1 POWER POINT PRESENTATION ON REVIEW ON PLAN SCHEMES & CSS FOR THE 3rd QUARTER ENDING 31st DECEMBER 2011 DAO, LAWNGTLAI.

2 1.WEATHER CONDITION Rainfall Record ( in mm) for the Year 2010 Name of District : Lawngtlai Sl.No Month Rainfall (in mm) 1 January Nil 2 February Nil 3 March April May June July August September October November December 14.7 TOTAL: mm

3 2. CROP STITUATION :KHARIF ADVANCE ESTIMATE OF PRODUCTION 2010 Name of Circle Lawngtlai Diltlang Sangau Chawngte Borapansury Damdep Total of District (Lawngtlai Dist.) Sl. No Name of Crops Area in Ha. Produ ction in MT Area in Ha. Produc tion in MT Area in Ha. Produc tion in MT Are a in Ha. Produ tion in MT Area in Ha. Produ ction in MT Area in Ha. Produc tion in MT Area in Ha. Produc tion in MT 1 PADDY 1) Jhum ) WRC (a)kharif TOTAL OF WRC GRAND TOTAL OF PADDY II MAIZE a) Kharif TOTAL OF MAIZE III TOPIOCA PULSES IV 1)Rice Bean (Kharif) ) ARHAR (Kharif) )COWPEA (a) Kharif TOTAL OF KHARIF GRAND TOTAL OF PULSES OILSEED 1)Soyabean (Kharif) )Sesamum(Kharif) TOTAL OF KHARIF GRAND TOTAL OF OILSEEDS GRAND TOTAL OF KHARIF

4 2. RABI CROPS PROSPECT Sl.No Name of Crop Area Covered ( in Ha) 1 Rice Potato Maize - 4 Pulses - 5 Oilseeds - TOTAL :

5 ABSTRACT 3. PROFORMA FOR REPORTING PROGRESS REPORTS OF NWDPRA PROJECTS DURING (PROJECT WISE) 3rd Quarter Name of District : Lawngtlai Rupees in lakh Sl. No Name of Project Target during Phy (Ha.) Fin (Ha.) Achievement during the 3 rd quarter Phy. Fin. Nos. of WH S const r- ucte d Total area of Terrac e constructed Total area of land developed Hort. Plant. (name may be specifie d) Nos. of famili es assist ed for Poultry Nos. of famili es assist ed for Pigge -ry Any other assistan ce given under Liveliho od support system Total nos. of famili es settle d so far A Administrative Cost L.S L.S 2.32 Sub Total L.S L.S 2.32 B Watershed Development works (1) Construction of Terraces/Land Development Works Ha Ha Ha 15 Ha. (2) Constructions of W.H.S 60 Nos (3) Vegetative Contour Barrier 30 Nos (4) Horticulture Plantation 62.5 Ha (5) Afforestation 154 Ha (6) Crop Demonstration Ha Sub Total Ha 90 Nos Ha Ha 15 Ha. 1 12

6 Sl. No Name of Project Target during Phy (Ha.) Fin (Ha. Achievement during the 3 rd quarter Nos. of Phy. Fin. WHS Constructed Total area of Terr ace const ructe d Total area of land devel oped Hort. Plant. (name may be Specified) Nos. of Families assisted for Poultry Nos. of families a assisted for Piggery Any other assistance Given under Liveli -hood support system Total nos. of f families settled so far C Livelihood Activities (1) Poultry 180 Nos Nos Nos. 90 Nos. 90 Nos. (2) Piggery 180 Nos Nos 4.50 (3) Pisciculture 180 Nos Nos 4.50 (4) Kitchen Garden 15 Unit Sub Total Grand Total Ha. 645 Nos Ha. 270Nos Ha 15Ha. 90 Nos. 90 Nos. 90 Nos. 1 13

7 4. PROGRESS REPORT 3rd QUARTER ENDING OF DECEMBER 2010, WDPSCA LAWNGTLAI DISTRICT. Expenditure sanction of Rs.84.73/- lakhs was obtained as below:- (a) Administration lakhs (b) Honorarium lakhs ( WDT/Secretary W.C) (c) Corpus Fund lakhs (d) Monitoring and Evaluation lakhs (e) Works lakhs TOTAL lakhs Out of these fund for works (Rs.71.14) and Monitoring and Evaluation (Rs.1.20) amounting to Rs lakhs are not yet drawn. As such no works are taken up yet under WDPSCA till date.

8 1 15

9 5. PROGRESS REPORT 3rd QUARTER ENDING OF 2010 ATMA LAWNGTLAI DISTRICT During the 3rd quarter ending 31st December 2010, 2 Nos. of SHG are formed under ATMA viz, Daifim SHG Lungpher S and SHG ATMA, Lawngtlai Block, Chawnhu. A sum of Rs. 10,000/- each were given to them as a seed money. In an effort to multiply this seed money both the SHGs cultivate Onion (Var. Matahari) at Lungpher and Chawnhu respectively. Below are some of the photos depicting their activities. Besides these, exposure visit within state was conducted during October 2010 at Champhai via N.Vanlaiphai wherein within state training was also conducted at KVK, N.Vanlaiphai. The team was led by Pu H.Lalbiaknia, AEO.

10

11

12

13 6. PROGRESS REPORT 3rd QUARTER ENDING DECEMBER 2010 ISOPOM LAWNGTLAI DISTRICT The following activities are taken up during the 3rd quarters (1) Training on Cultivation and Production technology on Oil Palm was conducted at 4 places viz, Sihtlangpui, Chawngtelui, Diltlang and Lawngtlai at the cost of Rs.1.05 lakhs i.e lakhs per training.

14

15

16 6. (2) Half Moon terraces are constructed in an area of 3.5 Ha. Some of the beneficiaries are 1) Pu L.Dosanga, Lawngtlai IV Ha. 2) Pu C.Lalnunzira, Diltlang Ha. 3) Pu Thangbika, Paithar Ha. 4) Pu Lalhmangaihkima,Lawngtlai Bazar Ha. 5) Pu Sangmuana, Mampui Ha. 6) Pu Chuankhupthanga, M.Kawnpui Ha. 7) Pu Ramzauva, Ngengpui Ha. Another 1.5 Ha. will be covered within February,2011. With this the total hectarage for construction of half moon terraces will come to 5 Ha. with an expenditure of Rs Rs lakhs per Ha.

17

18 6. (3) A total fund of Rs.0.75 lakhs was received for construction of 3 Nos. of Waters Harvesting Rs.0.25 lakhs per no. Out of these 2 nos. of Water Harvesting Structure are already constructed. The beneficiaries are: 1) Pu T.T. Nohmung, Ngengpui 2) Pu Rohlua, M.Kawnpui

19

20 7. Other schemes of MMA with focus to SRI and Farm Mechanization System of Rice Intensification SRI Sl. No Month Unit Target Achievem ent Ha/No. Phy Fin Phy Fin Remarks I Demonstration on System of Rice Intensification Ha II Small and Marginal Farmers III Large and Medium farmers

21 7. Farm Mechanization Sl. No I II Month Power sources Tractor Unit Target Achievement Ha/ No Phy Fin Phy Fin III Power Tiller Nos IV Light weight power tiller Remarks

22 8. NLUP : As an initial step, launching of NLUP was had at Chawngte on 14th January A total of 100 beneficiaries received the first Rs.20,000/- each. Our Department was allotted with 24 beneficiaries and the amount distributed comes to Rs.4,80,000/- (Rupess four lakh eighty thousand)only. List of recipients Sl.No. Name Address Trade Amount received (Rs. P) 1 Devamuno Udalthana I WRC - I 20, Pattar Chandra Udalthana I WRC I 20, Soibua Udalthana I WRC I 20, Chandra Surijo Udalthana I WRC I 20, Mritu joy Udalthana I WRC I 20, Santi muni New Jagana sury I WRC I 20, Bikash Kurbalovasora WRC I 20, Raj Kumar Kukurduleya WRC I 20, Karna Nakdarasora WRC I 20, Krishna chandra Barapansuri I WRC I 20, Manuram Baganpara WRC I 20, Nolotfal Kurbalovasora WRC I 20, Notun Kumar Mondirasora WRC I 20,000.00

23 14 Subaghya Devasora N WRC I 20, Basanta Kumar Fulsora WRC I 20, Chandra bidua Moinababsora II WRC I 20, Ananta Kumar Barakobahali WRC I 20, Rangasulo Chotaguisury I WRC I 20, Fulo chand Chotaguisury I WRC I 20, Ranjan Kumar Udalthana I WRC - I 20, Ranjani kumar Jaruldubosora WRC I 20, Purna kumar Udalthana I WRC I 20, Subash basu Udalthana I WRC I 20, Kalavizia Mondirasora WRC I 20,000.00

24 RKVY : Comprehensive District Agriculture Plan (C-DAP) in respect of Lawngtlai District was already prepared and submitted. An outlay of Rs lakhs was envisaged in the plan in respect Agriculture Department, Lawngtlai District. 9. Constraints and Strategies. A no of constraints are encountered which hinder progress of development works within Lawngtlai District. These are:- (i) Poor Communication problem. (ii) Inadequacy of field staffs. (iii) Ethnic and cultural diversity (iv) Lack of conveyance. (v) Poor out put capacity of the people. (vi) Political influence.

25 In order to boost up production in the District efforts are underway to take up cultivation of Paddy rice in areas where M.I. Department has constructed M.I projects at 14 locations. (1) Zotlang M.I Project, Cheural (2) Sangaului M.I Project, Archhuang (3) Ailianlui M.I Project, Lungpher (4) Peki M.I Project, Kawlchaw W (5) Chinranglui M.I Project, Chawngte P (6) Ralven M.I Project, Pangkhua (7) Siachang M.I Project,, Vawmbuk (8) Tuiphal M.I Project, Lawngtlai (9) Lower Siachang M.I Project Ph-II, Vawmbuk (10) Hmunnuam M.I Project, Sangau (11) Daihuai M.I Project, Bualpui NG (12) Dawnva M.I Project, Sangau (13) Nghaktawllui M.I Project, Siachangkawn (14) Sihdarlui M.I Project, Chawntlangpui

26 It was also planned that WRC farmers will be led to cultivate winter vegetables like Field pea, Cabbage, Cauliflower, Tomato, French Bean etc, by harnessing of these irrigation waters. After harvest of these Rabi crops, the land will be utilized again for cultivation of rice paddy and the course will follow the crop plan cycle.

27 10. Best Practices/ Innovation etc. : The prevailing best practices within Lawngtlai District is the double cropping system in respect of Paddy rice. The practice consist of wetting of rice seeds in a gunny bag for about 3 days and then packed with a wild Banana leaves for about 3 days in the month of November. The seeds then began to sprout. The sprouted seeds are then broadcasted in the prepared nursery. When the seedlings are about 2 inches. high water is admitted in the nursery and the seedlings are maintained for about 1 month in the nursery. Then they are transplanted in the main field at a spacing of 10 inches No. of seedlings per hill are usually 4-5 Nos. Again water is admitted in the field as per conventional method. On ripening stage water is drained out of the field. Harvesting is done from 15 of May after which the Field are plough again for cultivation of Kharif paddy rice. It is practised at Mautlang, Chamdur area, Devasora, Chhotaguisury etc. The productivity is 200 tins per Ha. equivalent to 20 qtls. per Ha. The variety usually cropped are IRI which is called Silchar Buh as reported by the local farmers. The variety is not very palatable. This year as many as 110 Nos. of farmers from Chhotaguisury; Nghalimlui, Devasora N, Golasury and Fangfarlui take up this double cropping practice. These farmers are all NWDPRA beneficiaries.

28 THANK YOU District Agriculture Officer Lawngtlai District, Lawngtlai