TERMS OF REFERENCE FEASIBILITY STUDY ON THE DEVELOPMENT OF A CENTRALISED POINT OF DATA SUBMISSION FOR THE BANKING SECTOR
|
|
- Lucas Mitchell
- 6 years ago
- Views:
Transcription
1 TERMS OF REFERENCE FEASIBILITY STUDY ON THE DEVELOPMENT OF A CENTRALISED POINT OF DATA SUBMISSION FOR THE BANKING SECTOR 1.0 INTRODUCTION 1.1 Background Since the rollout of Credit Information Sharing (CIS) in Kenya five years ago, a number of efforts have been made to strengthen the operations of the mechanism. The aim of these initiatives, structured in 3 phases, is to achieve a full-file comprehensive system that supports the use of credit reports and scores in credit risk management and increased access to credit for low-risk borrowers. Prior to 2013 when the Association of Kenya Credit Providers (AKCP) was established, coordination of these efforts was in the hands of the Kenya Credit Information Sharing Initiative (KCISI), a project jointly run by the Central Bank of Kenya (CBK) and Kenya Bankers Association (KBA) and funded principally by the Financial Sector Deepening Trust (FSD Kenya). AKCP is a member-based Association that brings under one umbrella all parties interested in promoting the extension of CIS in Kenya beyond CBK-regulated entities - namely commercial banks and microfinance banks (MFBs). FSD Kenya was established in early 2005 to support the development of financial markets in Kenya as a means to stimulate wealth creation and reduce poverty. It has played a significant role in supporting the development of CIS in Kenya by contributing to the budget of each of the three phases. FSD s interest in this process stems from the recognition that CIS is a fundamental piece of infrastructure that minimizes information asymmetry between suppliers and consumers of credit, thus promoting access to credit by Small and Medium Enterprises (SMEs). One of the turning points in the CIS journey in Kenya is the publication, in January 2014, of amended regulations that ushered in full-file CIS, with more explicit provisions allowing participation by non-bank credit providers. This has led to positive data sharing by commercial banks and microfinance banks, as well as the entry of many third party credit providers in the CIS mechanism. 1.2 Main challenges to be addressed Challenges posed by expansion of the range of participants The legal and regulatory framework for CIS in Kenya has allowed for the licensing of multiple CRBs. As a result, market forces are at play to incentivize the development of value-added products, including credit scores. Currently, there are three (3) registered CRBs operating in the market, TransUnion CRB (licensed in February 2010), Metropol CRB (licensed in April 2011) and CreditInfo CRB (licensed in April 2015). Participants to the mechanism are expected to submit information to all CRBs but are free to purchase reports from a CRB of their choice.
2 The presence of several credit bureaus has significant benefits, but also poses a number of challenges: Tedious data submission process Participants to the mechanism must submit the same set of data to each CRB through portals provided by the respective CRBs. Some of the data sets are enormous and take a long time to upload. Submission to multiple CRBs complicates the process by increasing the workload and the difficulty of implementing real-time data transmissions. Errors during data submission Where credit providers have to make repeated uploading of data, this may result in human-errors, such as submission of differing files to the CRBs. Such differences have been noted in past submissions. Conflicting Error Logs Each CRB carries out independent validations on the data, based on the rules in the Data Specification Template. However, huge variances have been noted in acceptance rates of data submission of the same file, some as high as 100% Sustainability of AKCP Being a member-based not-for-profit organization, AKCP s main source of funding is member subscriptions. Initiatives for the promotion of CIS have in the past been largely been donor-funded, but such funding is expected to reduce over time in order to allow increased industry ownership of the development of this mechanism. One of the strategies for increasing and retaining AKCP membership is by providing an efficient data transmission mechanism that will eventually be available only to members. 1.3 Need for Data Hub AKCP has for a long while considered the need of implementing a centralized data submission point to address the twin concerns raised in 1.2 above. If implemented, participants of the CIS mechanism will only make one submission. Each CRB would then be able to access a copy of the information submitted. The hub may also implement centralized validation rules that give a unified error log to a credit provider upon submission of data. Further, one protocol will be developed that will allow integration to credit provider systems, that will allow more frequent CRB updates, including daily submission of Application file that constitutes one of the next steps in the process. The establishment of a data hub was also envisioned by the CBK and provided for in clause 50 (6) of the Credit Reference Bureau Regulations, AKCP also considers the data hub essential as a value-added product to its members and one that provides an opportunity to strengthen its self-regulatory compliance function. It will also help streamline the access of new entrants to the CIS mechanism by guaranteeing that AKCP becomes the first point of call. It is intended that AKCP will pilot implementation of the central hub in partnership with Kenya Bankers Association. In this arrangement, the initial users of the hub will be the 45 members of
3 KBA who also subscribe to AKCP. After a successful pilot, it is anticipated that the services of the hub will be expanded to other members of AKCP. 2.0 OBJECTIVE AKCP would like to use the services of a consultant to help evaluate the options for implementing the data hub solution. The consultant will also undertake a feasibility study that will inform financial viability and technical specifications of the system. 3.0 SCOPE OF WORKS The consultant will be required to carry out the following specific tasks: 3.1. Conduct interviews on AKCP Secretariat and other stakeholders such as regulators (CBK and SASRA), industry bodies (KUSCCO, AMFI and KBA), credit bureaus (TransUnion, Metropol and CreditInfo), FSD Kenya, credit providers (KBA members) and other stakeholders to obtain views, needs and challenges associated with data submission, etc that may be addressed by the data hub Carry out desktop reviews on materials relevant to the implementation of a data hub including: a. The Existing Data Specification Templates and Data Transmission Rules b. Relevant Acts of Parliament dealing with ICT issues c. CRB Regulations d. AKCP Code of Conduct e. Documentation on South Africa CPA s data hub 3.3. Design an architectural representation of the implementation indicating: a. Application and Database Software to be used b. Networking infrastructure c. Encryption and Internet Security protocols d. Structure of back-up sites e. Data holding and transmission capacities 3.4. Identify possible options for hosting of the data hub; noting the cost implications 3.5. Estimate all costs and resources pertaining to the implementation and running of the data hub, including: a. Prerequisite skills/knowledge AKCP must possess for a smooth running of the data hub b. Application and database development, encryption, security, network bandwidth and back-up locations c. Number of support personnel that may be required to run the data hub, if any d. Annual recurrent costs of running the hub 3.6. Develop a draft project plan for the installation of the data hub indicating expected timelines for the project and the User Acceptance Testing (UAT) period Draw up an objective conclusion on the feasibility of implementing a Data Hub solution
4 3.8. Disseminate the findings of the feasibility study through stakeholders workshop 3.9. Draw up a final report on the findings; including feedback received during the stakeholders dissemination workshop. 4.0 CONDUCT OF WORK The consultant will formally report to the Chief Executive Officer AKCP based at the Kenya School of Monetary Studies. Progress on implementation will be monitored by FSD Kenya through the Head Finance for Growth. AKCP will take charge of logistics including organizing meetings with stakeholders. The consultant will manage their own timeline in consultation with AKCP especially where field visits are to be planned and adapt their schedule in light of availability of stakeholders, unforeseen opportunities and constraints and other factors. 5.0 OUTCOME AND DELIVERABLES The deliverables of this consultancy are: 5.1 An inception report, within 5 working days of commencement of the consultancy containing the findings in Section 3.1 and 3.2, as well as a draft work plan of this consultancy. 5.2 A report detailing a draft project plan and the financial implications of the implementation of the data hub, within 20 working days of commencement of the consultancy 5.3 A final report consolidating all the findings of this consultancy, including a summary of workshop deliberations within 25 working days of commencement of the consultancy. Payment under these Terms of Reference shall be made according to the following guidelines; a. Upon acceptance of the inception report, FSD will authorize payment of 30% of the agreed fee together with all expenses incurred to date b. Upon acceptance of the report containing the draft project plan and financial implications, a further 30% of the agreed fee shall be authorized for payment along with all expenses incurred. c. Upon acceptance of the final report, the remaining 40% of the agreed fee shall be paid after all substantive comments from AKCP are submitted and finalized with the consultants. Should AKCP not provide comments within 14 days of the submission of the draft (or subsequent redrafted) report, then the report will be deemed to have been finalized to AKCP s Satisfaction and payment will be due. The copyright for all material printed under these Terms of Reference will pass to AKCP and FSD Kenya. It is FSD s practice to publish the reports it commissions in its own house style. There is therefore no requirement for material to be extensively formatted beyond that required to indicate how material should be logically presented in the final report. All final reports should be presented in an electronic format allowing the text and graphics to be manipulated in preparation for publication. Where a final report is presented in a portable document format (pdf) generated from another format (such as Microsoft Word) it should be
5 accompanied by the original file from which it is generated. All representations of graphic material (tables, figures, drawings, charts, graphs and photographs) must be able to be reproduced at high print resolution. Tables, figures, drawings, charts, graphs should be provided in Microsoft Excel or Adobe Illustrator format. Photographs must be provided in high-resolution JPG images set to minimum of 300 dots per inch (dpi). Any technical questions regarding these requirements should be addressed to FSD s Communications Officer. 6.0 REQUIREMENTS Mandatory requirements Competence in system development and system analysis Competence in IT security and Data Communications Knowledge of CIS or experience in data sharing mechanisms Understanding of financial sector systems and operations Assessment criteria Weight (%) Competence in system development and system analysis 30 Competence in IT security and Data Communications 40 Knowledge in CIS, or experience in data sharing mechanisms 10 Understanding of financial sector systems and operations 15 Cost 5 Total TIMETABLE This work is expected to be completed within 25 working days of commencement.
Terms of Reference (TOR)
CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of Development Account Project 1415 AX Support
More informationDEVELOPMENT OF DATABASE FOR TBT TECHNICAL REGULATIONS AND CONFORMITY ASSESSMENT PROCEDURES AND ITS RESPECTIVE AGENCIES/BODIES
SCOPE OF WORK SHORT TERM TECHNICAL ASSISTANCE DEVELOPMENT OF DATABASE FOR TBT TECHNICAL REGULATIONS AND CONFORMITY ASSESSMENT PROCEDURES AND ITS RESPECTIVE AGENCIES/BODIES Position: A team of consultants.
More informationPROFESSIONAL SERVICES DIGITAL ADVISORY SERVICES GOLD LEVEL OF SERVICE STATEMENT OF WORK TO VERIZON PROFESSIONAL SERVICES SERVICE ATTACHMENT
PROFESSIONAL SERVICES DIGITAL ADVISORY SERVICES GOLD LEVEL OF SERVICE STATEMENT OF WORK TO VERIZON PROFESSIONAL SERVICES SERVICE ATTACHMENT This Digital Advisory Services Statement of Work (SOW) is entered
More informationINTERNATIONAL CENTRE FOR RESEARCH IN AGROFORESTRY. ICRAF House, UN Avenue Gigiri PO Box Nairobi Kenya
INTERNATIONAL CENTRE FOR RESEARCH IN AGROFORESTRY ICRAF House, UN Avenue Gigiri PO Box 30677 00100 Nairobi Kenya Tel. +254 20 524 000, Fax: +254 20 524 001 TENDER No. ICRAF /ME/09/2018 REQUEST FOR PROPOSAL
More informationMEETING OF INTELLECTUAL PROPERTY OFFICES (IPOs) ON ICT STRATEGIES AND ARTIFICIAL INTELLIGENCE (AI) FOR IP ADMINISTRATION
E WIPO/IP/ITAI/GE/18/4 ORIGINAL: ENGLISH DATE: MARCH 14, 2018 MEETING OF INTELLECTUAL PROPERTY OFFICES (IPOs) ON ICT STRATEGIES AND ARTIFICIAL INTELLIGENCE (AI) FOR IP ADMINISTRATION Geneva, May 23 to
More informationDETAILED TERMS OF REFERENCE FOR CONSULTANTS
Enhancing Agricultural Competitiveness in Viet Nam (KSTA Report VIE 50134) DETAILED TERMS OF REFERENCE FOR CONSULTANTS I. Objective of the Assignment 1. The Government of Viet Nam has received a grant
More informationFEDERAL GOVERNMENT OF SOMALIA
FEDERAL GOVERNMENT OF SOMALIA MINISTRY OF FINANCE THE SOMALI CORE ECONOMIC INSTITUTIONS AND OPPORTUNITIES PROGRAM (SCORE) REQUEST FOR EXPERSION OF INTREST Selection of Consultants Consulting Services for
More informationTERMS OF REFERENCE. For. The Design of a Monitoring & Evaluation System to track the Progress of the CARIFORUM-EU EPA Implementation
TERMS OF REFERENCE For The Design of a Monitoring & Evaluation System to track the Progress of the CARIFORUM-EU EPA Implementation Contracting Authority The Deutsche Gesellschaft fuer Internationale Zusammenarbeit
More informationREQUEST FOR PROPOSAL (RFP) FOR CONTRACT MANAGEMENT SYSTEM ISSUED BY THE RFP INFORMATION
REQUEST FOR PROPOSAL (RFP) FOR CONTRACT MANAGEMENT SYSTEM ISSUED BY THE NEW YORK ehealth COLLABORATIVE CONTACT NAME EMAIL ADDRESS SUBMISSION DEADLINE RFP INFORMATION NYeC RFP rfpcontact@nyehealth.org September
More informationTERMS OF REFERENCE. Independent Evaluation of the ILO Action Plan for Gender Equality
TERMS OF REFERENCE Independent Evaluation of the ILO Action Plan for Gender Equality 2010-15 1 Introduction The results-based ILO Action Plan for Gender Equality 2010-15 (the Action Plan) aims to operationalize
More informationANNEX A- TERMS OF REFERENCE MULTI-COUNTRY EMPLOYMENT OPPORTUNITY ASSESSMENT
ANNEX A- TERMS OF REFERENCE MULTI-COUNTRY EMPLOYMENT OPPORTUNITY ASSESSMENT 18 April 2016 Post Title: Posts: National Consultant: Employment Opportunity Assessment 1 National Consultant in Lebanon The
More informationThe Jordanian National Policy Framework for Microfinance Sector: Towards Inclusive Finance
The Jordanian National Policy Framework for Microfinance Sector: Towards Inclusive Finance Majdoulin Abu-Dalhoum Head of Civil Society Institutions & Microfinance Section Presentation submitted for: Iraq
More informationASEAN AUSTRALIA DEVELOPMENT COOPERATION PROGRAM (AADCP) PHASE II TERMS OF REFERENCE FOR
ASEAN AUSTRALIA DEVELOPMENT COOPERATION PROGRAM (AADCP) PHASE II TERMS OF REFERENCE FOR Study on Establishing an ASEAN Telecommunications Single Market Post-2015 The ASEAN Secretariat and the Australian
More informationThe Commercial Market Opportunity for Weather and Climate Services in Africa
The Commercial Market Opportunity for Weather and Climate Services in Africa Making Weather Information Commercially Relevant to the end user 15-17 March, 2016, Avani Falls Livingstone, Zambia By Robert
More informationTerms of Reference. Projects Outputs Evaluation
Terms of Reference Projects Outputs Evaluation Strengthening Participatory and Accountable Governance and Protection of Human Rights. Empowering Civil Society in A. BACKGROUND UNDP s corporate policy is
More informationREPUBLIC OF KENYA MINISTRY OF EDUCATION THE KENYA NATIONAL EXAMINATIONS COUNCIL SECONDARY EDUCATION QUALITY IMPROVEMENT PROJECT (SEQIP)
REPUBLIC OF KENYA MINISTRY OF EDUCATION THE KENYA NATIONAL EXAMINATIONS COUNCIL SECONDARY EDUCATION QUALITY IMPROVEMENT PROJECT (SEQIP) Title : CONSULTANCY FOR CAPACITY BUILDING ON COMPETENCY BASED ASSESSMENT
More informationTERMS OF REFERENCE. For a Bi-lingual Local Project Coordinator. To support stakeholder engagement and research on financial inclusion in Benin
TERMS OF REFERENCE For a Bi-lingual Local Project Coordinator To support stakeholder engagement and research on financial inclusion in Benin MAP and FinScope Consumer Survey Benin 2017 RFP ID: MAP BENIN_2017
More informationRequest for Proposals. Coastal Impact Mitigation and Adaptation Resources Scoping Exercise. for the project
Request for Proposals Coastal Impact Mitigation and Adaptation Resources Scoping Exercise for the project Strengthening Adaptive Capacity of Marine Protected Areas Commission for Environmental Cooperation
More informationAUDIT UNDP GLOBAL SHARED SERVICE CENTRE MALAYSIA. Report No Issue Date: 21 March 2014
UNITED NATIONS DEVELOPMENT PROGRAMME AUDIT OF UNDP GLOBAL SHARED SERVICE CENTRE IN MALAYSIA Report No. 1242 Issue Date: 21 March 2014 Table of Contents Executive Summary i I. About the Centre 1 II. Audit
More informationNATIONAL EXPORT STRATEGY
NATIONAL EXPORT STRATEGY BUILDING AN EXPORT CULTURE This document is for discussion purposes only and does not imply any engagement or liability on the part of the International Trade Centre (ITC). Copyright
More informationTerms of Reference for the Capacity Assessment of the Democratic Governance and Peace Consolidation Programmes
Terms of Reference for the Capacity Assessment of the Democratic Governance and Peace Consolidation Programmes 1. Introduction As one of the 8 pilot countries for the Delivering as One initiative, the
More informationInvitation to Tender for: Building Connections Fund Youth strand: Youth Resources. Issue Date: November 2018
Invitation to Tender for: Building Connections Fund Youth strand: Youth Resources Issue Date: November 2018 SECTION 1 - Information for Tenderers SECTION 2 Tender specifications SECTION 3 Evaluation Criteria
More informationGLOBAL STRATEGY AND ACTION PLAN FOR THE IMPROVEMENT OF REGIONAL SAFETY OVERSIGHT ORGANIZATIONS
International Civil Aviation Organization Air Navigation Bureau GLOBAL STRATEGY AND ACTION PLAN FOR THE IMPROVEMENT OF REGIONAL SAFETY OVERSIGHT ORGANIZATIONS (RSOOs) AND THE ESTABLISHMENT OF A GLOBAL
More informationREQUEST FOR EXPRESSIONS OF INTEREST FOR AN INDVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK
REQUEST FOR EXPRESSIONS OF INTEREST FOR AN INDVIDUAL CONSULTANT AFRICAN DEVELOPMENT BANK DELIVERY, PERFORMANCE MANAGEMENT AND RESULTS (SNDR) AfCoP Project Title of the assignment: to design and establish
More informationTERMS OF REFERENCE. Green enterprize Innovation and Development Project
Country Office for Zimbabwe and Namibia Call for Consultancy: An assessment of supply of and demand for technical and vocational skills to support green jobs opportunities for young women and men in Zimbabwe.
More informationFair and equitable benefit sharing
Fair and equitable benefit sharing Manual for the assessment of policies and practices along natural ingredient supply chains www.ethicalbiotrade.org Fair and equitable benefit sharing Manual for the
More informationSoftware Asset Management (SAM) Statement of Work (SOW) SAM Infrastructure Optimization (For use with the Microsoft SAM Services Incentives Program)
Software Asset Management (SAM) Statement of Work (SOW) SAM Infrastructure Optimization (For use with the Microsoft SAM Services Incentives Program) 1. Description The Infrastructure Optimization Engagement
More informationDivision for Sustainable Development Goals, United Nations Department of Economic and Social Affairs (DESA/DSDG)
Concept Note: Global Symposium on the Role of Micro-, Small- and Medium- Enterprises (MSMEs) in the achievement of the Sustainable Development Goals (SDGs) Location: Venue: New York, United States of America
More informationTITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE 19 th December 2017 TITLE OF CONSULTANT: Individual Consultant (IC) to Develop a Strategic Plan and Implementation Program for Business Botswana COUNTRY: BOTSWANA
More informationSeptember 12, 2017 SOLICITATION FOR EXPRESSIONS OF INTEREST
677 Ala Moana Boulevard, Suite 320, Honolulu, Hawai i 96813 Phone: +1 (808) 687-6175 Fax: +1 (808) 664-8510 www.piccc.net September 12, 2017 SOLICITATION FOR EXPRESSIONS OF INTEREST RESILIENT HAWAIIAN
More informationANNEX I - TERMS OF REFERENCE
ANNEX I - TERMS OF REFERENCE Review and Development of End User Monitoring (EUM) Standards and tools for Ready to Use Therapeutic Foods (RUTF) Supply Chain 1.0 Background The 2016 joint child malnutrition
More informationPD Re-engineering Program Charter
PD Re-engineering Program Charter Version:.0 Date: May 0, 0 Page Table of Contents INTRODUCTION... PROGRAM PURPOSE... PROGRAM OBJECTIVES... PROGRAM SCOPE DEFINITIONS... PD Re-engineering Program Scope
More informationPROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Medium-sized Project
PROJECT PREPARATION GRANT (PPG) PROJECT TYPE: Medium-sized Project TYPE OF TRUST FUND: GEF Trust Fund Submission date: 06/12/2012 GEF PROJECT ID: 4998 GEF AGENCY PROJECT ID: 5084 COUNTRY(IES): Uruguay
More informationREQUEST FOR EXPRESSIONS OF INTEREST EXTENSION OF DEADLINE OF SUBMISSION AFRICAN DEVELOPMENT BANK
REQUEST FOR EXPRESSIONS OF INTEREST EXTENSION OF DEADLINE OF SUBMISSION AFRICAN DEVELOPMENT BANK Office of the Special Envoy on Gender Immeuble du CCIA Rue Jean-Paul II PLATEAU 0 Boite Postale 387 ABIDJAN
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE / TERMS OF REFERENCE
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE / TERMS OF REFERENCE Title of Individual Consultant: Policy Specialist - Development Finance and Cooperation Project title: Aid Effectiveness (00092193) Duration
More informationINTERTANKO. Payment Performance System (PPS) Together we can make a difference
INTERTANKO Payment Performance System (PPS) Together we can make a difference PAYMENT PERFORMANCE SYSTEM (PPS): Together we can make a difference https://www.intertankopps.com 20 May 2016 Contents 1 Introduction...
More informationTerms of Reference for the Strategy Group, Management Group and Secretariat
Terms of Reference for the Strategy Group, Management Group and Secretariat UN-REDD PROGRAMME June 2012 Introduction Terms of Reference for the Strategy Group, Management Group and Secretariat 15 June
More informationREQUEST FOR PROPOSALS RFP #: EKACDM 11.4/ JUNE 2014
REQUEST FOR PROPOSALS RFP #: EKACDM 11.4/3.3.1 02 JUNE 2014 THE DISASTER RISK REDUCTION CENTRE INSTITUTE FOR SUSTAINABLE DEVELOPMENT THE UNIVERSITY OF THE WEST INDIES ENHANCING KNOWLEDGE AND APPLICATION
More informationChapter. Redesigning The Organization With Information Systems
Chapter Redesigning The Organization With Information Systems 1 Objectives Demonstrate how building new systems produces organizational change Explain how a company can develop information systems that
More informationEffectiveness Evaluation of Stockholm Convention
Effectiveness Evaluation of Stockholm Convention Eisaku TODA Environmental Health and Safety Division Ministry of the Environment, Japan The Stockholm Convention requests the parties to encourage and/or
More informationRules on Initiation of Power Procurement and Review of Power Purchase Agreements. Eng. Anastas Mbawala, EWURA
Rules on Initiation of Power Procurement and Review of Power Purchase Agreements Eng. Anastas Mbawala, EWURA 1 Overview of this Presentation Background on statutory powers and purpose of the Rules Description
More information8. The strategy agreed to by the Forum consists of the following three objectives:
Global Strategy and Action Plan for the Improvement of Regional Safety Oversight Organizations (RSOOs) and the Establishment of a Global System for the Provision of Safety Oversight Context 1. The participants
More informationAnnex A Draft agreed upon procedure for mainstreamed disclosures
Annex A Draft agreed upon procedure for mainstreamed disclosures 1 Summary The Secretariat proposes a draft agreed upon procedure for mainstreamed disclosures for consideration by the Implementation Committee.
More informationFAOSTAT2 Project and CountrySTAT. Haluk Kasnakoglu and Robert Mayo, Statistics Division, Food and Agriculture Organization of the United Nations
ESA/STAT/AC.94/7 28 November 2003 UNITED NATIONS DEPARTMENT OF ECONOMIC AND SOCIAL AFFAIRS STATISTICS DIVISION Meeting of the Expert Group on International Economic and Social Classifications New York,
More informationTerms of Reference End of Programme Evaluation of CAFOD s UK Aid Match Round 2 Programme: Climate Resilient Agriculture: transforming the livelihoods of 450,000 poor women, men and children in marginalised,
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 12 Jun 2017 Country: Bangkok, Thailand Description of the assignment: Policy Specialist - Development Finance and Cooperation Duty Station: Bangkok, Thailand
More informationThis document outlines the specifics of the training program that is being developed by M7 Training Solutions (MTS) for PJ Enterprises.
Project Plan This document outlines the specifics of the training program that is being developed by M7 Training Solutions (MTS) for PJ Enterprises. Project Name This phase of our project is called New
More informationUNICEF/EAPRO, Bangkok
UNICEF/EAPRO, Bangkok TERMS OF REFERENCE - LONG TERM ARRANGEMENT ********************************************************************************** 1. Background As a joint contribution towards the achievement
More informationTHE COLOMBO PLAN. (Colombo Plan Gender Affairs Programme) Terms of Reference
THE COLOMBO PLAN For Cooperative Economic and Social Development in Asia and the Pacific (Colombo Plan Gender Affairs Programme) Terms of Reference Institutional Capacity Assessments and Improvement Plans
More information1. Background. 2. Building on Phase 2. ToR SEIR: Workstream 1a
Terms of Reference: Socio-Economic Impact Research (SEIR), Off-Grid Solar Research Contractor, Phase 3, Workstream 1a: Building on Phase 2 Data Collection 1. Background GOGLA is a neutral, independent,
More informationSupplier FAQ s for submitting invoices to Caesars Entertainment via OB10
Supplier FAQ s for submitting invoices to Caesars Entertainment via OB10 What is electronic invoicing? Electronic invoicing (e-invoicing) is a communication methodology that utilizes the Internet to allow
More informationTERMS OF REFERENCE / STATEMENT OF WORK. 1. Research Project Title: Parental Employment Patterns: Implications for Child Development
TERMS OF REFERENCE / STATEMENT OF WORK 1. Research Project Title: Parental Employment Patterns: Implications for Child Development 2. Closing Date: This RFP will close on: January 30 th, 2009. Proposals
More informationREQUEST FOR PROPOSAL. Customer Inquiry Tracking Planning and Implementation Project Phase I March 25, 2014
REQUEST FOR PROPOSAL Customer Inquiry Tracking Planning and Implementation Project Phase I March 25, 2014 This Request for Proposal (RFP) is being sent to consulting firms to act as the Consultant in the
More information2015 SAP Quality Awards Questions in Online Application
2015 SAP Quality Awards Questions in Online Application Enter contact information Your nomination must be submitted online to be eligible, but below you can see all questions and start preparing responses
More informationSelf-assessment Exemplar 2
Self-assessment Exemplar 2 XYZ Awards Self-assessment Report & Plan 2015 This document represents the formal submission to SQA Accreditation from XYZ Awards of its 2015 Self-assessment in accordance with
More informationASSESSMENT OF TRAINING NEEDS FOR NATIONAL DISASTER ORGANISATIONS IN THE CARIBBEAN
REQUEST FOR PROPOSALS RFP #: EKACDM 11.4/2.1.1 02 JUNE 2014 THE DISASTER RISK REDUCTION CENTRE INSTITUTE FOR SUSTAINABLE DEVELOPMENT THE UNIVERSITY OF THE WEST INDIES ENHANCING KNOWLEDGE AND APPLICATION
More informationPublic Private Partnership. PPP Policy Overview. Policy and Planning Division Ministry of Economic Affairs
Public Private Partnership PPP Policy Overview Policy and Planning Division Ministry of Economic Affairs Delivery of Public Services Outsourcing: short-term contracts and parts of public service PPPs:
More informationAgreement between the United Nations and the World Tourism Organization
ECOSOC Resolution 2003/2 Agreement between the United Nations and the World Tourism Organization The Economic and Social Council, Recalling General Assembly resolutions 2529 (XXIV) of 5 December 1969,
More informationJOB CREATION AND ENTREPRENEURSHIP OPPORTUNITIES FOR SYRIANS UNDER TEMPORARY PROTECTION AND HOST COMMUNITIES IN TURKEY
JOB CREATION AND ENTREPRENEURSHIP OPPORTUNITIES FOR SYRIANS UNDER TEMPORARY PROTECTION AND HOST COMMUNITIES IN TURKEY TERMS OF REFERENCE FOR EXTERNAL COLLABORATOR FOR EVALUABILITY REVIEW Project Overview
More informationTERMS OF REFERENCE FOR CONSULTANTS
Implementing Innovative Approaches for Improved Water Governance (KSTA MON 51099) TERMS OF REFERENCE FOR CONSULTANTS 1. The knowledge and support technical assistance (TA) consultants will be recruited
More informationProposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
EUROPEAN COMMISSION Brussels, 20.9.2017 COM(2017) 538 final 2017/0232 (COD) Proposal for a REGULATION OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL amending Regulation (EU) No 1092/2010 on European Union
More informationINTERNAL AUDIT DIVISION AUDIT REPORT 2013/102
INTERNAL AUDIT DIVISION AUDIT REPORT 2013/102 Audit of the United Nations Conference on Trade and Development arrangements for initiation, review and clearance of technical cooperation projects Overall
More informationTerms of Reference (TOR)
Annex 4 Terms of Reference (TOR) Conducting Simplified Economic Appraisals for proposed labour intensive public infrastructure projects contributing to local economic development. 1. Project title: Simplified
More informationTHE WORLD BANK TERMS OF REFERENCE CONSTRUCTION PERMITS: PROCESS MAPPING AND RE-ENGINEERING
THE WORLD BANK TERMS OF REFERENCE CONSTRUCTION PERMITS: PROCESS MAPPING AND RE-ENGINEERING A. PROJECT BACKGROUND AND OBJECTIVES Project Background The Objective of the Multi-Donor Trust Fund (MDTF) financing
More informationMeasuring Our Performance Action plan
Measuring Our Performance Action plan First biennial survey of the health of CASA s relationship with industry Introduction This action plan has been prepared in response to the findings of the first biennial
More informationTERMS OF REFERENCE 1. BACKGROUND ECCSA. Demand Study for the Ethiopian Chamber of Commerce and Sectoral Associations (ECCSA) 1.1 Assignment background
ECCSA TERMS OF REFERENCE Sida Demand Study for the Ethiopian Chamber of Commerce and Sectoral Associations (ECCSA) July and August 2016 1. BACKGROUND 1.1 Assignment background The Ethiopian Chamber of
More informationBID REQUEST. External Quality Assessment Services against the Fair Trade Tourism Standard and Certification System March 2018
BID REQUEST External Quality Assessment Services against the Fair Trade Tourism Standard and Certification System March 2018 Contact: Ana Lemmer. E: ana@fairtrade.travel. T:012 342 2945 1. Bid Overview
More informationPROTOCOL ON RELATIONS BETWEEN THE AFRICAN ECONOMIC COMMUNITY AND THE REGIONAL ECONOMIC COMMUNITIES
PROTOCOL ON RELATIONS BETWEEN THE AFRICAN ECONOMIC COMMUNITY AND THE REGIONAL ECONOMIC COMMUNITIES THE PARTIES PREAMBLE INSPIRED by the provisions of the Treaty Establishing the African Economic Community
More informationTERMS OF REFERENCE. Internal Capacity Building for MSME Lending
TERMS OF REFERENCE Internal Capacity Building for MSME Lending 1. Background Outside the mining sector, the Mongolian economy is largely dominated by MSMEs, which accounted for 82 per cent of all companies
More informationTERMS OF REFERENCE CARIBBEAN INVESTMENT PROMOTION CERTIFICATION INITIATIVE (CIPCI)
TERMS OF REFERENCE CARIBBEAN INVESTMENT PROMOTION CERTIFICATION INITIATIVE (CIPCI) 1. BACKGROUND INFORMATION 1.1 Beneficiaries The primary beneficiaries under this initiative are the CARIFORUM Investment
More informationSTRATEGIC VISION FOR THE WORK OF ESCWA IN THE FIELD OF STATISTICS VERSION 2
UNITED NATIONS ECONOMIC AND SOCIAL COMMISSION FOR WESTERN ASIA STATISTICS DIVISION Fourth meeting of the Working Group Of the Statistical Committee Beirut, 3 4 February 2011 STRATEGIC VISION FOR THE WORK
More informationUoD IT Job Description
UoD IT Job Description Role: Service Delivery Manager (People HERA Grade: 8 Management Systems) Responsible to: Assistant Director (Business Services) Accountable for: Day to day leadership of team members
More informationREQUEST FOR PROPOSALS RFP #: EKACDM 11.4/ JUNE 2014
REQUEST FOR PROPOSALS RFP #: EKACDM 11.4/1.1.1 02 JUNE 2014 THE DISASTER RISK REDUCTION CENTRE INSTITUTE FOR SUSTAINABLE DEVELOPMENT THE UNIVERSITY OF THE WEST INDIES ENHANCING KNOWLEDGE AND APPLICATION
More informationConducting Feasibility Study and Developing Master Plan for Single Window Implementation. May, Sung Heun Ha KTNET KTNET.
Conducting Feasibility Study and Developing Master Plan for Single Window Implementation May, 2012 Sung Heun Ha KTNET KTNET www.ktnet.com Contents 1. Single Window in General 2. Conducting Feasibility
More informationTerms of Reference: Project Final Evaluation
Terms of Reference: Project Final Evaluation 1. Background Project: Implementing agency and partner(s): Project funding sources: Creating a space for the participation of Myanmar s civil society in policy
More informationCONSULTANCY AND EXTENSION SERVICES POLICY 2018
CONSULTANCY AND EXTENSION SERVICES POLICY 2018 On the recommendation of the Senate, the Council of the Wayamba University of Sri Lanka, as the governing authority of the, by resolution adopts the following
More informationModernizing Financial Management for Faster and More-Effective Decision Making
SAP Brief SAP SME s SAP Business ByDesign Objectives Modernizing Financial Management for Faster and More-Effective Decision Making Simplify your business operations with integrated financials Simplify
More informationInnovate 2 Succeed Invitation to Tender External Evaluator - June 2017
1. Introduction: Innovate 2 Succeed Invitation to Tender External Evaluator - June 2017 1.1 Invitation to Tender This is an invitation to submit a tender to provide services ( Services ) to meet the requirements,
More informationMINISTRY OF EDUCATION VOTE EDUCATION MINISTER FOR TERTIARY EDUCATION. 2010/11 Monitoring Report SECOND REPORT FOR THE YEAR ENDED 30 JUNE 2011
MINISTRY OF EDUCATION VOTE EDUCATION MINISTER FOR TERTIARY EDUCATION 2010/11 Monitoring Report SECOND REPORT FOR THE YEAR ENDED 30 JUNE 2011 1 JULY 2010 to 28 FEBRUARY 2011 1 Output Expense 7: Strategic
More informationREPORTING AND BUSINESS INTELLIGENCE
RSM TECHNOLOGY ACADEMY Syllabus and Agenda REPORTING AND BUSINESS INTELLIGENCE For Microsoft Dynamics 365 for Operations Course Details 3 Audience 3 At Course Completion 3 Course Cancellation Policy 4
More informationOfgem Incentive on Connections Engagement 2017/18 Key Performance Indicators
Ofgem Incentive on Connections Engagement 2017/18 Key Performance Indicators Q2 April-June 2017 Contents Key Performance Area Availability of Information Customer Service Connection Offers & Agreements
More informationTERMS OF REFERENCE Study to identify constraints to female participation in skills training and labor market in India
TERMS OF REFERENCE Study to identify constraints to female participation in skills training and labor market in India 1. Background The Government of India (GoI) introduced its National Policy for Skill
More informationTerms of Reference (TOR)
CONFÉRENCE DES NATIONS UNIES SUR LE COMMERCE ET LE DÉVELOPPEMENT UNITED NATIONS CONFERENCE ON TRADE AND DEVELOPMENT Terms of Reference (TOR) External Evaluation of Development Account Project 1213 I Strengthening
More informationNEPAD PLANNING AND COORDINATING AGENCY REQUEST FOR EXPRESSIONS OF INTEREST (RFP)
REQUEST FOR EXPRESSIONS OF INTEREST (RFP) PROVISION OF CONSULTANCY SERVICES AS A COMMUNICATION CONSULTANT FOR THE TECHNICAL AND OPERATIONAL SUPPORT IN DEVELOPING THE NEPAD COMMUNICATION STRATEGY AND ACTION
More informationCORE RESOURCE: REPLICATION APPLICATION ADDENDUM
CORE RESOURCE: REPLICATION APPLICATION ADDENDUM National Association of Charter School Authorizers 105 W. Adams Street, Suite 3500 Chicago, IL 60603-6253 www.qualitycharters.org Table of Contents Instructions...3
More informationfacilitating predictable outcomes in a constantly changing environment Establishing a Standard Chart of Accounts (SCOA)
facilitating predictable outcomes in a constantly changing environment Establishing a Standard Chart of Accounts (SCOA) A standard chart of accounts (SCOA) is a discrete set of items, or general-ledger
More informationProject details Project name As you wish for the lighting system or design to be referred to throughout the competition.
Entry Form Lighting for Building Performance Award This award recognises the lighting system or innovative lighting design that delivers the required illumination levels (on all relevant surfaces not just
More informationStatement of Work. Human Resources (HR) Health Check Engagement HR Function Process Assessment & Talent Management Process Assessment
www.pwc.com/ca Statement of Work Human Resources (HR) Health Check Engagement HR Function Process Assessment & Talent Management Process Assessment Submitted on August 8, 2017 for SPC on Finance on August
More informationICT Agency of Sri Lanka
ICT Agency of Sri Lanka Terms of Reference (ToR) Project Evaluation: ICT/BPO Industry Promotion Program (Situation Analysis) ICTA/GOSL/CO /CQS/2016/50 1.0 I TRODUCTIO 1.1 Project Background The ICT Capacity
More informationPROFESSIONAL SERVICES IOT FAST TRACK PROOF OF CONCEPT STATEMENT OF WORK TO VERIZON PROFESSIONAL SERVICES SERVICE ATTACHMENT
PROFESSIONAL SERVICES IOT FAST TRACK PROOF OF CONCEPT STATEMENT OF WORK TO VERIZON PROFESSIONAL SERVICES SERVICE ATTACHMENT 1. Description of Project. This Statement of Work (SOW) is entered into between
More informationConsultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III
Terms of Reference Consultant to support monitoring and evaluation planning for Capacity Development Partnership Fund (CDPF) Phase III UNICEF Cambodia 1. Background The Capacity Development Partnership
More information2012/13. Ministry of Education Output Plan. between. the Minister for Tertiary Education, Skills and Employment. and. the Secretary for Education
Te Tiilwlm ole Miitaura11ga 2012/13 Ministry of Education Output Plan between the Minister for Tertiary Education, Skills and Employment and the Secretary for Education 30 June 2012 Te Ttilmlm o tc Miifmmmga
More informationInformation for Development Program. Terms of Reference
Information for Development Program Terms of Reference ICTs & Education in the Caribbean: A Survey and Critical Review of their Use in Small Island Developing States infodev (www.infodev.org) invites eligible
More informationSECTOR SKILLS REVIEW ON THE ELECTRICITY SUB- SECTOR IN WEST AFRICA Ref: BJ-WAPP CS-CQS Consultant Qualification Selection TERMS OF REFERENCE
Economic Community Of West African States Communauté Economique Des Etats de l Afrique de l Ouest General Secretariat / Secrétariat Général SECTOR SKILLS REVIEW ON THE ELECTRICITY SUB- SECTOR IN WEST AFRICA
More informationREQUEST FOR PROPOSALS RFP #: EKACDM 1.2.1/YR3 DISASTER RISK REDUCTION CENTRE INSTITUTE FOR SUSTAINABLE DEVELOPMENT THE UNIVERSITY OF THE WEST INDIES
REQUEST FOR PROPOSALS RFP #: EKACDM 1.2.1/YR3 DISASTER RISK REDUCTION CENTRE INSTITUTE FOR SUSTAINABLE DEVELOPMENT THE UNIVERSITY OF THE WEST INDIES ENHANCING KNOWLEDGE AND APPLICATION OF COMPREHENSIVE
More informationPillar II. Institutional Framework and Management Capacity
PILLAR II. INSTITUTIONAL FRAMEWORK AND MANAGEMENT CAPACITY Pillar II. Institutional Framework and Management Capacity Pillar II assesses how the procurement system defined by the legal and regulatory framework
More informationMaking Access Possible (MAP) Nepal. Pre-bid briefing 21 May 2015
Making Access Possible (MAP) Nepal Pre-bid briefing 21 May 2015 Agenda 1. MAP Objectives 2. MAP Process 3. The MAP Nepal project management landscape 4. The MAP Research process 5. MAP Quality Control
More informationTERMS OF REFERENCE FOR JUNIOR NON-KEY EXPERT ON ACCOUNTING
TERMS OF REFERENCE FOR JUNIOR NON-KEY EXPERT ON ACCOUNTING 1 CONTRACT OBJECTIVES & EXPECTED RESULTS 2 1.1 Background to the Project 2 2 DESCRIPTION OF THE WORK 3 2.1 Activities to be carried out by the
More informationCOMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS
EUROPEAN COMMISSION Brussels, 2.10.2013 COM(2013) 686 final COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE
More informationISO INTERNATIONAL STANDARD. Quality management Guidelines for training. Management de la qualité Lignes directrices pour la formation
INTERNATIONAL STANDARD ISO 10015 First edition 1999-12-15 Quality management Guidelines for training Management de la qualité Lignes directrices pour la formation Reference number ISO 10015:1999(E) ISO
More information