Al Behrman Elementary School

Size: px
Start display at page:

Download "Al Behrman Elementary School"

Transcription

1 Mulberry Street Al Behrman Elementary School Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior Expand visitor parking lot and create a circulation loop to improve traffic flow at the school entrance, improve security, and improve student safety Parent Drop off Replace several portions of the roof Caulk and paint exterior Repair exterior window sills Seal coat drives and parking lots that are not being expanded Replace ceiling and inefficient lighting in restroom

2 East Elementary School Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior Relocate the library next to the gymnasium Improve exterior safety by including additional light poles to parking lot Supplement existing library furniture with new furniture which is appropriate to the new space Wheeler Street Replace original single pane windows to improve energy efficiency Provide new ceilings and lights in several classrooms to improve learning environments Provide a new fence along Jefferson Street New Construction Replace Windows 6th Street

3 Gordon Willson Elementary School Parent Drop off Relocate reception and principal s office to be adjacent to main entrance doors; provide secure entrance sequence and increase transparency to the exterior Provide sidewalk to current driving range to allow it to be used for parent pick-up and drop-off; this will separate bus and parent traffic and ease congestion caused by cross traffic Repave the hard surface playground area Provide air conditioning to classrooms that do not already have it, improve heat distribution, and Provide new ceilings and lights in several classrooms, media center, and corridors to improve learning environments Repair interior masonry wall joints Berkley Boulevard

4 Baraboo High School Provide secure entrance sequence by reconfiguring internal vestibule and reconfiguring reception desk layout Draper Street Provide air conditioning to the band / music rooms Improve heat distribution and level of fresh air to tech ed rooms Resurface main parking lot Replace inefficient lighting in technical education rooms Replace ceiling and inefficient lighting in art room Replace hardware on gymnasium doors Repair brick on gymnasium exterior wall Replace a portion of the roof Seal coat west parking lot Update mechanical units serving the technical education rooms and several classrooms Repair one of the boilers serving the building

5 Jack Young Middle School Provide a more easily identifiable main entrance Relocate main office to be adjacent to main entrance doors where the current Family And Consumer Education room is located; provide secure entrance sequence and increase transparency to the exterior Improve exterior safety by including additional light poles to parking lot Relocate Family And Consumer Education room to existing main office location Draper Street Provide air conditioning to the auditorium Update swimming pool chemical controller and chlorine feeder Caulk joints in swimming pool Add a floor drain to swimming pool storage room Replace flooring of intermediate landing at south stair Provide privacy shower in girl s locker room Caulk exterior wall joints and paint exterior steel lintels Seal coat parking lot New Construction

6 North Freedom Elementary School Provide secure entrance sequence by reconfiguring internal vestibule N. Maple Street Repair exterior gutters

7 West Elementary School Provide secure entrance sequence by reconfiguring internal vestibule Center Street Replace inefficient exterior windows and east entrance doors Provide new ceilings in all occupied spaces Repair exterior masonry wall joints Replace roof 5th Avenue Replace Windows