waste Generation and Disposal SCHEMATIC REPRESENTATIONS OF THE FEASIBILITY DRAWING WHICH GIVE INFORMATION OF EIA PURPOSE SITE ANALYSIS CONNECTIVITY By Road By Air By Rail LAND FORM, LAND USE AND LAND OWNERSHIP TOPOGRAPHY (ALONG WITH MAP) EXISTING LAND USE PATTERN EXISTING INFRASTRUCTURE SOIL CLASSIFICATION CLIMATIC DATA FROM SECONDARY SOURCES TABLE OF CONTENT ECO CHEM SALES & SERVICES JULY,

4 2 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX 4.8 SOCIAL INFRASTRUCTURE Health & Education `Fire & Emergency PLANNING BRIEF PLANNING CONCEPT LANDUSE PLANNING ASSESSMENT OF INFRASTRUCTURE DEMAND AMENITIES/FACILITIES PROPOSED INFRASTRUCTURE INDUSTRIAL AREA (PROCESSING AREA) RESIDENTIAL AREA (NON-PROCESSING AREA) GREEN BELT SOCIAL INFRASTRUCTURE CONNECTIVITY DRINKING WATER MANAGEMENT SEWAGE SYSTEM SOLID & INDUSTRIAL WASTE MANAGEMENT POWER REQUIREMENT & SUPPLY/ SOURCE REHABILITATION & RESETTLEMENT (R & R) PLAN POLICY TO BE ADAPTED (CENTRAL /STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUTSEE, LAND OUTSEE AND LANDLESS LABOURERS PROJECT SCHEDULE AND COST ESTIMATE LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATA OF COMPLETION ESTIMATES PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT ANALYSIS OF THE PROPOSAL (FINAL RECOMMENDATIONS)... 20

5 LIST OF TABLES Table 2-1: Schedule and category of the proposed project... 3 Table 2-2: Brief description of the project... 3 Table 2-3: Storage capacity... 4 Table 3-1: Latitude and Longitude of the Corners of the Proposed Project site... 6 Table 3-2: Existing & additional storage tanks... 8 Table 3-3: Fuel Consumption details Table 3-4: Water Consumption Details Table 3-5: Wastewater Generation and disposal Table 3-6: Hazardous waste Generation and disposal Table 4-1: Predominant/Mean Wind Direction, IMD Karnal Table 6-1: Area breakup of the site TABLE OF CONTENT ECO CHEM SALES & SERVICES JULY,

6 4 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX LIST OF FIGURES Figure 3-1: Process Flow Diagram... 9

7 1 EXECUTIVE SUMMARY 1.1 PLANT FEATURES The proposed project is for expansion in storage capacity of Ethanol by 6000 KL at Indian Oil Corporation Limited (IOCL), Panipat marketing Complex, Village-Baholi, P.O.-Panipat Refinery, Tehsil Panipat, District Panipat, Haryana. Currently, Panipat Marketing Complex has cumulative storage capacity of 2,39,280 KL for ATF, FO, HSD, MS, MTO, Naphtha, SKO & Ethanol. In which the ethanol storage capacity is 280 KL after the proposed expansion it will increase up to 6280 KL. The proposed 6000 KL ethanol will be stored into the existing SKO tanks (2 Nos. x 3000 KL). The transportation of the product will be done by Rail and Trucks. This expansion is also important to reduce pollution level and reduce fossil fuel consumption. 1.2 ENVIRONMENT Air Emissions Existing flue gas stacks are of firewater engine and DG sets. Panipat Marketing Complex has existing 2 DG set (1670 KVA) stacks and 7 Fire Engines (480 BHP) Stacks. There will be no additional air emission source envisaged. Water Panipat Marketing Complex (PMC) has existing water requirement is 40 KLD which is used in domestic and gardening purpose. Source of water is from local supplier. Waste water There is no generation of industrial effluent. There being no manufacturing activity involving hence effluent is not generated. Domestic wastewater will be disposed of in soak pit through septic tank. Hazardous Waste There will be generation of used oil and slop oil, which will be sent to ETP of panipat refinery for further re-processing and reuse. Safety system MFEG (Medium expansion foam generator) HVLR (High Volume Long Range) system Rim seal provided to floating roof as a fire protection system Hydrocarbon detector Foam pouring system Fire hydrant pump Fire extinguisher Fire tender ambulance Water sprinklers 1.3 CONCLUSION In the light of the above, it can be stated that IOCL, Panipat Marketing Complex have established procedures, systems and infrastructure for the proposed storage tanks of ethanol. Existing two SKO CH 1: EXECUTIVE SUMMARY ECO CHEM SALES & SERVICES JULY,

8 2 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX tank (3000 KL each) will be modified (from Roof tank to Internal Floating Roof tank) and used for storage of ethanol hence, construction of additional new tanks will not take place. This expansion is also helpful to reduce pollution level and reduce fossil fuel consumption. Looking to the overall project justification, process, pollution potential and pollution prevention measures /technologies installed by proponent, environmental management activities of proponent; the proposed project would be environmentally acceptable, in compliance with environmental legislation and standards.

9 2 INTRODUCTION OF THE PROJECT 2.1 IDENTIFICATION OF PROJECT AND PROJECT PROPONENT The proposed project is for expansion in storage capacity of Ethanol by 6000 KL at Indian Oil Corporation Limited (IOCL), Panipat marketing Complex, Village-Baholi, P.O.-Panipat Refinery, Tehsil Panipat, District Panipat, and Haryana. This proposed expansion falls under schedule/activity; Service Sector under EIA notification dated 14 th September, 2006 and amended till date, to be appraised at SEIAA, Haryana. Details on schedule and category as per notification are shown in Table 2-1. Table 2-1: Schedule and category of the proposed project Project or Activity Category Proposed Expansion 6 (b) Isolated Storage and Handling of hazardous chemicals Project Proponent B Ethanol by 6000 KL Indian Oil Corporation (Indian Oil) is India's largest commercial enterprise with a sales turnover of Rs. 3, 99,601 crore (US$ 61 billion) and profits of Rs. 10,399 crore (US$ 1,589 million) for the year Indian Oil is ranked 161 st among the world's largest corporates (and first among Indian enterprises) in the prestigious Fortune Global 500 listing for the year As India's flagship national oil company, with a 33,000 strong work-force currently, Indian Oil has been meeting India s energy demands for over half a century. With a corporate vision to be 'The Energy of India' and to become 'A globally admired company,' Indian Oil's business interests straddle the entire hydrocarbon value-chain from refining, pipeline transportation and marketing of petroleum products to exploration & production of crude oil & gas, marketing of natural gas and petrochemicals, besides forays into alternative energy and globalization of downstream operations. Having set up subsidiaries in Sri Lanka, Mauritius and the UAE, the Corporation is simultaneously scouting for new business opportunities in the energy markets of Asia and Africa. It has also formed about 20 joint ventures with reputed business partners from India and abroad to pursue diverse business interests Brief description of nature of the project Indian Oil Corporation Limited (IOCL), Panipat Marketing Complex has an isolated petroleum storage and distribution terminal facility at Panipat, Haryana. The original refinery with 6 MMTPA capacity was built and commissioned in 1998 at a cost of Rs crore. IOCL Panipat Marketing Complex is located at ~10.63 km aerial distance in SE from Panipat. The Panipat marketing complex of IOCL covers an area of around ~ 300 acres of land. Brief description of the project & storage capacity of project is given in Table 2-2 & Table 2-3 respectively. Table 2-2: Brief description of the project Sr. No. Details Description 1 Nature Isolated Storage and Handling of hazardous chemicals 2 Product Expansion of Ethanol Storage by 6000 KL 3 Location IOCL- Panipat Marketing Complex, Village Baholi, District-Panipat, Haryana CH 2: INTRODUCTION OF THE PROJECT ECO CHEM SALES & SERVICES JULY,

10 4 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX Sr. No. Details Description 4 Cost of the project INR 3.64 Cr. Table 2-3: Storage capacity S. No. Material Storage Capacity (KL) Existing Additional Total Nos. of Storage Tanks Storage Capacity (KL) Nos. of Storage Tanks Storage Capacity (KL) Nos. of Storage Tanks 1 Ethanol , MS 24, , NAPTHA 20, , HSD 1,17, ,17, MTO SKO 30, , ATF 20, , Furnace Oil 26, ,000 7 Total 2,39, ,39, NEED FOR THE PROJECT AND ITS IMPORTANCE TO THE COUNTRY AND OR REGION Government of India proposes to increase Ethanol blending in fuels from 5% to 10% aiming to reduce dependency on fossil fuels and to reduce pollution levels. In view of this policy, IOCL-Panipat proposed expansion to increase storage of Ethanol from 280 KL to 6280 KL. Easily availability of ethanol from nearby sources i.e. Sugar industries in UP and Haryana. It will create employability to local people. Currently, Panipat Marketing Complex has cumulative storage capacity of 2,39,280 KL for ATF, FO, HSD, MS, MTO, Naphtha, SKO and Ethanol. For the proposed expansion, two tanks of SKO having capacity of 3000 KL each will be used to store Ethanol. Hence, total cumulative storage capacity will be remain same. 2.3 DEMAND SUPPLY GAP There is continuous increase in demand of fuels. To reduce the gap and dependency on fossil fuels, government of India asked to increase blending of Ethanol. 2.4 IMPORTS VS. INDIGENOUS PRODUCTION Not Applicable. 2.5 EXPORT POSSIBILITY Not Applicable. 2.6 DOMESTIC/EXPORT MARKETS MS, HSD, Superior Kerosene and Ethanol (for blending) are being used as a transportation fuel in vehicles such as passenger cars, two-wheelers and three-wheelers. Demand of transportation fuel is continuously increasing.

11 2.7 EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT During the construction phase around ~ 15 people will be required on contractual bases. CH 2: INTRODUCTION OF THE PROJECT ECO CHEM SALES & SERVICES JULY,

12 6 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX 3 PROJECT DESCRIPTION 3.1 TYPE OF PROJECT INCLUDING INTERLINKED AND INTERDEPENDENT PROJECT, IF ANY There is no interlinked and interdependent project. 3.2 LOCATION WITH CO-ORDINATES Site location The project is located at village Baholi, Tehsil and district Panipat, Haryana. The site is easily approachable via refinery road and Assandh-Panipat road. General and specific location of the site is shown in Map 3-1 and coordinates of nine corners of the site in given in Table 2-1. Map 3-1: Site Location Map Project Co-ordinates The co-ordinates of the project site are given in Table 3-1 Google image is shown in Map 3-2. Table 3-1: Latitude and Longitude of the Corners of the Proposed Project site Sr. No. Point Latitude Longitude 1 A 29 28'50.06"N 76 53'14.19"E 2 B 29 28'50.30"N 76 53'31.25"E 3 C 29 28'19.28"N 76 53'42.21"E 4 D 29 28'18.32"N 76 53'37.78"E

13 Sr. No. Point Latitude Longitude 5 E 29 28'13.45"N 76 53'38.83"E 6 F 29 28'14.52"N 76 53'25.49"E 7 G 29 28'8.97"N 76 53'25.14"E 8 H 29 28'10.04"N 76 53'21.53"E 9 I 29 28'21.58"N 76 53'13.39"E Map 3-2: Site Location on Google image A detailed site layout plan is attached as an Annexure DETAILS OF ALTERNATE SITES CONSIDERED The proposed project is expansion of ethanol storage capacity by 6000 KL at an existing site, with requisite facilities available at site hence, no alternate sites considered. 3.4 SIZE OR MAGNITUDE OF THE OPERATIONS Currently, Panipat Marketing Complex has cumulative storage capacity of on 2,39,280 KL for ATF, HSD, MS, MTO, SKO, NAPTHA and Ethanol. Proposed expansion will increase Ethanol storage capacity of Panipat Marketing Complex by 6000 KL. The details for existing and additional storages are given in Table 3-2. CH 3: PROJECT DESCRIPTION ECO CHEM SALES & SERVICES JULY,

14 8 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX Table 3-2: Existing & additional storage tanks S. No. Material Storage Capacity (KL) Existing Additional Total Nos. of Storage Tanks Storage Capacity (KL) Nos. of Storage Tanks Storage Capacity (KL) Nos. of Storage Tanks 1 Ethanol , MS 24, , NAPTHA 20, , HSD 1,17, ,17, MTO SKO* 30, , ATF 20, , Furnace Oil 26, ,000 7 Total 2,39, ,39, *Out of total 5 existing SKO tanks, 2 tanks will be used for Ethanol storage, which is 6000 KL and rest of the tanks will be remain same. 3.5 PROJECT DESCRIPTION WITH PROCESS DETAILS Existing Indian Oil Corporation Limited (IOCL) Panipat Marketing Complex is having storage facility of ATF, FO, HSD, MS, MTO, Naphtha, SKO, and Ethanol. It also handles premium products like CRMB, PMB 40, Xtrapremium and Xtramile along with ethanol blended MS. The Terminal operates in single shift and the activity involved is receipt, storage and distribution of petroleum products. The PMC receives products from Panipat Refinery through Pipeline as well as railway wagons, and distribution of these products is done by road tankers to different consumers. PMC has 32 nos. of fully automated Bays (58 Loading Points) of White oil and 15 fully automated loading bays (FO/LSHS-06; Benzene-02; MS96-01; CRMB/PMB-06) of Black Oil. The terminal has a total of 53 Nos. pumps. The terminal is operated in accordance with the provisions of licenses and consents granted by regulatory departments viz. Departments of Petroleum & Explosives Safety Organization, Directorate of Factories, Manufacture, Storage & Import of Hazardous Chemical Rules & Pollution Control Board etc. as per the applicable regulatory statutory acts and rules of Govt. of India Activities at Terminal Tank lorry loading: MS, HSD, SKO, ATF, MTO, FO, LSHS. Tank lorry unloading: Ethanol. Rail wagon loading: MS, HSD, SKO, ATF, Naptha, FO, LSHS. Rail wagon unloading: HSD, MS, Naptha. Storage of slop in 900 KL Slop tank (Mixture of various products i.e. FO, HSD, Ethanol MS, MTO & Naptha) Tank Water Draining Operation. Sampling of Product from Tank after every receipt. Emptying out of Tank at fixed interval for Maintenance/ Cleaning for Quality Control adherence. Opening of Strainers for Cleaning of Strainer s Filters at fixed interval. Maintenance and Repair of various Equipments Viz. Pumps, Motors, Fire Engines, Air Compressors etc. Process Flow Diagram of the operation at Terminal is enumerated as Figure 3-1.

15 Figure 3-1: Process Flow Diagram Way to Operate/Operating Culture Each and every Operation of the terminal is undertaken in line with well-defined Standard Operating Procedures (SOPs). Any requirement to modify/ amend/ change the SOP is only with approval of competent authority through Management of Change (MOC) document Culture of Safety All the employees/ Contract Workmen/ Security Guards/ Tank Lorry Crew etc. are mandated to undergo certain proficiency training at regular intervals (but not later than once every three years). The monthly mock drills are undertaken in line with pre fire plans to gauge the effectiveness of preparation. Also, safety committee meeting are undertaken monthly to discuss various safety related issues of the unit. Recently, behavior based safety (BBS) has been embraced for bringing desired improvement on sustained basis. Any maintenance work (Hot work/ Cold Work/ Electrical maintenance/ working at height etc.) is undertaken only subsequent to issuance of relevant work permit. All the employees are subjected to health check on regular intervals. Each Tank Lorry Crew undergoes mandatory eye testing at regular intervals to gauge various deficiencies viz. Cataract, Vision problem, and night as well as color blindness. CH 3: PROJECT DESCRIPTION ECO CHEM SALES & SERVICES JULY,

16 10 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX 3.6 RAW MATERIALS & FINAL PRODUCTS The principal activity of the Panipat marketing complex is to storage, handling and distribution services for petroleum products i.e. ATF, FO, HSD, MS, MTO, Naphtha, SKO, and Ethanol. 3.7 RESOURCE OPTIMIZATION/RECYCLING AND REUSE ENVISAGED IN THE PROJECT There will not be additional usage of resources due to proposed expansion. 3.8 AVAILABILITY OF WATER RESOURCES, ENERGY/POWER REQUIREMENT AND SOURCE Power Requirement The Electrical power requirement will be 5 MW and is source from Captive power of Panipat refinery. Two DG set of 1670 KVA is available in case of emergency uses. There is no additional power requirement for Said expansion Fuel Requirement The details of fuel consumption are shown in Table 3-3. There is no additional fuel requirement for Said expansion. Table 3-3: Fuel Consumption details Sr. No. Stack Attached to Capacity Stack Nos. Type of Fuel used Fuel consumption Existing 1 D.G. set 1670 KVA 2 HSD 2 Fire pumps 480 BHP 7 HSD 320 Ltrs/hr. at full load 80 Ltrs/hr. at full load Water Requirement Water will be sourced from local source. Total 40 KLD water will be required for domestic and gardening use. There is no additional water will be required for Said expansion. Details of the same are given in Table 3-4.

17 Table 3-4: Water Consumption Details S. No. Description Water Consumption in KLD Existing Additional Total 1 Processing Gardening Domestic Total QUANTITY OF WASTES TO BE GENERATED AND SCHEME FOR THEIR MANAGEMENT/DISPOSAL Waste Water Generation and Disposal Domestic Wastewater generated will be 15 KLD. There will be no generation of industrial effluent. Domestic wastewater will be disposed off in soak pit through septic tank. Break up of wastewater generation along with disposal mode is given in following Table 3-5. Table 3-5: Wastewater Generation and disposal S. No. Description Wastewater Generation in KLD Existing Additional Total Disposal Mode 1 Industrial Operation Gardening Domestic Send to Septic Tank Total Solid and Hazardous Waste Generation and Disposal Table 3-6: Hazardous waste Generation and disposal S. No. Hazardous Waste Hazardous Waste Category Quantity (L/Day) Existing Proposed Total 1 Used Oil Slop Oil* Management Used Oil is diverted to ETP of Panipat Refinery for further reprocessing. Sent to Panipat Refinery for further reprocessing. * Store in 900 KL storage tank (slop tank) 3.10 SCHEMATIC REPRESENTATIONS OF THE FEASIBILITY DRAWING WHICH GIVE INFORMATION OF EIA PURPOSE A drawing (i.e. Site Layout Plan) explaining the salient project features with an index giving area break up is attached as Annexure 1. CH 3: PROJECT DESCRIPTION ECO CHEM SALES & SERVICES JULY,

18 12 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX 4 SITE ANALYSIS 4.1 CONNECTIVITY By Road The site can easily approachable via refinery road (adjacent to refinery), Assandh road ( 1.80 km, N direction from refinery) and Assandh panipat road ( 9.06 Km, S direction from refinery) By Air Nearest airport is karnal airport located at an aerial distance of ~ Km in NNE direction By Rail Nearest railway station is Babarpur railway station located ~ 7.34 km in ESE direction. Nearest Junction is Panipat Junction located at an aerial distance of ~ Km in SE of direction. 4.2 LAND FORM, LAND USE AND LAND OWNERSHIP The current landform is industrial and there will not be and any change in landuse pattern after proposed expansion. 4.3 TOPOGRAPHY (ALONG WITH MAP) Topography of the study area is almost flat and devoid of any major drainage. Entire area is covered by vast alluvium plan. There are no National Parks/ Wildlife Sanctuary/ Eco-sensitive zone Reserved Forests/ Protected forests with in the 10 km radius of the refinery area. 4.4 EXISTING LAND USE PATTERN The existing landuse pattern is industrial and will remain same after proposed expansion. 4.5 EXISTING INFRASTRUCTURE The main activities involve at IOCL Panipat Marketing Complex are collection, storage and distribution of fuel(s). Following facilities are present in the plant: Buildings: Administrative office, Canteen, Store, Pump house, Loading-unloading Bay, Toilets No. of Tanks : 39 Product handle at site: ATF, FO, HSD, MS, MTO, Naphtha, SKO & Ethanol. 900 KL Slop tank: Mixture of various products i.e. FO, HSD, MS, Ethanol, MTO & Naptha. No. of Tank Lorry Loading bays: 32 For Emergency/ stand by power: DG Sets. (02 Nos. of 1670 KVA) No. of Fire engines: 7 Nos. of 480 BHP. each capacity diesel driven fire engines as per OISD STD 117

19 Following Safety Measures provided at Plant MFEG (Medium expansion foam generator) HVLR (High Volume Long Range) system Rim seal provided to floating roof as a fire protection system Hydrocarbon Detector Foam pouring system Fire hydrant pump Fire extinguisher Fire tender ambulance Water sprinklers 4.6 SOIL CLASSIFICATION Not Required. 4.7 CLIMATIC DATA FROM SECONDARY SOURCES As per the climatological norms for the nearest IMD station Karnal: Average daily maximum temperature remains at 30.1 C and average daily minimum temperature remains at 17.4 C. The highest temperature recorded is 43.1 C and lowest 3 C. Average annual rainfall in this region is mm with average 33.2 rainy days Humidity goes high up to 83 % during monsoon and goes as low as 31% during summer. Mornings are more humid than evenings. Wind Long term wind direction data is presented in Table 4-1. Overall for the whole year, first and second predominant wind direction is from NW Direction and third predominant wind direction is from SE Direction. Table 4-1: Predominant/Mean Wind Direction, IMD Karnal Month Predominant Wind First Second Third Morning Evening Morning Evening Morning Evening January CALM NW NW NW W W February NW NW W W NW CALM March NW NW CALM SW W W April NW NW CALM W W SW May NW NW E W SE SW/SE June E NW NW W SE SW July E E CALM SE SE NW August CALM E E W/CALM SE NW September CALM CALM E E W SW October CALM CALM NW NW E/W W November CALM CALM W NW NE W December CALM CALM NW NW W W CH 4: SITE ANALYSIS ECO CHEM SALES & SERVICES JULY,

20 14 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX 4.8 SOCIAL INFRASTRUCTURE Dadlana is a nearest village located at 1.85 km, NNE direction from site. Other nearby villages includes Begampur, Razapur, Baholi, and Singhpur. Dadlana has an education facility available up to 12 std. Secondary and Higher secondary education. People are mostly engaged in Agriculture and occupied in other activities. Panipat city and district headquarter located at ~ 9.90 km in SE direction from site. Ahmednagar is well developed city and well connected with major villages. It has facilities related health, education, transportation etc Health & Education Good health and education facilities are available in Dadlana, Asan Khurd & Panipat City `Fire & Emergency IOCL has fully developed disaster management center.

21 5 PLANNING BRIEF 5.1 PLANNING CONCEPT Propose to increase Ethanol storage capacity by 6000 KL at the IOCL Panipat Marketing Complex by using existing two SKO tanks (3000 KL each). 5.2 LANDUSE PLANNING The total plot area is ~ 300 Acres. The proposed expansion will be take place in the existing premises. 5.3 ASSESSMENT OF INFRASTRUCTURE DEMAND All necessary infrastructures are available at site. 5.4 AMENITIES/FACILITIES The existing site is having Canteen facility for employees, Occupational Health Center (OHC) and emergency assembly point. CH 5: PLANNING BRIEF ECO CHEM SALES & SERVICES JULY,

22 16 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX 6 PROPOSED INFRASTRUCTURE 6.1 INDUSTRIAL AREA (PROCESSING AREA) Total Plot area is ~ 300 Acres. Total area breakup is given in Table 6-1. Table 6-1: Area breakup of the site Sr.No. Description Area (SQ. M) Area (%) 1 Admin Building 2, Calibration Tower Canteen Compressor House Control Room Electrical Substation (including D.G. Shed & Transformer Room) 1, Fire Pump House Gantry Loading Area 25, Green belt 4,50, Open Space 4,00, Pump House 9, Roads 1,25, Scrap Yard 11, Tank / Truck parking 44, Tank Farm Area 1,21, TLF - Truck Loading Facility 1, Weigh Bridge Other Buildings such as Rest Room, S&D building, Store/Ware House etc. 16, Total 12,14, RESIDENTIAL AREA (NON-PROCESSING AREA) The amenities like fire water storage tank, Plantation area, admin building, canteen etc. is already provided. 6.3 GREEN BELT Total green belt area developed is 4,50,591 m 2 which is equal to % of total plot area. 6.4 SOCIAL INFRASTRUCTURE Covered in Section 4.8, chapter CONNECTIVITY Covered in Section 4.1, chapter 4

23 6.6 DRINKING WATER MANAGEMENT Drinking water is purchased from local suppliers. 6.7 SEWAGE SYSTEM Sewage water gets collected through septic tank and disposed of. 6.8 SOLID & INDUSTRIAL WASTE MANAGEMENT Covered in Section 3.9.2, chapter POWER REQUIREMENT & SUPPLY/ SOURCE Covered in Section 3.8,1, chapter 3. CH 6: PROPOSED INFRASTRUCTURE ECO CHEM SALES & SERVICES JULY,

24 18 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX 7 REHABILITATION & RESETTLEMENT (R & R) PLAN 7.1 POLICY TO BE ADAPTED (CENTRAL /STATE) IN RESPECT OF THE PROJECT AFFECTED PERSONS INCLUDING HOME OUTSEE, LAND OUTSEE AND LANDLESS LABOURERS Not applicable. Proposed project only for an expansion of ethanol storage tank capacity within the existing facility, so there is no additional land requirement. Hence rehabilitation & resettlements is not required.

25 8 PROJECT SCHEDULE AND COST ESTIMATE 8.1 LIKELY DATE OF START OF CONSTRUCTION AND LIKELY DATA OF COMPLETION The proposed project is for expansion of ethanol storage capacity, which will be take place by using existing two SKO tanks. Construction work is not required for proposed project. 8.2 ESTIMATES PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT Estimated project cost is INR 3.64 Crores. CH 8: PROJECT SCHEDULE & COST ESTIMATION ECO CHEM SALES & SERVICES JULY,

26 20 INDIAN OIL CORPORATION LIMITED PREFEASIBILITY REPORT FOR INCREASING STORAGE CAPACITY OF ETHANOL BY 6000 KL AT IOCL PANIPAT MARKETING COMPLEX 9 ANALYSIS OF THE PROPOSAL (FINAL RECOMMENDATIONS) Availability of land at site. Availability of internal infrastructure. Availability of well-developed safety systems as per OISD norms. Availability of connectivity for transportation of material. Availability of existing skilled manpower. Government of India proposes to increase Ethanol blending in fuels from 5% to 10% aiming to reduce dependency on fossil fuels and to reduce pollution levels. In view of this policy, IOCL-Panipat proposed expansion to increase storage of Ethanol from 280 KL to 6280 KL. It will largely Reduce fossil fuel consumption Reduce pollution level Hence project is beneficial for country.

27 Annexure 1: Site Layout Plan ANNEXURES ECO CHEM SALES & SERVICES JULY,