The Dominican Republic AGLIPO Agricultural Development Project (2)

Size: px
Start display at page:

Download "The Dominican Republic AGLIPO Agricultural Development Project (2)"

Transcription

1 The Dominican Republic AGLIPO Agricultural Development Project (2) External Evaluator: Hajime Onishi (PADECO Co., Ltd.) Field Survey: November Project Profile and Japan s ODA Loan USA Miami Bahamas Cuba Project site Jamaica Haiti Santiago Santo Domingo Map of Project Area Secondary irrigation channel and farm road 1.1. Background There were concerns in the Dominican Republic 1 that the country is dependent on imports of rice for consumption as a staple food and the domestic water supply is insufficient. However, there is little cultivated land with irrigation equipment and many paddy fields face problems such as poor drainage and damage from salt, which hinder attempts to increase production 2. The present project was carried out in the districts of Aguacate and Guajabo, in the country s northern region. In the 1994 survey, this was the main rice-producing region, accounting for approximately 80% of the country s rice crop, but the majority of the areas where the project was carried out did not have irrigation facilities; rice cultivation was inefficient, relying on regenerated water or rainwater. For this reason, the efficient use of water through the installation of new irrigation and drainage facilities was seen as a matter of urgency, and it was also hoped to increase rice production by enabling two crops a year to be grown. The present project is a continuation of the AGLIPO Agricultural Development Project (1), which was carried out from 1983 to 1989 in the El Paso district to the northwest of the districts where the present project was carried out. As this agricultural development project will contribute to 1 The Dominican Republic has a population of 8.5 million people and covers an area of 48,670 km 2 ; this is roughly the same as the population of Tokyo s 23 wards (8.48 million) and the area of Kyushu and Kochi Prefecture combined (49,285 km 2 ). 2 At the time the survey was carried out (1994), no more than approximately 20% (236,000 ha) of the total cultivated land in the Dominican Republic had irrigation equipment. The total area of paddy fields at the time was 184,000 ha, of which over 50% suffered problems of poor drainage or salt damage (from compiled survey data). 1

2 strengthening the country s system for self-sufficiency in rice, it should ideally be implemented at an early stage Objective The project aims to increase rice production and strengthen the system for self-sufficiency in rice, thus contributing to an increase in the income of farmers and the creation of job opportunities, through the installation of irrigation and drainage facilities in the districts of Aguacate and Guajabo in the northeast of the Dominican Republic Borrower/Executing Agency The Government of the Dominican Republic/Instituto Nacional de Recursos Hidráulicos (INDRHI) 1.4. Outline of Loan Agreement Loan Amount/ billion yen/8.765 billion yen Disbursed Amount Exchange of Notes November 1993 / March 1994 Loan Agreement Terms and Conditions - Interest Rate 3.0% - Repayment Period (Grace Period) 30 years 10 years - Procurement General untied Final Disbursement Date December 2003 Works Agreement Ingco (local company), Impregilo S.P.A. (Italian company) Consulting Agreement Pacific Consultants International, E.A.Roa & Asociados (local company) Feasibility Study (F/S) etc : JICA 1992: Revisions by Government of the Dominican Republic 2

3 2. Evaluation Result 2.1. Relevance Relevance at the time of appraisal Under the five-year public investment plan ( ) at the time of the appraisal, agricultural development and the installation of irrigation facilities were considered to be major problems and there was concern about the insufficient rice production. There was an increasing need to install irrigation equipment in the northern region of the country, which is the main rice-producing area. Furthermore, the paddy fields in the area where the present project was carried out suffered damage through water shortages because of the dependence on regenerated water or rainfall for irrigation, which increased the importance of the present project to install new irrigation and drainage facilities Relevance at the time of evaluation Increased competitiveness of agricultural produce, fair development of agricultural communities, reform of agricultural systems, and concern for the environment are considered to be priority issues under the 10-year strategy of the Department of Agriculture and Livestock ( ); this strategy calls for improved rice production and improved incomes for farmers. The northern region currently accounts for as much as 94% 3 of the country s total rice production, but improved efficiency in water use and improved productivity of irrigated agriculture are seen as issues and there is still a need to continue promoting the installation of irrigation and drainage facilities. The present project enables two crops a year to be grown and together with the first project, AGLIPO Agricultural Development Project (1), it is contributing to increased rice production; as it is responsible for strengthening the Dominican Republic s system of self-sufficiency in rice, the present project continues to have a high degree of importance Efficiency Output Table 1 shows the planned outputs and the actual performance of the present project. The location of the construction work was changed following a review of the optimum location for the head works that had been decided when the detailed 3 From Instituto Nacional de Recursos Hidráulicos (INDRHI) data 4 Although the Dominican Republic s level of self-sufficiency in rice reached almost 100% in 2002, production later fell as a result of heavy rains in the northern region as well as pest and disease outbreaks across the whole country, and rice imports commenced again in The risk of having to import rice as a result of natural disasters should be addressed in the future. 3

4 design was drawn up in In line with this change, the length of the extensions to the irrigation and drainage channels was reduced, and the length of the extensions to the farm roads along these channels was also reduced. Because some areas were to be irrigated using existing pump equipment at the time the detailed design was drawn up, the irrigated area was changed from 7,500ha to 7,000ha at the time of the appraisal. According to the INDRHI, the area under irrigation was 7,343ha as of 2005, exceeding the planned figure set after the detailed design was drawn up. Item 1) Head works 5 2) Irrigation channels 3) Drainage channels 4) Farm roads 5) Area irrigated Table 1: Comparison of Outputs Plan (At the Time Plan (After Detailed of Appraisal) Design) Dam height 3.8m, Height 4.2m, length 56.0 m dam length 68.5m Total: 273km Total: 125km Total: 181km Total: 195km 7,500ha Total: 135km Total: 130km 7,000ha Additional Outputs 6) Concrete walls on irrigation channels: 60km 7) Auxiliary works on drainage facilities: 135 places 8) Extensions to shed at head works and other places Source: INDRHI Actual As in plan drawn up after detailed design Total: 112km Total: 139km Total: 141km 7,343ha As in plan drawn up after detailed design As in plan drawn up after detailed design As in plan drawn up after detailed design The additions to the outputs at the time of the detailed design are as follows: Following the results of soil tests carried out at the time of the detailed design, the walls of the irrigation channels were changed from mud to concrete to prevent leakage. Total: 60 km Auxiliary works on drainage facilities includes longitudinal and latitudinal culverts, spillways, etc. Extensions were constructed to the sheds at two regulation facilities in order to house the sluice gate regulation machinery. 5 A general term for the facilities for collecting river water for use in irrigation channels. These comprise 1a dam to regulate the headwater level built across the Yuna River, which runs through the project districts; 2intake ports to collect water for irrigation; 3secondary facilities and maintenance facilities, etc. 4

5 Project Period The planned period of the project at the time the appraisal was carried out was 70 months, from March 1994 to December However, the project was set back a total of 48 months (four years) and actually took 118 months, lasting until December The reasons for this were a delay in the start to the procedures for selecting a consultant (approximately 13 months), an extension in the time for these procedures (approximately 13 months), a lengthening of the discussions concerning the tendering requirements for contractors and delays in agreement over contract alterations (approximately 21 months), delays in procurement and completion resulting from defects 6 in some of the materials, etc Project Cost As a result of efficient orders by international competitive tendering and changes in the scope of the project from the time of the detailed design, the overall cost was reduced from the original plan of 12,017 million yen to 9,691 million yen, about 80% of the original figure Effectiveness Yearly Increase in the Area Planted with Rice Table 2 shows the planned yearly increase in the area planted with rice and the actual performance. The increases during the first and second years following the completion of the project exceeded the plans. The second year after project completion saw an increase in the order of 1,000ha less than the first year, but this is presumed to be the result of disease to the rice plants and the effect of prolonged rains, which will be examined in detail in the following section. Table 2. Area Planted with Rice by Year Reference year Plan 7 (ha) Performance (ha) First year following project completion (expected to be 1999 at the time of appraisal; performance is harvest from fiscal ) Second year following project completion (expected to be 2000 at the time of appraisal; performance is harvest from 4,482 7,113 8,619 7,620 6 Defects were identified in the quality of the rubber materials procured for use in the intake weir of the head works; a delay was unavoidable while the materials were procured again. This delay affected the construction schedule. 7 These figures are extrapolated from the planned rice production at the time of the appraisal, and show the total increase in the area planted with annual and twice-yearly crops. In the case of newly-created paddy fields, several rice harvests are generally required until the soil becomes suited to rice growing. The build-up period from the completion of the project until achievement of the target rice yield was taken to be five years. 8 The harvest year is from November until October of the following year. Because the irrigation channels were first filled with water in March 2004, the data for the harvest year of shows the total from April to October The data for October 2005 in the harvest year are not shown, as they are currently being collected by the INDRHI. 5

6 fiscal ) Fifth year following project completion (expected to be 2003 at the time of appraisal) Source: Agricultural Statistics Department, INDRHI 15,000 (7,500ha x 2) Increase in Rice Production (Production Volume) Table 3 shows planned and performance figures for rice production, production increase, and yield per unit area. In the first year following completion of the project, production and production increase both greatly exceeded the planned figures, and the yield per unit area reached about 90% of the planned figure. However, part of the project district was greatly affected by the outbreaks of disease 9 that have occurred across the whole country from 2004 onwards and by the tropical storms and heavy rains that have occurred intermittently since the completion of the project; the effects started to be felt in the second year following project completion, and all of the indicators for the second year were very much less than for the first year following project completion 10. The INDRHI is currently carrying out drainage works in Guajabo and other areas 11 in order to resolve this problem. Table 3. Comparisons of Rice Production, Production Increase, and Yield Per Unit Area (Upper figures for first year following project completion, lower figures for second year) Indicator for Comparison Plan Performance Comparison with Plan 1) Production (tons) Target Figure for Five Years after Project Completion: 90,000 tons 26,890 42,680 48,310 24, % 58% 2) Production Increase (tons) Target Figure for Five Years after Project Completion: 78,890 tons 15,780 31,570 37,200 13, % 43% 9 A disease of rice plants called vaneamiento (which means that the ears of rice do not ripen sufficiently) has spread across the whole country. The causes are believed to include abnormal weather conditions such as high temperatures and heavy rain, viruses, and rice blast, but the details are not fully understood. 10 In the east of the district of Guajabo in particular, the drainage situation worsened as a result of tropical storms and prolonged rain; the resulting intermittent floods proved to be a handicap to rice production. There was particularly serious damage as a result of the flooding of the lower reaches of the Yana River in June 2004, and all the farmers resident in the eastern region responding to the beneficiaries questionnaire (16) responded that rice production had fallen because of this water damage. 11 The works commenced in August 2004, with the main purpose being to resolve the problem of flooding in the district of Guajabo. Completion is scheduled for February The project involves 1dredging the mouth of the Yana River and riverbank reinforcement work in the downstream region, 2work on measures to improve drainage, and 3 restoration work after a flood that occurred in June

7 3) Yield Per Unit Area Target Figure for Five Years after Project Completion: 6.0 tons/ha % 68% Source: Agricultural Statistics Department, INDRHI. Figures for production and production increase are based on unhusked rice Organization of Irrigation Associations and Rates of Collection of Water Charges As a result of the lessons learned from the first AGLIPO project, an organization of irrigation associations was created under the present project before the completion of the project. The lowest branch of this organization is the nucleo, each made up of 38 irrigation associations; the next branch up consists of four asociaciones, which unite the nucleos into groups; at the top is the highest level of the organization, the single junta. This is the first time such a measure has been carried out in the Dominican Republic, and with success in the early stages of creation of the organization, the rate of collection of water charges reached 72% in the second year following completion of the project 12. All the farmers in the project district currently participate in irrigation associations (with a 100% rate of incorporation of the associations into the organization) and the rate of collection of water charges is forecast to increase Estimation of the Economic Internal Rate of Return (EIRR) When the Estimation of the Economic Internal Rate of Return (EIRR) was recalculated using the same conditions as at the time of the appraisal, (project costs being construction costs and maintenance costs, profits being the remainder of the profits for crops after production costs are subtracted and the project life being 30 years), it came to 14.6%. This is a slight reduction on the figure of 17.1% calculated at the time of the appraisal, but it is still at a high level Impact Increase in Farmers Revenue 12 Data from the INDRHI Agricultural Statistics Department. According to the department, irrigation associations with the collection rate of over 90% seen in other regions may be expected a certain length of time after completion of the project. However, it is extremely rare to achieve a 72% rate just two years following the completion of the project. 13 In the recalculation the build-up period of five years, assumed at the time of the appraisal, was used and the production in fiscal year was taken to be 90,000 tons. The EIRR for the first AGLIPO project recalculated at the time of the post-project evaluation (1990) was 12.7%. 14 Regarding resettlement in line with the present project, 51 farmhouses in the area planned for use for the head works were resettled. The INDRHI provided the resettled households with new housing and the surrounding infrastructure (water supply, electricity, telephone service, roads, etc.). The new housing was situated on high ground, so the risk of the housing being flooded was less than in the residents original homes on the floodplain of the Yana River. In the survey of beneficiaries, all of the 54 households that responded said that there had been no problem with resettlement. 7

8 An attempt was made to ascertain the degree of improvement in farmers incomes before and after the project through a beneficiaries survey. Regarding incomes first, as can be seen in figure 1, the results show that 70% of farmers responded that their incomes had increased. In particular, over half of those that reported an increase in revenue responded that the increase had been by 20% or more over their pre-project revenue. On the other hand, approximately 90% of the farmers that reported a decrease in revenue were resident in the eastern part of the district of Guajabo, which was affected by tropical storms and prolonged rain. 15 Next, to the questions regarding changes in the standard of living, about 70% of farmers responded that their standard of living had improved. Specific reasons other than increase in revenue that were given for the improvement in standard of living included (1) improved accessibility through building of farm roads, 16 (2) reduction in irrigation costs, 17 and (3) reduction of transportation costs of produce (rice) (Fig. 2). Fig. 1 Increase in Farmers' Revenue (Results of Beneficiaries Survey, N=54) Revenue decreased: 30% Revenue Increased: 70% Increase of 0-20%: 27% Increase of 20-40%: 31% No reply concerning rate of increase: Increase of more than 40%: 6% 15 Tropical storm Jeanne hit the Dominican Republic in September 2004, causing serious damage. There were also floods along the lower reaches of the Yana River, including in areas where the present project was carried out, in June The INDRHI points to the following three areas as the impact of improved accessibility on standard of living: 1 movement to cultivated land is easier, improving the efficiency of farm labor; 2farm machinery may be taken into cultivated land, allowing cost reduction through mechanization of harvesting and other farm work; 3rice traders and sales brokers are able to enter previously inaccessible agricultural districts, reducing transport costs. 17 Specifically, reduction in fuel costs for pumping irrigation water, etc. 8

9 Fig. 2 Reasons for Improvement in Standard of Living (Multiple Answers) 21 Improved access through farm roads 17 Reduced production & transportation costs Other Number of households responding (multiple answers) Although there is concern about the effects of natural disasters in the future, it can be concluded from the results given above that revenue in the project districts has been improved by the project and that farmers incomes have been improved by reduction in the costs of irrigation and transport Creation of Employment Opportunities Of the households that responded to the beneficiaries survey, 96% responded that they had hired day laborers during the busy farming season (mainly planting and harvest). Regarding the actual numbers of people hired, approximately half (44%) of the households that had hired laborers reported taking on five or more day laborers (Fig. 3). Additionally, 37% of households that had hired laborers reported taking on 10 or more laborers during the rice planting season, which is considered to be the busiest of all periods in the rice farming calendar. Because the project was only completed slightly less than two years ago it is still too early to conclude whether or not it will continue to create employment opportunities, but from the above survey results it can be said that a definite number of employment opportunities have been secured since the project s completion in the districts where it was carried out. According to the INDRHI, the main source of day labor is the tenant farmers living in these districts, a large proportion of whom are refugees from neighboring Haiti, where wages are very low. It can thus be concluded that the poorer social strata within the project districts have obtained employment opportunities. 9

10 Fig. 3 Numbers of Day Laborers Hired (Results of beneficiaries' survey, N=54) More than 10: 6% None hired: 4% 5-10: 38% Less than 5: 52% Foreign Exchange Savings through Strengthening the System of Self-Sufficiency in Rice During the harvest year of , the first year since the completion of the project, rice production increased as a result of the project by 24,180 tons (figure for unhusked rice), which accounted for a saving of US$11.20 million in foreign exchange. In 2004, 77,840 tons of rice were imported 18, for which a purchase cost of US$36.05 million was paid. If the present project had not been carried out, a total of US$47.25 million (US$36.05 million + US$11.20 million) would have had to be paid; this means that there has been a saving of approximately one quarter of the foreign currency required for purchasing rice imports (Table 4). The country s rate of self-sufficiency in rice was 83% in Table 4. Amount of Foreign Currency Saved through Increased Rice Production (2004) Amount Produced (tons) Amount Consumed (tons) Amount Imported (tons) Cost of Imports (millions of US dollars) a Increase in Rice Production from Project (tons) Amount of Foreign Exchange Saved (millions of US dollars) b Degree of Foreign Currency Saving b/(a + b) 374, ,667 77, , % Source: Secretaría de Estado de Agricultura (SEA) and INDRHI Note: The amount consumed is taken as the total of the amount produced and the amount imported. Increase in rice produced is calculated from the figures in table 18 Strictly speaking, the rice imports during the harvest year (November 2003 October 2004) should be used for comparison, but because no statistics are available the rice imports for 2004 were used instead. The amount of foreign exchange saved during the harvest year has not been calculated because the various different statistics are still in the process of being compiled into aggregates. 10

11 3, based on unhusked rice Sustainability Executing Agencies There is a clear sharing of roles in the administration and maintenance: INDRHI is responsible for the administration and maintenance of the head works, the main channels and the farm roads; the union of irrigation associations (Junta de Regantes Aglipo-II) is responsible for the administration and maintenance of the secondary channels. Settlement of newly cultivated land is the responsibility of the Instituto Agrario Dominicano (IAD), activities to encourage agriculture within the project districts are the responsibility of the Secretaría de Estado de Agricultura (SEA), and agricultural financing is the responsibility of the Banco Agricola (BA) Technology a) INDRHI There were no technological problem in the administration and maintenance. Training for maintenance of the head works was carried out by the company that did the construction work, and an administration and maintenance manual has been completed. Regarding personnel, although the administration and maintenance of the present project is under the jurisdiction of the Operations Bureau of the INDRHI, no specialist technical staff has officially been assigned to the project because of the effects of an organizational reshuffle in March It is believed that the establishment of a support system in the INDRHI Operations Bureau, which includes ascertaining the optimal personnel for maintenance, will take some time. b) Junta de Regantes Aglipo II Training of irrigation association members in administration and maintenance was carried out by the INDHRI; however, it is only just under two years since the completion of the project, and it will require more time for the administration and maintenance skills, which include expertise in managing the irrigation associations, to be mastered 19. Regarding the personnel, an issue to be addressed in the future is 19 Specifically, from August to October 2005, training, seminars, and observations relating to the following were carried out: 1methods of maintenance for irrigation channels and facilities; 2use of fertilizers and agricultural chemicals; and 3administration and management of irrigation association activities. However, the results of the beneficiaries survey show that no more than 41% of the households that responded (22 out of 54) said that the guidance was useful in maintaining the facilities. Regarding the overall administration of the irrigation associations in particular, it is expected that mastering the administration skills will take some time because the organizational structure is fairly complex, with a large number of members at the lowest level (there is one junta with a small number of asociaciones below it; the lowest level of the organization is the nucleo, of which there are 38). (From an interview with the training organization 11

12 the clear division of roles among the irrigation association members However, the rate of entry into the association organization of farmers in the project districts is 100%, so there are plenty of association members to carry out the work of administration and maintenance. There are currently two projects relating to irrigation in the Dominican Republic, which are being carried out by the Japan International Cooperation Agency (JICA) and the Inter-American Development Bank (IDB) 20, 21. These projects aim to improve the capacity of INDRHI personnel in relation to the administration and maintenance of irrigation equipment, and to smooth out the process of transferring authority over the administration and maintenance of irrigation facilities to the irrigation associations Organization a) INDHRI The Operations Bureau is the main department in charge, and it gives its support to the present project through its local office (Bajo Yuna Irrigation District Office. The bureau has 10 irrigation district offices under its jurisdiction. b) Junta de Regantes Aglipo II The junta (union of irrigation associations) is the highest level of the organization, beneath which the next level is the asociación. There are four asociaciones, each covering a separate district and carrying the responsibility for substantive administration and maintenance activities. Following completion of the project, the union of irrigation associations called for the transfer of the machinery and tools (particularly the heavy machinery) used for operation and maintenance. The machinery and tools are now in the possession of INDHRI, which is carrying out continuous talks with the union of irrigation associations regarding their ownership. The INDHRI proposes flexible use of the department of the INDRHI) 20 JICA has been implementing the Proyecto de Mejoramiento Tecnológico de la Agricultura Bajo Riego (PROMTECAR [Project for Improving Technology of Agriculture under Irrigation]) since March 2001 with the aim of improving the administration and maintenance technology of irrigation facilities; under the project, technology relating to the maintenance of irrigation facilities and water management is being transferred to the INDHRI, the Secretaría de Estado de Agricultura (SEA), and irrigation associations in model districts. The INDHRI intends to extend the results of this project across the whole country. 21 The IDB has been implementing the Programa Administración de Sistemas de Riego Por los Usuarios (PROMASIR [Program for the Management of Irrigation Systems by Water Users]), which aims to 1install irrigation infrastructure, 2promote the transfer of control of the administration and maintenance of irrigation facilities to the irrigation associations, and 3build up the capacity of the organization of irrigation associations, etc. Technical guidance relating to the administration and maintenance of irrigation facilities has been given in 40 irrigation districts across the whole country. There have also been results through cooperation with the above JICA project. 12

13 heavy machinery across the whole country Finances a) INDHRI The budget for the INDHRI (amount disbursed) has varied in the region of between 1.0 billion and 1.3 billion Dominican pesos over the last few years (Table 5). The budget for administration and maintenance of the present project amounted to million pesos in fiscal 2004 and million pesos in fiscal 2005, which accounted for 3.0% and 3.5% respectively of the average disbursed budget of 1.16 billion pesos over the last five years. Table 5. INDHRI Budget (Unit: million pesos) Fiscal Year Amount disbursed Amoun t agreed at beginning of fiscal year , ,099 1, ,295 1, ,283 1, , Note: The current exchange rate is 1 peso = approx. 3.3 yen b) Junta de Regantes Aglipo II The revenue of the union of irrigation associations during fiscal was 16.9 million pesos, of which 94% was revenue from irrigation charges. The union s expenditure was 16.2 million pesos, leaving the union approximately 70,000 pesos in the black. The INDHRI compensates the union for part of the wages paid to union officials. The irrigation charges were increased in November 2005 from a yearly pesos/tarea 23 to a yearly pesos/tarea, which was a significant price hike of 50%. However, according to the results of the beneficiaries survey the level was 22 The INDRHI proposes that the heavy machinery should not be for the exclusive use of the project districts but should be used effectively across the whole country, and has retained possession of the machinery, for the following three reasons: 1the union of irrigation associations does not yet have the capability to manage the heavy machinery; 2the operation and maintenance expenses for the heavy machinery are considerably in excess of the financial burden the union of irrigation associations is capable of assuming; and 3demands from other regions for heavy machinery have grown as a result of the natural disasters that have occurred continuously across the country since Heavy machinery centers for the unified management of the heavy machinery used in the operation and maintenance of irrigation facilities are currently being built in four locations around the country under the PROMASIR project being carried out by the IDB. One of these is slated for construction in the northeastern region. The Junta de Regantes Aglipo II for the present project will be able to use this heavy machinery by paying a fixed usage fee to the center 23 One tarea is approximately 0.06ha. 13

14 appropriate, 24 and it can be concluded that there is little risk of a drop in revenue due to any increase in non-payment of irrigation charges Maintenance As detailed below, neither the INDHRI nor the Junta de Regantes Aglipo II carries out regular maintenance work. Ideally, a system of maintenance in line with the administration and maintenance manual should be put in place and strengthened at an early stage. Also, due to the particular soil conditions of the districts where the project was carried out the growth of weeds and the buildup of soil in the irrigation channels are both faster than in other districts. It is therefore necessary for both the INDHRI and the union of irrigation associations to 26, 27 recognize anew the importance of maintenance work. a) INDHRI The head works and the main channels have been maintained in the same condition as at the time of the completion of construction work, and no particular problems have occurred. Work is currently being carried out on the drainage channels to maintain and strengthen their capacity. Regarding the farm roads, the surface of the main trunk road has become uneven in places as a result of heavy rain; although the road is not impassable, there are stretches of the road where the passage of vehicles is impaired 28. Part of the main irrigation channel was damaged in the widespread flooding of June 2006, but as a result of emergency repair work all the damaged areas have been mended. b) Junta de Regantes Aglipo II Although weeds have been removed by hand and herbicide has been sprayed along some of the secondary channels, partly because the maintenance system of the lower levels of the union s organization is currently being reorganized, regular 24 93% of households that gave valid responses responded that the amount collected in irrigation charges was not high. 25 The INDHRI maintains that higher irrigation charges and more efficient collection of irrigation charges are necessary in order for the irrigation associations under the present project to use the heavy machinery from the heavy machinery center to be constructed in the northeastern region of the country under the IDB project. 26 The union of irrigation associations maintains that it is unable to carry out maintenance work using heavy machinery such as silt dredging because of the present environment in which it does not have free use of heavy machinery. However, the INDHRI judges that heavy machinery is not necessary for dredging silt from the secondary irrigation channels. 27 In the beneficiaries survey, the four possible overall evaluations for the maintenance activities under the responsibility of the irrigation associations were extremely good, good, bad, and extremely bad ; 56% of the households that gave valid responses (30 out of 54) evaluated them as extremely good or good. These results may reflect biases from the time of the beneficiaries survey, but over half of the households do not see any problem in the current maintenance activities. Furthermore, the same trend was seen in the in responses to a question as to whether the association members were actively participating in maintenance activities: 67% of households (36 out of 54) responded that the participation was either very active or active. 28 The INDHRI says it will carry out appropriate repairs to the problem areas along the main road. 14

15 maintenance activities have not been carried out 29. Furthermore, maintenance work such as silt dredging that requires backhoes, dumper trucks or other heavy machinery is not believed to have been carried out at all since the completion of the project. 3. Feedback 3.1. Lessons Learned None 3.2. Recommendations Recommendation 1 for the Executing Agencies and the Junta de Regantes Aglipo II Regarding the maintenance of the irrigation facilities, there should be an early shift from the present makeshift solutions toward a system that enables regular maintenance work to be carried out; where there are any risks of a reduction in irrigation capacity due to buildup of silt, work should be carried out to prevent problems before they actually occur. Specifically, the INDHRI should appoint the staff responsible at an early stage, and the union of irrigation associations should first work to clarify the division of roles among association members. Moreover, it would be desirable for the administration and maintenance manual to be revised and updated to meet the actual situation, and for regular maintenance work to be carried out in accordance with this updated manual. Recommendation 2 for the Executing Agencies and the Junta de Regantes Aglipo II Regarding the problem of the ownership of the heavy machinery for maintenance, the parties concerned should work their way toward the construction of a scheme whereby the heavy machinery can be used effectively; as the capacity of the irrigation associations to administer funds grows, in the long term the ownership of the machinery should then be transferred to the union of irrigation associations. However, the Junta de Regantes Aglipo II does not yet have sufficient skills to maintain the heavy machinery; if the ownership is to be transferred, it is necessary to train the association members in maintenance and to raise again the irrigation charges, which will be the source of funds for the 29 The reasons that regular maintenance work has not been carried out are thought to be unclear division of roles and problems in the organization of the maintenance system, to which can be added the lack of awareness of the importance of maintenance work among the individual association members referred to in footnote

16 machinery maintenance costs. For this reason, the INDHRI and the Junta de Regantes Aglipo II should hold discussions aimed at a method of transferring ownership which is acceptable to both parties. 1 Output 1) Head works construction Comparison of Original and Actual Scope Item Plan Actual Dam height 3.8m, dam length 68.5m, planned intake flow 8.5m 3 /s (after detailed plan: 10.55m 3 /s) Dam height 4.2 m, dam length 56.0 m, planned intake flow m 3 /s 2) Construction of irrigation channels 3) Construction of drainage channels 4) Construction of farm roads 5) Procurement of equipment for maintenance 6) Area irrigated (area benefiting from irrigation and drainage channel installation, farm road installation, reclamation of farm land, etc.) 2Project Period 3Project cost Foreign currency Local currency Total Total: 273km (after detailed design: 125km) Total: 181km (after detailed design: 135km) Total: 195km (after detailed design: 130km) Backhoes, bulldozers, dumper trucks, radio system, etc. 7,500ha (after detailed design: 7,000ha) March 1994 December 1999 (70 months) 7,325 million yen 4,692 million yen (469 million Dominican pe sos) 12,017 million yen Total: 112km Total: 139km Total: 141km As a result of a review of the items of maintenance equipment for procurement at the time of the detailed plan, purchase of some equipment was suspended an d there was new procurement of amphibous vehicles and other equipment. 7,343ha (as of 2005) Additional Output Concrete walls for irrigation channels: 60km Work in area of drainage facilities: 135 places Extension to shed at head works March 1994 December 2003 (118 months) 5,766 million yen 3,925 million yen (702 million Dominican peso s) 9,691 million yen 16

17 ODA Loan Portion Exchange rate 9,013 million yen 1 Dominican peso = 10.0 yen (Jan. 1993) 8,765 million yen 1 Dominican peso = 5.6 yen (monthly average Mar Dec. 2003) 17

Report date: March 2001 Field survey: October Project Profile and Japan s ODA Loan

Report date: March 2001 Field survey: October Project Profile and Japan s ODA Loan Myanmar South Nawin Irrigation Project Report date: March 2001 Field survey: October 2000 1. Project Profile and Japan s ODA Loan Project site Site Map: Bago administrative division, Myanmar Irrigation

More information

Minipe and Nagadeepa Irrigation Rehabilitation Project

Minipe and Nagadeepa Irrigation Rehabilitation Project Sri Lanka Minipe and Nagadeepa Irrigation Rehabilitation Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 The Philippines Manila Cebu Project Site Map

More information

Ex-Post Monitoring for Completed ODA Loan Projects

Ex-Post Monitoring for Completed ODA Loan Projects (Onsite evaluation: July 2006) ExPost Monitoring for Completed ODA Loan Projects Evaluator: Kenji Momota (IC Net, Ltd.) Project Name: Indonesia: Bila Irrigation Project Phases (I) (II) (L/A No. IP364,

More information

Metro Manila Flood Control Project (II)

Metro Manila Flood Control Project (II) Philippines 1. Project Profile and Japan s ODA Loan Metro Manila Flood Control Project (II) Report Date: March 2001 Field Survey: September 2000 Project site The Philippines Manila Cebu Site Map: Manila

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Haor Flood Management and Livelihood Improvement Project Loan Agreement: June 16, 2014 Loan

More information

Bangkok Chonburi Highway Construction Project (1)

Bangkok Chonburi Highway Construction Project (1) Thailand Bangkok Chonburi Highway Construction Project (1) 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: September 2000 Myanmar Loas Thailand Bangkok Chonburi Cambodia Project

More information

China Dalian Water Supply System Rehabilitation Project

China Dalian Water Supply System Rehabilitation Project China Dalian Water Supply System Rehabilitation Project External Evaluator: Chiaki Nakamura (Global Link Management Ltd.) Field Survey: October 2005 1. Project Profile and Japan s ODA Loan Kazakhstan Mongolia

More information

Jakarta Water Supply Distribution Pipeline Project

Jakarta Water Supply Distribution Pipeline Project Indonesia Jakarta Water Supply Distribution Pipeline Project 1. Project Profile and Japan s ODA Loan Report Date: March 2001 Field Survey: August 2000 (1) Background Distribution Pipeline Laid by this

More information

Telecommunication Expansion Project (II)

Telecommunication Expansion Project (II) Ghana Telecommunication Expansion Project (II) Report Date: October, 2002 Field Survey: July, 2001 1. Project Profile and Japan s ODA Loan Project Site Switchboard System (Accra Station) 1.1 Background

More information

India Kothagudem A Thermal Power Station Rehabilitation Project. Field Survey: July Project Profile and Japan s ODA Loan

India Kothagudem A Thermal Power Station Rehabilitation Project. Field Survey: July Project Profile and Japan s ODA Loan India Kothagudem A Thermal Power Station Rehabilitation Project Field Survey: July 2003 1. Project Profile and Japan s ODA Loan China New Delhi Nepal Bhutan Bangladesh India Calcutta Myanmar Hyderabad

More information

Jiujiang Fertilizer Plant Construction Project (1)(2)(3)

Jiujiang Fertilizer Plant Construction Project (1)(2)(3) China Jiujiang Fertilizer Plant Construction Project (1)(2)(3) 1. Project Profile and Japan's ODA Loan Report Date October 2002 Field Survey July 2001 Site Map Jiujiang-city, Jiangxi Province Site Photo

More information

Report date: March 2001 Field survey: August Project Profile and Japan s ODA Loan

Report date: March 2001 Field survey: August Project Profile and Japan s ODA Loan Kenya Tana River Delta Irrigation Project (I) Report date: March 2001 Field survey: August 2000 1. Project Profile and Japan s ODA Loan Project site Malindi Site Map: The Delta of the Lower Tana in the

More information

External Monitoring Consultant: Eiko Nakamoto / Toyo Tanaka, Nakamoto&Associates Co., Ltd. Irrigation Water Reservoir (Fernana)

External Monitoring Consultant: Eiko Nakamoto / Toyo Tanaka, Nakamoto&Associates Co., Ltd. Irrigation Water Reservoir (Fernana) Ex-Post Monitoring of Japanese ODA Loan Project Tunisia Barbara Irrigation Project External Monitoring Consultant: Eiko Nakamoto / Toyo Tanaka, Nakamoto&Associates Co., Ltd. 1. Project Description Project

More information

Ex-ante Project Evaluation

Ex-ante Project Evaluation Ex-ante Project Evaluation 1. Name of project Country: Socialist Republic of Vietnam Name of project: Hai Phong City Environmental Improvement Project (II) L/A signing date: March 31, 2009 Loan amount:

More information

Summary of Terminal Evaluation. 1.Outline of the Project. Management for the Municipality of Panama in the Republic of Panama

Summary of Terminal Evaluation. 1.Outline of the Project. Management for the Municipality of Panama in the Republic of Panama Summary of Terminal Evaluation 1.Outline of the Project Country:Republic of Panama Sector:Waste Management Division in Charge:Environmental Management Division 2, Environmental Management Group, Global

More information

Ex-Post Evaluation of Japanese ODA Loan Walawe Left Bank Irrigation Upgrading and Extension Project (E/S)(I)(II)

Ex-Post Evaluation of Japanese ODA Loan Walawe Left Bank Irrigation Upgrading and Extension Project (E/S)(I)(II) Sri Lanka Ex-Post Evaluation of Japanese ODA Loan Walawe Left Bank Irrigation Upgrading and Extension Project (E/S)(I)(II) External Evaluator: Hisae Takahashi Ernst & Young Sustainability Co., Ltd. 0.

More information

Baguio. Manila. Project site. Cebu City. Philippines. Davao

Baguio. Manila. Project site. Cebu City. Philippines. Davao Philippines Subic Bay Freeport Environment Management Project External Evaluator: Atsushi Fujino (KRI International Corp.) Field Survey: September 2004 1. Project Profile and Japan s ODA Loan Baguio Manila

More information

Japanese ODA Loan. Ex-Ante evaluation

Japanese ODA Loan. Ex-Ante evaluation Japanese ODA Loan Ex-Ante evaluation 1. Project Country: People's Republic of Bangladesh Name of the Project: Matarbari Ultra Super Critical Coal-Fired Power Project (I) Loan Agreement: June 16, 2014 Loan

More information

Japanese ODA Loan. Ex-Ante Evaluation

Japanese ODA Loan. Ex-Ante Evaluation Japanese ODA Loan Ex-Ante Evaluation 1. Name of the Project Country: Republic of Costa Rica Project: Las Pailas II Geothermal Project (Guanacaste Geothermal Development Sector Loan) Loan Agreement: August

More information

1. Project Description. 1.1 Background

1. Project Description. 1.1 Background Kingdom of Morocco Ex-Post Evaluation of Japanese ODA Loan Water Supply Sector Development Project (II) External Evaluator: Keishi Miyazaki, OPMAC Corporation 0. Summary The objective of this project was

More information

Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi

Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi Republic of Indonesia FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Tarahan Coal Fired Steam Power Plant Project External Evaluator: Masumi Shimamura, Mitsubishi UFJ Research and Consulting Co.,

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: Federative Republic of Brazil Project: Belem Metropolitan Trunk Bus System Project Loan Agreement: September

More information

PART-III. Present Condition and Pre-F/S level Development Plan for Each Irrigation Scheme

PART-III. Present Condition and Pre-F/S level Development Plan for Each Irrigation Scheme PART-III Present and Pre-F/S level Development Plan for Each Irrigation Scheme Location of District N CENTRAL SULAWESI SINJAI DISTRICT SOUTHEAST SULAWESI Kassi PARE-PARE UJUNG PANDANG SOUTH SULAWESI PROVINCE

More information

Philippines Metro Manila Road Pavement Rehabilitation Project

Philippines Metro Manila Road Pavement Rehabilitation Project Philippines Metro Manila Road Pavement Rehabilitation Project 1. Project Profile and Japan s ODA Loan Report date: March 2001 Field survey: September 2000 Project site Site Map: Metropolitan Manila, the

More information

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives

1. Name of the Project 2. Necessity and Relevance of JBIC s Assistance 3. Project Objectives Ex-ante Evaluation 1. Name of the Project Country: India Project: Swan River Integrated Watershed Management Project (Loan Agreement: 03/31/2006; Loan Amount: 3,493 million yen; Borrower: The President

More information

Ex-ante Evaluation - 1 -

Ex-ante Evaluation - 1 - Ex-ante Evaluation 1. Name of the Project Country: The Socialist Republic of Vietnam Project: Hue City Water Environment Improvement Project (Loan Agreement: March 31, 2008; Loan Amount: 20,883 million

More information

Mexico Mexico Metropolitan Area Reforestation Project

Mexico Mexico Metropolitan Area Reforestation Project Mexico Mexico Metropolitan Area Reforestation Project External Evaluator: Kenji Momota (IC Net Ltd.) Field Survey: August 2005 1. Project Profile and Japan s ODA Loan America Mexico Project Site Guatemala

More information

1.4 Borrower/Executing Agency The Government of the Republic of the Philippines / The Department of Public Works and Highways (DPWH).

1.4 Borrower/Executing Agency The Government of the Republic of the Philippines / The Department of Public Works and Highways (DPWH). Philippines Second Mandaue Mactan Bridge Construction Project Report Date September, 2002 Field Survey June, 2001 1. Project Profile and Japan s ODA Loan Project Location Map Second Mandaue-Mactan Bridge

More information

Operating margin decreased by 0.4%, and net margin decreased by 0.5%. The reversal of deferred tax assets in preparation for federal corporate tax

Operating margin decreased by 0.4%, and net margin decreased by 0.5%. The reversal of deferred tax assets in preparation for federal corporate tax 1 Operating margin decreased by 0.4%, and net margin decreased by 0.5%. The reversal of deferred tax assets in preparation for federal corporate tax rate cut in the United States effected a decrease in

More information

Ex-Post Project Evaluation 2012: Package I-6. (Paraguay, Brazil)

Ex-Post Project Evaluation 2012: Package I-6. (Paraguay, Brazil) Ex-Post Project Evaluation 2012: Package I-6 (Paraguay, Brazil) November 2013 JAPAN INTERNATIONAL COOPERATION AGENCY GLOBAL GROUP 21 JAPAN, INC. EV JR 13-19 Preface Ex-post evaluation of ODA projects has

More information

Cattle Improvement Project Fields: Agricultural/Rural development- Agricultural Development

Cattle Improvement Project Fields: Agricultural/Rural development- Agricultural Development 1. Outline of the Project Country name: The Philippines Project name: Water Buffaloes and Beef Cattle Improvement Project Fields: Agricultural/Rural development- Agricultural Development Assistance type:

More information

Republic of Turkey Ex-Post Evaluation of Japanese ODA Loan Project Seismic Reinforcement Project for Large Scale Bridges in Istanbul

Republic of Turkey Ex-Post Evaluation of Japanese ODA Loan Project Seismic Reinforcement Project for Large Scale Bridges in Istanbul Republic of Turkey Ex-Post Evaluation of Japanese ODA Loan Project Seismic Reinforcement Project for Large Scale Bridges in Istanbul External Evaluator: Yasuhiro Kawabata, Sanshu Engineering Consultant

More information

1. Project Description. Wells Pump Stations along the Tora River

1. Project Description. Wells Pump Stations along the Tora River Mongolia Ex-Post Evaluation of Japanese Grant Aid Project The Project for Improvement of Water Supply Facilities in Ulaanbaatar in Mongolia External Evaluator: Maki HAMAOKA, Foundation for Advanced Studies

More information

RICE POLDERS IN THE ACID SULFATE SOILS OF THE BOLANHAS IN THE MANGROVES OF GUINEA-BISSAU

RICE POLDERS IN THE ACID SULFATE SOILS OF THE BOLANHAS IN THE MANGROVES OF GUINEA-BISSAU RICE POLDERS IN THE ACID SULFATE SOILS OF THE BOLANHAS IN THE MANGROVES OF GUINEA-BISSAU R.J. Oosterbaan and J. Vos Published in Annual Report 1980 International Institute for Land Reclamation and Improvement

More information

Asuncion. Uruguay Montevideo

Asuncion. Uruguay Montevideo Paraguay Asuncion Metropolitan Area Potable Water Project External Evaluator: Yoshiro Okamoto (Mitsubishi UFJ Research and Consulting Co., Ltd.) Field Survey: December 2005 1. Project Outline and Japan

More information

CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM

CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM CHAPTER SIX PROBLEMS OF SMALL-SCALE IRRIGATION DEVELOPMENT AND MANAGEMENT SYSTEM This section of the study paid a particular attention to the assessment of small scale irrigation management activities

More information

Indonesia Ujung Pandang Port Urgent Rehabilitation Project Report Date June, 2002 Field Survey July, Project Profile and Japan s ODA Loan

Indonesia Ujung Pandang Port Urgent Rehabilitation Project Report Date June, 2002 Field Survey July, Project Profile and Japan s ODA Loan Indonesia Ujung Pandang Port Urgent Rehabilitation Project Report Date June, 2002 Field Survey July, 2001 1. Project Profile and Japan s ODA Loan Project Location Map Hatta Quay of Makassar Port 1.1 Background

More information

The Small Scale Irrigation Management Project

The Small Scale Irrigation Management Project Indonesia The Small Scale Irrigation Management Project Report Date October, 2002 Field Survey August, 2001 Project Profile and Japan s ODA Loan Location Map of the Project Surface Irrigation in NTB (West

More information

Alternative techniques of supplementary irrigation for the rain-fed paddy schemes in Brunei Darussalam: a case study of the Kg. Junjungan paddy scheme

Alternative techniques of supplementary irrigation for the rain-fed paddy schemes in Brunei Darussalam: a case study of the Kg. Junjungan paddy scheme Water Resources Management VI 547 Alternative techniques of supplementary irrigation for the rain-fed paddy schemes in Brunei Darussalam: a case study of the Kg. Junjungan paddy scheme K. B. M. Shafiuddin

More information

Drought Situations and Management in Vietnam

Drought Situations and Management in Vietnam Drought Situations and Management in Vietnam Background: In Vietnam, drought is one of the most frequent natural disasters, only after flood and storm, and has been becoming more severe due to the impact

More information

Agricultural Statistical System in Japan

Agricultural Statistical System in Japan Agricultural Statistical System in Japan Makoto Shimizu Director for Statistical Planning Statistics Department Minister s Secretariat Ministry of Agriculture, Forestry and Fisheries Japan 15 June 2015

More information

Summary of Evaluation Results

Summary of Evaluation Results Summary of Evaluation Results I. Outline of the Project Country: Mongolia Issue/Sector: Environmental Management-Urban Solid W astes Division in Charge: JICA Mongolian Office Period of Cooperation Record

More information

Rural Water Supply Project (IV)

Rural Water Supply Project (IV) Philippines Rural Water Supply Project (IV) 1. Project Profile and Japan s ODA Loan Report Date: July, 2002 Field Survey: July, 2001 Location Map of the Project Level I System (Deep Well) 1.1. Background

More information

Indonesia Ex-post Monitoring for ODA Loan Project Jakarta Solid Waste Management System Improvement Project

Indonesia Ex-post Monitoring for ODA Loan Project Jakarta Solid Waste Management System Improvement Project Indonesia Ex-post Monitoring for ODA Loan Project Jakarta Solid Waste Management System Improvement Project Evaluator: Ryujiro Sasao (IC Net Limited) Field Survey: May 2008 1. Outline of the project and

More information

SRI LANKA. Drought Impact Assessment and Monitoring using Computer Assisted Telephone Interviewing (CATI) Services. August 2017

SRI LANKA. Drought Impact Assessment and Monitoring using Computer Assisted Telephone Interviewing (CATI) Services. August 2017 SRI LANKA Drought Impact Assessment and Monitoring using Computer Assisted Telephone Interviewing (CATI) Services Implemented By: Ministry of Disaster Management Assessment Technical Lead: United Nations

More information

Madiun River Urgent Flood Control Project

Madiun River Urgent Flood Control Project Indonesia Madiun River Urgent Flood Control Project Report date October, 22 Field Survey August, 21 Project Profile and Japan s ODA Loan Location Map of the Project Madiun River (improved river section)

More information

Indonesia Ex-Post Evaluation of Japanese ODA Loan Project Railway Double Tracking on Java South Line (1) (2)

Indonesia Ex-Post Evaluation of Japanese ODA Loan Project Railway Double Tracking on Java South Line (1) (2) Indonesia Ex-Post Evaluation of Japanese ODA Loan Project Railway Double Tracking on Java South Line (1) (2) External Evaluator: Takako Haraguchi, International Development Associates 0. Summary The double

More information

EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM

EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM EFFECTS OF UPSTREAM HYDROPOWER DAMS AND WATER DIVERSION PROJECTS TO THE DROUGHT AND SALINE INTRUSION OF THE MEKONG RIVER DELTA IN VIETNAM Le Anh Tuan Can Tho Univerity E mail: latuan@ctu.edu.vn The Mekong

More information

Agri-Service Industry Report

Agri-Service Industry Report Years Since Presidential Election 1950 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 Billions Agri-Service Industry Report November 2016 Dan Hassler Farm Income and Presidential Elections

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of Indonesia Project: Engineering Services (E/S) for Construction of Jakarta Mass Rapid Transit East-West

More information

Integrating food security & water & the impact of climate change

Integrating food security & water & the impact of climate change Integrating food security & water & the impact of climate change Background paper for session 2 by EKN Dhaka and EKN Bamako, including the outcomes of the discussion during the Food Security Exchange week.

More information

Thailand Traffic Planning and Management Sector Loan

Thailand Traffic Planning and Management Sector Loan Thailand Traffic Planning and Management Sector Loan 1. Project Profile and Japan s ODA Loan External Evaluator: Hiroyasu Otsu, Graduate School of Kyoto University Field Survey: August 2007 March 2008

More information

Malaysia Ex-Post Evaluation of Japanese ODA Loan Project Port Dickson Power Station Rehabilitation Project (2)

Malaysia Ex-Post Evaluation of Japanese ODA Loan Project Port Dickson Power Station Rehabilitation Project (2) Malaysia Ex-Post Evaluation of Japanese ODA Loan Project Port Dickson Power Station Rehabilitation Project (2) External Evaluator: Mitsue Mishima, OPMAC Corporation 0. Summary The Project aimed at stable

More information

1.2 Objective. between 16 and 23 May 2009 respectively. The feedback seminar was held on 19 May 2009.

1.2 Objective. between 16 and 23 May 2009 respectively. The feedback seminar was held on 19 May 2009. Pakistan Karachi Water Supply Improvement Project External Evaluator:Chiyo Mamiya Kaihatsu Management Consulting, Inc. Field Survey:March to May 2009 1 1. Project Description and Outline of the ODA Loan

More information

Eastern Karnataka Afforestation Project

Eastern Karnataka Afforestation Project India OFFICIAL USE ONLY Eastern Karnataka Afforestation Project 1. Project Profile and Japan s ODA Loan External Evaluator: Koichi Ishii (Pegasus Engineering Corporation) Field Survey: May 2008 New Delhi

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Kingdom of Morocco Project: Sewerage System Development Project (III) Loan Agreement: March 26, 2013 Loan

More information

Summary of the Joint Terminal Evaluation

Summary of the Joint Terminal Evaluation Summary of the Joint Terminal Evaluation 1. Outline of the Project Country: The Kingdom of Cambodia Issue/Sector: Agricultural Development / Rural Development Division in Charge: Rural Development Department

More information

1. Project Description and Outline of the ODA Loan Assistance

1. Project Description and Outline of the ODA Loan Assistance Sri Lanka Towns North of Colombo Water Supply Project External Evaluator:Tomoko Tamura (Kaihatsu Management Consulting Inc.) Field Survey: From February 2009 to April 2009 1. Project Description and Outline

More information

I. Project Outline. Background. Objectives of the Project. Activities of the project

I. Project Outline. Background. Objectives of the Project. Activities of the project Internal Ex-Post Evaluation for Technical Cooperation Project conducted by Indonesia Office: March 2016 Country Name The Beef Cattle Development Project Utilizing Local Resources in the Eastern Part Republic

More information

GIEWS Country Brief Malaysia

GIEWS Country Brief Malaysia Reference Date: 28-July-2017 FOOD SECURITY SNAPSHOT The 2017 rice production increased from last year s dry-weather affected output Cereal imports t forecast to increase in 2017/18 marketing year (July/June)

More information

1. Project Description

1. Project Description Indonesia Ex-Post Evaluation of Japanese Technical Cooperation Project Freshwater Aquaculture Development Project Mr. Koichiro Ishimori, Value Frontier Co., Ltd 0.Summary Implementation of the Freshwater

More information

Ex-Post Evaluation of Japanese ODA Loan Project Cai Lan Port Expansion Project

Ex-Post Evaluation of Japanese ODA Loan Project Cai Lan Port Expansion Project Viet Nam Ex-Post Evaluation of Japanese ODA Loan Project Cai Lan Port Expansion Project External Evaluator: Ryujiro Sasao, IC Net Limited 0. Summary This project, the objective of which is to improve the

More information

ROLES AND EFFORTS OF THE IRRIGATION SECTOR IN MYANMAR AGRICULTURE PRACTICE

ROLES AND EFFORTS OF THE IRRIGATION SECTOR IN MYANMAR AGRICULTURE PRACTICE ROLES AND EFFORTS OF THE IRRIGATION SECTOR IN MYANMAR AGRICULTURE PRACTICE Mu Mu Than 1 ABSTRACT Agriculture has always been the dominant sector in Myanmar economy. Agriculture sector contributes 22.1%

More information

Sri Lanka. Fighting Hunger Worldwide. mvam Methodology. 1 Sri Lanka Methodology Note

Sri Lanka. Fighting Hunger Worldwide. mvam Methodology. 1 Sri Lanka Methodology Note Fighting Hunger Worldwide Sri Lanka mvam Methodology Background: Since the beginning of 2016, Sri Lanka has experienced a drought situation affecting most parts of the country. Although the country was

More information

also checking the effectiveness of the project in each city.

also checking the effectiveness of the project in each city. United Mexican States Ex-Post Evaluation of Japanese ODA Loan Baja California Water Supply and Sanitation Project External Evaluator: Hiromi Suzuki S., IC Net Limited 0. Summary This project aimed to solve

More information

Ex-Post Evaluation of Japanese Grant Aid Project Project for Rehabilitation of Gresik Steam Power Plant Units 3 and 4

Ex-Post Evaluation of Japanese Grant Aid Project Project for Rehabilitation of Gresik Steam Power Plant Units 3 and 4 Indonesia Ex-Post Evaluation of Japanese Grant Aid Project Project for Rehabilitation of Gresik Steam Power Plant Units 3 and 4 1. Project Description External Evaluators: Junko Fujiwara, OPMAC Corporation

More information

Operational Costs of Canal Companies and Irrigation Districts in the Intermountain Region

Operational Costs of Canal Companies and Irrigation Districts in the Intermountain Region Operational Costs of Canal Companies and Irrigation Districts in the Intermountain Region by John Wilkins-Wells, 1 Hubert J. Lagae, 2 Raymond L. Anderson, 3 and Muhammad S. Anwer 4 Presented at Western

More information

September Expert Consultation on Statistics in Support of Policies to Empower Small Farmers. Bangkok, Thailand, 8-11 September 2009

September Expert Consultation on Statistics in Support of Policies to Empower Small Farmers. Bangkok, Thailand, 8-11 September 2009 Agenda item 5 STAT-EMPOWER-8 September 2009 Expert Consultation on Statistics in Support of Policies to Empower Small Farmers Bangkok, Thailand, 8-11 September 2009 STRATEGIES IN MEETING THE STATISTICAL

More information

Building more resilient pathways to prosperity in Tougouri, Manni, and Gayeri health districts in Burkina Faso FASO PROGRAM RESILIENCE BRIEF 1

Building more resilient pathways to prosperity in Tougouri, Manni, and Gayeri health districts in Burkina Faso FASO PROGRAM RESILIENCE BRIEF 1 FASO PROGRAM RESILIENCE BRIEF 1 Photo by CRS Burkino Faso staff Building more resilient pathways to prosperity in Tougouri, Manni, and Gayeri health districts in Burkina Faso SYNOPSIS While the Catholic

More information

Distribution reservoir constructed at the Iquitos Sanitation Service Company

Distribution reservoir constructed at the Iquitos Sanitation Service Company Republic of Peru FY 2015 Ex-Post Evaluation of Japanese ODA Loan Project Provincial Cities Water Supply and Sewerage Improvement and Expansion Project (Iquitos, Cusco and Sicuani) External Evaluator: Hajime

More information

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary: CARTAGENA, COLOMBIA Case Study (Water) Project Summary: Cartagena is a city of almost 900,000 people on the northern coast of Colombia, and serves as the capital of one of the country s departments (states),

More information

Pershing County Alfalfa Hay Establishment, Production Costs and Returns, 2006

Pershing County Alfalfa Hay Establishment, Production Costs and Returns, 2006 Fact Sheet-06-19 Pershing County Alfalfa Hay Establishment, Production Costs and Returns, 2006 Don Breazeale, Pershing County Extension Educator, University of Nevada Cooperative Extension Kynda Curtis,

More information

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1

SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 Country Partnership Strategy: Timor-Leste, 2016 2020 SECTOR ASSESSMENT (SUMMARY): AGRICULTURE, NATURAL RESOURCES, AND RURAL DEVELOPMENT 1 A. Sector Performance, Problems, and Opportunities 1. Agriculture

More information

Dams: Conditions & Capacity

Dams: Conditions & Capacity The average age of the 84,000 dams in the country is 52 years old. The nation s dams are aging and the number of high-hazard dams is on the rise. Many of these dams were built as low-hazard dams protecting

More information

Ex-Post Evaluation of Japanese ODA Loan Project Laoag River Basin Flood Control and Sabo Project

Ex-Post Evaluation of Japanese ODA Loan Project Laoag River Basin Flood Control and Sabo Project Republic of the Philippines Ex-Post Evaluation of Japanese ODA Loan Project Laoag River Basin Flood Control and Sabo Project 0. Summary External Evaluator: Masumi Shimamura Mitsubishi UFJ Research and

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan 1.Name of the Project Country: The Republic of Indonesia Project: Upper Citarum Basin Flood Management Sector Loan Loan Agreement: March 28,

More information

ACTION PLAN TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN CAMBODIA

ACTION PLAN TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN CAMBODIA CONCLUDING REPORT On ACTION PLAN TOWARD EFFECTIVE FLOOD HAZARD MAPPING IN CAMBODIA Prepared by: HORN SOVANNA Chief Office of Hydrology Works Department of Hydrology and River Works (DHRW) Ministry of Water

More information

Agri-Service Industry Report

Agri-Service Industry Report Agri-Service Industry Report December 2016 Dan Hassler 2017 U.S. Industry Outlook A little better or a little worse is the quickest way to sum up the expectations for the agricultural equipment industry

More information

MYANMAR. Planting Period Highlights FOOD SECURITY MONITORING BULLETIN FSIN INFORMATION MAY 2012

MYANMAR. Planting Period Highlights FOOD SECURITY MONITORING BULLETIN FSIN INFORMATION MAY 2012 FOOD SECURITY MONITORING BULLETIN FSIN FOOD SECURITY INFORMATION N E T W O R K MAY 2012 MYANMAR Planting Period Highlights Stocks from the 2011 monsoon and the 2012 winter crop and summer paddy harvests

More information

Cost increases in Global tea production and sharp rises in import prices.

Cost increases in Global tea production and sharp rises in import prices. Newsletter 06/2012 A report from sustainable fairbiotea projects: Cost increases in Global tea production and sharp rises in import prices. The more expensive production costs and cost increase in distribution

More information

Agricultural Mechanization in Cambodia

Agricultural Mechanization in Cambodia Agricultural Mechanization in Cambodia The 2 nd Regional Forum on Sustainable Agricultural Mechanization - Enabling Environment for Custom Hiring of Agricultural Machinery 9-11 September 2014 Serpong,

More information

By Dr. Apichart Pongsrihadulchai

By Dr. Apichart Pongsrihadulchai By Dr. Apichart Pongsrihadulchai Presented at OECD-ASEAN Regional Conference on Agricultural Policies to Promote Food Security and Agro-Forestry Productivity Seoul, Republic of Korea 12 October 2015 Relative

More information

( ) Page: 1/10 NOTIFICATION

( ) Page: 1/10 NOTIFICATION 20 September 2016 (16-4994) Page: 1/10 Committee on Agriculture Original: Spanish NOTIFICATION The following submission, dated 12 September 2016, is being circulated at the request of the delegation of

More information

EIA implementation and Follow-up

EIA implementation and Follow-up EIA implementation and follow up: a case study of Koga irrigation and watershed management project- Ethiopia By: W.B. Abebe, W.J.A.M. Douven, M.McCartney, J. Leentvaar This research was done for the partial

More information

Republic of the Philippines Ex-Post Evaluation of Japanese ODA Loan Mindanao Sustainable Settlement Area Development Project. Target Sites.

Republic of the Philippines Ex-Post Evaluation of Japanese ODA Loan Mindanao Sustainable Settlement Area Development Project. Target Sites. Republic of the Philippines Ex-Post Evaluation of Japanese ODA Loan Mindanao Sustainable Settlement Area Development Project External Evaluator: Miyoko Taniguchi, IC Net Limited 0. Summary The Department

More information

Yoshinaga Ikuo *, Y. W. Feng**, H. Hasebe*** and E. Shiratani****

Yoshinaga Ikuo *, Y. W. Feng**, H. Hasebe*** and E. Shiratani**** NITROGEN REMOVAL FUNCTION OF PADDY FIELD IN A CIRCULAR IRRIGATION SYSTEM Yoshinaga Ikuo *, Y. W. Feng**, H. Hasebe*** and E. Shiratani**** * National Institute for Rural Engineering, Tsukuba Science City

More information

Soil and Water Conservation/ Watershed Management

Soil and Water Conservation/ Watershed Management Vandna B.Tech., 6 th Semester Department of Civil Engineering JNGEC Sundernagar, Mandi (H.P.) 175018 ABSTRACT The watershed is a geographical area through which water flows in the form of streams, rivers,

More information

Overview. Study Approach. Impacts

Overview. Study Approach. Impacts Overview Natural disasters such as hurricanes, cyclones, and tropical depressions cause average annual direct losses of US$284 million in the Pacific. With a combined population of fewer than 10 million

More information

LGUs include regions, provinces, cities, municipalities and barangays. Barangay is the smallest administrative division under a city or municipality.

LGUs include regions, provinces, cities, municipalities and barangays. Barangay is the smallest administrative division under a city or municipality. Republic of the Philippines Ex-Post Evaluation of Japanese ODA Loan Rural Water Supply and Sanitation Project (V) External Evaluator: Akemi Serizawa, Sanshu Engineering Consultant 0.Summary The objectives

More information

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name Balochistan Small Scale Irrigation Project Region SOUTH ASIA

More information

1. Introduction and Country Overview

1. Introduction and Country Overview CASE STUDY NATURAL DISASTER AND CRISES RESPONSE BY THE TANZANIA SOCIAL ACTION FUND 1 1. Introduction and Country Overview 2. The Tanzania Social Action Fund: Program Overview 3. Response to Crises and

More information

Working Together for a

Working Together for a China-Japan Intergovernmental Technical Cooperation The Project for Protection of Natural Grassland and Nomad Settlement Model in Xinjiang Uygur Autonomous Region Working Together for a Greener Xinjiang

More information

IFUGAO AMBANGAL MINI HYDRO

IFUGAO AMBANGAL MINI HYDRO PROJECT IFUGAO AMBANGAL MINI HYDRO LOCATION TIMELINE CATEGORY TECHNICAL PARAMETERS OBJECTIVES BENEFICIAIRIES & PARTNERS OPERATORS Philippines, Ifugao, Kiangan. Lat: 16 47'30.59"N / Long: 121 6'24.90"E

More information

VIABILITY OF AGRICULTURAL INPUT VOUCHERS

VIABILITY OF AGRICULTURAL INPUT VOUCHERS Assessment Report VIABILITY OF AGRICULTURAL INPUT VOUCHERS in Grey Zone Areas of Donetsk and Luhansk Regions of Eastern Ukraine People in Need (PIN) October 2016 CONTENTS EXECUTIVE SUMMARY... 3 INTRODUCTION...

More information

The Capacity Development Project for Non Revenue Water Reduction in Jordan Summary Sheet for Result of Evaluation Study after the Project

The Capacity Development Project for Non Revenue Water Reduction in Jordan Summary Sheet for Result of Evaluation Study after the Project The Capacity Development Project for Non Revenue Water Reduction in Jordan Summary Sheet for Result of Evaluation Study after the Project I. Outline of the Project Country: The Hashemite Kingdom of Jordan

More information

Metro Cebu Development Project (II)

Metro Cebu Development Project (II) PhIlIppInes 1. Project ProfIle and Japan s ODA Loan Metro Cebu Development Project (II) Report Date: March 2001 FIeld Survey: September ~ October 2000 The PhIlIppInes ManIla Project site Cebu Metro Cebu

More information

Country Profile - Republic of Korea INFORMATION

Country Profile - Republic of Korea INFORMATION INFORMATION Geography The Republic of Korea occupies the southern portion of the Korean Peninsula, which extends some 1,100 km from the Asian mainland. This mountainous peninsula is flanked by the Yellow

More information

Rice Cultivation in Africa <Part 1>

Rice Cultivation in Africa <Part 1> New Series < No. 67 > Rice Cultivation in Africa Introduction In order to achieve comprehensive development through people s own efforts in Africa, one certainly cannot ignore the existence of

More information

11,251 million yen/10,893 million yen Disbursed Amount Loan Agreement Signing Date/

11,251 million yen/10,893 million yen Disbursed Amount Loan Agreement Signing Date/ Ex-Post Monitoring of Completed ODA Loan Project Indonesia "Surabaya Urban Development Project (1)" External Evaluator: George Terahara (International Development Center of Japan Incorporated) Field Survey:

More information

Jakarta Water Supply Development Project (Immediate Project of 2nd Stage,

Jakarta Water Supply Development Project (Immediate Project of 2nd Stage, Indonesia Jakarta Water Supply Development Project (Immediate Project of 2nd Stage, First Phase) 1. Project Profile and Japan s ODA Loan Report Date: October, 2002 Field Survey: September, 2001 Location

More information