1 Chapter Proposed Action and Alternatives Chapter 2 Proposed Action and Alternatives Page 15

2 CHAPTER 2 - PROPOSED ACTION AND ALTERNATIVES INTRODUCTION Chapter 2 describes and compares the Southwest Fence Relocation and Waterline Project s Proposed Action and its alternatives. This chapter also identifies several alternatives that were considered but eliminated from detailed study. This project s alternatives were developed in response to the key issues described in Chapter 1. While many potential alternatives exist, it is neither practical nor feasible to consider every possible option. The Proposed Action and alternatives described here represent a range of management approaches. Note: NEPA regulations require the Forest Service to analyze a No Action Alternative as a baseline for comparing the effects of other alternatives (40 CFR (d), FSH , 23.1). DESCRIPTION OF ALTERNATIVES Three alternatives were considered in detail. These were: 1) the No Action Alternative, 2) the Proposed Action, and 3) the Modified Action Alternative. Specifics of these alternatives follow. Chapter 2 Proposed Action and Alternatives Page 16

3 Alternative 1: No Action The No Action Alternative would continue current management in the project area (Figure 3). The Chester (Middle), Chester (West), Horsethief (West), and Kennedy (West) Pastures have existing, reliable water in the form of either water tanks or stockdams. These pastures would be grazed by livestock almost annually. The Horsethief (East), Stony Butte (#2), and West Engen (Main) Pastures would be grazed intermittently when water supplies allowed. The Dry Hole (Chester) Pasture would remain in multi-year rest. The existing deferred grazing rotation system with rest pastures would remain unchanged. The fence between the West Engen (Main) and Horsethief (West) pastures would remain in its current location (i.e. it would remain across Booth Dam). The electric fence separating the Camp Flat (East North) and Camp Flat (East South) Pastures would remain electric. Figure 3. Map of the No Action Alternative showing the distribution of fence and water sources that would result after alternative implementation. Note that the water sources shown are not necessarily reliable for livestock watering uses; see Figure 2 for more information. Chapter 2 Proposed Action and Alternatives Page 17

4 Alternative 2: Proposed Action The Proposed Action Alternative (Figure 4) would install approximately 3.6 miles of waterline and install five water tanks into the following pastures: Dry Hole (Chester), Horsethief (East), Kennedy (West), Stony Butte (#2), and West Engen (Main). This would increase flexibility in the existing grazing rotation system by allowing managers to place any of the project area s pastures on either the rest schedule or the grazing schedule, based on the particular resource needs in any given year. The Proposed Action Alternative would relocate the boundary fence between the Horsethief (West) and West Engen (Main) Pastures. That fence currently crosses through Booth Dam. The fence would be relocated ~0.25 mile to the north, near Forest Service Road 227. This would change the approximate pasture size for Horsethief (West) from 352 to 543 acres and West Engen (Main) from 750 to 559 acres. The electric fence separating Camp Flat (East North) and Camp Flat (East South) Pastures would be converted to a barbwire fence. Figure 4. Map of the Proposed Action Alternative showing the distribution of fence and water sources that would result after alternative implementation. Note that the water sources shown are not necessarily reliable for livestock watering uses; see Figure 2 for more information. Chapter 2 Proposed Action and Alternatives Page 18

5 Alternative 3: Modified Action The Modified Action Alternative (Figure 5) would: Combine the Horsethief (East), Horsethief (I.T. #25), and Dry Hole (Chester) pastures into a single 940-acre pasture. Interior fences as well as a cattle guard along Forest Service Road 227 would then no longer be necessary and so would be removed. Temporary (i.e. 1-3 years in any one location) use of electric fence would be permissible for the purpose of vegetative management. Remove the existing fence from Booth Dam, relocating it near Forest Service Road 227. Convert the existing electric fence between Camp Flat (East North) and Camp Flat (East South) pastures to a barbwire fence. Install approximately 3 miles of underground waterline and five water tanks. One tank would be placed in pastures: Kennedy (West), Stony Butte (#2), and West Engen (Main). Two tanks would be placed in the newly combined pasture. Compared to the Proposed Action, the pipeline s route under this alternative would be slightly different; specifically, the west tank in the combined pastures would be further south. Reclaim (i.e. fill-in) five water sources. The water sources affected would be: #810w10 (in Chester (Middle) pasture); #817w05 (in Dry Hole (Chester) pasture); #825w04 (in Horsethief (East) pasture); #854w04 (in West Engen (Main) pasture), and #848w03 (in Stony Butte (#2) pasture). The latter s dilapidated exclosure would also be removed. Figure 5. Map of the Modified Action Alternative showing the distribution of fence and water sources that would result after alternative implementation. Note that the water sources shown are not necessarily reliable for livestock watering uses; see Figure 2 for more information. Chapter 2 Proposed Action and Alternatives Page 19

6 DESIGN CRITERIA & FEATURES COMMON TO ALTERNATIVES Design criteria and features common to alternatives are described below: Archeological Clearance Alternatives 2 and 3 propose new range improvements. A cultural resource inventory and all required clearances would be completed prior to any ground disturbing activities. Fence Design Alternatives 2 and 3 propose new fences. All newly constructed fences would comply with LRMP recommendations for big game movement and recreational use. In particular, all new fences would have easy-opening gates and a bottom smooth wire 16 above the ground surface to facilitate pronghorn passage (see LRMP pp. 1-30, B-1). In addition, special care would be taken to reduce potential impact to a sharp-tailed grouse lek near Booth Dam; specifically, the relocated fence would be routed to avoid the lek (if it is active); fence markers would be placed on that portion of the fence closest to the lek site if necessary. Monitoring Monitoring would occur under all alternatives (funding permitting), though not all alternatives would require the same monitoring. See Table 3 for details. Noxious Weeds Alternatives 2 and 3 propose new range infrastructure. All construction equipment used for the installation of that infrastructure would be required to be cleaned of any noxious weed seeds prior to being moved into the project area. Any new noxious weed infestations resulting from ground disturbing activities would be treated as necessary. Reclamation Alternatives 2 and 3 propose new range improvements. Following the completion of each ground disturbing activity, the site would be seeded with native seed if seeding was determined to be necessary for vegetative recovery. Soil Disturbance Alternatives 2 and 3 propose new range improvements. To help reduce the potential for soil disturbance, the best management practices labeled: Watershed Conservation Practices (WCPs) Required for All Activities Associated with Project Implementation in the project file would be followed. See the Soil Specialist Report in the project file for more details. Timing of Construction Activities Alternatives 2 and 3 propose new range improvements. To help reduce disturbances to nesting and breeding sharp-tailed grouse and greater prairiechicken, construction activities would not be allowed from March 1 through June 15 within 1 mile of active display grounds from 0.5 hour before sunrise until after 09:30 a.m. Water Tank Escape Ramps Alternatives 2 and 3 propose installing new water tanks. Each of these tanks would be required to have a wildlife escape ramp installed. See the Wildlife Specialist Report in the project file for more detail. Water Tank Placement Alternatives 2 and 3 propose installing new water tanks. Water tanks would be located to minimize visibility from roads, thus reducing the impact on the scenic integrity of the area. Chapter 2 Proposed Action and Alternatives Page 20

7 Table 3. Summary of monitoring that would be conducted in the project area. ISSUE DETAILS Livestock Management Grazing use distribution maps would be compiled by Forest Service personnel for the first 3 years of this project s implementation. Mapping would be done after livestock were rotated out of each grazed pasture. This information would help assess how range infrastructure had affected livestock distribution. Incidental monitoring would be used to assess whether existing water sources caused any problems related to livestock, pet, or human safety. These monitoring efforts would be conducted under Alternatives 1, 2, or 3. Vegetation Under all alternatives, vegetative litter and species composition would be monitored by Forest Service personnel every 5-10 years. This information would help assess whether there had been changes in litter levels as well as species composition, including both native and exotic species. Under Alternatives 2 and 3, Forest Service personnel would monitor areas of ground-disturbance for the 3 years following that disturbance. This information would help assess the need for native grass seeding and identify any areas of noxious weed establishment. Wildlife Habitat Visual obstruction readings (VOR) would be taken by Forest Service personnel in the project area under Alternatives 1, 2, or 3. Monitoring protocol would follow the current methods already in use across the Fort Pierre National Grassland. This information would help assess availability of high structure vegetation to dependent wildlife. The South Dakota Game, Fish, and Parks Department currently conducts lek surveys in the project area. This information would provide an index to population levels of greater prairie-chicken and sharp-tailed grouse. It is anticipated that these surveys would continue under all alternatives. Under Alternatives 2 and 3, range infrastructure would be periodically inspected to assess impacts on wildlife. Questions addressed would include: Are escape ramps in place and effective? Is the bottom smooth wire in place and properly situated on new fences? Chapter 2 Proposed Action and Alternatives Page 21

8 COMPARISON OF ALTERNATIVES This section provides three summaries of the alternatives. Table 4 compares the projects that are being proposed. Table 5 compares the alternatives by key issue. Table 6 displays the extent to which each alternative would meet the guidance provided in the LRMP. Table 4. Projects proposed by alternative ALTERNATIVE PROJECT Install waterlines No Yes; about 3.6 miles Yes; about 3.0 miles Install five water tanks No Yes Yes Relocate boundary fence No Yes Yes between West Engen (Main) and Horsethief (West) Pastures Replace electric fence No Yes Yes separating Camp Flat (East North) and Camp Flat (East South) Pastures with barbwire fence Reclaim 5 water sources No No Yes Chapter 2 Proposed Action and Alternatives Page 22

9 Table 5. Comparison of how alternatives would address key issues ALTERNATIVE ISSUE Livestock Management: cost of range improvements Livestock Management: electric fence Livestock Management: water sources Livestock Management: water source reclamation Livestock Management: grazing rotations There would be no cost for range improvements. Fence between Camp Flat (East North) and Camp Flat (East South) would remain electric; maintenance would continue to be a long-term problem. No new water sources would be installed, reliable water for livestock would be unavailable in some pastures. No water sources would be reclaimed. No changes would be made in current livestock managment. Certain pastures would continue to be grazed every year, some pastures would be grazed only in years with high precipitation, while other pastures would remain in multi-year rest. New range improvements would cost ~$15,928. The electric fence between Camp Flat (East North) and Camp Flat (East South) Pastures would be converted to a barb-wire fence; maintenance needs would be lessened. New water sources would be installed, providing reliable water for livestock. See Alternative 1 regarding water source reclamation. Management flexibility would be increased. It would be easier to change grazing rotations. Pastures that are currently grazed on a yearly basis could be rested, while pastures that are currently in multi-year rest could be grazed. New range improvements would cost ~$14,428; reclamation of 5 existing water sources would cost ~$16,000. See Alternative 2 regarding electic fence. See Alternative 2 regarding water sources. Five poorlyfunctioning water sources would be reclaimed. See Alternative 2 regarding grazing rotations. Chapter 2 Proposed Action and Alternatives Page 23

10 ALTERNATIVE ISSUE No pastures would be combined. Livestock Management: pasture size Livestock Management: Booth Dam fence Vegetation: Invasive & native grass species composition Vegetation: noxious weeds Fence currently at Booth Dam would remain in place; fence maintenance and effectiveness would continue to problematic. Booth Dam would still be split between two pastures, requiring both pastures rotations to be altered to modify grazing use around the dam. Current vegetative would continue. Invasive species such as smooth brome would persist and potentially continue to spread. There would be no ground disturbing activities, therefore there would be no potential for the associated machinery to introduce noxious weeds. See Alternative 1 regarding pasture size. Fence currently at Booth Dam would be moved near Forest Service Road 227 thus removing it from the water s edge at Booth Dam. The dam would then be located solely within Horsethief (West) Pasture; only one pasture s use would have to be changed to modify grazing along shoreline. Through prescribed grazing management, invasive grass species would likely decrease and native species increase. There would be potential for noxious weed introduction during construction of proposed improvements. These potential effects would be mitigated (see p. 20). Horsethief (East), Horsethief (I.T. #25), and Dry Hole (Chester) would be combined into one pasture, increasing the average pasture size. See Alternative 2 regarding Booth Dam fence. See Alternative 2 regarding species composition. See Alternative 2 regarding noxious weeds. Chapter 2 Proposed Action and Alternatives Page 24

11 ALTERNATIVE ISSUE Vegetative structure Amount and See Alternative 2 would not be distribution of high regarding vegetative changed due to structure vegetation structure. changes in could change in the livestock project area as more distribution from pastures became able creation of new to be grazed or water sources. rested. Note: 10% of Note: 10% of the the Fort Pierre Fort Pierre National National Grassland Grassland would be would be rested each rested each year. year. Vegetation: vegetative structure Wildlife Habitat: water source reclamation Wildlife Habitat: sensitive species viability and management indicator species population trends Wildlife Habitat: disturbance No existing water source would be reclaimed. Sensitive species would be affected, though viability would not be threatened. Management indicator species would be affected, though population trends would remain unchanged. No new range infrastrure would be installed; sensitive and management indicator species would not be disturbed by construction. See Alternative 1 regarding water source reclamation. See Alternative 1 regarding sensitive and management indicator species. New range infrastructure would be installed; sensitive and management indicator species could be disturbed by construction, though the level and duration of disturbance would likely be minor. Five existing water sources would be reclaimed. Species such as northern leopard frog could be affected, positively or negatively, depending on the quality of wetland habitat that would have otherwise been provided. See Alternative 1 regarding sensitive and management indicator species. See Alternative 2 regarding disturbance to wildlife. Chapter 2 Proposed Action and Alternatives Page 25

12 Table 6. Comparison of how Alternatives 1, 2, and 3 would meet guidance contained in the Nebraska National Forest s Land and Resource Management Plan (LRMP). FPNG = Fort Pierre National Grassland ALTERNATIVE LRMP DIRECTION Objective: The desired plant species composition objective across the geographic area is as follows: Late seral 20% to 40%, Late Intermediate Seral: 30% to 50%, Early Intermediate Seral 10% to 30%, Early Seral: 1% to 10% Objective: Manage the geographic area to meet the vegetation structure objectives identified below: High: 30% to 50%, Moderate: 30% to 50%, Low: 10% to 30%. Goal 1.c: Increase the amount of forests and grasslands restored to or maintained in a healthy condition with reduced risk and damage from fires, insects and diseases, and invasive species. Goal 2.c: Improve the capability of the Nation s forests and grasslands to provide a desired sustainable level of uses, values, products, and services. B-13 Water: Design activities to protect and manage the riparian ecosystem. Maintain the integrity of the ecosystem including quantity and quality of water. (Standard) Little or no change from current Little or no change from current on FPNG as a whole or in the project area Little or no change from current Little or no change from current on FPNG as a whole; vegetative structure diversity in project area would be more variable Little or no change from current Little or no change from current on FPNG as a whole; vegetative structure diversity in project area would be more variable Chapter 2 Proposed Action and Alternatives Page 26

13 ALTERNATIVE LRMP DIRECTION F-4 Fish, Widlife, and Rare Plants: Design and build new structures, including fences, to reduce hazards to big game and to allow big game movement throughout the year (Appendix B). This doesn t include fences designed to specifically exclude wildlife. (Guideline) I-9 Livestock Grazing: Prioritize and remove any fences or water developments that are not contributing to achieving desired. (Guideline) J-6 Non-native and Invasive Species, Noxious Weeds and Insect Management: Utilize all methods feasible, including livestock grazing strategies, in the integrated pest management program. (Guideline) Q-6 Infrastructure Use and Management: Build new and reconstructed fences to provide for big game movement (Appendix B) and access for recreation, fire protection, and mineral development. (Guideline) Q-10 Infrastructure Use and Management: Prioritize and reconstruct those fences that do not meet big game specifications. (Guideline) Does not meet or move towards LRMP ; no new or relocated fences are proposed ; 1 new and 1 relocated fence are proposed ; 1 new and 1 relocated fence are proposed Chapter 2 Proposed Action and Alternatives Page 27

14 ALTERNATIVE LRMP DIRECTION Infrastructure 1: Increase the average pasture size by 25 percent over the decade. (Objective) No change from current ; average pasture size on FPNG when this objective was established was 500 acres 1 ; average pasture size now is 537 acres (115,973 acres/216 pastures) See Alt. 1. Moves further toward objective; average pasture size in project area increased from 509 acres to 622 acres; average pasture size on FPNG increased from 537 acres to 542 acres (115,973 acres/214 pastures) Rest 1: Maintain at least 10 percent of the suitable rangeland in rest each year. (Objective) Infrastructure 1: Allow no net decrease in the average pasture size. (Guideline) Infrastructure 2: Allow no net gain in the number of water developments... (Guideline) 1 USDA Forest Service 2001b, Table 3-34, p , i.e. while there would be an increase in water developments compared to existing, there would not be an increase compared to the present when this guideline was established, i.e. there would be no net gain in water developments even compared to existing Chapter 2 Proposed Action and Alternatives Page 28

15 OTHER ALTERNATIVES CONSIDERED Federal agencies are required to rigorously explore and objectively evaluate all reasonable alternatives developed in detail (40 CFR ). Several alternatives that were proposed were not carried forward for detailed analysis. Some of these alternatives may have been outside the scope of the need for the proposal, duplicative of the alternatives considered in detail, or determined to have components that would cause unnecessary environmental harm. These alternatives are summarized below: Combine Pastures, Trade Water Sources, and Mow Exclosures: One commenter suggested an alternative that would combine eight pastures into four larger pastures and would eliminate livestock access to three existing water sources while installing three new water sources. This alternative as a whole would decrease management flexibility in grazing rotations and therefore would not meet the purpose and need of the proposed action. A decision regarding mowing of exclosures was outside the scope of this project. Parts of this proposal, however, were used to create the Modified Action Alternative. Specifically, that alternative included the concept of trading water sources (i.e. creating some new water sources while eliminating livestock access to an equal number of existing water sources) so that there would be no net gain in the number of water sources on the Fort Pierre National Grassland from what currently exists. The Modified Action Alternative also included the concept of combining some pastures to create a larger pasture. Dam and Dugout Repair and/or Creation: The option of repairing existing dams and dugouts or building new ones, rather than installing new water tanks was suggested. The option for dam and dugout repair already exists (i.e. repair does not require additional approval). Dam and dugout repair alone, however, was considered unlikely to address this project s purpose and need long-term due to continuing sedimentation and dam breaching, and in some cases, poor siting (e.g. Dam #817w05). The project area does not contain additional suitable sites for dam creation; sites suitable for creation of new dugouts are largely limited to natural wetlands. Excavating such sites would cause unnecessary environmental harm and would be inconsistent with the LRMP (see LRMP p. 1-10). Drill Wells: The option of drilling 5 wells in the project area was also identified as an alternative to putting in a pipeline. The average depth of water wells in this area is 1,800 to 2,400 feet; the average cost is $80,000 to $100,000 per well. Well drilling was therefore not considered to be an economically-viable alternative to pipeline installation. Haul Water: The option of hauling water to dispersed locations in the project area was also identified as an alternative to putting in a pipeline. This would require hauling water to each selected location several times a week during the summer grazing season. Due to the volume and frequency of trips this would entail, about 1 mile of newly road would have to be built. This option was also deemed less responsive to the project s purpose to increase management flexibility by increasing water reliability. Furthermore, this alternative is already very similar to the No Action Alternative (i.e. permittees already have the option to haul water). Chapter 2 Proposed Action and Alternatives Page 29

Proposed Action and Alternatives

Proposed Action and Alternatives Chapter Proposed Action and Alternatives Page 15 CHAPTER 2 - PROPOSED ACTION AND ALTERNATIVES INTRODUCTION Chapter 2 describes and compares the Southwest Fence Relocation and Waterline Project s Proposed

More information

APPENDIX F LIVESTOCK MANAGEMENT TOOLS

APPENDIX F LIVESTOCK MANAGEMENT TOOLS APPENDIX F LIVESTOCK MANAGEMENT TOOLS Management of livestock grazing has always been a fluid process that requires the flexibility to address resource issues/concerns as they occur, there is not a one

More information

DECISION MEMO FOR USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT SLOPE COUNTY, NORTH DAKOTA

DECISION MEMO FOR USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT SLOPE COUNTY, NORTH DAKOTA DECISION MEMO FOR TWO (2) MEDORA RANGER DISTIRICT RANGE WATER PROJECTS ON ALLOTMENTS 023 AND 037 RANGE WATER STOCK TANKS AND PIPELINES AND RECLAIM and FENCE OUT DAMS USDA FOREST SERVICE DAKOTA PRAIRIE

More information

Appendix B Adaptive Management Strategy

Appendix B Adaptive Management Strategy Adaptive Management Strategy This appendix identifies the adaptive management strategy that would be implemented as part of the proposed action. This strategy and the processes contained and described

More information

Miller Pasture Livestock Water Pipeline Extension Proposed Action

Miller Pasture Livestock Water Pipeline Extension Proposed Action Introduction Miller Pasture Livestock Water Pipeline Extension Proposed Action USDA Forest Service Williams Ranger District, Kaibab National Forest Coconino County, Arizona February 10, 2017 The Miller

More information

United States Department of the Interior

United States Department of the Interior United States Department of the Interior BUREAU OF LAND MANAGEMENT Baker Resource Area PO Box 947 Baker City, OR 97814 4100 (#3606260) Notice of Field Manager s Final Decision for Renewal of Grazing Permit

More information

Keefer Pasture Drift Fence Project. Challis-Yankee Fork Ranger District Salmon-Challis National Forest

Keefer Pasture Drift Fence Project. Challis-Yankee Fork Ranger District Salmon-Challis National Forest Keefer Pasture Drift Fence Project Challis-Yankee Fork Ranger District Salmon-Challis National Forest PROPOSED ACTION The Challis-Yankee Fork Ranger District proposes construction of approximately.11 miles

More information

FSM 2000 NATIONAL FOREST RESOURCE MANAGEMENT ZERO CODE 2080 NOXIOUS WEED MANAGEMENT

FSM 2000 NATIONAL FOREST RESOURCE MANAGEMENT ZERO CODE 2080 NOXIOUS WEED MANAGEMENT FOREST SERVICE MANUAL NORTHERN REGION (REGION 1) MISSOULA, MT. ZERO CODE NOXIOUS WEED MANAGEMENT Supplement No.: R1 2000-2001-1 Effective Date: May 14, 2001 Duration: Effective until superseded or removed

More information

1.2 How is Grazing Managed on the Wallowa-Whitman National Forest

1.2 How is Grazing Managed on the Wallowa-Whitman National Forest 1. Introduction We are proposing to update the allotment management plans for four grazing allotments on the Whitman Ranger District of the Wallowa-Whitman National Forest. We are proposing to prepare

More information

3.8 Key Issue: Grazing Economics

3.8 Key Issue: Grazing Economics 3.8 Key Issue: Grazing Economics Several scoping respondents and EA commenters identified the economic impacts of the proposed actions as an issue. Many of the actions proposed in this document would have

More information

DECISION MEMO. Vipond Water Development

DECISION MEMO. Vipond Water Development Page 1 of 5 DECISION MEMO USDA Forest Service Wise River Ranger District Beaverhead County T2S, R10W, Sections 12, 13, 14, &18 Background This project is located in the Pioneer Landscape, East Face Management

More information

APPENDIX B Allotment Summaries

APPENDIX B Allotment Summaries Final Environmental Impact Statement B-1 for Allotment Management Planning in the McKelvie GA APPENDIX B Allotment Summaries Objectives Common to All Allotments... B-2 Monitoring Common to All Allotments...

More information

Chapter 2 36 Snowies Little Belts EA

Chapter 2 36 Snowies Little Belts EA Proposed Action: This ranch was recently purchased by the present owners. The public land was historically overgrazed by the previous permittee. The current owner has reduced livestock numbers which is

More information

Galiuro Exploration Drilling Project

Galiuro Exploration Drilling Project Galiuro Exploration Drilling Project Range and Noxious Weeds Report Prepared by: Gwen Dominguez Range Staff for: Safford Ranger District Coronado National Forest Date September 2, 2016 Forest Plan/Policy

More information

Bald Fire Salvage and Restoration Project

Bald Fire Salvage and Restoration Project Bald Fire Salvage and Restoration Project Range Report Prepared by: KC Pasero Rangeland Management Specialist Hat Creek Ranger District /s/ KC Pasero April 27, 2015 Introduction The Bald Fire Salvage and

More information

Burns Paiute Tribe s s Wildlife Acquisitions

Burns Paiute Tribe s s Wildlife Acquisitions Burns Paiute Tribe s s Wildlife Acquisitions Logan Valley 2000-009 009-00 Purchased: April 2000 Malheur River 2000-027 027-0000 Purchased: November 2000 Location of Properties Malheur Malheur River Subbasin

More information

Poker Chip Project. Noxious Weed Risk Assessment Almanor Ranger District Lassen National Forest

Poker Chip Project. Noxious Weed Risk Assessment Almanor Ranger District Lassen National Forest Noxious Weed Risk Assessment Almanor Ranger District Lassen National Forest June 3, 2013 Introduction When a ground-disturbing action or activity is proposed, a Noxious Weed Risk Assessment (NWRA) determines

More information

Proposed Action: In response to resource specialist concerns raised during internal scoping, the following restrictions will apply:

Proposed Action: In response to resource specialist concerns raised during internal scoping, the following restrictions will apply: DECISION MEMO USDA Forest Service Inyan Kara Riders Motorcycle Enduro Event Rocky Mountain Region Thunder Basin National Grassland Medicine Bow-Routt National Forests Douglas Ranger District April 2011

More information

APPENDIX B: DRAFT ALLOTMENT MANAGEMENT PLANS

APPENDIX B: DRAFT ALLOTMENT MANAGEMENT PLANS APPENDIX B: DRAFT ALLOTMENT MANAGEMENT PLANS DRAFT BURNT FORK CATTLE AND HORSE ALLOTMENT MANAGEMENT PLAN Evanston -Mountain View Ranger District Uinta-Wasatch-Cache National Forest Uinta County, Wyoming

More information

PROPOSED ACTION Cooperative Horse Removal with Fort McDermitt Paiute-Shoshone Tribe

PROPOSED ACTION Cooperative Horse Removal with Fort McDermitt Paiute-Shoshone Tribe PROPOSED ACTION Cooperative Horse Removal with Fort McDermitt Paiute-Shoshone Tribe Proposed Action The Santa Rosa Ranger District of the Humboldt-Toiyabe National Forest is proposing to remove all unauthorized

More information

SUMMARY OF THE MARTIN BASIN RANGELAND PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT BACKGROUND

SUMMARY OF THE MARTIN BASIN RANGELAND PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT BACKGROUND SUMMARY OF THE MARTIN BASIN RANGELAND PROJECT FINAL ENVIRONMENTAL IMPACT STATEMENT BACKGROUND Project Area The Humboldt-Toiyabe National Forest is proposing to continue livestock grazing under a specific

More information

Prescribed Grazing Plan

Prescribed Grazing Plan FWC 17/18-77 EXHIBIT III Prescribed Grazing Plan Prepared for Babcock - Cecil Webb WMA Charlotte County, Florida In cooperation with Charlotte Soil & Water Conservation District And United States Department

More information

USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT BILLINGS COUNTY, NORTH DAKOTA

USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT BILLINGS COUNTY, NORTH DAKOTA GMX RESOURCES INC. LITTLE MISSOURI FEDERAL 24-10-1H OIL AND GAS WELL AND ACCESS ROAD #734-22 LOCATED WITHIN SW¼ of SE¼, SECTION 10, T141N, R100W BILLINGS COUNTY, NORTH DAKOTA USDA FOREST SERVICE DAKOTA

More information

Appendix C: Analysis of BLM Required Design Features for Greater Sage Grouse

Appendix C: Analysis of BLM Required Design Features for Greater Sage Grouse Appendix C: Analysis of BLM Required Design Features The Study team analyzed Required Design Features (RDFs) from the Nevada and Northeastern California Greater Sage-Grouse Approved Resource Management

More information

Childs Meadow Fence Project Almanor Ranger District, Lassen National Forest

Childs Meadow Fence Project Almanor Ranger District, Lassen National Forest Childs Meadow Fence Project Almanor Ranger District, Lassen National Forest Tehama County, California April 6, 2015 Introduction The Almanor Ranger District (ALRD) of the Lassen National Forest (LNF) proposes

More information

In 2013, Gunnison sage-grouse was proposed for an "endangered" listing by the U.S. Fish and Wildlife Service under the Endangered Species Act.

In 2013, Gunnison sage-grouse was proposed for an endangered listing by the U.S. Fish and Wildlife Service under the Endangered Species Act. Gunnison County, CO Community Development Department 221 N. Wisconsin St. Ste. D Gunnison, CO 81230 (970) 641-0360 Website: www.gunnisoncounty.org Email: planning@gunnisoncounty.org Information Sheet:

More information

Clarks Fork of the Yellowstone Comprehensive River Management Plan

Clarks Fork of the Yellowstone Comprehensive River Management Plan Clarks Fork of the Yellowstone Comprehensive River Management Plan Background The Clarks Fork of the Yellowstone River is located on the Shoshone National Forest, approximately 30 miles north-northwest

More information

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT USDA Forest Service Bend/Fort Rock Ranger District, Deschutes National Forest Deschutes County, Oregon

More information

Long-term Management Plan For The Mitigation Bank

Long-term Management Plan For The Mitigation Bank Note: The California multi-agency Project Delivery Team developed this general outline to assist in the development of the Long-term Management Plan for mitigation banks. Objectives and tasks are provided

More information

Long-term Management Plan For The Mitigation Bank

Long-term Management Plan For The Mitigation Bank Note: The California multi-agency Project Delivery Team developed this general outline to assist in the development of the Long-term Management Plan for mitigation banks. Objectives and tasks are provided

More information

CHAPTER 2 - ALTERNATIVES

CHAPTER 2 - ALTERNATIVES CHAPTER 2 - ALTERNATIVES Introduction This chapter describes the proposed action and 2 alternatives to the proposed action. This chapter is intended to provide the decision-maker the basis for choice.

More information

Re: Powerline Road Access Project, Pryor Mountains, Beartooth District Custer Gallatin National Forest

Re: Powerline Road Access Project, Pryor Mountains, Beartooth District Custer Gallatin National Forest United States Department of Agriculture Forest Service Custer Gallatin National Forests Beartooth Ranger District 6811 Highway 212 S. Red Lodge, MT 59068 Re: Powerline Road Access Project, Pryor Mountains,

More information

United States Department of Agriculture. Forest Service. Beaverhead-Deerlodge National Forest. September 2014

United States Department of Agriculture. Forest Service. Beaverhead-Deerlodge National Forest. September 2014 United States Department of Agriculture Forest Service Beaverhead-Deerlodge National Forest September 2014 Beaverhead-Deerlodge National Forest Land and Resource Management Plan Explanation Supporting

More information

Wildlife-Friendly Fences: Tools for Healthy Riparian Areas

Wildlife-Friendly Fences: Tools for Healthy Riparian Areas CLICK HERE TO TAKE SURVEY Prepared by Big Hole River Foundation Wildlife-Friendly Fences: Tools for Healthy Riparian Areas Technical Guidance Series V o l u m e 1, N u m b e r 1 J u n e 2 0 1 0 A Resource

More information

Gunnison Sage Grouse (2006) Primary threats to be addressed under a CCAA o Habitat loss o Fragmentation and degradation from urban/human population

Gunnison Sage Grouse (2006) Primary threats to be addressed under a CCAA o Habitat loss o Fragmentation and degradation from urban/human population Identification of Conservation Measures and Management Activities Property owner and the Service should o Describe the nature, extent, timing, duration, and other pertinent details of the conservation

More information

Morapos Creek, Wilson Mesa and Deer Creek Sheep & Goat Grazing Allotments

Morapos Creek, Wilson Mesa and Deer Creek Sheep & Goat Grazing Allotments Decision Notice Morapos Creek, Wilson Mesa and Deer Creek Sheep & Goat Grazing Allotments USDA Forest Service Blanco District, White River National Forest Rio Blanco & Moffat Counties, Colorado Township

More information

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE OURAY RANGER DISTRICT OURAY COUNTY, COLORADO BACKGROUND The Owl Creek Gravel Pit, also known as the Spruce Ridge Pit,

More information

The following recommendations will need to be re-evaluated given the recent fire at the Kennedy Meadows Pack Station.

The following recommendations will need to be re-evaluated given the recent fire at the Kennedy Meadows Pack Station. Kennedy Meadows Planning Unit The following recommendations will need to be re-evaluated given the recent fire at the Kennedy Meadows Pack Station. Sustainable Forestry Evaluate existing timber inventory

More information

STONY BUTTE ASSESSMENT

STONY BUTTE ASSESSMENT STONY BUTTE ASSESSMENT Fort Pierre National Grassland By Darrin Jons, Kelly Fuoss, Ruben Mares, Ryan Cumbow, Dan Svingen June 2016 1 Cover photo: Stony Butte Creek. Photo August 2015 by Kelly Fuoss. Recommended

More information

Decision Memo. Delta A Septic Repair (#33)

Decision Memo. Delta A Septic Repair (#33) Decision Memo Delta A Septic Repair (#33) USDA Forest Service Willamette National Forest McKenzie River Ranger District T16S, R5E, Section 16 Lane County, OR Proposed Action The McKenzie River Ranger District

More information

Riparian Buffer Requirements. Department of Environmental Protection Bureau of Watershed Management

Riparian Buffer Requirements. Department of Environmental Protection Bureau of Watershed Management 102.14 - Riparian Buffer Requirements Department of Environmental Protection Bureau of Watershed Management 102.2 Scope and Purpose BMPs to protect, maintain, and restore water quality and existing designated

More information

PROJECT HIGHLIGHTS,

PROJECT HIGHLIGHTS, PROJECT HIGHLIGHTS, 2012-003 935 linear feet of fence encompassing livestock pond 1 water tank, 2 water troughs, 3800 linear feet pipeline Project: 2012-003 Watershed: Tomales Bay, East Shore Practices:

More information

DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT

DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT HIGH WEST ENERGY, INC. For A Single-Phase (2-Wire), Overhead Power Line US FOREST SERVICE Arapaho & Roosevelt National Forests and Pawnee

More information

Decision Notice for the Sunflower Allotment Grazing Analysis Project

Decision Notice for the Sunflower Allotment Grazing Analysis Project for the Sunflower Allotment Grazing Analysis Project USDA Forest Service Mesa Ranger District Tonto National Forest Gila and Maricopa Counties, Arizona Introduction The Sunflower Allotment encompasses

More information

NCORPE Project - Public Lands & Programs Edition

NCORPE Project - Public Lands & Programs Edition PROJECT - PUBLIC LANDS & PROGRAMS EDITION Issue 2 Project - Public Lands & Programs Edition Northern Harrier PUBLIC ACCESS PROGRAM - HUNTING IN THIS ISSUE Public Access Program Update Public Access Program

More information

Lignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co.

Lignite Mining and Reclamation Process. Kayla Torgerson The Coteau Properties Co. Lignite Mining and Reclamation Process Kayla Torgerson The Coteau Properties Co. 1 Presentation Overview History of Regulation The Process of Mining and Reclamation Harmony Lake 2 1 2 3 4 5 6 7 8 Which

More information

U.S. DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE OKLAHOMA ECOLOGICAL SERVICES FIELD OFFICE

U.S. DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE OKLAHOMA ECOLOGICAL SERVICES FIELD OFFICE U.S. DEPARTMENT OF THE INTERIOR FISH AND WILDLIFE SERVICE OKLAHOMA ECOLOGICAL SERVICES FIELD OFFICE May 11, 2009 STANDARD RECOMMENDATIONS TO AVOID, MINIMIZE AND MITIGATE POTENTIAL IMPACTS OF WIND ENERGY

More information

Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project

Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon The Crescent Ranger

More information

Reading Project Noxious Weed Risk Assessment Hat Creek Ranger District Lassen National Forest April 3, 2013

Reading Project Noxious Weed Risk Assessment Hat Creek Ranger District Lassen National Forest April 3, 2013 Reading Project Noxious Weed Risk Assessment Hat Creek Ranger District Lassen National Forest April 3, 2013 Prepared By: /s/ Tim Kellison Date: 05-31-2013 Tim Kellison Assistant Forest Botanist Reviewed

More information

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING

INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING INVASIVE SPECIES CONTROL PLAN FOR CONSTRUCTION ACTIVITIES AND POST CONSTRUCTION MONITORING INTRODUCTION Black Oak Wind Farm, LLC is proposing to develop a wind-powered electric generating facility (the

More information

DECISION MEMO Divide Creek Barrier Enhancement

DECISION MEMO Divide Creek Barrier Enhancement Page 1 of 7 Background DECISION MEMO USDA Forest Service Butte Ranger District Silver Bow County, Montana T. 2 N., R. 9 W., Section 32 The North Fork of Divide Creek is approximately 4 miles west of the

More information

California s Rangelands. Annual Grassland Dominated Systems

California s Rangelands. Annual Grassland Dominated Systems *Grazing Systems on California s Rangelands Annual Grassland Dominated Systems What is a Grazing System & are they applicable for California Grazing Systems refers to specialized grazing management that

More information

Alberta Conservation Association 2008/09 Project Summary Report

Alberta Conservation Association 2008/09 Project Summary Report Alberta Conservation Association 2008/09 Project Summary Report Project name: MULTISAR Project leader: Paul Jones Primary ACA staff on this project (including seasonals): Brad Downey, Julie Landry-DeBoer,

More information

3-13 Other Required Findings and Regulatory Compliance

3-13 Other Required Findings and Regulatory Compliance Affected Environment and Environmental Consequences 3-13 Other Required Findings and Regulatory Compliance 3-13.1 Short-term Uses and Long-term Productivity NEPA requires consideration of the relationship

More information

LARRY D. COSPER Black Range District Ranger cc: Teresa Smergut, Lisa Mizuno. Forest Service

LARRY D. COSPER Black Range District Ranger cc: Teresa Smergut, Lisa Mizuno. Forest Service United States Department of Agriculture Forest Service Black Range Ranger District Voice: 575.894.6677 FAX: 575.894.3597 1804 N. Date Street Truth or Consequences, NM 87901 Internet: www.fs.fed.us/r3/gila/

More information

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management

More information

Proposal for the Flag Point Emergency Rock Source Project

Proposal for the Flag Point Emergency Rock Source Project Proposal for the Flag Point Emergency Rock Source Project USDA Forest Service Alaska Region Cordova Ranger District, Chugach National Forest BACKGROUND The Copper River Highway (CRH) extends about 49.5

More information

Environmental Assessment Gold Digger Mining Plan of Operations

Environmental Assessment Gold Digger Mining Plan of Operations Environmental Assessment Gold Digger Mining Plan of Operations June 2016 i ;..-.I ' Lead Agency Responsible Official For Further Information, Contact: US Forest Service Seward Ranger District Francisco

More information

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description

Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Warren Wagon Road Improvement Project McCall Ranger District, Payette National Forest Project Description Introduction The analysis of the Warren Wagon Road Improvement Project is tiered to the 2003 Environmental

More information

DECISION MEMO. Crow Creek Hardened Crossing

DECISION MEMO. Crow Creek Hardened Crossing Page 1 of 5 DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W in Section 35 Background A perennial cattle crossing on Crow Creek in in the Gravelly Landscape in the Centennial

More information

BEST MANAGEMENT PRACTICES 1

BEST MANAGEMENT PRACTICES 1 BEST MANAGEMENT PRACTICES 1 Soil and Water Land management activities have been recognized as potential sources of non-point water pollution. By definition, non-point pollution is not controllable through

More information

Nez Perce National Forest Moose Creek Ranger District

Nez Perce National Forest Moose Creek Ranger District United States Department of Agriculture Forest Service Nez Perce National Forest Moose Creek Ranger District 831 Selway Road Kooskia, ID 83539 208 926-4258 TTY 208 926-7725 File Code: 1950 Date: Dec 30,

More information

Chapter 7: Rangeland Inventory and Monitoring

Chapter 7: Rangeland Inventory and Monitoring Chapter 7: Rangeland Inventory and Monitoring 1. What is rangeland inventory? 2. What is rangeland monitoring? 3. What vegetational attributes are commonly used in range management? 4. What are the four

More information

Decision Memo Cow Pen Project. USDA Forest Service Talladega National Forest - Oakmulgee District Bibb and Tuscaloosa Counties, Alabama

Decision Memo Cow Pen Project. USDA Forest Service Talladega National Forest - Oakmulgee District Bibb and Tuscaloosa Counties, Alabama Decision Memo Cow Pen Project USDA Forest Service Talladega National Forest - Oakmulgee District Bibb and Tuscaloosa Counties, Alabama Decision and Rationale I have decided to implement the actions listed

More information

Rangeland Conservation Effects Assessment Program (CEAP)

Rangeland Conservation Effects Assessment Program (CEAP) Rangeland Conservation Effects Assessment Program (CEAP) Program Overview with Emphasis on the Literature Review of Rangeland Practices Pat L. Shaver, PhD Rangeland Management Specialist USDA-NRCS West

More information

Appendix E : Guidelines for Riparian Buffer Areas

Appendix E : Guidelines for Riparian Buffer Areas Appendix E : Guidelines for Riparian Buffer Areas This document should be read in conjunction with the CRCA Planning Policy. 1.0 PURPOSE The purpose of this document is to summarize the recommendations

More information

Public Lands Grazing Overview and Opportunities

Public Lands Grazing Overview and Opportunities Public Lands Grazing Overview and Opportunities Grazing as a Management Tool The upland grasslands and interspersed wetlands of the Great Plains evolved under an intense disturbance regime that included

More information

Environmental Assessment

Environmental Assessment United States Department of Agriculture Forest Service May 2009 Environmental Assessment Powder River Campground Decommissioning Powder River Ranger District, Bighorn National Forest Johnson and Washakie

More information

RE: Request for public comments on a proposal to construct Cattle Watering Systems

RE: Request for public comments on a proposal to construct Cattle Watering Systems United States Department of Agriculture Forest Service Midewin National Tallgrass Prairie 30239 South State Route 53 Wilmington, IL 60481 (815) 423-6370.. File Code: 1950 Date: January 14, 2009 Dear Friends

More information

Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada

Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada Background The Ann Exploration Project is located on the

More information

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC Page 1 of 20 FOREST SERVICE MANUAL NATIONAL HEADQUARTERS (WO) WASHINGTON, DC Amendment No.: 2500-2010-1 Effective Date: November 23, 2010 Duration: This amendment is effective until superseded or removed.

More information

Lake Britton Planning Unit. Fish, Plant, and Wildlife Habitat LAKE BRITTON PLANNING UNIT

Lake Britton Planning Unit. Fish, Plant, and Wildlife Habitat LAKE BRITTON PLANNING UNIT LAKE BRITTON PLANNING UNIT Pit-McCloud River Watershed Lake Britton Planning Unit Fish, Plant, and Wildlife Habitat Conduct surveys of lands outside the FERC boundary to identify biological resources and

More information

Pre and Post Vegetation Management Decisions around Burning & Grazing

Pre and Post Vegetation Management Decisions around Burning & Grazing Pre and Post Vegetation Management Decisions around Burning & Grazing Stephanie Larson, PhD Livestock & Range Management Advisor Sonoma & Marin Counties Prescriptive Burning Weather Fire Spread, Severity

More information

3.28 RESEARCH NATURAL AREAS

3.28 RESEARCH NATURAL AREAS 3.28 RESEARCH NATURAL AREAS Introduction Research Natural Areas (RNAs) are areas designated, in perpetuity, for non-manipulative research and educational purposes, as well as to help maintain ecological

More information

Re: Initial Comments on the Mount Laguna and Pine Valley Community Defense and Healthy Forest Restoration Project

Re: Initial Comments on the Mount Laguna and Pine Valley Community Defense and Healthy Forest Restoration Project Marian Kadota Adaptive Management Services Enterprise Team U.S. Forest Service 1072 Casitas Pass Road #288 Carpinteria, CA 93013 mkadota@fs.fed.us Re: Initial Comments on the Mount Laguna and Pine Valley

More information

MANTI-LA SAL NATIONAL FOREST

MANTI-LA SAL NATIONAL FOREST MANTI-LA SAL NATIONAL FOREST FERRON RANGER DISTRICT CATEGORICAL EXCLUSION REVIEW FILE NUMBER: 2240 PROJECT TITLE: Olsen-McCadden Livestock Water Development PROJECT LEAD: Steven Cox ESTIMATED DATE FOR

More information

Meeting the Challenge: Invasive Plants in Pacific Northwest Ecosystems

Meeting the Challenge: Invasive Plants in Pacific Northwest Ecosystems September 2006 Meeting the Challenge: Invasive Plants in Pacific Northwest Ecosystems Ann Bartuska Deputy Chief, FS R&D USDA Forest Service Washington, DC Organization of Presentation The Threat Forest

More information

Documentation of Land Use Plan Conformance and NEPA Adequacy (DNA) OR014 DNA 04-11

Documentation of Land Use Plan Conformance and NEPA Adequacy (DNA) OR014 DNA 04-11 Documentation of Land Use Plan Conformance and NEPA Adequacy (DNA) OR014 DNA 04-11 U.S. Department of the Interior Bureau of Land Management (BLM) Note: This worksheet is to be completed consistent with

More information

Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations

Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations June 2015 Chugach National Forest Seward Ranger District 29847 Seward Highway Seward, Alaska 99664 Decision It

More information

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT BLACK HILLS NATIONAL FOREST NOXIOUS WEED MANAGEMENT PLAN. United States Department of Agriculture

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT BLACK HILLS NATIONAL FOREST NOXIOUS WEED MANAGEMENT PLAN. United States Department of Agriculture United States Department of Agriculture Forest Service Black Hills National Forest January 2003 BLACK HILLS NATIONAL FOREST NOXIOUS WEED MANAGEMENT PLAN DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT

More information

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park

DRAFT FINDING OF NO SIGNIFICANT IMPACT. for. Tioga Sports Park DRAFT FINDING OF NO SIGNIFICANT IMPACT for Tioga Sports Park The U.S. Fish and Wildlife Service (USFWS) prepared an Environmental Assessment (EA) to analyze the potential effects of the proposal by the

More information

Upper Green River Area Rangeland Project Draft Environmental Impact Statement Glossary

Upper Green River Area Rangeland Project Draft Environmental Impact Statement Glossary Actual use: The number of livestock and date of actual dates of use within the season of use or the degree of forage or browse utilization during the season of use, often reported at the end of the season.

More information

APPENDIX B EFFECTS TO PHYSICAL AND BIOLOGICAL ENVIRONMENT

APPENDIX B EFFECTS TO PHYSICAL AND BIOLOGICAL ENVIRONMENT APPENDIX B EFFECTS TO PHYSICAL AND BIOLOGICAL ENVIRONMENT Botany No known proposed, endangered, threatened, and sensitive vascular plant, bryophyte, lichen and fungi (PETS) species are present within the

More information

Coronado National Forest Sierra Vista Ranger District

Coronado National Forest Sierra Vista Ranger District United States Department of Agriculture Forest Service Coronado National Forest Sierra Vista Ranger District 4070 South Avenida Saracino Hereford, Arizona 85615 Phone (520) 378-0311 FAX (520) 378-0519

More information

Wildlife Habitat Restoration and Improvements FY 2007 Project

Wildlife Habitat Restoration and Improvements FY 2007 Project United States Department of Agriculture Forest Service Pacific Northwest Region Wildlife Habitat Restoration and Improvements FY 2007 Project Umpqua National Forest Diamond Lake Ranger District April 2008

More information

Monitoring Grazing Lands in Oregon 1

Monitoring Grazing Lands in Oregon 1 Oregon State University BEEF023 Beef Cattle Library Beef Cattle Sciences Monitoring Grazing Lands in Oregon 1 Dustin D. Johnson 2 Introduction A critical, but often overlooked step in the development of

More information

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake 2015 Recreation Residence Projects Odell Lake USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon Background The Crescent Ranger District maintains 66 recreation

More information

Agency Organization Organization Address Information. Name United States Department of Agriculture

Agency Organization Organization Address Information. Name United States Department of Agriculture Logo Department Name United States Department of Agriculture Agency Organization Organization Address Information Forest Service Pacific Northwest Region 1220 SW Third Avenue (97204) P.O. Box 3623 Portland,

More information

Mount Diablo Baseline and Meridian. T42N, R54E, Section 29 and 30

Mount Diablo Baseline and Meridian. T42N, R54E, Section 29 and 30 DECISION MEMO Walker Ridge Gold Exploration Project Plan of Operations #06-12-05 Mountain City Ranger District, Humboldt-Toiyabe National Forest Elko County, Nevada BACKGROUND On February 21, 2012, Columbia

More information

PRESCRIBED GRAZING (Ac.)

PRESCRIBED GRAZING (Ac.) PA528 1 NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE STANDARD PRESCRIBED GRAZING (Ac.) CODE 528 DEFINITION Managing the harvest of vegetation with grazing and/or browsing animals. PURPOSE

More information

DOI BLM ENVIRONMENTAL ASSESSMENT LIVESTOCK GRAZING AUTHORIZATION. Calcutta Allotment. Surprise Field Office DOI-BLM-CA-N EA 5/29/2009

DOI BLM ENVIRONMENTAL ASSESSMENT LIVESTOCK GRAZING AUTHORIZATION. Calcutta Allotment. Surprise Field Office DOI-BLM-CA-N EA 5/29/2009 DOI BLM ENVIRONMENTAL ASSESSMENT LIVESTOCK GRAZING AUTHORIZATION Calcutta Allotment Surprise Field Office DOI-BLM-CA-N070-2009-0008-EA 5/29/2009 Contents CHAPTER 1: INTRODUCTION...5 Background...5 Current

More information

January 2, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D.

January 2, Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C Attention: Ms. Kimberly D. January 2, 2019 Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Attention: Ms. Kimberly D. Bose, Secretary Re: El Paso Natural Gas Company, L.L.C.; Docket No. CP18-332-000;

More information

Decision Notice and Finding of No Significant Impact

Decision Notice and Finding of No Significant Impact Decision Notice and Finding of No Significant Impact Gold Lake Bog Research Natural Area Boundary Adjustment and Nonsignificant Forest Plan Amendment #53 USDA Forest Service Middle Fork Ranger District,

More information

DECISION MEMO. Missoula Electric Cooperative Point 118. MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118)

DECISION MEMO. Missoula Electric Cooperative Point 118. MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118) DECISION MEMO Missoula Electric Cooperative Point 118 MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118) USDA Forest Service - Lolo National Forest Missoula Ranger District

More information

Engaging Livestock in Weed Management

Engaging Livestock in Weed Management Engaging Livestock in Weed Management Grazing is Powerful Over Grazing Saudi Arabia A Western Perspective Rangeland Ecology & Management University of Idaho Karen Launchbaugh Sheep Reduce Forbs Goats Reduce

More information

BLM Office: Lakeview District, Klamath Falls Resource Area Phone #:

BLM Office: Lakeview District, Klamath Falls Resource Area Phone #: Decision Memorandum on Action and for Application of: Categorical Exclusion 516 DM2, Appendix 1, 1.12 Hazardous Fuel Reduction (PLAN CONFORMANCE AND CATEGORICAL EXCLUSION DETERMINATION) CX Log #: CX-04-17

More information

Prevention and Early Detection

Prevention and Early Detection Prevention and Early Detection Prevention, early detection, and eradication of newly introduced invasive weed species is the most economical means of weed management. Prevention is best accomplished by

More information

[FWS R8 ES 2015 N170; FXES ENDT0 156 FF08ENVD00] Endangered and Threatened Wildlife and Plants; Proposed Low-Effect Habitat

[FWS R8 ES 2015 N170; FXES ENDT0 156 FF08ENVD00] Endangered and Threatened Wildlife and Plants; Proposed Low-Effect Habitat This document is scheduled to be published in the Federal Register on 09/04/2015 and available online at http://federalregister.gov/a/2015-22059, and on FDsys.gov Billing Code 4310 55 DEPARTMENT OF THE

More information

MONITORING QUESTIONS AND TASKS FOR THE GEORGE WASHINGTON PLAN

MONITORING QUESTIONS AND TASKS FOR THE GEORGE WASHINGTON PLAN MONITORING QUESTIONS AND TASKS FOR THE GEORGE WASHINGTON PLAN MONITORING THEME 1 CONSERVATION OF BIOLOGICAL DIVERSITY FOR ECOSYSTEMS MQ 1: How are ecological conditions maintaining or making progress toward

More information