1 Maintains journey from Paper and/or IW42 to mobile DONG Energy IT Tom Høgh Kristensen Lead Application Consultant ERP Logistics

2 History: DONG Energy was established in 2006 by the merger of six Danish energy companies: DONG, Elsam, Energi E2, Nesa, Københavns Energi and Frederiksberg Forsyning. The story started on March 27 th 1972 when the Danish state founded Dansk Naturgas A/ S. The name was changed to Dansk Olie og Naturgas A/ S in 1973 and to DONG in

3 Dong Energy A/S DONG Energy is one of the leading energy groups in Northern Europe. Our business is based on procuring, producing, distributing and trading in energy and related products in Northern Europe. Division s Exploration & Production Wind Power Thermal Power Customers and Markets Employees

4 Dong Energy Wind Power DONG Energy Wind Power is the market leader within offshore wind energy. Our activities are focused on Northern Europe with Denmark, UK and Germany being our most important markets. Together with the business unit Exploration & Production, Wind Power is a growth area within DONG Energy. In 2014 installed 2,5 GW - In 2020 installed +6,5 GW 1900 employees (end 2013) 4

5 From paper to mobile Before 2013 Service reports was printed and filed out by hand No results was typed into SAP Technicians was reporting hours with end of the day (sometime getting overtime) No follow-up's Findings reported by Phones, radios, back on the service report, stickers. Within and after 2013 ü Service reports handled by SAP work manager ü All finding created as notifications in SAP via the work manager ü Technicians reporting hours via work manager ü Data transparency in SAP 5

6 SAP work manager Selection process Stop a already running mobile project based on SAP old mobile concept Syclo work manager track record Native App (Off / On line solution) User friendly Standard integration towards SAP EAM/PM Possibility to change UI without destroying interface towards SAP Device selection ipad 2 and following ipad 3 and air Cover from Griffin (Tested and certified to meet or exceed US Department of Defense Standard 810F) 6

7 DONG Energy Wind Power Mobile project phase 1 Business needs to be very clear and specific on demands. Analyse the way you want to work Target group Stick to SAP standard Draw the process Check, involvement and commitment within the business Does this support our process in the business? Yes/ No If no consider to change the process in business (change management) KIS (Keep It Simple) 7

8 Project plan Activity Analysis Process work/choose solution Choose mobile device Sep Oct Nov Dec Jan Feb Mar Apr Maturation Initial test of standard solution Setup infrastructure Blueprint on non standard funct. Execution Finalize infrastructure setup Development Integration test User acceptance test Training Technical go-live Roll out to HR2 & hyper care 8

9 Project findings Stick to your process map Don't fall for sophisticated consultant ideas Target group in mind SAP ECC knowledge is important Be able to take fast decisions Before project start make priority list Needed Nice Phase 2 Phase 3 Involvement of end-user in the test phase 9

10 Work Order list Main screen Synchronisation icon Navigation icons Order notes Get all notes shown by clicking on the magnifying glass icon in the right corner 10 Issued materials

11 DONG Energy Wind Power Mobile project phase 2 11

12 DONG Energy Wind Power Mobile project phase 2 12

13 DONG Energy Wind Power Mobile project phase 3 13

14 DONG Energy Wind Power Mobile project phase 3 Upgrade from Agentry 2.0 towards SMP 3.0 Upgrade work manager from 5.2 towards 6.2 Document management A list that show all materials with no or 0 value in Withdraw Qty. is to be shown. From the popup screen the tech need to be able to type in 0 or the used amounted Possibility to modify and reprocess errors from the log. In the BBP it is stated that the log is "read only" which means that you do not get a link which makes you able to correct the error directly Update logic, when creating a Notification from a measuring point and a ZR01 order, it must be the same. Change workflow. When completing a ZR02 order, failure codes (Damaged, Cause and Activity) must come up before time registration. Add a new field in damaged, cause and activity (ZH Siemes Notification) Show Object list item, Equipments or FL and all info Link to document as PRT Create an order from Pending Notifications Show Description on measuring Points, when these are entered. See if a Tool is linked as PRT Show Serial Number from SerData Tab on Equipment Info. Sort orders, Status Process in top Return unused material. search in Old material number (Manufacture number) 14

15 Dong Energy Mobile Landscape 15

16 DONG Energy E&P Mobile project phase 1 16

17 DONG Energy E&P Mobile project phase 1 Integration to SAP planning function, then the work order can be uploaded / accessing the mobile solution, and after work performed that the data uploaded to SAP Online as well as offline, with the system Single sign on RFID tags Create new notifications, and add pictures to this notification When looking at a work order, it must also be possible to view the notifications overview screen, to see what has happened Possible to create a notification for further maintenance, during a preventive maintenance job (PM02 Work order ), so that we can fix outstanding items, but keep track of root source work order When working with the device screens, shall be logical, accessible, so first we see the orders and the order long text, and func.loc, equipment's When entering a work order, we must be able to see the operations lines with detail description, Func.Loc.,Equip.No. basic start and end date Information regarding a func.loc and equipment's, by selecting the line, and press screen to see information 17

18 DONG Energy E&P Mobile project phase 1 Documents, that are selected in backend, must be transferred to device, so they are accessible in offline mode Possible to enter values for measuring points, linked to the work order If a reading is not performed, a reason table value must be selected, and feedback added to the work order All materials assigned to the work order, incl. the Job Pack materials ( Non Stock ) From the emergency spares warehouse offshore, we must be able to withdraw materials to a work order, with the device, by using barcode scanners Reason codes should be used to complete the work order Time registering be done automatically in SAP CATS based on employees allocated to work order and times recorded Bill of Materials for a Func.Loc or Equipment, must be shown on a screen when entering the FL, EQ data screen Device ATEX Zone 2 18

19 DONG Energy E&P Mobile project phase 1 Selection process Analyse WP mobile solution RFID (Radio Frequency Identification) Supporting rounding's ATEX zone 2 Device selection GETAC Z710-Ex (Android) 7 screen. Device change Samsung Galaxy Tab 4 (Andriod) 8 screen. (Approved Feb ATEX zone 2) 19

20 DONG Energy E&P Mobile project phase J F M A M J JUL A S O N D J F Analysis Maturation Execution Analysis phase ends Functional descriptions and requirements specifications Installation of SMP 3.0 and Work Manager 6.0 Ongoing work assumes choice of Android device Purchase of android devices for test Gap Analysis Work Manager 6.0 Maturation phase ends Blueprints IT Deliverables plan Test approach Development Final choice of device Prepare for production UAT December/January SMP test Mid January Hypercare January/February Executions phase ends Evaluation Evaluation phase ends

21 Running Mobile project. Incl. GEO 21

22 Running Mobile project 22

23 Dong Energy s running mobile solutions Live demo 23