1 SC110 Umoja Requisitioning Overview Umoja Requisitioning Overview Version 14.2 Last Modified: 23 July

2 Agenda Course Introduction Module 1: Requisitioning in Umoja Module 2: Creating Requisitions Module 3: Low Value Acquisitions Course Summary Course Assessment Course Survey 2

3 Course Overview The purpose of the Umoja Requisitioning Overview course is to explain the Requisitioning process in Umoja. This course will also explain the concept of Shopping Carts and introduce the concept of Low Value Acquisitions (LVAs). Prerequisite Review You should have completed the following prerequisite course: Umoja Overview Umoja Master Data & Coding Block Overview Umoja Material Master Data Overview Umoja Funds Management Overview Umoja ECC Navigation Umoja SRM Navigation Course Duration: 2 hours 3

4 Course Objectives After completing this course, you will be able to: Identify the important changes and benefits of Umoja for the Requisitioning process Describe the impact of Umoja Supplier Relationship Management (SRM) on the Requisitioning process List the key Enterprise Roles and responsibilities in the Requisitioning process Describe the concept and use of Shopping Carts Identify the different types of Master Data relevant for requisitioning Describe the new process for Low Value Acquisitions (LVAs) 4

5 Agenda Course Introduction Module 1: Requisitioning in Umoja Module 2: Creating Requisitions Module 3: Low Value Acquisitions Course Summary Course Assessment Course Survey 5

6 Module 1 Objectives After completing this module, you will be able to: Identify the important changes and benefits of Umoja for the Requisitioning process Describe the impact of Umoja SRM on the Requisitioning process List the key Enterprise Roles and responsibilities in the Requisitioning process 6

7 Key Terminology Key Term Contract Catalog ERP Central Component (ECC) Goods Receipt Low Value Acquisition (LVA) Material Master Description It is a searchable database of goods and services sourced from the existing Systems and Local Contracts from which Requisitioners can add items to their Shopping Carts. The main Umoja component comprising various modules. It is a document generated to acknowledge the receipt of delivered goods. It is a Purchase Order (PO) used for requirements that not exceeding $4,000 USD, issued without the direct involvement of Procurement. This replaces the current Short Form PO and Direct Expenditure processes. Material Master records contain all the information about the materials that the UN procures, stores and ships (Product Categories, Product IDs, etc.). The integration of all information about a material into a single record eliminates redundancy and makes it possible to store material data for all relevant system components in a single, central database. It is used to populate Shopping Carts, identify the goods required and is used in many other Supply Chain and Finance processes. 7

8 Key Terminology Key Term Product Category Product ID RFx Service Master Shopping Cart Supplier Relationship Management (SRM) Description Represents the general type of product or material and is part of the Material or Service Master Record. Product categories are a subset of United Nations Standard Products and Services Code (UNSPSC) classifications. A Product Category usually contains multiple Product IDs. It is the unique, specific ID number of a particular material or service that is a sub-set of a Product Category. This is identical to the Material or Service Number fields in ECC and is part of the Material or Service Master Record. The Product ID is not derived from the Product Category, but created by the UN during codification. It is a generic term for a Solicitation document. The x signifies that the solicitation document could either be an RFQ, RFP or ITB. Is equivalent to the Material Master, but is for all services procured by UN. Service Master Records are also stored in the same central database as Material Master Records. It is a term used in Umoja SRM for what is currently referred to as a Purchase Requisition. It is a Web-based Umoja application/component used specifically for procurement and requisitioning activities. 8

9 Roles & Responsibilities The following Umoja Source to Acquire (SA) Enterprise Roles are involved in the Requisitioning/Procurement process: Requisitioner (SA.01a & SA.01b) Requisitioner Direct Procurement (SA.02) Approver (SA.07a, SA.07b, SA.07d & SA.11) SA.01a Creates: Shopping Carts (previously referred to as Purchase Requisitions) for goods (for consumption) and services; Reservations for items to be obtained from inventory; and Service Entry Sheets for receipt of services in ECC. SA.01b - Creates Shopping Carts for Consultants and Independent Contractors; and Service Entry Sheets for receipt of services in ECC. Same transactions as the Requisitioner Role, however, can also create Shopping Carts for goods that will go into inventory. Reviews and approves or rejects supply chain documents: - SA.07a: Shopping Carts, Low Value Acquisition Purchase Orders (POs) and Service Entry Sheets. - SA.07b: Solicitation Documents, POs and contracts. - SA.07d: Letters of Assist (DFS, NY Only). - SA.11: MOU POs/Contracts (FBFD, DFS, NY only). * Appropriate delegations of authority is required 9

10 Roles & Responsibilities The following Umoja Enterprise Roles are involved in the Requisitioning process: Low Value Acquisitioner (SA.08) Buyer (SA.03) Buyer Supervisor (SA.06) Buyer LOA (SA.05) Creates Purchase Orders under the Low Value Acquisition (LVA) process for requirements not exceeding $4,000 USD. Creates Service Entry Sheets in ECC for the receipt of LVA services. Processes Shopping Carts through solicitations, POs and contracts and submits for approval. Manages groups of Buyers; performs workload redistribution; and allocates Shopping Carts to Buyers. Creates Purchase Orders for Letters of Assist (DFS, New York staff only). MOU Purchaser (SA.12) Creates Purchase Orders for goods and/or services under military MOUs (FBFD, DFS, NY only). 10

11 Requisitioning in Umoja The Requisitioning process is a self-service supply chain process wherein an authorized User identifies the need for goods or services and initiates a procurement request in the form of a Shopping Cart (replaces the previous Purchasing Requisitions ). For goods, this process is initiated only after the User confirms that requirement will not be issued from existing stock. The Requisitioning or Requisitioning Direct Procurement Enterprise Role is required to create Shopping Carts for procurement action in Umoja. This process is designed to empower authorized Users to be more self-sufficient and leverage existing contracts. This will expedite the procurement actions and allow the procurement staff to focus on strategic procurement activities. Umoja provides Requisitioners with the functionality to search on-line for goods or services that are covered in existing UN Systems and Local Contracts through the use of the Contract Catalog. 11

12 Major Changes A summary of the major changes in the UN Requisitioning and Procurement processes as a result of the Umoja implementation is given below: System Change One integrated system for all procurement activities that replaces disparate procurement systems (Mercury, ProcurePlus) that do not communicate, and allows real time financial integration, removing need for duplicate entry in legacy applications (SUN, IMIS) Workflow Approvals Workflows in Umoja SRM route documents and enable Approvers to have full visibility of all items that are awaiting their approval in the Work Overview screen. This reduces the need to follow up manually with the Requisitioners. LVAs The new Low Value Acquisition process enables the direct creation of Purchase Orders for requirements not exceeding $4,000 USD Automatic PO Generation Goods and services on existing contracts (Systems/Local Contracts) are stored in the Umoja Contract Catalog. Requisitioners can add these items directly to their Shopping Carts. When approved, a PO is automatically generated for review/ release by buyers. 12

13 Major Benefits The Umoja implementation will empower authorized users to be more self-sufficient in the Requisitioning process. The benefits for procurement are as follows: Increase the speed of procurement and improve efficiency and consistency Provide an integrated procurement environment across the Secretariat Build and maintain compliance through improved internal controls and reporting Enable intuitive and web-based requisitioning Facilitate easy access to the internal UN Contract Catalog containing all items from Systems and Local Contracts Maximize the use of automated Requisition to PO processes where a specific source of supply (existing contract) is available 13

14 Umoja SRM Functionality Umoja uses the SRM application for all requisitioning and procurement related activities excluding Service Entry Sheet which is created/approved in ECC. Umoja SRM is accessed through a Web-based portal (via internet browser). Umoja SRM uses Shopping Carts instead of the current Purchase Requisitions. Umoja SRM is used to: Create Shopping Carts Create LVAs Create RFxs Create Contracts Create POs Approve all SRM Documents* Requisitioner Low Value Acquisitioner Buyer and Buyer Supervisor Approver Note: Documents are routed to Approvers via workflow based on their configuration in the SRM organizational structure. A Delegations of Authority is required for the Approver Role i.e. approve Shopping Carts/LVAs/Service Entry Sheets (Certifying delegation) OR RFxs, POs and Contracts (Procurement delegation) etc. 14

15 Requisitioning Process in Umoja SRM - Summary UN Contract Catalog Items Published to the UN Contract Catalog UNGM Vendors Requisitioning (Create & Approve a Shopping Cart (SC)) Material/ Service Master No Contract Exists Re-occurring (Unfunded SC) Contract Exists (Funded SC) No Contract Exists One Time Buy (Funded SC) Buyer Receives the SC and Creates an RFx (Solicitation) Buyer Receives an Automatically Populated Purchase Order Buyer Receives the SC and Creates an RFx (Solicitation) Buyer Creates an Unfunded Contract that is Approved Purchase Order is Approved and Released Purchase Order is Approved and Released Receipt, Invoice & Payment Processing With the introduction of the UN Contract Catalog and integrated Master Data, the Requisitioning process will be more streamlined: For re-occurring requirements (Systems Contracts, multi-year contracts etc.), items can be solicited and published to the Contract Catalog (includes vendor, price, Incoterms etc.) Contract Catalog items are added to the Shopping Carts and upon approval (SA Approver), Umoja generates a populated Purchase Order (vendor, Product Category, ID, item, price etc.) that is forwarded to the Buyer for review, approval (SA Approver) and release For items that are not Contract Catalog items, Material and Service Master Data allows Requisitioners to add goods/services to Shopping Carts for solicitation Upon approval, a Shopping Cart is forwarded to the Buyer for issuance of an RFx and resulting PO 15

16 Material and Service Master Data The Material and Service Masters are Master Data objects that contain information about all services and products procured, stored and shipped by UN and are searchable in Umoja. A Product ID and corresponding Product Category are selected in Umoja to describe all goods and services: i.e. Digital Projector in Umoja = Product ID (Projector: Dig) and Product Category (Projectors, Supplies). Product IDs are linked to a Product Category and have defined Material Characteristics i.e. unit of measure, Physical and Financial Characteristics in the Material and Service Masters that cannot be changed by the Requisitioner. Type of material/service based on the UNSPSC classification Product Category Example: (Projectors, Supplies) Unique ID of a material/service linked to a Product Category Characteristics to enable Material Management Product ID Example: (Projector: Dig) Material Characteristics Example: Unit of Measure Material/Service Master Data Records Other Physical or Financial Characteristics Example: G/L Account 16

17 Learning Checkpoint 1 In Umoja, the LVA process generates what type of document(s): Select all that are correct. A. Purchase Requisitions B. Shopping Carts C. Purchase Orders D. Solicitations 17

18 Learning Checkpoint 1 In Umoja, the LVA process generates what type of document(s): Fill in the blank with the correct option. A. Purchase Requisition B. Shopping Cart C. Purchase Order D. Solicitation Option C is the correct answer. The LVAs bypass the need for a Shopping Cart and are processed as Purchase Orders. 18

19 Module 1 Summary The key points covered in this module are listed below: Umoja SRM is used to create Shopping Carts, LVAs, solicitations, purchase orders and contracts Umoja SRM s Shopping Cart feature will be used for requisitioning Workflow in SRM automatically routes the documents The Approver s Work Overview screen in Umoja SRM reduces manual follow-up for approving requisitions The LVA process will be used for requirements not exceeding $4,000 USD The key components of the Material/Service Master include Product ID, Product Category, Material Management characteristics and other physical or financial characteristics 19

20 Agenda Course Introduction Module 1: Requisitioning in Umoja Module 2: Creating Shopping Carts Module 3: Low Value Acquisitions Course Summary Course Assessment Course Survey 20

21 Module 2 Objectives After completing this module, you will be able to: Identify the main ways to add items to a Shopping Cart (previously referred to as Purchase Requisitions) Select account assignments and funding for a Shopping Cart Describe the approval process for Shopping Carts 21

22 Key Terminology Key Term Account Assignment Account Availability Check (AVC) UNSPSC (United Nations Standard Products and Services Code) Workflow Work Overview Description It is the funding information that is needed for all Shopping Carts/LVAs (includes applicable Funds and Funds Centers) before being submitted for approval. Refers to an automated check conducted before Shopping Carts are ordered to verify if the required funds are available. If funds are not available, the Shopping Cart cannot be submitted for approval. It is a UN system used by Umoja to classify products according to their category. It refers to Shopping Carts or other financial/procurement documents being automatically routed to the appropriate person(s) for review and/or approval. It is the screen in Umoja SRM that lists all the tasks that require an action by a user, such as approvals (Approver) or required revisions to Shopping Carts (Requisitioner). 22

23 Requisitioning vs. Reservations Requisitioner Inventory Manager Check Stock Requirement List Create Reservation Check Stock Requirement List Approve Reservation Goods Issue or Goods Transfer Similar to the current business practice, a Requisitioner should always determine if the required material/goods are already available, locally, in their Plant's inventory/stock prior to commencing a procurement activity (i.e. raising a Shopping Cart, previously referred to as a Purchase Requisition ). In Umoja, the Requisitioner can run a Stock Availability Report (Stock Overview) in ECC (T-Code: ZLE_STCK_OVRVW) to verify the availability of a material at their Plant, on the required date. Additional policies and/or guidance maybe issued in this respect by the responsible authority. If the material is available at their Plant, the Requisitioner can create a Reservation to request issuance of the material from stock. More information on the steps to create a Reservation is available in the Job Aid Creating a Reservation and in the Umoja Local Inventory Goods Movement course. If local stock is not available, the Requisitioner can then raise a Shopping Cart to commence procurement action.

24 Requisitioning Process Flow Estimate Total Value Create Shopping Cart Order Shopping Cart Approve Shopping Cart The diagram above depicts the process flow for creating a Shopping Cart in Umoja SRM. As previously mentioned, the Requisitioner or Requisitioner Direct Procurement Enterprise is required to create a Shopping Cart in Umoja. The Requisitioner determines the need for a good or service. Recall, that prior to creating a Shopping Cart the Requisitioner must ensure that the requirement (goods) will not be satisfied through existing inventory and that procurement action is required. The Requisitioner determines the quantity and estimates the total value over the lifetime of the requirement: If the estimated cost value is not exceeding $4,000 USD, the LVA process could be an option. The LVA process is described in more detail later in the course. If the item is being added from the Contract Catalog (Systems or Local Contract) the unit pricing is typically fixed and is automatically added to the Shopping Cart 24

25 Requisitioning Process Flow Estimate Total Value Create Shopping Cart Order Shopping Cart Approve Shopping Cart The Requisitioner creates the Shopping Cart by adding items to it. The User must enter the item specifics such as estimated price (unless the item is added from the Contract Catalog), quantities and delivery date, as well as, Account Assignment information, such as the Cost Center and the Fund. 25

26 Requisitioning Process Flow Estimate Total Value Create Shopping Cart Order Shopping Cart Approve Shopping Cart The Requisitioner then orders the Shopping Cart. Umoja SRM will perform an Account Availability Check (AVC) to determine if funds are available. A Shopping Cart cannot be submitted for approval if the required funds are not available.* The Shopping Cart is then routed to the appropriate Approver (Certifying Officer) through Workflow. Workflow is configured in Umoja prior to go-live based on discussions with the entities and appropriate delegations of authorities. The Approver reviews and either accepts or rejects the items (line by line) in the Shopping Cart. The Approvers use the Work Overview screen in Umoja SRM to see an up-to-date list of all items waiting for their approval. Note: * It is also possible to create an Unfunded Shopping Cart. These do not have budget impacts and replace the current $1 Purchase Requisitions used for the creation of Systems Contracts for example. 26

27 Adding Items to a Shopping Cart The three main ways to add an item to a Shopping Cart are as follows: Contract Catalog Search Internal Goods/Services Old Shopping Carts and Shopping Cart Templates 27

28 Umoja UN Contract Catalog Search UN Contract Catalog Search Internal Goods/Services Old Shopping Carts and Shopping Cart Templates Searching the UN Contract Catalog for an item is the easiest and most efficient way to requisition many goods and services. Items can be searched based on Product Category, product description, Contract ID or other criteria. Typically, all items in the Contract Catalog are identified/defined by a combination of the appropriate Product ID (very specific description) linked to a Product Category (higher level generic description) All items in the Contract Catalog are tied to existing Systems Contracts, including Local Contracts (multi-fiscal period requirements etc.) After these Shopping Carts are approved, a PO will automatically be generated and sent to the buyer to review/release. The PO could be to undertake procurement action or to add funding to a multi-fiscal period contract such as a lease, catering contract etc. If there are multiple contracts available for an item, the Requisitioner has the option to select the contract to be used 28

29 Internal Goods/Services UN Contract Catalog Search Internal Goods/Services Old Shopping Carts and Shopping Cart Templates If an item is not available from the Contract Catalog or if the items in the Contract Catalog are not appropriate, a Requisitioner can search for the Product ID and corresponding Product Category using the Material and Service Masters and add it to the Shopping Cart for solicitation Because the description and coding of items is standardized, identifying a product using the Material or Service Master enables faster processing of Shopping Carts through procurement and supports downstream process (e.g. goods receipt, inventory) and reporting. The Umoja SRM system will display a warning if the selected good/service is available through the Contract Catalog. Umoja will allow the Requisitioner to choose to select the item from the Contract Catalog or not. Note: Umoja provides the functionality to facilitate easy online searches of the Material and Service Masters. 29

30 Old Shopping Carts and Shopping Cart Template UN Contract Catalog Search Internal Goods/Services Old Shopping Carts and Shopping Cart Templates It is also possible to add items to a Shopping Cart by copying old Shopping Carts. The items can be modified as required prior to ordering the new Shopping Cart. If particular items are requisitioned on a regular basis, a Shopping Cart Template can be created with the items and saved to be used as a starting point for the creation of a Shopping Cart in the future. A Shopping Cart Template will pre-populate most of the required fields for the user. 30

31 Complete Item Details (Account Assignment) In order to determine the funding source, all Shopping Carts need to have accurate Account Assignment information before they can be ordered. The key fields that the Requisitioner needs to validate for Account Assignment are: Account Assignment Category Specifies what type of object in Umoja is being charged (for example Cost Center, Internal Order, WBS, Unfunded etc.) for the Shopping Cart. Fund Generally the same across an entity (example: UNIFIL = 20OLA). Funds Center Generally, the same across a self-accounting unit. All Cost Centers have an identical Funds Center. The Funds Center is prepopulated based on the Cost Center, which is defaulted based on the user profile. Recall that when the Requisitioner attempts to submit a Shopping Cart for approval, Umoja SRM will perform an AVC to verify if sufficient funds are available to cover the total value of the Shopping Cart. If funds are not available the Shopping Cart will not be submitted for approval. Only after the Funded Shopping Cart has been approved will there be budgetary impacts (i.e. a 'Pre-commitment' of funds). 31

32 Account Assignment Categories While the default Account Assignment Category of Cost Center is typically used in many offices for the majority of Shopping Carts, it may be necessary to select another option. The key Account Assignment Categories to be familiar with are: Cost Center Used for the majority of Shopping Carts, this option will charge the selected Cost Center (defaulted based on the Requisitioner s user attributes) for the estimated amount i.e (Supply Section). Asset An item defined as an Asset under IPSAS i.e. valued at $20,000 USD ( $5,000 USD for specified smaller entities) and for certain items (i.e. vehicles) valued at $5,000 USD. WBS (Work Breakdown Structure) Order (Internal Order) Used to collect costs and revenues for a specific event/simple project that has defined start and end dates and is usually temporary in nature and where costs should be segregated from other events or on-going operations to enable more detailed monitoring. Users would be advised when to requisition against an Internal Order. Used only for larger projects associated with the Project Management module of Umoja. Users would be advised when to requisition against a WBS. Unfunded Unfunded Shopping Carts are typically used to initiate the solicitations process to create an Unfunded Contract i.e. Systems Contract, multi-year contract, BPO. A funded Shopping Cart will subsequently be required to issue a PO to procure items or add internal funding. 32

33 Learning Checkpoint 1 The Account Availability Check is performed by the Umoja SRM system to check: Select the correct option. A. The availability of a Systems Contract B. The history of previous Purchase Orders C. The workflow needed for approval D. The availability of funds 33

34 Learning Checkpoint 1 The Account Availability Check is performed by the Umoja SRM system to check: Select the correct option. A. The availability of a Systems Contract B. The history of previous Purchase Orders C. The workflow needed for approval D. The availability of funds Option D is the correct answer. The Account Availability Check is performed to check whether the specified Fund is sufficient to cover the estimated value of the Shopping Cart. 34

35 Learning Checkpoint 2 Which of the following methods is NOT a method that can be used to add an item to a Shopping Cart? Select the correct option. A. Work Overview B. Internal Goods/Services C. Contract Catalog Search D. Old Shopping Carts and Shopping Cart Templates 35

36 Learning Checkpoint 2 Which of the following methods is NOT a method that can be used to add an item to a Shopping Cart? Select the correct option. A. Work Overview B. Internal Goods/Services C. UN Contract Catalog Search D. Old Shopping Carts and Shopping Cart Templates Option A is the correct answer. The Work Overview screen displays all items that require action for the user. It cannot be used to add items to a Shopping Cart. 36

37 Module 2 Summary The key points covered in this module are listed below: Umoja SRM automatically performs an Account Availability Check (AVC) to determine if funds are available for the Shopping Cart Shopping Carts will not be submitted for approval if funds are insufficient Three ways to add items to a Shopping Cart are: Contract Catalog search; Internal Goods/Services (Material/Service Masters); and Old Shopping Cart/Shopping Cart Templates The Approver s Work Overview screen in Umoja SRM lists all the items pending for approval 37

38 Agenda Course Introduction Module 1: Requisitioning in Umoja Module 2: Creating Requisitions Module 3: Low Value Acquisitions Course Summary Course Assessment Course Survey 38

39 Module 3 Objectives After completing this module, you will be able to: Describe when and how LVAs are used 39

40 Key Terminology Key Term Low Value Acquisition (LVA) Description It is a PO used for requirements not exceeding $4,000 USD, issued without the direct involvement of Procurement. This replaces the current Short Purchase Order Form and Direct Expenditure processes. 40

41 Low Value Acquisitions - Overview The Low Value Acquisition (LVA) process is used for ad-hoc requirements that do not exceed $4,000 USD. LVAs should typically not contain Contract Catalog Items, meaning those items linked to an existing Systems or Local Contract. The exception is if the item is a Contract Catalog Item from a Blanket Purchase Order (more to follow on this). The Low Value Acquisitioner Enterprise Role is required to undertake the LVA process in Umoja An approved LVA is a Purchase Order (PO) for goods or services and replaces and automates the current Short Form Purchase Order and Direct Expenditures processes Once approved by the Approver (Certifying Officer of the Cost/Fund Center selected), the PO can be issued to the Supplier directly without the involvement of the Buyer/Procurement 41

42 Low Value Acquisitions - Overview The Low Value Acquisitioner Enterprise Role can use the Low Value Acquisition (LVA) process to create a Purchase Order under the following conditions (in green below): - the item (good/service) does not exceed $4,000 and the item is not a contract catalog item (on an existing contract) OR - the item (good/service) does not exceed $4,000 and the item is a Blanket Purchase Order Contract Catalog Item (discuss further with the Procurement Office) Note only the scenario in green below is for action by the Low Value Acquisitioner Role. The red scenarios are for action by the Requisitioner or Requisitioner Direct Procurement Roles only. Order $ No Existing Contract* Use Low Value Acquisitioner Role LVA Process Order $ Contract Exists* Use Requisitioner Role * Excludes items from BPO Contracts Shopping Cart with Catalog Item * Items from BPO Contracts can be accessed using the LVA process Order >$4000 Use Shopping Cart Requisitioner Role 42

43 Purpose of LVAs The LVA process is designed to make users self-sufficient in procuring goods and services that are not exceeding $4,000 USD. The LVA process Reduces paperwork and processing times for LVAs Enables tracking and reporting of all LVAs across UN. This will improve visibility and allow for enhanced internal controls. It will also allow for a more detailed analysis of low value spending, potentially leading to the creation of new Systems Contracts 43

44 LVA Process LVAs can only be created by users with the Low Value Acquisitioner Role If a User does not have this Enterprise Role, they will not be able to create an LVA in Umoja SRM If a User has both the Requisitioner and Low Value Acquisitioner roles, they will have access to create both a Shopping Cart and an LVA The Supplier must be assigned when creating the LVA Generally, there are two sets of vendors available All vendors registered through the United Nations Global Market Place (UNGM) are available for both the LVA process and the regular Requisitioning and Procurement processes There is a separate set of vendors available for only the LVA process. These vendors did not enter through UNGM registration. More information on this subject is provided in the detailed LVA course. 44

45 LVA Process During the creation of an LVA, the user can attach documents or enter details related to the informal quotations received from the vendors and/or other documentation required as specified by the appropriate authority. The LVA process results in the automatic creation of a PO. This has two implications: A vendor must be assigned to the LVA prior to submission for approval When the LVA is approved, a Funds Commitment (i.e. previously referred to as an obligation) is created since a PO is created. This is different from a Shopping Cart which creates only a Funds Pre-Commitment on approval and upon the approval of a PO, a Funds Commitment is created. 45

46 Learning Checkpoint 1 Which of the following is true regarding the LVA process: Select the correct option. A. The LVA process creates a Shopping Cart that is approved by the Buyer as long as the cost does not exceed $4000 USD B. A user with the Requisitioner Enterprise Role can create an LVA as long as it does not exceed $4000 USD C. The Low Value Acquisitioner can create a Purchase Order up to $4,000 that is approved by the Approver (Certifying Officer) and issued directly to the supplier D. The LVA process creates a Purchase Order that is approved by the Approver (Certifying Officer) and the hard copy Purchase Order must be signed by the Buyer 46

47 Learning Checkpoint 1 Which of the following is true regarding the LVA process: Select the correct option. A. The LVA process creates a Shopping Cart that is approved by the Buyer as long as the cost does not exceed $4000 USD B. A user with the Requisitioner Enterprise Role can create an LVA as long as it does not exceed $4000 USD C. The Low Value Acquisitioner can create a Purchase Order not exceeding $4,000 that is approved by the Approver (Certifying Officer) and issued directly to the supplier D. The LVA process creates a Purchase Order that is approved by the Approver (Certifying Officer) and the hard copy Purchase Order must be signed by the Buyer Option C is the correct answer. LVAs are POs and once approved (by Certifying Officer) are issued directly to the supplier with no required involvement from Procurement. 47

48 Module 3 Summary The key points covered in this module are listed below: LVAs are forms of Purchase Orders The new LVA process enables tracking and reporting of all LVAs Vendors selection must be finalized for the LVA process 48

49 Agenda Course Introduction Module 1: Requisitioning in Umoja Module 2: Creating Requisitions Module 3: Low Value Acquisitions Course Summary Course Assessment Course Survey 49

50 Course Summary The key points covered in this course are listed below: Umoja SRM is used to create Shopping Carts, LVAs, solicitations, purchase orders, contracts and for approvals Umoja SRM s Shopping Cart feature will be used for Requisitioning LVA can be used for most requirements not exceeding $4,000 USD Umoja SRM automatically performs an AVC to determine if funds are available to fund the Shopping Cart prior to releasing for approval Key components of the Material/Service Master include: Product ID, Product Category, Material Management Characteristics and other physical or financial characteristics Three ways to add items to a Shopping Cart are: Contract Catalog; Internal Goods/Services; and Old Shopping Carts/Shopping Cart Templates The Approver s Work Overview screen in Umoja SRM lists all the items pending for approval The LVA process enables tracking and reporting of all LVAs Supplier selection must be finalized for the LVA process Upon approval, funds are committed in the LVA process as opposed to a pre-commitment in the Shopping Cart process 50

51 Agenda Course Introduction Module 1: Requisitioning in Umoja Module 2: Creating Requisitions Module 3: Low Value Acquisitions Course Summary Course Assessment Course Survey 51

52 Course Assessment Now that you have completed all the modules in this course, you can test your knowledge by completing the Course Assessment. To receive credit for completing this course, you must pass this assessment with a minimum score of 80%. To complete the assessment you must return to the Learning Management System: 1. Log into Inspira 2. Navigate to Main Menu -> Self-Service -> Learning -> My Learning 3. Search for the name of the course under the My Learning Activities section 4. Click the Start link of the course assessment 5. Click the Submit button once you have completed the assessment 52

53 Agenda Course Introduction Module 1: Requisitioning in Umoja Module 2: Creating Requisitions Module 3: Low Value Acquisitions Course Summary Course Assessment Course Survey 53

54 Course Survey Your feedback is important to the continuous improvement of our training program. Please complete the evaluation for this course using the following steps: 1. Log into Inspira 2. Navigate to Main Menu -> Self-Service -> Learning -> My Learning 3. Search for the name of the course under the My Learning Activities section 4. Click the Start link of the course survey 5. Click the Submit button once you have completed the course survey 54

55 Congratulations! You have successfully completed the Umoja Requisitioning Overview course. 55

SC110 Umoja Requisitioning Overview. Umoja Requisitioning Overview Version 12 1

SC110 Umoja Requisitioning Overview. Umoja Requisitioning Overview Version 12 1 SC110 Umoja Requisitioning Overview Umoja Requisitioning Overview Version 12 Last Copyright Modified: United 01-August-13 Nations 1 Agenda Course Introduction Module 1: Requisitioning in Umoja Module 2:

More information

Umoja Requisitioning

Umoja Requisitioning Umoja Requisitioning V3 (06 Dec 2016) Umoja Requisitioning Table of Contents Module 1: Enterprise Roles... 1 Enterprise Roles & Responsibilities... 1 Module 2: Related Umoja Courses... 2 Module Introduction...

More information

SC111 Umoja Procurement Overview. Umoja Procurement Overview Version 11 Last Modified : 14-Aug-13 Copyright United Nations

SC111 Umoja Procurement Overview. Umoja Procurement Overview Version 11 Last Modified : 14-Aug-13 Copyright United Nations SC111 Umoja Procurement Overview Umoja Procurement Overview Version 11 Last Modified : 14-Aug-13 1 Agenda Course Introduction Module 1: Supply Chain Master Data Module 2: Solicitations Module 3: Contracts

More information

SC328 Umoja Contract and PO Creation. Umoja Contract and PO Creation Version 5 1

SC328 Umoja Contract and PO Creation. Umoja Contract and PO Creation Version 5 1 SC328 Umoja Contract and PO Creation Umoja Contract and PO Creation Version 5 Copyright Last Modified: United 17-May-13 Nations 1 Agenda Course Introduction Module 1: Contracts in Umoja Module 2: Create

More information

SC112 Umoja Logistics Overview (Inbound Goods Process): PK & SPM. Umoja Logistics Overview (Inbound Goods Process): PK & SPM Version 17 1

SC112 Umoja Logistics Overview (Inbound Goods Process): PK & SPM. Umoja Logistics Overview (Inbound Goods Process): PK & SPM Version 17 1 SC112 Umoja Logistics Overview (Inbound Goods Process): PK & SPM Umoja Logistics Overview (Inbound Goods Process): PK & SPM Version 17 Copyright Last Modified: United 01-August-13 Nations 1 Agenda Course

More information

SC341 Umoja Requesting Services of Consultants and Individual Contractors

SC341 Umoja Requesting Services of Consultants and Individual Contractors SC341 Umoja Requesting Services of Consultants and Individual Contractors Umoja Requesting Services of Consultants and Individual Contractors Version 18 Last Modified: 20 November 2013 1 Agenda Course

More information

Umoja Cluster 4 Course Catalogue

Umoja Cluster 4 Course Catalogue Umoja Cluster 4 Course Catalogue 1 Course Curriculum Summary No. of Courses Training (hours) Total Curricula 72 596.5 1 Courses 18 37 2 Courses 5 10 3 Courses 49 549.5 2 Course Curriculum Summary No. of

More information

SEC302 Umoja Security GRC Analysis. Umoja Security GRC Analysis Version 8 1

SEC302 Umoja Security GRC Analysis. Umoja Security GRC Analysis Version 8 1 SEC302 Umoja Security GRC Analysis Umoja Security GRC Analysis Version 8 Last Copyright Modified: United 16-August-13 Nations 1 Agenda Course Introduction Module 1: User Access Risk Analysis Overview Module

More information

TV155 Umoja Travel Overview

TV155 Umoja Travel Overview TV155 Umoja Travel Overview 1 Agenda Course Introduction Module 1: Umoja Travel Overview Module 2: Travel Request Module 3: Travel Approval Process Course Summary Course Assessment 2 Course Overview The

More information

FI113 Umoja Accounts Payable Overview. Umoja Accounts Payable Overview Version 10 1

FI113 Umoja Accounts Payable Overview. Umoja Accounts Payable Overview Version 10 1 FI113 Umoja Accounts Payable Overview Umoja Accounts Payable Overview Version 10 Copyright Last Modified: United 01-Aug-13 Nations 1 Agenda Course Introduction Module 1: Financial Accounting in Umoja Module

More information

SC343 Umoja Managing Services of Consultants and Individual Contractors

SC343 Umoja Managing Services of Consultants and Individual Contractors SC343 Umoja Managing Services of Consultants and Individual Contractors Umoja Managing Services of Consultants and Individual Contractors Version 12 Copyright Last Modified: United 17-August-13 Nations

More information

FI334 Umoja Month-End Closing Process. Umoja Period and Year End Closing Process Version 17

FI334 Umoja Month-End Closing Process. Umoja Period and Year End Closing Process Version 17 FI334 Umoja Month-End Closing Process Umoja Period and Year End Closing Process Version 17 Last Copyright Modified: United 16-August-13 Nations 1 Agenda Course Introduction Module 1: Pre-closing Check/Readiness

More information

SC119 Umoja Plant Maintenance Overview. Umoja Plant Maintenance Overview Version 7 1

SC119 Umoja Plant Maintenance Overview. Umoja Plant Maintenance Overview Version 7 1 SC119 Umoja Plant Maintenance Overview Umoja Plant Maintenance Overview Version 7 Last Copyright Modified: 20 United February, Nations 2015 1 Agenda Course Introduction Module 1: Plant Maintenance Overview

More information

SC119 Umoja Plant Maintenance Overview. Umoja Plant Maintenance Overview Version 6 1

SC119 Umoja Plant Maintenance Overview. Umoja Plant Maintenance Overview Version 6 1 SC119 Umoja Plant Maintenance Overview Umoja Plant Maintenance Overview Version 6 Last Copyright Modified: 28 United October Nations 2014 1 Agenda Course Introduction Module 1: Plant Maintenance Overview

More information

TV155 Umoja Travel Overview. Umoja Travel Overview Version 3 Last Modified: 27-Sep-15 Copyright United Nations 1

TV155 Umoja Travel Overview. Umoja Travel Overview Version 3 Last Modified: 27-Sep-15 Copyright United Nations 1 TV155 Umoja Travel Overview Umoja Travel Overview Version 3 Last Modified: 27-Sep-15 Copyright United Nations 1 Agenda Course Introduction Module 1: Umoja Travel Overview Module 2: Travel Request Module

More information

Job Aid UNDP 2-0 Advance Replenishment

Job Aid UNDP 2-0 Advance Replenishment Job Aid UNDP 2-0 Advance Replenishment TABLE UNDP 2-0 Advance Replenishment Job Aid Table of Contents 1. UNDP Advance Overview... 1 1.1 Relevant T-codes for UNDP processes... 1 1.2 Glossary of Terminology...

More information

3142 Umoja Create Official Travel Request. Umoja Create Official Travel Request Version 4 Last Modified: 15-May-15 1

3142 Umoja Create Official Travel Request. Umoja Create Official Travel Request Version 4 Last Modified: 15-May-15 1 3142 Umoja Create Official Travel Request Umoja Create Official Travel Request Version 4 Last Modified: 15-May-15 1 Agenda Course Introduction Module 1: Travel Request Overview Module 2: Official Business

More information

Public Sector Procurement and Payables in Microsoft Dynamics AX 2012 Course 80415A: 3 Days; Instructor-Led

Public Sector Procurement and Payables in Microsoft Dynamics AX 2012 Course 80415A: 3 Days; Instructor-Led Public Sector Procurement and Payables in Microsoft Dynamics AX 2012 Course 80415A: 3 Days; Instructor-Led About this Course This course provides insight and guidance to procurement and sourcing features

More information

Overview Terminology. Buy A&M Terminology TAMUS Terminology Definition

Overview Terminology. Buy A&M Terminology TAMUS Terminology Definition Overview Terminology Buy A&M Terminology TAMUS Terminology Definition Accounts Payable Basic Purchasing Bid Accounts Payable Purchaser Bid; Solicitation Enter data from invoices received from vendors into

More information

Business Partners Commercial Supplier Management in Umoja

Business Partners Commercial Supplier Management in Umoja Business Partners Commercial Supplier Management in Umoja Objective & Scope The object of this presentation is to provide an overview of how commercial suppliers are managed in Umoja Entry points Replication

More information

SC320 Umoja Inbound Goods Process: PK & SPM. Umoja Inbound Goods Process: PK & SPM Version 26 1

SC320 Umoja Inbound Goods Process: PK & SPM. Umoja Inbound Goods Process: PK & SPM Version 26 1 SC320 Umoja Inbound Goods Process: PK & SPM Umoja Inbound Goods Process: PK & SPM Version 26 Copyright Last Modified: United 23 Aug Nations 13 1 Introduction Please share with us: Your name Your section/unit

More information

SC123 Umoja Logistics Overview for Non-Peacekeeping Entities

SC123 Umoja Logistics Overview for Non-Peacekeeping Entities SC123 Umoja Logistics Overview for Non-Peacekeeping Entities Umoja Logistics Overview (non-pk) Version 10 Last Copyright Modified: United 20-March-15 Nations Agenda Course Introduction Module 1: Umoja

More information

Job Aid Administration of Consultants and Individual Contractors

Job Aid Administration of Consultants and Individual Contractors Administration of Consultants and Individual Contractors Table of Contents Page Overview..3 Objectives...3 Enterprise Roles..3 Search for Business Partner (BP) Record Requisitioner.....4 Search and Request

More information

TV3146 Umoja Create Shipment Request. Umoja Create Shipment Request Version 3 1

TV3146 Umoja Create Shipment Request. Umoja Create Shipment Request Version 3 1 TV3146 Umoja Create Shipment Request Umoja Create Shipment Request Version 3 Copyright Last Modified: United 28-April-15 Nations 1 Agenda Course Introduction Module 1: Umoja Shipment Overview Module 2:

More information

80308: Procurement in Microsoft Dynamics AX 2012

80308: Procurement in Microsoft Dynamics AX 2012 Let s Reach For Excellence! TAN DUC INFORMATION TECHNOLOGY SCHOOL JSC Address: 103 Pasteur, Dist.1, HCMC Tel: 08 38245819; 38239761 Email: traincert@tdt-tanduc.com Website: www.tdt-tanduc.com; www.tanducits.com

More information

GDP Role Guides. Umoja Team 05 September 2017

GDP Role Guides. Umoja Team 05 September 2017 GDP Role Guides Umoja Team 05 September 2017 Table of Contents RD.01: RD Inbound Coordinator...2 RD.02: RD Property Control User...4 RD.04: RD Inventory User...6 RD.05: RD Inventory Senior User...8 RD.06:

More information

Grants Management - Pass-through Grant Execution

Grants Management - Pass-through Grant Execution Grants Management - Pass-through Grant Execution Umoja Grants Management Overview Version 1 Last Modified: 13 April 2015 1 Agenda Course Introduction Module 1: Overview of Pass-through Grant Execution

More information

Oracle R12 Procure to Pay

Oracle R12 Procure to Pay Oracle R12 Procure to Pay 4 days training for 1,695 exc. VAT Oracle R12 Procure to Pay Course Overview This course covers the full 'Procure to Pay' cycle from the point where a requirement for goods or

More information

IBM TRIRIGA Version 10 Release 4.0. Procurement Management User Guide

IBM TRIRIGA Version 10 Release 4.0. Procurement Management User Guide IBM TRIRIGA Version 10 Release 4.0 Procurement Management User Guide Note Before using this information and the product it supports, read the information in Notices on page 29. This edition applies to

More information

SC339 Umoja Local Inventory Goods Movement. Umoja Local Inventory Goods Movement Version

SC339 Umoja Local Inventory Goods Movement. Umoja Local Inventory Goods Movement Version SC339 Umoja Local Inventory Goods Movement Umoja Local Inventory Goods Movement Version 13.7 Copyright Last Modified: United 27-April-2015 Nations 1 Agenda Course Introduction Module 1: Local Inventory

More information

SC339 Umoja Local Inventory Goods Movement. Umoja Local Inventory Goods Movement Version

SC339 Umoja Local Inventory Goods Movement. Umoja Local Inventory Goods Movement Version SC339 Umoja Local Inventory Goods Movement Umoja Local Inventory Goods Movement Version 13.9 Copyright Last Modified: United 21-Sep-2015 Nations 1 Agenda Course Introduction Module 1: Local Inventory Goods

More information

Oracle Procure to Pay

Oracle Procure to Pay Oracle Procure to Pay Duration: 4 Days Course Code: FP2P Overview: This course covers the full 'Procure to Pay' cycle from the point where a requirement for goods or services is identified to the point

More information

MyFloridaMarketPlace Requisitioning 101 Workshop

MyFloridaMarketPlace Requisitioning 101 Workshop MyFloridaMarketPlace Requisitioning 101 Workshop Agenda MyFloridaMarketPlace Overview Purchasing Overview Creating Requisitions Approving Requisitions Receiving Goods Creating an Invoice Approving Services

More information

Processing of Expense Report. Umoja Processing Expense Report Version 3 Last Modified: 28-April-15 1

Processing of Expense Report. Umoja Processing Expense Report Version 3 Last Modified: 28-April-15 1 3147 - Processing of Expense Report Umoja Processing Expense Report Version 3 Last Modified: 28-April-15 1 Agenda Course Introduction Module 1: Overview (Expense Report Process) Module 2: Create Expense

More information

CS324 Umoja Lease Administration Process. Umoja Lease Administration Process Version 20 1

CS324 Umoja Lease Administration Process. Umoja Lease Administration Process Version 20 1 CS324 Umoja Lease Administration Process Umoja Lease Administration Process Version 20 Copyright Last Modified: United 22-Sep-14 Nations 1 Agenda Course Introduction Module 1: Lease Administration Overview

More information

INTRODUCTION to NAFWerX. AFMAN and AFI are still applicable when using the NAFWerX application.

INTRODUCTION to NAFWerX. AFMAN and AFI are still applicable when using the NAFWerX application. (20 May 2015) - 1 - INTRODUCTION to NAFWerX NAFWerX has been developed as tool for use by all Air Force Nonappropriated Fund Instrumentalities (NAFI). This system will allow procurement of supplies and

More information

FI-AA JA-2-1 Manual Acquisition of Asset (Current Year) Table of Contents

FI-AA JA-2-1 Manual Acquisition of Asset (Current Year) Table of Contents FI-AA JA-2-1 Manual Acquisition of Asset (Current Year) Table of Contents Overview... 2 Transactions:... 2 T1 Creating the Asset Master record (AS01)... 2 T2 Acquiring the Asset (F-90) Current fiscal year

More information

UNOE TRANSPORTATION MANAGEMENT END TO END PROCES

UNOE TRANSPORTATION MANAGEMENT END TO END PROCES UNOE TRANSPORTATION MANAGEMENT END TO END PROCES Transportation Planning and Management and Track & Trace (TPTM T&T project) 4 th December 2018 S R M PROCURE PLAN PROCURE FREIGHT EXECUTE & MONITOR UNOE

More information

FMC eprocure Sapphire Presentation. eprocure. best in class, cost efficient services via technology-driven procurement

FMC eprocure Sapphire Presentation. eprocure. best in class, cost efficient services via technology-driven procurement FMC Sapphire Presentation best in class, cost efficient services via technology-driven procurement FMC Overview Today, FMC Corporation is a leading global specialty chemical company serving agricultural,

More information

MyFloridaMarketPlace Requisitioning 101 Workshop

MyFloridaMarketPlace Requisitioning 101 Workshop MyFloridaMarketPlace Requisitioning 101 Workshop Agenda MyFloridaMarketPlace Overview Purchasing Overview Creating Requisitions Approving Requisitions Receiving Goods Creating Invoices Approving Services

More information

Rowdy Exchange Training Overview

Rowdy Exchange Training Overview Rowdy Exchange Training Overview Spring/Summer 2017 1 Course Objectives 2 Transition & Application Overview 3 New Purchasing Terminology 4 Navigation & User Profile 5 Shopping Catalogs and Forms 6 7 Requisition

More information

Fixed Scope Offering for Oracle Fusion Procurement. Slide 1

Fixed Scope Offering for Oracle Fusion Procurement. Slide 1 Fixed Scope Offering for Oracle Fusion Procurement Slide 1 Today s Business Challenges Adopt leading Global SCM practices & strategies across the entire enterprise value chain to move into the future.

More information

Oracle R12 Procure to Pay

Oracle R12 Procure to Pay Oracle R12 Procure to Pay Duration: 4 Days Course Code: FP2PR12 Overview: This course covers the full 'Procure to Pay' cycle from the point where a requirement for goods or services is identified to the

More information

Training Guide. (November 14, 2016) - 1 -

Training Guide. (November 14, 2016) - 1 - Training Guide (November 14, 2016) - 1 - INTRODUCTION to NAFWerX NAFWerX has been developed as a tool for use by Air Force Nonappropriated Fund Instrumentalities (NAFI). This system will allow procurement

More information

AggieBuy Allocator Quick Reference Guide

AggieBuy Allocator Quick Reference Guide Home Page: When logging in through SSO it should bring you to this page each time. Approvals: Click the approvals tab or Unassigned Approvals to see requisitions awaiting approval in your workflow folder.

More information

Requisitions REQ_300. Requisitions Requisitions

Requisitions REQ_300. Requisitions Requisitions Requisitions REQ_300 Requisitions 2-8-06 1 Requisitions 10-16-06 1 Prerequisites and Roles Prerequisites SAP R/3 Awareness and Navigation UK100 Roles Departmental Requisitioners Requisitions 2-8-06 2 Requisitions

More information

Microsoft MB6-871 Exam Questions & Answers

Microsoft MB6-871 Exam Questions & Answers Microsoft MB6-871 Exam Questions & Answers Number: MB6-871 Passing Score: 700 Time Limit: 180 min File Version: 40.2 http://www.gratisexam.com/ Microsoft MB6-871 Exam Questions & Answers Exam Name: Microsoft

More information

System Overview Training. MyFloridaMarketPlace Procure to Pay Overview

System Overview Training. MyFloridaMarketPlace Procure to Pay Overview System Overview Training MyFloridaMarketPlace Procure to Pay Overview AGENDA MyFloridaMarketPlace Overview Procure-to-Pay Process Vendors Solicitations Purchase Orders Receipts Invoices Invoice Reconciliations

More information

153 Umoja Organizational Management Overview

153 Umoja Organizational Management Overview 153 Umoja Organizational Management Overview 1 Course Overview The purpose of the Umoja Organizational Management Overview is to explain the different processes included in Organizational Management while

More information

Public Sector. Dynamics 365 for Finance and Operations

Public Sector. Dynamics 365 for Finance and Operations Public Sector This document walks you through an overview of the Public Sector functionality in Microsoft Dynamics 365 for Finance and Operations. Demo script June 2018 Send feedback. Learn more about

More information

How to Review Standard Orders and Process Billing. Table of Contents

How to Review Standard Orders and Process Billing. Table of Contents Table of Contents Overview... 2 Objectives... 2 Display List of Open Standard Orders... 3 Review Details of Standard Order... 6 Review Billing of Prior-Period Services... 20 Display, Change or Cancel Invoice...

More information

System Overview Training. MyFloridaMarketPlace Procure to Pay Overview

System Overview Training. MyFloridaMarketPlace Procure to Pay Overview System Overview Training MyFloridaMarketPlace Procure to Pay Overview AGENDA MyFloridaMarketPlace Overview Procure-to-Pay Process Vendors Solicitations Purchase Orders Receipts Invoices Invoice Reconciliations

More information

Dell E-Commerce guide for Skyward Users 1

Dell E-Commerce guide for Skyward Users 1 Dell E-Commerce guide for Skyward Users 1 This document contains instructions on how to use the e-commerce application running on Skyward s Business Suite to purchase from your Dell Premier Page. E-Commerce

More information

MyFloridaMarketPlace Disbursements 101. *This training replaces the former Invoicing 101 training.

MyFloridaMarketPlace Disbursements 101. *This training replaces the former Invoicing 101 training. MyFloridaMarketPlace Disbursements 101 *This training replaces the former Invoicing 101 training. Agenda MyFloridaMarketPlace Overview Invoice Overview Creating Invoices - PO-based Invoice - Contract-based

More information

Custom Historical Reports

Custom Historical Reports FAM: All Carts Ordered Custom Historical Data in these reports is refreshed nightly *Required Field This query shows the details of all carts ordered, including the organization unit of the submitter and

More information

Allocator Guide Table of Contents

Allocator Guide Table of Contents Allocator Guide Table of Contents What are my responsibilities as the Department Allocator?... 2 Training... 2 Required Allocator training... 2 Recommended Allocator Training... 2 Shopping... 3 Shopping

More information

FI321 Umoja Accounts Payable Process. Umoja Accounts Payable Process Version 15 1

FI321 Umoja Accounts Payable Process. Umoja Accounts Payable Process Version 15 1 FI321 Umoja Accounts Payable Process Umoja Accounts Payable Process Version 15 Copyright Last Modified: United 23-Feb-15 Nations 1 Agenda Course Introduction Module 1: G/L Accounts for Accounts Payable

More information

i2 Procurement i2 Solution i2 Procurement Version

i2 Procurement i2 Solution i2 Procurement Version A leading provider of closed-loop supply chain management solutions, i2 designs and delivers software that helps customers optimize and synchronize activities involved in successfully managing supply and

More information

SC350 Umoja Inbound Goods Process for Non-Peacekeeping Entities

SC350 Umoja Inbound Goods Process for Non-Peacekeeping Entities SC350 Umoja Inbound Goods Process for Non-Peacekeeping Entities Umoja Inbound Goods Process: Non-PK Version 20 Last Copyright Modified: United 20-March-2015 Nations 1 Agenda Course Introduction Module

More information

UCSB Business & Financial Services Procurement

UCSB Business & Financial Services Procurement UCSB Business & Financial Services Procurement Gateway Systems 101 (12/6/2016) Presented By: Kathleen Yabsley Last Modified Date: 11/2/2016 The 30,000ft View Gateway replaced low value (LVPA) and high

More information

Harness the power of ReQlogic

Harness the power of ReQlogic 1 Harness the power of ReQlogic We love ReQlogic for its great integration with Dynamics GP. It gives us a great level of comfort when it comes to data accuracy. We also like its light footprint and deployment

More information

PEOPLESOFT eprocurement

PEOPLESOFT eprocurement PEOPLESOFT eprocurement Provide visibility and control of indirect goods. Improve supplier relationships. Empower employees to make better, faster, more-informed decisions. An important part of supplier

More information

Copyright Basware Corporation. All rights reserved.. Permissions Guide Basware P2P 18.1

Copyright Basware Corporation. All rights reserved.. Permissions Guide Basware P2P 18.1 Copyright 1999-2017 Basware Corporation. All rights reserved.. Permissions Guide Basware P2P 18.1 1 General Permissions 1.1 General Access System (0) This permission gives a user/group access to the system.

More information

REQUISITIONS, PURCHASE ORDERS, AND REVIEWING PAYMENT INFORMATION

REQUISITIONS, PURCHASE ORDERS, AND REVIEWING PAYMENT INFORMATION REQUISITIONS, PURCHASE ORDERS, AND REVIEWING PAYMENT INFORMATION TABLE OF CONTENTS OVERVIEW... 2 CREATE A REQUISITION... 2 CREATE A BLANKET REQUISITION... 15 CREATE A REQUISITION FOR THE COMPUTER DEPOT...

More information

Rowdy Exchange Training Overview

Rowdy Exchange Training Overview Rowdy Exchange Training Overview Spring/Summer 2017 1 Course Objectives 2 Transition & Application Overview 3 New Purchasing Terminology 4 Navigation & User Profile 5 Shopping Catalogs and Forms 6 7 Requisition

More information

How to Update an Inbound Delivery

How to Update an Inbound Delivery Objective Use these procedures to update an Inbound Delivery document. Updates shall include information related to delivery date, actual quantity to be delivered and the uploading of any related documentation

More information

Purchasing. Shannon Soja, Tina Massaconi, Maria Pizzino, Peter Vander Veer (OSC) Divya Chadalavada (SFS) Tricia Holley (BSC)

Purchasing. Shannon Soja, Tina Massaconi, Maria Pizzino, Peter Vander Veer (OSC) Divya Chadalavada (SFS) Tricia Holley (BSC) Purchasing Shannon Soja, Tina Massaconi, Maria Pizzino, Peter Vander Veer (OSC) Divya Chadalavada (SFS) Tricia Holley (BSC) 1 Roadmap Procurement Card Use Purchase Orders Purchase Order and Contract Management

More information

ORACLE UPK PRE-BUILT CONTENT FOR: E-BUSINESS SUITE R12.2

ORACLE UPK PRE-BUILT CONTENT FOR: E-BUSINESS SUITE R12.2 ORACLE UPK PRE-BUILT CONTENT FOR: E-BUSINESS SUITE R12.2 Oracle s User Productivity Kit (UPK) is a collaborative content development platform that drives end-user and project team productivity throughout

More information

END-USER GUIDE. The Procure-to-Pay Process

END-USER GUIDE. The Procure-to-Pay Process END-USER GUIDE The Procure-to-Pay Process Version 1.1 June 30, 2016 Contents 1 The E-Procurement Process... 2 2 Creating Requests... 4 2.1 Shopping Catalogs... 4 2.2 Shop Off-Catalog... 7 2.3 Shopping

More information

Welcome To AggieBuy! High-Level System Overview 11/22/2017

Welcome To AggieBuy! High-Level System Overview 11/22/2017 Welcome To AggieBuy! High-Level System Overview 1 Notes on Today s Training This is a high-level overview of AggieBuy Separate Approvers information session is also available for AggieBuy Approvers, including

More information

MyFloridaMarketPlace Advanced Requisitioning

MyFloridaMarketPlace Advanced Requisitioning MyFloridaMarketPlace Advanced Requisitioning Learning Objectives Key Learning Objectives: Prerequisites for this training are that you have take Requisitioning 101 and have submitted or approved at least

More information

COE TRANSPORTATION MANAGEMENT END TO END PROCES

COE TRANSPORTATION MANAGEMENT END TO END PROCES COE TRANSPORTATION MANAGEMENT END TO END PROCES Transportation Planning and Management and Track & Trace (TPTM T&T project) December 2018 D LIST COE PLAN NON- PROCURE FREIGHT NON- EXECUTE & MONITOR NON-

More information

1z0-963.exam. https://www.gratisexam.com/ Oracle. 1z Oracle Procurement Cloud 2017 Implementation Essentials. Version 1.0

1z0-963.exam. https://www.gratisexam.com/ Oracle. 1z Oracle Procurement Cloud 2017 Implementation Essentials. Version 1.0 1z0-963.exam Number: 1z0-963 Passing Score: 800 Time Limit: 120 min File Version: 1.0 https://www.gratisexam.com/ Oracle 1z0-963 Oracle Procurement Cloud 2017 Implementation Essentials Version 1.0 Exam

More information

MyFloridaMarketPlace Change Review Board (CRB) Meeting. August 6, 2015

MyFloridaMarketPlace Change Review Board (CRB) Meeting. August 6, 2015 MyFloridaMarketPlace Change Review Board (CRB) Meeting August 6, 2015 Agenda Completed Change Requests CRs in Review Each agency provided MFMP with a primary and backup member. If the primary representative

More information

ebuy Supplier Portal Training Webinar

ebuy Supplier Portal Training Webinar ebuy Supplier Portal Training Webinar Download this document at: http://www.mjn.com/supplierlink/ (Go to Supplier Portal section) March 1, 2011 v2.0 Training Agenda Portal Setup Procure to Pay Process

More information

SUGMAYA END USER DOCUMENT FOR MATERIAL MANAGEMENT PURCHASE ORDER FOR PROJECTS

SUGMAYA END USER DOCUMENT FOR MATERIAL MANAGEMENT PURCHASE ORDER FOR PROJECTS ERP - PROJECT SUGMAYA END USER DOCUMENT FOR MATERIAL MANAGEMENT PURCHASE ORDER FOR PROJECTS TABLE OF CONTENTS 1DOCUMENT CONTROL... 4 1.1 DOCUMENT HISTORY...4 1.2 DISTRIBUTION...4 2. BUSINESS PROCESS...5

More information

Reining in Maverick Spend. 3 Ways to Save Costs and Improve Compliance with e-procurement

Reining in Maverick Spend. 3 Ways to Save Costs and Improve Compliance with e-procurement 3 Ways to Save Costs and Improve Compliance with e-procurement Contents The Need to Eliminate Rogue Spending Exists for all Businesses...3 Leveraging Technology to Improve Visibility...5 Integrate your

More information

Create Contract Requisition

Create Contract Requisition This job aid describes the steps to submit a requisition for new City Attorney contract requests. 1. Type Create Requisition in the Workday Search field (partial words will work). 2. Select Create Requisition

More information

ACUMATICA CLOUD KEY BENEFITS ACCESS YOUR ERP ANYTIME FROM ANY DEVICE, EASILY SCALE RESOURCES, AND CHOOSE YOUR DEPLOYMENT OPTION WORK THE WAY YOU WANT

ACUMATICA CLOUD KEY BENEFITS ACCESS YOUR ERP ANYTIME FROM ANY DEVICE, EASILY SCALE RESOURCES, AND CHOOSE YOUR DEPLOYMENT OPTION WORK THE WAY YOU WANT ACUMATICA CLOUD ACCESS YOUR ERP ANYTIME FROM ANY DEVICE, EASILY SCALE RESOURCES, AND CHOOSE YOUR DEPLOYMENT OPTION For many small and midsize businesses, choosing software as a service (SaaS) offers the

More information

digital business solution d.velop procurement for SAP ERP

digital business solution d.velop procurement for SAP ERP digital business solution d.velop procurement for SAP ERP Procurement application workflow in SAP ERP d.velop procurement for SAP ERP is a solution developed specifically for SAP, digitizing and largely

More information

Skyward User s Manual

Skyward User s Manual Skyward User s Manual Skyward School Business Suite, Purchasing / Receiving Prepared for Leon County School District Date: January 2014 Version 2.0 TABLE OF CONTENTS Chapter 1. Logging into Skyward...

More information

Purchase Requisitions and Receiving

Purchase Requisitions and Receiving Purchase Requisitions and Receiving VERSION: February 2018 Table of Contents About the Purchasing Process 3 Working With Requester Preferences 5 Creating a New Purchase Requisition 9 Reporting a Misuse

More information

Creating Early Entry Requisitions Job Aid

Creating Early Entry Requisitions Job Aid State of Wisconsin Department of Administration Creating Early Entry Requisitions Job Aid Version 1.0 Version History Version Date Editor Description 1.0 5/5/16 Will Kammerait Initial Release 2.0 5/11/16

More information

Job Aid. Equipment Creation Post Go-Live

Job Aid. Equipment Creation Post Go-Live Equipment Creation Post Go-Live : Equipment Creation Post Go-Live Job Aid Table of Contents Overview... 2 Objectives... 2 Trigger... 2 Manual Creation of Equipment Single Record... 4 Enterprise Roles &

More information

SAP FICO Course Content

SAP FICO Course Content Introduction to SAP R/3 Introduction to ERP, Advantages of SAP over other ERP Packages Introduction to SAP R/3 FICO Financial Accounting Basic Settings: Definition of company Definition of company code

More information

Procurement and Sourcing. Microsoft Dynamics AX 2012 R3

Procurement and Sourcing. Microsoft Dynamics AX 2012 R3 Procurement and Sourcing Microsoft Dynamics AX 2012 R3 Table of Contents Course Details 1 Prerequisites 2 Course Outline 3 Agenda 8 Course Details This two-day instructor-led course, Procurement and Sourcing

More information

Configuring E-Procurement to Achieve Early Wins

Configuring E-Procurement to Achieve Early Wins Configuring E-Procurement to Achieve Early Wins The automation of business processes enables procurement departments to go beyond savings in creating business value for stakeholders. Failure to do so negatively

More information

AVANTUS TRAINING PTE LTD

AVANTUS TRAINING PTE LTD Project Essentials in Microsoft Dynamics AX 2012 Course 80316A: 2 Days; Instructor-Led About this Course This two-day instructor-led course provides students with the knowledge and skills to set up the

More information

A basic knowledge of ERP concepts will help you in understanding the concepts of SAP Material Management System described in this tutorial.

A basic knowledge of ERP concepts will help you in understanding the concepts of SAP Material Management System described in this tutorial. About the Tutorial SAP is an enterprise resource planning software that was basically designed to manage resources, information and activities that are required to complete business processes such as procurement

More information

Best of Breed Automation September 2014

Best of Breed Automation September 2014 www.pwc.com Best of Breed Automation September 2014 Tom Torlone Managing Director, US Leader Shared Services and Outsourcing Advisory Tom is a Managing Director at and is the U.S. Leader of the firm s

More information

Grant Execution: Implementing Partners. Table of Contents

Grant Execution: Implementing Partners. Table of Contents Grant Execution: Table of Contents Overview.. 2 Chapter 1 Background..2 Chapter 2 Advance to Implementing Partner..4 Chapter 3 Settlement Process 17 Chapter 4 Multiple Advances and Settlements 28 Chapter

More information

MyFloridaMarketPlace Contracts Seminar

MyFloridaMarketPlace Contracts Seminar MyFloridaMarketPlace Contracts Seminar AGENDA MyFloridaMarketPlace Overview Contracts Overview Contract Requests and Creating Contracts Changing a Contract Adjusting a Contract Amount Creating Invoices

More information

wvoasis Procurement Part I State Purchasing Conference Camp Dawson October 4th and 5th, 2018

wvoasis Procurement Part I State Purchasing Conference Camp Dawson October 4th and 5th, 2018 wvoasis Procurement Part I State Purchasing Conference Camp Dawson October 4th and 5th, 2018 Objectives 1. To provide an overview of wvoasis procurement functionality 2. To explain the structure and role

More information

National Grid -Supplier Enablement. Frequently Asked Questions for Suppliers

National Grid -Supplier Enablement. Frequently Asked Questions for Suppliers National Grid -Supplier Enablement Frequently Asked Questions for Suppliers National Grid 10/24/2018 Frequently Asked Questions As part of our continuous engagement with our suppliers, National Grid has

More information

REQUISITIONS, PURCHASE ORDERS, AND REVIEWING PAYMENT INFORMATION USER GUIDE

REQUISITIONS, PURCHASE ORDERS, AND REVIEWING PAYMENT INFORMATION USER GUIDE REQUISITIONS, PURCHASE ORDERS, AND REVIEWING PAYMENT INFORMATION USER GUIDE Please note: This user guide is intended for online use, and has a number of embedded links. Printing of these documents is discouraged,

More information

Umoja Travel Claim and Finance Integration Course UNHQ

Umoja Travel Claim and Finance Integration Course UNHQ Umoja Travel Claim and Finance Integration Course UNHQ Umoja Travel Claim and Finance Integration v1 Last Modified: 21-June-2015 Course Overview The purpose of this course is to provide participants with

More information

The Order Hub. Bringing E-Commerce Capabilities to Maximo

The Order Hub. Bringing E-Commerce Capabilities to Maximo The Order Hub Bringing E-Commerce Capabilities to Maximo P2Insight BACKGROUND At P2Insight, we focus on one thing: Extending Maximo with E- Commerce capabilities Extending Maximo to enable collaboration

More information

APSSDC E-Invoicing Module. User Instructions Document for APSSDC ERP

APSSDC E-Invoicing Module. User Instructions Document for APSSDC ERP APSSDC E-Invoicing Module User Instructions Document for APSSDC ERP INTRODUCTION APSSDC aims at becoming a paperless organisation by leveraging technology to transform every aspect of process and activities

More information

December 2012 Customer Satisfaction Survey Results 91% of survey respondents are satisfied

December 2012 Customer Satisfaction Survey Results 91% of survey respondents are satisfied To: The Boston University Community Date: January 16, 2013 From: Richard Stack, Director Sourcing & Procurement Subject: December 2012 Customer Satisfaction Survey Results We would like to thank everyone

More information

Buy A&M Implementation Core Team Readiness Guide. May 2015

Buy A&M Implementation Core Team Readiness Guide. May 2015 Buy A&M Implementation Core Team Readiness Guide May 2015 Agency Readiness Components This workbook is designed to assist the Buy A&M Core Team in completing required readiness tasks for the Buy A&M Implementation.

More information