Initial Environmental Examination Report (Final) THA: Southern Thailand Waste-to-Energy Project (Part 1 of 5)

Size: px
Start display at page:

Download "Initial Environmental Examination Report (Final) THA: Southern Thailand Waste-to-Energy Project (Part 1 of 5)"

Transcription

1 Initial Environmental Examination Report (Final) Project Number: October 2017 THA: Southern Thailand Waste-to-Energy Project (Part 1 of 5) Prepared by Chana Green Company Ltd. The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the Terms of Use section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

2 Chana Green Power Plant CHAPTER 1 EXECUTIVE SUMMARY Figure 1-1

3 Chana Green Power Plant Figure 1-1 Project Site and Study Area

4 Chana Green Power Plant 1.1 Air quality 1 WB EHS guidelines to be complied: on general guidelines; on waste management facilities (as ash pond on site); on transmission and distribution lines (for associated facility); and on thermal power (Table 5 - Effluent Guidelines).

5 Chana Green Power Plant P P P P 1.2 Noise

6 Chana Green Power Plant 1.3 Water consumption 1.4 Water quality/irrigation and flooding prevention

7 Chana Green Power Plant

8 Chana Green Power Plant 1.5 Traffic Daily averaging impact (Normal case): Impact over urgent period and non urgent period:

9 Chana Green Power Plant 1.6 Waste management

10 Chana Green Power Plant 1.7 Socio-economic management plan

11 Chana Green Power Plant 1.8 Occupational health and safety management, and 1.9 Aesthetics management.

12 Chana Green Power Plant 1.10 Grievance redress mechanism 1.11 Measures

13 Chana Green Power Plant 1.12 Recommendations

14 Chana Green Power Plant Project CHAPTER 2 POLICY, LEGAL AND ADMINISTRATIVE FRAMEWORK 2.1 Policy, Legal and Administration Framwork Relevant Thai Regulation

15 Chana Green Power Plant Project (1) Thai Environmental Standard/Regulations Standard of Ambient Air Pollutant Concentration µg/m 3 ) P P 2) Noise level standard Standard of Noise Level, Decible (A) q r 3) Surface Water Quality Standard

16 Chana Green Power Plant Project Table Table Surface water quality standard Quality Measurement Index Unit Standard Quality of Surface Water 1/ Standard Quality of Water Discharged to Irrigation Canal 2/ P qr sq q q t s 3 s 4P s 4P ❶

17 Chana Green Power Plant Project 3) Ground Water P Table 2.1-2

18 Chana Green Power Plant Project Table Groundwater quality standard 4) 0 E.Coli (2) Power Plant Standard/Regulations

19 Chana Green Power Plant Project 1) Air emission standard Fuel TSP (mg/nm 3 ) SO 2 (ppm) NO x as NO 2 (ppm) 2) Water Discharge Standard Table Table Industrial Effuent Standard No. Parameter Standard Values

20 Chana Green Power Plant Project (3) EIA Regulations

21 Chana Green Power Plant Project Concerned ADB Regulations (1) Social Protection Strategies (2001) (2) Safeguard Policy Statement (2009) 2.2 Scope of EIA study

22 Chana Green Power Plant Project 2.3 Methodology Table 2.3-1

23 Chana Green Power Plant Project Table Method of The Study and Data Compilation for The Chana Power Plant Potential Impact Studied Areas Source of data

24 Chana Green Power Plant Project Potential Impact Studied Areas Source of data 2.4 ONEP EIA Review and Approval Process

25 Chana Green Power Plant Project 2.5 EIA Approval PPPPPPPPPPPPPPPPPPPPP