Using ModelBuilder to Evaluate Risk and Prioritize Sewer Upgrades

Size: px
Start display at page:

Download "Using ModelBuilder to Evaluate Risk and Prioritize Sewer Upgrades"

Transcription

1 ESRI User Conference 2015 Using ModelBuilder to Evaluate Risk and Prioritize Sewer Upgrades July 2015 Presenters: Erin Smith (City of Alameda) Andy Baldwin (RMC Water and Environment)

2 ESRI User Conference 2015 Using ModelBuilder to Evaluate Risk Agenda 1. Background and Goals 2. Risk Analysis 1. Likelihood / Consequence of Failure 2. Risk Model Approach 3. Risk Analysis using ArcGIS ModelBuilder 1. Model Design and Development 2. ModelBuilder: Tricks and Tips 4. Risk Analysis Results and CIP Planning 2

3 Sewer Master Plan - Background Project Background Flow monitoring and hydraulic modeling used to identify infiltration/inflow and capacity issues Evaluate Structural condition assessment through CCTV Sewer master plan defines 20+ year CIP Background and Goals Risk Analysis Goals Evaluate likelihood and consequence of failure of sewer infrastructure Assign total risk scores to all pipes Use risk scores to identify and prioritize CIP projects Update risk scores as collection system changes 3

4 Using ModelBuilder to Update Risk Risk Management General: Implement standard procedures for updating the risk model to support the City s on-going CIP program Key requirements: Re-evaluate risk using GIS Use ModelBuilder to automate process Update risk when GIS is updated Use risk scores to prioritize CIP projects 4

5 Risk Analysis - Approach Risk Analysis Likelihood of Failure: Structural Hydraulic Operational I/I Consequence of Failure: Triple Bottom Line Evaluation in GIS 5

6 Why Evaluate Risk? CIP Prioritization Risk Model General: Use risk factors (total score) to identify and prioritize CIP projects Replace or rehab pipe prior to failure Minimize expensive emergency repairs Meet regulatory requirements CIP Projects (Example)

7 Likelihood of Failure - Factors LOF Factors Likelihood Category Indicator Weight (%) Likelihood Score 1 (Low) (High) Condition 1 Highest structural grade (from CCTV) Pipe Age < 20 years 20 to < 40 years 40 to < 60 years 60 to < 80 years >= 80 years Operations O&M Score (from CCTV) 20 <= > 9 Capacity Predicted Surcharge 10 No surcharge or not in model Model predicts surcharge resulting from backwater conditions N/A Model predicts surcharge resulting from throttle conditions Model shows surcharging due to throttle pipe resulting in spills Inflow / Infiltration Inflow Grade 20 Low N/A Medium N/A High 7

8 Risk Model - Condition Scoring Approach Risk Model 10 Grade 4/5 Grade 2/3 Score Score Ratio (R) Grade Defect Count (C) Number of Grade 4/5 defects that would trigger a pipe replacement. This value is defined by the user based on pipe replacement policies Score = Score Ratio (R) x Defect Count (C) Total Score = (R 4/5 x C 4/5 ) + (R 2/3 x C 2/3 ) + (R 1 x C 1 )

9 Hydraulic: Surcharging Indicates Capacity and Overflow Risks LOF Factors 9

10 LOF Factors Inflow / Infiltration: Consent Decree Targets to reduce Wet Weather Flows to Bay 10

11 Triple Bottom Line Consequence of Failure (COF) Evaluation Economic Environmental Social Economic Direct cost to repair Social Impacts to society and customers Environmental Violations and degradation to the natural environment

12 Consequence of Failure - Summary COF Factors Consequence Category Indicator Weight (%) Consequence Score 1 (Low) (High) Economic Diameter (Flow Volume) 30 <= 8 10 to to to 27 > 27 Road Type Local NA Collector Arterial CALTRAN Community (Social) 30 Land Use Other N/A Commercial District School Hospital, Fire Station Easements N/A N/A Yes N/A N/A Environmental Distance to Surface Waters 40 N/A N/A N/A 50 to < 250 ft. < 50 ft. Distance to Storm Inlet N/A N/A N/A 50 to < 250 ft. < 50 ft. 12

13 Environmental: Water Bodies and Storm Inlets COF Factors Water Bodies Bay Inland waterways Storm Water Storm Inlets 13

14 Risk Model Approach Total Score Risk Model LOF Scores COF Scores 14

15 Risk Model - COF Weighted Scoring Example Risk Model Pipes Pipe 1 Pipe 2 Pipe 3 Economic (30%) Pipe Size Social (30%) Highest Score Used Roads Land Use Easements inch Arterial Comm. Public None inch Local Comm. Private None inch Local Comm. Public None Env (40%) Highest Water Score / Storm Weighted Average Score Weighted Average Score = 3.9 = 5 x 30% + 8 x 30% + 0 x 40% Non-Weighted Average Score = 4.3 = ( ) / 3 (= 5 x 33.3% + 8 x 33.3% + 0 x 33.3%)

16 GIS Tools Risk Analysis using ArcGIS ModelBuilder Use ArcGIS ModelBuilder to build and document risk model Tools designed for City to update risk model Utilize out-of-the-box GIS processes (no custom software) 16

17 ModelBuilder Risk Tools ModelBuilder Design and Development Risk tools bundled into an ArcGIS Toolset Tools grouped into Pre-Processing, Risk Analysis and Mapping Core processes utilize sub-models similar to software library routines (eg; Risk Core Engine) 17

18 ModelBuilder Risk Tools ModelBuilder: Pre-Processing Example 18

19 ModelBuilder: Risk Engine Module ModelBuilder Risk Tools Risk Scoring Engine calculates the risk score for each sewer pipe. Risk criteria entered Core processes utilize submodels similar to software library routines (eg; Risk Core Engine) Utilizes the Iterator Row Selection 19

20 Using ModelBuilder ModelBuilder: Tips and Tricks Spatial Join tool works intermittently Test tools before adding to model layout Use model variable to define absolute project path name Linking tables from MS Access is painful! 20

21 Risk Analysis Results LOF Scores Risk Analysis Results 21

22 Risk Analysis Results COF Scores Risk Analysis Results 22

23 Risk Analysis Results Total Scores Risk Analysis Results 23

24 Using the Risk Model CIP Prioritization Risk Model General: Use risk factors (total score) to identify and prioritize CIP projects Other factors that impact CIP projects: Pavement program schedule Regulatory / internal rehab targets (miles per year) Project grouping practical benefits CIP budget CIP Projects (Example)

25 Summary: Using ModelBuilder to Evaluate Risk Summary Risk model provides a rational basis for prioritizing projects for CIP Use of GIS tools and ModelBuilder provide an efficient and repeatable process Agency staff can update the risk analysis and CIP as data and conditions change 25

26 THANK YOU! ESRI User Conference 2015 Using Model Builder to Evaluate Risk and Prioritize Sewer Upgrades Presenters: Erin Smith (City of Alameda) Andy Baldwin (RMC Water and Environment)

The City of Tacoma s GIS-Centric Wastewater Asset Performance Modeling Approach

The City of Tacoma s GIS-Centric Wastewater Asset Performance Modeling Approach The City of Tacoma s GIS-Centric Wastewater Asset Performance Modeling Approach Tacoma s Sanitary Sewer Upfront Information Tacoma is located within Puget Sound on Commencement Bay Over 90,000 Customers

More information

Section 8 System Evaluation and Capacity Assurance Plan (SECAP)

Section 8 System Evaluation and Capacity Assurance Plan (SECAP) System Evaluation and Capacity Assurance Plan (SECAP) The WDR requires owners and operators of sewer collection systems to have a (SECAP). This component involves preparing and implementing a Capital Improvement

More information

IMPLEMENTING AN ADAPTIVE CAPITAL IMPROVEMENT PLAN

IMPLEMENTING AN ADAPTIVE CAPITAL IMPROVEMENT PLAN IMPLEMENTING AN ADAPTIVE CAPITAL IMPROVEMENT PLAN MATTHEW WHITMAN IT TECH SUPPORT ANALYST CITY/COUNTY UTILITIES, WINSTON-SALEM NC BRIAN LENDT GISP B&V SR, GIS SPECIALIST ESRI INTERNATIONAL USER CONFERENCE

More information

Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1

Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1 Newberg Inflow and Infiltration Study WES 2017 PETER OLSEN, PE EMILY FLOCK, EI 1 What is Infiltration and Inflow? Infiltration and inflow (I/I) represent extraneous groundwater and storm water runoff that

More information

Risk Assessment Toolbox

Risk Assessment Toolbox Risk Assessment Toolbox A Custom ArcGIS Toolbox for Wastewater Asset Management Case Study: SJRA, The Woodlands, TX Matt Stahl, EIT Conducted with John D Antoni, PE and Umer Khan, EIT Alan Plummer Associates,

More information

TO REPLACE? TO REHAB? TO UPSIZE? THAT IS THE QUESTION.

TO REPLACE? TO REHAB? TO UPSIZE? THAT IS THE QUESTION. TO REPLACE? TO REHAB? TO UPSIZE? THAT IS THE QUESTION. CITY OF IRVING WASTEWATER SYSTEM MASTER PLAN Jessica Brown, P.E. Thomas Haster, P.E. Freese and Nichols, Inc. April 16, 2009 ACKNOWLEDGEMENTS City

More information

Clean Water 2020 Program

Clean Water 2020 Program Clean Water 2020 Program INFRASTRUCTURE REHABILITATION PROGRAM (IR Program) November 2016 Updated March 2017 Table of Contents Infrastructure Rehabilitation Program 2016 List of Tables... 2 List of Figures...

More information

NJ Future CSO Permittee Meeting

NJ Future CSO Permittee Meeting NJ Future CSO Permittee Meeting 1 Best Practices Carter Strickland, JD HDR 2 Getting the Best LTCP CSO controls will be expensive Include Best Practices to Maximize visible and tangible benefits Create

More information

Infiltration and Inflow. Michael Sassaman Phone

Infiltration and Inflow. Michael Sassaman Phone Infiltration and Inflow Michael Sassaman msassaman@entecheng.com Phone 610-373-3345 Inflow and Infiltration PA DEP Learning Objectives Do you have Excessive I/I? Sources of Inflow and Infiltration I/I

More information

Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives

Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives Measure Twice, Cut Once Using Flow Monitoring Data to Re-evaluate Wet Weather Improvement Alternatives Barbara Moranta, PE CDM Smith Multi-Million Dollar Upgrades Planned for Crooked Creek Basin Planning

More information

Good to Great: A More Dynamic and Robust Linear Asset Management Program. Presented By: Jonathan Okafor, P.E. Fairfax County Paul Longo Dewberry

Good to Great: A More Dynamic and Robust Linear Asset Management Program. Presented By: Jonathan Okafor, P.E. Fairfax County Paul Longo Dewberry Good to Great: A More Dynamic and Robust Linear Asset Management Program Presented By: Jonathan Okafor, P.E. Fairfax County Paul Longo Dewberry Outline What is Asset Management? Fairfax County Overview

More information

Leveraging Lucity Data for Water and Sewer Asset Management Rehabilitation Planning and Prioritization

Leveraging Lucity Data for Water and Sewer Asset Management Rehabilitation Planning and Prioritization Leveraging Lucity Data for Water and Sewer Asset Management Rehabilitation Planning and Prioritization Innovyze at a Glance 49 of the top 50 cities in US Innovyze is also proud to have... 84 of the top

More information

PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES

PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES PROPERTY OWNERS MEETING SEWER SERVICE CHARGE RATES Burlingame Hills Sewer Maintenance District Burlingame Public Library Lane Community Room 480 Primrose Road Burlingame, CA May 23, 2007 6:30 P.M. County

More information

System Evaluation and Capacity Assurance Plan

System Evaluation and Capacity Assurance Plan City of Cedar Hills System Evaluation and Capacity Assurance Plan The City of Cedar Hills believes that one of the keys to preventing sanitary sewer overflows is to evaluate system capacity and to monitor

More information

Smarter: Denton s bottom up asset

Smarter: Denton s bottom up asset Empowering Employees to Work Smarter: Denton s bottom up asset management plan P. S. Arora, P.E. Director Wastewater Utilities City of Denton, Texas Presentation Scope Why asset management Software tools

More information

Town of New Castle, New Hampshire Sewer Infrastructure Evaluation

Town of New Castle, New Hampshire Sewer Infrastructure Evaluation Town of New Castle, New Hampshire Sewer Infrastructure Evaluation March 2016 EXECUTIVE SUMMARY The Town of New Castle (Town) is working collaboratively with the City of Portsmouth (City) to consider options

More information

WEF Collection Systems Conference Managing the Useful Life of Your Segmented Block Combined Sewer

WEF Collection Systems Conference Managing the Useful Life of Your Segmented Block Combined Sewer Managing the Useful Life of Your Segmented Block Combined Sewer Dianne M Sumego, P.E. Black & Veatch ABSTRACT Following two road collapses, as a result of deterioration within the City s segmented block

More information

Streamlining I/I Repairs in Berlin Charter Township

Streamlining I/I Repairs in Berlin Charter Township Case Study: Streamlining I/I Repairs in Berlin Charter Township Presented by: Rich Grant, PE Agenda Discussion of the problems & the SAW I/I Evaluation & SSES = Asset Management Groundtruthing of Results

More information

The New Age for Sewer Planning at the City of Los Angeles

The New Age for Sewer Planning at the City of Los Angeles The New Age for Sewer Planning at the City of Los Angeles Mario Dimzon 1 * P.E., Fernando Gonzalez 1 P.E., Ali Poosti 1 PE, Adel Hagekhalil 1 PE, Erick Heath 2 P.E., Rajan Ray 2 P.E., Erin Breen 2 P.E.

More information

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois

Updating the MWRD s Excessive Infiltration and Inflow Control Program. February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois Updating the MWRD s Excessive Infiltration and Inflow Control Program February 19, 2014 Southwest Conference of Mayors Chicago Ridge, Illinois MWRD SEPARATE SEWER AND COMBINED SEWER AREAS LEGEND: Separate/Unsewered

More information

Capacity Assurance in Charlotte s Central Business District

Capacity Assurance in Charlotte s Central Business District November 2017 Capacity Assurance in Charlotte s Central Business District Micah Burgess, PE Barbara Moranta, PE October 2017 Charlotte Water Facts Provides Water and Sanitary Sewer Service to Mecklenburg

More information

Improved Pipeline Renewal Planning Using Advanced Risk Assessment Practices

Improved Pipeline Renewal Planning Using Advanced Risk Assessment Practices Improved Pipeline Renewal Planning Using Advanced Risk Assessment Practices Imagine 1 22 April the 2015 result 2014 ARCADIS Celine Hyer, PE Conveyance Market Sector Leader Discussion Agenda Overview of

More information

To Build or not to Build: Field Verification for Capital Planning

To Build or not to Build: Field Verification for Capital Planning To Build or not to Build: Field Verification for Capital Planning Michael Stover City/County Utilities Tina Whitfield - HDR 2017 HDR, Inc., all rights reserved. Agenda 01 02 03 04 Setting the Stage The

More information

SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns

SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns SSES Implementation and SSES Pilot Study Program Large-Scale Rehabilitation in Multiple Towns Jason F. Waterbury, P.E. The Metropolitan District 555 Main Street Hartford, CT 06142 Katelyn M. Biedron, P.E.

More information

Hurricane Matthew Preparedness & Recovery with Cityworks

Hurricane Matthew Preparedness & Recovery with Cityworks Hurricane Matthew Preparedness & Recovery with Cityworks Esri Water Conference Feb 7-9, 2017 Orlando Fl. Greg Baird Director of Enterprise Strategies Cityworks gbaird@cityworks.com With Asset Management

More information

Sewer Modeling of Near- Term Development Technical Memorandum

Sewer Modeling of Near- Term Development Technical Memorandum Sewer Modeling of Near- Term Development City of Reedley, CA March 8, 2018 Page Intentionally Blank The City of Reedley (City) is anticipating near-term developments to the north of the City s currently

More information

BOROUGH OF ALBURTIS SEWER DEPARTMENT

BOROUGH OF ALBURTIS SEWER DEPARTMENT BOROUGH OF ALBURTIS SEWER DEPARTMENT Capacity, Management, Operations, and Maintenance Program for Sewers Borough of Alburtis Lehigh Co., Pennsylvania February 2018 Prepared for: BOROUGH OF ALBURTIS 260

More information

WEF Collection Systems Conference 2017

WEF Collection Systems Conference 2017 Large Scale, Priority-Driven Field Data Collection through to Rehabilitation: How DeKalb County Department of Watershed Management Managed Multiple Assessment Contractors to Target and Coordinate Sewer

More information

SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM

SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM SWIMMING IN SUCCESS, NOT I/I WHAT MADE IT WORK CLEVELAND, TENNESSEE S SCOPE 10 PROGRAM Travis E. Wilson, PE 1, Greg Clark, PE 2 twilson@smeinc.com 1 S&ME, Inc., Murfreesboro, Tennessee 2 Cleveland Utilities,

More information

PROPERTY OWNERS MEETING SEWER SERVICE RATES

PROPERTY OWNERS MEETING SEWER SERVICE RATES PROPERTY OWNERS MEETING SEWER SERVICE RATES Fair Oaks Sewer Maintenance District (District) Garfield School 3600 Middlefield Road North Fair Oaks May 9, 2017 6:30 P.M. Department of Public Works OVERVIEW

More information

The Queen City - Cincinnati, Ohio

The Queen City - Cincinnati, Ohio The Queen City - Cincinnati, Ohio GETTING STARTED Reactive Maintenance Culture Transition From: Long, difficult road Proactive Maintenance Culture = Asset Management Best Practices Seattle Public Utilities

More information

Community Open House

Community Open House Mayor Kasim Reed The Department of Watershed Management & Atlanta Memorial Park Conservancy Community Open House 10/28/2016 1 AGENDA: Meet & Greet Opening Remarks & Introductions District 8 Council Member

More information

2.3.3 Defining Metrics Refining Survey Questions Arranging Data in a Matrix Reviewing Performance Indicators 18

2.3.3 Defining Metrics Refining Survey Questions Arranging Data in a Matrix Reviewing Performance Indicators 18 Table of Contents Chapter 1 Understanding Wastewater Collection System Problems and Needs 1.1 Purpose of a Wastewater Collection System 2 1.2 Problems 2 1.3 O&M Programs 4 1.3.1 Types of Maintenance 5

More information

Sanitary Sewer System Master Plan for Water Environment Services. Final January

Sanitary Sewer System Master Plan for Water Environment Services. Final January Sanitary Sewer System Master Plan for Water Environment Services Final January 2 0 1 9 JETT Number: A X 0 9 0 7 1 8 1 1 2 2 P D X Document Title Final January 2019 Project No: 672585.03.30.10.12.02 Document

More information

3/27/2018. Today s Presentation. Baltimore Department of Public Works. Background and Overview. Key Programs / Initiatives. Data Management / GIS

3/27/2018. Today s Presentation. Baltimore Department of Public Works. Background and Overview. Key Programs / Initiatives. Data Management / GIS American Council of Engineering Companies (ACEC) Maryland Chapter Asset Management in City DPW Asset Management March in 28, Baltimore 2018 City DPW Today s Presentation Background and Overview Key Programs

More information

Springfield, MO SSO Control Program: Using Big Data to Chart Progress

Springfield, MO SSO Control Program: Using Big Data to Chart Progress Springfield, MO SSO Control Program: Using Big Data to Chart Progress 30 August 2017 Richard Hayslett & Josh Tedder Springfield s Overflow Control Plan 10 year, $200 Million Phase 1 Foundation Projects

More information

EPA Consent Decree Taming the Condition Monster. Annette Duron, Interim Director, SAWS Erin Mills, P.E., Freese and Nichols, Inc.

EPA Consent Decree Taming the Condition Monster. Annette Duron, Interim Director, SAWS Erin Mills, P.E., Freese and Nichols, Inc. EPA Consent Decree Taming the Condition Monster Annette Duron, Interim Director, SAWS Erin Mills, P.E., Freese and Nichols, Inc. Agenda SAWS Background Condition CD Requirements Basin Planning Consultants

More information

The Case for Operational Optimization

The Case for Operational Optimization The Case for Operational Optimization MSD of Greater Cincinnati s Wet Weather Challenge and Opportunity Southwest Ohio experiences over 40 inches of rain in a typical year, and, as is common in an urban

More information

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques

Agenda. Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques Streamlining I/I Repairs in Berlin Charter Township.. Innovative Techniques MWEA Collections System Seminar September 2012 Presented by: Elaine Venema, PE Rich Grant, PE Agenda Discussion of the problems

More information

EPA Consent Decree Annual Informational Meeting Integrated Plan/Regional Wet Weather Management Plan. January 22, 2019

EPA Consent Decree Annual Informational Meeting Integrated Plan/Regional Wet Weather Management Plan. January 22, 2019 EPA Consent Decree Annual Informational Meeting Integrated Plan/Regional Wet Weather Management Plan January 22, 2019 Annual Public Meeting Requirements of the Consent Decree after providing reasonable

More information

Portland At a Glance 7/23/2014. Asset Management for Sanitary Sewer Systems - Beyond CMOM and Asset Management. APWA 2014 Congress August 17, 2014

Portland At a Glance 7/23/2014. Asset Management for Sanitary Sewer Systems - Beyond CMOM and Asset Management. APWA 2014 Congress August 17, 2014 APWA 2014 Congress August 17, 2014 Asset Management for Sanitary Sewer Systems - Beyond CMOM and Asset Management Portland named America s most livable city in 2009 -Forbes One of the Where to Live NOW

More information

Mobile GIS Transforms Operations at St. Johns County Utilities

Mobile GIS Transforms Operations at St. Johns County Utilities Mobile GIS Transforms Operations at St. Johns County Utilities St. Johns County Utilities is using technology that transforms how they manage and provide water, waste water, and reuse water to 100,000

More information

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter

SSO- WDR Compliance Workshop Electronic Reporting: Reporting Requirements & Tips. Sewer System Management Plan Chapter Chapter Contents Introduction SSMP Requirements and Suggested Content SSMP Preparation Deadlines Introduction This chapter provides a brief overview of the GWDR requirements for an SSMP and provides some

More information

Sewer Condition Assessment & Rehabilitation. Presented by Elizabeth Ehret, PE

Sewer Condition Assessment & Rehabilitation. Presented by Elizabeth Ehret, PE Sewer Condition Assessment & Rehabilitation Presented by Elizabeth Ehret, PE June 22, 2011 Agenda PACP Report (what to expect to receive from CCTV crew) PACP Grading System Using Grading System and Other

More information

SEWERSHED PRIORITIZATION WORK PLAN. Department of Public Works Wastewater Infrastructure Redevelopment Program

SEWERSHED PRIORITIZATION WORK PLAN. Department of Public Works Wastewater Infrastructure Redevelopment Program SEWERSHED PRIORITIZATION WORK PLAN Department of Public Works Wastewater Infrastructure Redevelopment Program SEPTEMBER 30, 2013 Sewershed Prioritization Work Plan Contents 1.0 Introduction... 1-1 1.1

More information

APPENDIX 14. Inflow and Infiltration in the CRD

APPENDIX 14. Inflow and Infiltration in the CRD APPENDIX 14 Inflow and Infiltration in the CRD As documented in the CRD-published discussion paper Cost versus Benefit of Reducing Inflow and Infiltration inflow and infiltration refers to rainwater and

More information

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update

Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update Study Session Wastewater Enterprise, Proposed Improvement Projects and Projected Funding Needs Update February 24, 2015 Overview Wastewater Collection System Customer Base 16,276 SFR 1,968 MFR 1,364 COM/IND

More information

Sausalito-Marin City Sanitary District

Sausalito-Marin City Sanitary District Sausalito-Marin City Sanitary District Wet Weather Improvements and Needed Rate Increase Directors Norman C. Wohlschlaeger. President Ann Arnott, Vice President Donald L. Beers William R. Berkman Raymond

More information

WASTEWATER ASSET MANAGEMENT PLAN

WASTEWATER ASSET MANAGEMENT PLAN Must be kept on file and available upon request until 2032 (per 2014 MDEQ/SAW grant requirements) WASTEWATER ASSET MANAGEMENT PLAN CITY OF NORTON SHORES, MI May 2017 Where we re going: System Goals INTRODUCTION

More information

The New Standard to Pipe Asset Management. Presented by: Laurie L. Perkins, PE

The New Standard to Pipe Asset Management. Presented by: Laurie L. Perkins, PE The New Standard to Pipe Asset Management Presented by: Laurie L. Perkins, PE NASTT-NE November 17, 2016 Background PACP Updates MACP/LACP Updates Risk Management Program Benefits V7 Software Certification

More information

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS

INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS 1 of 5 8/1/2013 2:10 PM INFLOW & INFILTRATION CORRECTION VIA LATERAL LINE DITCH LEAK REPAIRS Project Location and Description Glen Mayberry, Project Manager Roy F. Weston, Houston, TX The project is in

More information

Columbia s $750M Consent Decree: Program Update and Improvements in the O&M and Management Processes

Columbia s $750M Consent Decree: Program Update and Improvements in the O&M and Management Processes Bryan Cully, PE Columbia s $750M Consent Decree: Program Update and Improvements in the O&M and Management Processes November 2017 October 2017 Agenda Who is Columbia and what s going on? Year 4 of the

More information

Storm Water and Sanitary Sewer

Storm Water and Sanitary Sewer Public Works Department Summary Report on Planned Capital Improvements Storm Water and Sanitary Sewer Introduction Public Works has assembled this summary report to highlight major capital improvements

More information

City of San Carlos. Sewer Collection System Master Plan. Water and Environment

City of San Carlos. Sewer Collection System Master Plan. Water and Environment City of San Carlos Sewer Collection System Master Plan January 2013 Final Report Water and Environment January 2, 2013 Mr. Jay Walter, P.E. Public Works Director/City Engineer City of San Carlos 600 Elm

More information

Rehabilitating a 105-inch Interceptor Innovations and Lessons Learned

Rehabilitating a 105-inch Interceptor Innovations and Lessons Learned Rehabilitating a 105-inch Interceptor Innovations and Lessons Learned Pipe User Group Northern California March 13, 2018 Tim Karlstrand and Gary Warren Agenda System Overview Project Need Video Lessons

More information

City of Chico Sewer System Management Plan

City of Chico Sewer System Management Plan City of Chico Sewer System Management Plan Updated July 2014 Table of Contents I-1 Background... i I-2 System Overview... i I-3 Definitions... ii Element 1 Goals...1-1 Element 2 Organization...2-1 2.1

More information

Using GIS to Assess Risk and Prioritize Storm Sewer Maintenance, Repair and Replacement

Using GIS to Assess Risk and Prioritize Storm Sewer Maintenance, Repair and Replacement Using GIS to Assess Risk and Prioritize Storm Sewer Maintenance, Repair and Replacement Liz Stout, P.E. City of Minneapolis Janna Kieffer, P.E. Barr Engineering Co. CEAM Conference January 27, 2016 Agenda

More information

STORMWATER ASSET MANAGEMENT:

STORMWATER ASSET MANAGEMENT: STORMWATER ASSET MANAGEMENT: DEFINING THE ASSETS CONDITION John Martin, City of Sylvan Lake Nicole Selais, Hubbell, Roth & Clark, Inc. Janice Lerg, Hubbell, Roth & Clark, Inc. MWEA WATERSHED & STORMWATER

More information

ADDENDUM II BLOOMINGTON CITY COUNCIL AGENDA DECEMBER 15, 2014

ADDENDUM II BLOOMINGTON CITY COUNCIL AGENDA DECEMBER 15, 2014 ADDENDUM II BLOOMINGTON CITY COUNCIL AGENDA DECEMBER 15, 2014 CORRECTION TO CONSENT AGENDA Item 6K. Agreement for Scheduled Replacement of Trucks for Parks, Recreation and Cultural Arts Department s Parks

More information

The Metropolitan District Status of LTCP Update. January 9, 2017

The Metropolitan District Status of LTCP Update. January 9, 2017 The Metropolitan District Status of LTCP Update January 9, 2017 Agenda CH2M Hill LTCP Peer Review/Water Quality Analysis CDM Smith LTCP Update & CSO Meters Affordability Analysis 3 Hartford MDC - LTCP

More information

LEHIGH COUNTY REGIONAL SEWER SYSTEM

LEHIGH COUNTY REGIONAL SEWER SYSTEM LEHIGH COUNTY AUTHORITY Lowhill Township New Tripoli, PA 18066 LEHIGH COUNTY REGIONAL SEWER SYSTEM Kline s Island WWTP EPA Administrative Order Public Meeting Lehigh County Government Center November 13,

More information

Wastewater Collection System Infrastructure Condition Update

Wastewater Collection System Infrastructure Condition Update Wastewater Collection System Infrastructure Condition Update Planning Committee May 12, 2015 Agenda Background Condition Assessment Findings Gravity Interceptors Force Mains Pump Stations Phased Capital

More information

TECHNICAL MEMORANDUM

TECHNICAL MEMORANDUM Attachment 1 TECHNICAL MEMORANDUM DATE: January 8, 2015 TO: Richard Chiu Jr., P.E. City Engineer and Public Works Director FROM: Vivian W. Housen, P.E., RCE No. 46324 SUBJECT: In July 2014, the Town of

More information

The Wastewater Tsunami is Coming

The Wastewater Tsunami is Coming The Wastewater Tsunami is Coming How do we stop it? Trooper Smith, PE, Freese and Nichols, Inc. Jennifer Baldwin, Ph.D., PE, Jacobs Outline Project Background Central Basin Rilling Road Storage 30% Design

More information

City of Elmhurst Comprehensive Flooding Plan December 5, 2011

City of Elmhurst Comprehensive Flooding Plan December 5, 2011 December 5, 2011 City of Elmhurst Comprehensive Flooding Plan December 5, 2011 Sanitary Sewer System Summary of Findings Prepared by CBBEL RJN Group Sanitary Sewer Presentation Outline Where: Sources of

More information

A Transformation in Collection System Optimization: The Implementation of a Real Time Decision Support System in South Bend, IN

A Transformation in Collection System Optimization: The Implementation of a Real Time Decision Support System in South Bend, IN A Transformation in Collection System Optimization: The Implementation of a Real Time Decision Support System in South Bend, IN August 25, 2015 Timothy Ruggaber, P.E. Patrick Henthorn, P.E. Agenda Real

More information

Implementing a Risk- Based Main Replacement Strategy at EWEB

Implementing a Risk- Based Main Replacement Strategy at EWEB Eugene Water & Electric Board Implementing a Risk- Based Main Replacement Strategy at EWEB Chris Irvin, Senior Engineer PNWS-AWWA 2017 Presentation Overview About EWEB Introduction to risk concepts and

More information

Watershed Management Plan

Watershed Management Plan SESWA Annual Conference City of Atlanta Watershed Management Plan 24 October 2013 Agenda I. Purpose of the WMP II. Why plan for the future? III. Watershed management prioritization IV. Capital improvement

More information

Framework for Comprehensive. Rehabilitation MACP Provides. Manhole Assessment & Collection System Specialty Conference

Framework for Comprehensive. Rehabilitation MACP Provides. Manhole Assessment & Collection System Specialty Conference Manhole Assessment & Rehabilitation MACP Provides Framework for Comprehensive Program Iowa Water Environment Association Collection System Specialty Conference March 9-11, 2011 - Marshalltown, Iowa Andrew

More information

System - Wide Hydraulic Model

System - Wide Hydraulic Model System - Wide Hydraulic Model Department of Watershed Management (DWM) Capacity, Management, Operations, and Maintenance (CMOM) Program January 2013 Version 1 Contents DEKALB COUNTY DWM Contents... i Acronyms...

More information

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 15, 2011

CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 15, 2011 CITY OF ENCINITAS CITY COUNCIL AGENDA REPORT Meeting Date: June 15, 2011 TO: VIA: FROM: SUBJECT: City Council Phil Cotton, City Manager Jennifer Smith, Finance Director Lawrence A. Watt, Public Works Director

More information

MWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018

MWRD Infiltration and Inflow Control Program Compliance Update. Committee of the Whole Meeting April 3, 2018 MWRD Infiltration and Inflow Control Program Compliance Update Committee of the Whole Meeting April 3, 2018 Presentation Outline Background on MWRD s Watershed Management Ordinance Wastewater, Infiltration

More information

Section 9 Monitoring, Measurement, and Program Modifications

Section 9 Monitoring, Measurement, and Program Modifications Monitoring, Measurement, and Program Modifications One of the critical components of a comprehensive SSMP program is the development and tracking of performance indicators. Performance indicators describe

More information

Planning Committee February 10, 2015

Planning Committee February 10, 2015 Leland Reservoir Replacement Planning Committee February 10, 2015 Open-Cut Reservoir Projects Permanently out of service Completed Next five years (FY2016-20) Construction beyond FY2020 LELAND RESERVOIR

More information

Leveraging GIS Data to Prevent Water Pollution. Presented By: Mike Homenuke, EIT Kerr Wood Leidal Associates Ltd. (KWL)

Leveraging GIS Data to Prevent Water Pollution. Presented By: Mike Homenuke, EIT Kerr Wood Leidal Associates Ltd. (KWL) Leveraging GIS Data to Prevent Water Pollution Presented By: Mike Homenuke, EIT Kerr Wood Leidal Associates Ltd. (KWL) URISA BC Environmental Decision Making with GIS June 10, 2008 Overview Sewers and

More information

SEATOWN. BEATING CSOs IN. Seattle Public Utilities approaches overflow problems with a unique big-picture perspective

SEATOWN. BEATING CSOs IN. Seattle Public Utilities approaches overflow problems with a unique big-picture perspective HUMAN SIDE: STAY INTERVIEWS ENGAGE EMPLOYEES, REDUCE TURNOVER PAGE 24 BETTER MOUSETRAPS: POLYPROPYLENE PIPE PROVIDES QUICK, EFFICIENT SOLUTION PAGE 36 SEWER: CIPP CURES COON RAPIDS COLLECTIONS SYSTEM PROBLEMS

More information

City of Asheville Capital Improvements and Risk Based Planning. April

City of Asheville Capital Improvements and Risk Based Planning. April City of Asheville Capital Improvements and Risk Based Planning April 19 2016 Introduction City of Asheville Water System System Characteristics: 125,000 Customers 20.5 MGD Distribution System 3 Treatment

More information

#-I. SUPPLEMJl.NT AGENDA ITEM# ~, l) Distributed: Ip J \ 4'--./ l'---'4::: Deborah Padovan. Subject: Attachments: To: From: Sent:

#-I. SUPPLEMJl.NT AGENDA ITEM# ~, l) Distributed: Ip J \ 4'--./ l'---'4::: Deborah Padovan. Subject: Attachments: To: From: Sent: Deborah Padovan From: Sent: To: Subject: Attachments: #-I SUPPLEMJl.NT AGENDA ITEM# ~, l) Distributed: Ip J \ 4'--./ l'---'4::: Wednesday, June 18, 2014 11:26 PM Carl Cahill; Deborah Padovan; Gary C. Waldeck;

More information

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS

PART 3 - STANDARDS FOR SEWERAGE FACILITIES DESIGN OF STORM SEWERS PART 3 - STANDARDS FOR SEWERAGE FACILITIES 3.3 - DESIGN OF STORM SEWERS 3.301 Design of Storm Sewers A. General Information B. Investigations and Surveys C. Special Projects 3.302 Design Criteria for Storm

More information

CITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW

CITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW CITY OF TOPPENISH General Sewer Plan DRAFT FOR AGENCY REVIEW G&O #15039 JUNE 2017 CITY OF TOPPENISH YAKIMA COUNTY WASHINGTON GENERAL SEWER PLAN G&O#l5039 JUNE 2017 Gray & Oshor.n.e~ l.n.c. CONSUL TING

More information

August 26, 2010 Kevin Campanella, DPU Assistant Director and Asset Manager

August 26, 2010 Kevin Campanella, DPU Assistant Director and Asset Manager August 26, 2010 Kevin Campanella, DPU Assistant Director and Asset Manager Webinar on Asset Management (Part 2 of 3) Columbus DPU Customers and Assets DOSD Division of Sewerage and Drainage Department

More information

Developing a MOM Program 2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg

Developing a MOM Program 2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg 2015 OWEA Annual Conference Sean P. O Rourke, P.E. Hazen and Sawyer David Reimer, City of Miamisburg Four Questions: 1. Who is Miamisburg? 2. What is a MOM Program? 3. Why develop one? 4. How was the City

More information

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River

Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Sanitation District No. 1 of Northern Kentucky Sanitation District No.1 Cost Effectively Reduces Overflows Into the Ohio River Ohio WEA Collection Systems Workshop May 5, 2011 Sanitation District No. 1

More information

Wastewater Information Management System: Flow Modeling and Sewer Connection Permit Applications

Wastewater Information Management System: Flow Modeling and Sewer Connection Permit Applications Chapter 22 Wastewater Information Management System: Flow Modeling and Sewer Connection Permit Applications David Crawford and Felix Limtiaco The City and County ofhonolulu, Department of Wastewater Management

More information

Assessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration

Assessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration Assessing SWMM 5 Hydrologic Parameter Benefits for Model Calibration Justin Siegrist, 1 Daniel Anderson, 2 Joseph Koran, 2 Mark Pribak, 3 Uzair M. (Sam) Shamsi 4 and Dave White 1 1 Wade Trim, Inc., Cincinnati,

More information

SFPUC Flooding Workshop Tuesday, February 9, 2016

SFPUC Flooding Workshop Tuesday, February 9, 2016 Presenters: SFPUC Flooding Workshop Tuesday, February 9, 2016 Tommy Moala, Assistant General Manager, Wastewater Enterprise Stefani Harrison, Project Manager Photo: Dec 3, 2014 End of Cayuga Street 25-year

More information

Sewer Asset Management Implementation Plan June 1, San Pablo Ave Albany, CA Telephone (510) Fax (510)

Sewer Asset Management Implementation Plan June 1, San Pablo Ave Albany, CA Telephone (510) Fax (510) City of Albany Public Works Department Sewer Asset Management Implementation Plan June 1, 2014 1000 San Pablo Ave Albany, CA 94706 Telephone (510) 524-9543 Fax (510) 524-9722 Page left intentionally blank

More information

City of Lawrence, Kansas

City of Lawrence, Kansas Table of Contents 1 EXECUTIVE SUMMARY... 1-1 1.1 General Overview... 1-1 1.2 Phase 1 Field Investigation Findings... 1-3 1.2.1 Public Sector Inflow/Infiltration Sources... 1-3 1.2.2 Private Sector Inflow/Infiltration

More information

NEORSD Member Community Infrastructure Program (MCIP) Opening Remarks

NEORSD Member Community Infrastructure Program (MCIP) Opening Remarks NEORSD Member Community Infrastructure Program (MCIP) Opening Remarks Clean Water Act Issues Clean Water Act issues are more than CSO Sanitary sewer overflows (SSO) including surcharged sewers, basement

More information

The New Age for Smarter Capital Improvement Planning

The New Age for Smarter Capital Improvement Planning The New Age for Smarter Capital Improvement Planning Christopher Kahn, MGIS, GISP Senior GIS Project Manager New Jersey American Water Rajan Ray Director of Marketing & CSM Innovyze Agenda 01 Introductions

More information

4.1 Sewer System Mapping

4.1 Sewer System Mapping A preventive and proactive Operations and Maintenance (O&M) Program is the basis of a well-run sewer collection system. It describes what work is done on a regular basis to the collection system mains,

More information

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017

PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 PHASE 1 OF THE CONSENT DECREE/ WET WEATHER IMPROVEMENT PROGRAM ACCOMPLISHMENTS THROUGH 2017 MSD is delivering Phase 1 is under the original cost estimate Improving Trends in Water Quality MSDGC has completed

More information

Wastewater System Master Plan and SSO Initiative

Wastewater System Master Plan and SSO Initiative Wastewater System Master Plan and SSO Initiative Project Drivers Rapid Population Growth in Fort Worth 800000 700000 46% Increase in Population Over the Last 10-Years 702,850 600000 Population 500000 400000

More information

STORM WATER ASSET MANAGEMENT PLAN & PROGRAM

STORM WATER ASSET MANAGEMENT PLAN & PROGRAM STORM WATER ASSET MANAGEMENT PLAN & PROGRAM City of Walker, MI September 2017 System Goals and Action Plan INTRODUCTION About this Document This document is our Storm Water Asset Management Plan & Program

More information

Modelling a Combined Sewage and Stormwater Flood Detention Basin

Modelling a Combined Sewage and Stormwater Flood Detention Basin Modelling a Combined Sewage and Stormwater Flood Detention Basin A. Pugh B.E. (Hons), Member A.W.A. Sales and Support Manager, Wallingford Software Pty Ltd, Australia S. Ratcliffe B.Sc(Hons), Grad Dip

More information

ASSET MANAGEMENT SETTING UP A COLLECTION SYSTEM FOR. October 20, By Karyn Stickel, HRC Tim Sikma, City of Wixom.

ASSET MANAGEMENT SETTING UP A COLLECTION SYSTEM FOR. October 20, By Karyn Stickel, HRC Tim Sikma, City of Wixom. SETTING UP A COLLECTION SYSTEM FOR ASSET MANAGEMENT City of Wixom, MI October 20, 2016 MWEA Collections Seminar By Karyn Stickel, HRC Tim Sikma, City of Wixom CITY OF WIXOM DESCRIPTION AGENDA NEED FOR

More information

City of Clovis Sewer System Management Plan

City of Clovis Sewer System Management Plan City of Clovis Sewer System Management Plan July 2014 City of Clovis Sewer System Management Plan 1 Element 1 - Goals This Sewer System Management Plan (SSMP) element identifies the goals of the City of

More information

Stormwater Advisory Committee

Stormwater Advisory Committee 1 Agenda Introductions & Background Project Approach & Progress Review of Gaps and Development of Priorities & Strategies Funding Strategies Questions / Conclusion Stormwater Advisory Committee Name Representative

More information

Comparing Tools for Managing Infrastructure. VUEWorks. September 15, 2016

Comparing Tools for Managing Infrastructure. VUEWorks. September 15, 2016 Comparing Tools for Managing Infrastructure VUEWorks September 15, 2016 Foundations (10 Minutes) 2 1 3 VUEWorks Performance-Based Asset Management - Forecast capital budget needs - Create & manage

More information

ACI NA Economics and Human Capital Conference

ACI NA Economics and Human Capital Conference ACI NA Economics and Human Capital Conference Strategic Capital and Asset Management Decisions Asset Management - Identifying the Future Capital Investment Needs Colin Chung, Ph.D. March 13, 2013 ASCE

More information