Case Study: Implementing an e-validation Solution within a BioPharma Company
|
|
- Johnathan Robinson
- 6 years ago
- Views:
Transcription
1 Case Study: Implementing an e-validation Solution within a BioPharma Company
2 Index Company Background Business Drivers Alternatives Identified Solution Justification Implementation Strategy Solution Implementation Process Results Outcomes Additional Accomplishments Recommendations/Lessons Learned
3 Customer Company Background BioPharma: multi site & multi-country Commercial & clinical phase products Company Growing: facility expansion, new site construction and acquisitions, new products Existing Quality IT Systems including ERP, Content Management and QMS (Deviation/CAPA) Corporate Quality Validation Policy and Guidance Documents established Validation paper based with final validation packages archived as scanned PDF copies Good regulatory inspection history with some observations relating to site validation inconsistencies
4 Business Drivers Company Growth Compliance Challenges Knowledge transfer Products and site expansions increasing demand for timely validation services Test execution errors, Deviation management, Lost records, Data Integrity concerns. Val Status Information not readily available. Historic Val information not effectively captured for Sharing and Reuse Productivity Current Val processes manual, inefficient and labor intensive; Val resources quantity/cost rapidly increasing Speed/Predictability Time predictability for completion of validation activities very challenging; Critical Path project deadlines occasionally not met (reg submission impact) Information Access Real time Val and project status information not available. Historic Validation content not readily available when and where needed
5 Alternatives Considered 1. Continue to use current paper based validation processes 2. Lean out existing validation process - eliminate unnecessary steps 3. Add resources to support increasing validation demands 4. Customize existing content management system to address validation process needs 5. Develop internal custom system to address validation process needs 6. Assess/Select commercial e-validation solution to address business process needs
6 Identified Solution Management authorized Alternative 6 ( Select commercial e-validation Solution) High level Future State Business Process and User Requirements Defined 3 commercially available e-validation Solutions identified and assessed against User Requirements 2 e-val solutions selected for trial 1 solution selected to implement (functionality, ease of use, adaptability to future business process needs)
7 Justification for Project Proposal Project champion summarized benefits of e-val Future State business process vs Current State process Project champion got buy-in from Project Sponsor and key stakeholders Key Val Process improvements Data from e-val Solution Pilot compiled in Business Case format Business Case Summary showed significant Payback/ROI from e-val solution Key Benefits: Cross Company Val process alignment Productivity and Compliance improvements Real Time Val Status information Quick & easy e-access to Val information Ease of extendibility to new sites
8 Implementation Strategy Scope of e-val solution project: All Validation Types (Process, Equipment, Cleaning, Facilities, Utilities, Sterilization, CSV, etc) Global /Enterprise e-val Solution implementation - All Sites Legacy Val information loaded to new e-val Solution Incremental implementation based on business priorities: Val Types prioritized for implementation Site implementation scheduled (could be concurrent or staggered) Legacy Val data scheduled for import after Val types implemented Other: Establish Steering Committee assign corporate implementation performance goals Establish full time Project Manager and team with assigned business SMEs for each site Leverage experience and support of e-val Solution Vendor Leverage out of box configurable functionality
9 Implementation Project Charter and Project Implementation Plan Establish Project schedule, Resource plan and Issues Resolution plan Establish Steering Committee and Project Team (multi-site & vendor) Establish Application Software environments including training/ practice environment Vendor Audit Application Validation - leverage vendor Validation package using Risk Based Validation approach Prepare SOPs, Train Users, Perform UAT Go Live
10 Results Project items implemented per schedule (thanks to effective project mgmt/vendor support) Very Positive User and Management feedback from all sites; Effective Post Go Live support team identified and resolved issues quickly Val process alignment achieved; (sites collaboration team working on additional Val process improvements) Productivity improvements (payback) exceeded expectations (refer to chart)
11 Results
12 Additional Accomplishments Company wide Validation Registration Index being developed to track History and Status of all Validations System being configured for managing and archiving Equipment and Facility Vendor Turn Over Package Records
13 Lessons Learned Effective Sr Management Project Sponsor, Steering Committee, Project Manager Enthusiastic and knowledgeable Business Process Owner/Champion Well trained Business SMEs (at all-sites) for new e-val Solution Effective Communication program: What s Coming, Impact to You, Questions Hot Line Active multi-site Collaboration Team Members who provide both Pre and Post Go Live Support Celebrating and Communicating Achievements - milestones, team recognition Value of establishing parallel project team for Legacy Val Data import
14 Thank You Questions? 14
Case Study: Validation Process Innovation in Molecular Diagnostics:
Published on IVT Network (http://www.ivtnetwork.com) By Shane Pew and Lou Killian Case Study: Validation Process Innovation in Molecular Diagnostics: Implementing a new and innovative Computer System Validation
More informationImplementing an e-validation Solution at Myriad Genetics
Implementing an e-validation Solution at Myriad Genetics 1 Slide Index Company Background Business Drivers for an e-validation Solution Alternatives Considered Key requirements Assessment Implementation
More informationIVT 2017 Validation Week Europe
Educational Workshop Agenda IVT 2017 Validation Week Europe 5 Steps to Plan, Justify & Implement e-validation & Taking Your IDEA/VISION to the Finish Line Global BioPharma e-validation Case Study Background
More informationHow to Reduce Costs in Computer and Software Validation
How to Reduce Costs in Computer and Software Validation IVT Computer Validation Conference San Diego CA April 26 2017 ValGenesis, Inc. Fremont Tampa Chennai CA FL IND Agenda Challenges with traditional
More informationLegacy Decommissioning Planning, Savings & Meaningful Data
Legacy Decommissioning Planning, Savings & Meaningful Data Session #131, February 21, 2017 Jon Russell, SVP/CIO, John Muir Health System Tony Paparella, President, MediQuant, Inc. 1 Speaker Introduction
More informationWho Should be on Your Project Team: The Importance of Project Roles and Responsibilities
Who Should be on Your Project Team: The Importance of Project s and One significant factor contributing to the success of projects is having the right people engaged in the process. Who are the right stakeholders
More informationHow To s and How Not To s for Data Integrity Governance Programs
How To s and How Not To s for Data Integrity Governance Programs A Case Study Cathlin Shapiro August 17, 2017 Data Integrity Governance Programs Covering all the Bases 2 Current Environment Risk Factors
More informationCompany Name Here ios Approval and Deployment Project Charter
Company Name Here ios Approval and Deployment Project Charter Version 1.0 Revision Date: 1/25/12 Approval of the project charter indicates an understanding of the purpose and content described in this
More informationClinical trial databases are a crucial investment in clinical research. Part 4 - The "Life" of a Data Manager - Project Manager for the Database
Clinical trial databases are a crucial investment in clinical research Part 4 - The "Life" of a Data Manager - Project Manager for the Database Speakers: M.Duvenhage K. Laras S. Erari 12 Oct 2018 Overview
More informationGood afternoon members of the jury and members of the audience.
1 1 Good afternoon members of the jury and members of the audience. I am Ernesto Marano, champion of our project, which is called Surfing is not so complex. 2 Telefónica Group is the market leader in telecommunications
More informationSample CPI Project Selection Criteria And Project Charter
Sample CPI Project Selection Criteria And Project Charter Sample CPI Project Selection Criteria The most successful CPI projects are targeted at processes and value streams critical to the organization
More informationArticle from: CompAct. April 2013 Issue No. 47
Article from: CompAct April 2013 Issue No. 47 Overview of Programmatic Framework and Key Considerations Key elements Description Items to consider Definition and identification of EUCs The statement that
More informationCHAPTER 4 PRODUCT DEVELOPMENT LIFE CYCLE
CHAPTER 4 PRODUCT DEVELOPMENT LIFE CYCLE 1 Learning Objectives Review the Systems Development Life Cycle (SDLC). Examine the problems and alternatives with SDLC. Know the key issues in ERP implementation
More informationProven steps to get the most out of your GIS investment. Paul Burgess Anna Sokol
Proven steps to get the most out of your GIS investment Paul Burgess Anna Sokol The Esri Method Maximize Business Impact with GIS Definition and Purpose High level approach any organization can follow
More informationNASCIO 2004 Recognition Awards Missouri Project Oversight Program. Executive Summary
NASCIO 2004 Recognition Awards Missouri Project Oversight Program Executive Summary Statistics regarding national failure rates of information technology related projects are staggering. At the turn of
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationBanner Executive Steering Committee (BESC) Governance Charter
Banner Executive Steering Committee (BESC) Governance Charter November 11, 2016 Purpose The Banner Executive Steering Committee is responsible for the oversight and delivery of the overall strategic direction
More informationMANAGING ASSETS THROUGH CAPABILITY AND KNOWLEDGE (MACK)
MANAGING ASSETS THROUGH CAPABILITY AND KNOWLEDGE (MACK) Ben Clark, Assets Business Administrator, City of Tea Tree Gully Abstract Managing Assets through Capability and Knowledge is a continuous improvement
More informationSolution Analysis and Design Strategy (D18)
(D18) Department of Financial Services Date: 11/29/2018 Revision: 1.0 Table of Contents Table of Contents... 2 Revision History... 3 Executive Summary... 4 1 Introduction... 4 2 Solution Analysis and Design
More informationFinancial and Cash Management Task Force
Financial and Cash Management Task Force Recommended Enterprise Project Governance 12/1/08 1.1 It is important to address the proper structure for governing projects that will be implementing enterprise
More informationCDISC/TransCelerate Collaboration and TransCelerate work streams. -Clinical Data Standards -Common Protocol Template -esource
CDISC/TransCelerate Collaboration and TransCelerate work streams -Clinical Data Standards -Common Protocol Template -esource July 2016 TransCelerate Clinical Data Standards Project Opportunity
More informationThe roadmap to EU-MDR Implementation
...the practical approach Scope and Plan GAP Assessment Portfolio Rationalization Global Impact Analysis Master Compliance Roadmap EU-MDR Compliance Regulatory Training Effectiveness Check Implementation
More informationPLANNING FOR CRM SUCCESS STRATEGIES FOR YOUR CRM DEPLOYMENT OR UPGRADE
PLANNING FOR CRM SUCCESS STRATEGIES FOR YOUR CRM DEPLOYMENT OR UPGRADE Melissa Green SR Business Analyst Managing Consultant mgreen@ledgeviewpartners.com Jodie Gilroy SR Business Analyst Managing Consultant
More informationModernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management
Modernization and Migration Management (M3) Playbook GSA, Unified Shared Services Management Introduction How to Read an Activity Description Objective: Provides the overall objective of the activity :
More informationBuilding A BPM Center of Excellence
Building A BPM Center of Excellence A Con Ed Case Study by Frank La Rocca 1 2 1 The Implied Business Process Strategic Contract Negotiator Buyer Warehouse Stock Person A/P Delivery Inspector Application
More informationSix Sigma Black Belt Week 3. Six Sigma Black Belt Week 3. Six Sigma Black Belt Week 3. Project Management. Chapter 3-4
Chapter 3-4 Project Management 3-4-1 Project Management Six Sigma involves a process of improvement projects. In order for these to be successful they must be managed. 3-4-2 Administrative Support Steering
More informationProject Origination: Item Description (Origination) Comments (or reasons for NOT completing)
Project Origination: (Origination) Develop Project Proposal: 24 Formulate business need/problem and 24 anticipated benefits to all parties Review project s fit with organization s mission 24 Identify project
More informationPMP Exam Preparation Workshop. Chapter # 5 Project Scope Management
PMP Exam Preparation Workshop Chapter # 5 Copyright PMI SOC 2013 1 Learning Objectives By the end of this session you will understand: How scope management processes relate to the process groups Project
More informationUnderstanding RPA ROI
A I Understanding RPA ROI How to Measure It and Why It s Important Sponsored by 1 Introduction Robotic process automation (RPA) can deliver significant benefits to companies of practically any size and
More informationActive Record Retention and Legacy System Decommissioning:
Active Record Retention and Legacy System Decommissioning: Use Cases and Lessons Learned from Successful Projects NMHIMA Spring Conference April 18, 2017 Presented by Tony Paparella, President The Triumph
More informationPMO Services Checklist
PMO Services Checklist by IMPACTbyLaura.com Services Checklist This resource is a list of possible services and categories that you can consider when determining how you will drive IMPACT with your PMO.
More informationPMP. Processexam.com. PMI Project Management Professional. Exam Summary Syllabus Questions
PMP PMI Project Management Professional Processexam.com Exam Summary Syllabus Questions Table of Contents Keys to success in PMP Exam on PMI Project Management Professional... 2 PMI PMP Certification Details:...
More informationProactively Managing ERP Risks. January 7, 2010
Proactively Managing ERP Risks January 7, 2010 0 Introductions and Objectives Establish a structured model to demonstrate the variety of risks associated with an ERP environment Discuss control areas that
More informationAchieving Organisational Goals. Accomplishing Strategic Initiatives. Implementation of Organisational Objectives. Stakeholder Management
Achieving Organisational Goals Accomplishing Strategic Initiatives Implementation of Organisational Objectives High Quality Training Courses presented by Internationally Recognised Expert Speakers Stakeholder
More informationD6.5 Documentum Compliance Manager Rapid Success Program
D6.5 Documentum Compliance Manager Rapid Success Program 1. Introduction This document provides an overview of, and requirements for participation in the EMC D6.5 Documentum Compliance Manager Rapid Success
More informationSTRATEGIC PLANNING FOR KNOWLEDGE MANAGEMENT
The world s foremost authority in benchmarking, best practices, process and performance improvement, and knowledge management. STRATEGIC PLANNING FOR KNOWLEDGE MANAGEMENT Cindy Hubert, Executive Director
More informationCASE STUDY IMPROVE EFFICIENCIES AND QUALITY IN CLINICAL DOCUMENTATION USING STRUCTURED CONTENT AND DITA. Document and Content Management
Document and Content Management CASE STUDY IMPROVE EFFICIENCIES AND QUALITY IN CLINICAL DOCUMENTATION USING STRUCTURED CONTENT AND DITA BUSINESS CHALLENGES Pharmaceutical companies generate a large number
More informationDefinition. Name of the tool or technique Project mission statement
Tools and Techniques Definitions (or by alphabetic order ; see below) A definition of each of the tools and techniques is provided below. The primary sources of definitions were the PMBOK Guide and Max
More informationTop Challenges with Late Stage Trial Master Files
Top Challenges with Late Stage Trial Master Files The transition from a paper to an electronic Trial Master File (TMF) system is a significant task. In many cases, some pharma and biotech firms (sponsors)
More informationSelecting a Manufacturing Execution System (MES)
Selecting a Manufacturing Execution System (MES) Executive Summary This white paper offers a basic introduction to the MES selection process. Insights offered in this paper are developed from customer
More informationBEST PRACTICES FOR RANDOMIZATION AND TRIAL SUPPLY MANAGEMENT (RTSM)
WHITE PAPER BEST PRACTICES FOR RANDOMIZATION AND TRIAL SUPPLY MANAGEMENT (RTSM) Guidelines for Sponsor IRT Strategy Study Start-Up, Maintenance and Close-Out Bringing crucial medicines to those who need
More informationCHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS
CHAPTER 2: IMPLEMENTATION PHASES AND OFFERINGS Objectives Introduction The objectives are: Describe the purpose of the phase planning activity, preconditions, and deliverables in the implementation methodology.
More informationProject Management Methodology. Construct & Unit Test SubPhase
Project Management Methodology & Unit Test SubPhase Course Purpose Familiarize team members with the & Unit Test Sub- Phase processes. Understand process flows, team member roles, and artifacts employed.
More informationFixed Scope Offering for Implementation of Oracle Fusion CRM in Cloud
Fixed Scope Offering for Implementation of Oracle Fusion CRM in Cloud Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage of CRM to attract new customers, develop
More informationProject Management Overview 4/17/2013 1
Project Management Overview 4/17/2013 1 Without Project Management 4/17/2013 2 Without Project Management 4/17/2013 3 What is a Project? A temporary and one-time endeavor undertaken to create a unique
More informationA Guide to Critical Success Factors in Agile Delivery
IBM Global Business Services, U.S. Federal May 6, 2016 A Guide to Critical Success Factors in Agile Delivery Paul Gorans, Agile Competency Lead, IBM GBS Federal A bit about me 6 Years USAF: NSA Operations,
More informationSTRATEGIC PLANNING: IMPLEMENTATION ROADMAP
STRATEGIC PLANNING: IMPLEMENTATION ROADMAP MOVING FROM THE STRATEGIC PLAN TO AN OPERATIONAL PLAN Strategic plans provide broad guidance and direction for a higher education institution s immediate future.
More informationImplementation of SAP s Public Budget Formulation (PBF) Module
Santa Clara County Implementation of SAP s Public Budget Formulation (PBF) Module Project Charter Introduction The following project charter is designed to establish a foundation for the County of Santa
More informationCMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide
processlabs CMMI-DEV V1.3 CMMI for Development Version 1.3 Quick Reference Guide CMMI-DEV V1.3 Process Areas Alphabetically by Process Area Acronym processlabs CAR - Causal Analysis and Resolution...
More informationCity of Tacoma Performance Audit for SAP
1 Table of Contents Section 1 Executive Summary... 4 Section 2 Audit Methodology, Key Findings and Recommendations... 7 Section 2.1: Introduction... 7 Section 2.2: Audit Approach... 7 Section 2.3: Technical
More informationmscoa IMPLEMENTATION AN ERP PROJECT GOVERNANCE APPROACH 01 December 2014
mscoa IMPLEMENTATION AN ERP PROJECT GOVERNANCE APPROACH 01 December 2014 Why mscoa? Successes of SCOA reform for National and Provincial Governments to be translated to Local Government. Seeks to deliver
More informationPART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)
PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes
More informationEstablishing a Comprehensive IT Process Governance Framework
Establishing a Comprehensive IT Process Governance Framework Ensuring clear accountability and assigned responsibility for IT process operations, integration and continual improvement. Thorsten Manthey
More informationRobbie Morehead Project Manager
Profile The consultant is an accomplished quality professional with 27 years' extensive medical device, pharmaceutical, regulatory, and Food and Drug Administration (FDA) experience. The consultant s experience
More informationDefining Project Scope
Defining Project Scope Casey Ayers PMP MBA CaseyAyers.com @caseyayers linkedin.com/in/caseyayers PMP is a registered mark of the Project Management Institute, Inc. Module Overview Overview Project Scope
More informationData Warehousing provides easy access
Data Warehouse Process Data Warehousing provides easy access to the right data at the right time to the right users so that the right business decisions can be made. The Data Warehouse Process is a prescription
More informationIPMA Professional Development Event
IPMA Professional Development Event Department of Revenue Tax and Licensing Systems Replacement (TLSR) Project January 27, 2016 Transforming Revenue s Future through collaborative efforts, improved processes,
More informationAppendix. Process Inputs and Outputs
3601cA.fm Page 493 Wednesday, October 26, 2005 12:47 AM Appendix A Process and Throughout this book, PMP: Management Professional Study Guide, 3rd Edition, I ve discussed the inputs and outputs to the
More informationNetwork Drives Cleanup
Network Drives Cleanup The Project With No End Date ARMA Spring Conference April 8, 2015 June 2013 Patricia Zimmerman, CRM Senior Director, Enterprise Records & Information Management UnitedHealth Group
More informationCore Competency Education Objectives and Testing Parameters for VMA and CVS
Core Competency Testing for Value Methodology Associate () and Certified Value Specialist () assume that the exam and exam are now separate tests, where a examinee has previously passed the exam. examinees
More informationPROJECT MANAGEMENT. By Pompeyo Rios
PROJECT MANAGEMENT By Pompeyo Rios PROJECT A project is a temporary endeavor undertaken to create a unique product, service, or result. Por example, constructing a building or plant, or implementing, improving,
More informationData Integrity Prioritization and Gap Analysis to Prove Data Integrity
Data Integrity Prioritization and Gap Analysis to Prove Data Integrity Oct 9 th 2018 Speakers Alex Brindle Principal Consultant with DPS. Alex holds a B.Sc. in Chemistry, a M.Sc. in Analytical Science
More informationCA Mainframe Resource Intelligence
SOLUTION BRIEF CA MAINFRAME RESOURCE INTELLIGENCE CA Mainframe Resource Intelligence Can I have a simple report to show our stakeholders how our mainframe is actually reducing opex and driving digital
More informationAssessing Quality Performance at Genzyme Manufacturing Sites. Todd Snell. Genzyme Corporation April 20, 2005
Assessing Quality Performance at Genzyme Manufacturing Sites Todd Snell Genzyme Corporation April 20, 2005 1 Agenda Past Product Regulatory Compliance Challenges Why Introduce Metrics? Applying Metrics
More informationPMI Scheduling Professional (PMI-SP)
PMI Scheduling Professional (PMI-SP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute PMI Scheduling Professional (PMI-SP) Exam Content Outline Published by: Project Management
More informationSummary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)
Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder
More informationOPERATIONS. Copyright 2015 by EdFuel. This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.
OPERATIONS EdFuel s Blueprint for Success initiative aims to address a looming talent deficit in the education field, developing many more highly effective K-12 system leaders capable of managing complex
More informationQuEST Forum TL 9000 Jump-Start Program. TL 9000 Enterprise Registration Approach and Lessons Learned
QuEST Forum TL 9000 Jump-Start Program TL 9000 Enterprise Registration Approach and Lessons Learned John Wronka Alcatel-Lucent 24 September, 2006 Dallas, Texas, USA www.questforum.org Discussion Topics
More informationTxDOT s Compass Project. September 29, 2009
TxDOT s Compass Project September 29, 2009 Agenda I. Project Background II. Part 1 Maintenance Management Study III. Part 2 Maintenance Management System Selection IV. Part 3 The Compass Project V. Questions
More informationBUSINESS INTELLIGENCE & ANALYTICS
CASE STUDY PART 2 BUSINESS INTELLIGENCE & ANALYTICS INTRODUCTION LOCATION New Jersey WEBSITE www.atlanticare.org SIZE 70 Locations DEPLOYMENT Fall, 2016 EMPLOYED SANTA ROSA SOLUTIONS Business Intelligence
More informationImplementing a Metadata Repository Solution - A User Story
Paper DS08 Implementing a Metadata Repository Solution - A User Story Wade Fairbanks, Pfizer, Groton, CT, USA Barrie Nelson, Nurocor, Austin, TX, USA ABSTRACT With a Metadata Repository (MDR) solution
More informationData Integrity Compliance Project
Data Integrity Compliance Project RISK FACTORS FOR DI ISSUES Outsourcing Supply Chain Data Review Practices Increasing use of electronic systems Economic Stressors 2 Fully Integrated into QMS DATA INTEGRITY
More informationBusiness Risk Intelligence
Business Risk Intelligence Bringing business focus to information risk It s a challenge maintaining a strong security and risk posture. CISOs need to constantly assess new threats that are complex and
More informationBldg & Env Services Tehcnician- Advanced, ATTENDANCE Bldg & Env Services Tehcnician- Advanced, SAFETY TRAINING... 3
Table of Contents HR Consultant-Journey, OUTREACH INITIATIVE... 1 HR Consultant-Journey, PERFORMANCE MANAGEMENT CONSULTATIONS... 2 HR Consultant-Journey, PROCEDURAL PROJECTS... 2 HR Consultant-Journey,
More informationMicrosoft REJ Framework: Step by Step
Microsoft REJ Framework: Step by Step Quantifying the Business Value of Information Technology (IT) Investments Abstract IT managers today face challenges of delivering products to markets faster, making
More informationM3 Playbook Guidance. 1.1 Establish Initial Customer PMO and Processes. Human Resources (HR)/Staffing Plan
M3 Playbook Guidance Phase 1: Readiness This guidance is intended for use by organizations to confirm and validate that their plans are comprehensive and have adequate level of detail for proper migration
More informationChange Management Methodology
Change Management Methodology Presented by: December 2010 Anne Warren Regional Director Beacon Partners Proven Process The Beacon Process incorporates five key elements: Vision Workflow Integration Communication
More informationEnterprise Application Integration and its Reusable Assets
Enterprise Application Integration and its Reusable Assets Integration of IBM Sterling Integrator and SAP ERP using accelerators Fujitsu India, Inc. Service Integration Division Tushar Aggarwal Abstract:
More informationLessons Learned Systems Implementation Projects by Shenaz Jeraj
Lessons Learned Systems Implementation Projects by Shenaz Jeraj Date: October 2, 2018 Purpose Share experience of Systems Implementation projects Will share lessons learned from Enterprise Systems implementations
More informationITS Project Management Framework. Idea/Project Classification
ITS Project Management Framework This document provides an overview of the Project Management Framework for University of Maine System (UMS) Information Technology projects. The framework provides a standardized
More informationProject Management Professional (PMP)
Project Management Professional (PMP) E X A M I N AT I O N CO N T E N T O U T L I N E Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published
More informationProject Planning and Management (PPM) V2.0. WBS Dictionary
Project Planning and Management (PPM) V2.0 WBS Dictionary Software as a Service (SaaS) Version 1.0 August 2014 1 Table of Contents PPM V2.0 Work Breakdown Structure (WBS) Dictionary 1 Project Type: Software
More informationCHANGE MANAGEMENT IN PROCUREMENT TRANSFORMATION. Bloomberg. Page 1
CHANGE MANAGEMENT IN PROCUREMENT TRANSFORMATION Bloomberg Page 1 Agenda and Objective Defining the challenges we faced Creating the business case Building the change management playbook Setting the strategy
More informationFixed Scope Offering for Oracle Fusion Procurement. Slide 1
Fixed Scope Offering for Oracle Fusion Procurement Slide 1 Today s Business Challenges Adopt leading Global SCM practices & strategies across the entire enterprise value chain to move into the future.
More informationDRAFT EXAMPLE ACTIVITY / PROJECT PLAN. Compliance with the Transportation Requirements for Special Waste. South Coast Region
DRAFT EXAMPLE ACTIVITY / PROJECT PLAN Compliance with the Transportation Requirements for Special Waste South Coast Region Prepared By: Date: Project Manager Approved By: Project Sponsor Date: Note: Appendix
More informationKronos Workforce Ready Implementation Methodology and Customer Responsibilities for WFR Time Keeping Implementations
DATASHEET WORKFORCE READY DEPLOYMENT GUIDE Kronos Workforce Ready Implementation Methodology and Customer Responsibilities for WFR Time Keeping Implementations As you begin your Kronos Workforce Ready
More informationBusiness Process Management: The Right Way to Do It
Business Process Management: The Right Way to Do It Smita Sharma Introduction BPM is really all about managing processes, the people who are the doers of the process, and the systems that help them achieve
More informationAudit Program Background Definition Management Example Content Risk assessment approach
AUDIT PROGRAM Audit Program Background Definition Management Example Content System audits vs study audits Risk assessment approach ICH-GCP E6 new content Management Example 2 Background - Definition There
More informationProject+ Examination Blueprint Version June 1, 2003
Introduction The Project + examination is designed for business professionals involved with projects with a technology component. The examination is designed for candidates possessing at least 12 months
More informationChapter 11 Project Implementation, Closure, and Evaluation
Chapter 11 Project Implementation, Closure, and Evaluation Introduction, project implementation, Administrative closure, project evaluation, project audit Project Implementation Focuses on installing or
More informationRoadmap for Managing Multiple CRO Vendors
PharmaSUG 2017 - Paper PO27 Roadmap for Managing Multiple CRO Vendors Veena Nataraj, Shire, Lexington, MA Karin LaPann, Shire, Lexington, MA ABSTRACT When working with CROs, the relationship established
More information5 Chapter 5: Preliminary Selfassessment
5 Chapter 5: Preliminary Selfassessment of Your T&D This chapter is the final effort in the introduction and overview of the T&D s View. This preliminary assessment is a quick and dirty pass, to be done
More informationE-PROCUREMENT CHANGE MANAGEMENT
E-PROCUREMENT CHANGE MANAGEMENT PART ONE STRATEGY Digitizing business processes is inevitable; the challenge for procurement leaders will be changing perceptions internally to win the support needed to
More informationProject Planning & Scheduling
Project Planning & Scheduling 2 Objectives To introduce and discuss key concepts and techniques for planning and scheduling major projects To provide ideas for development of a practice session to apply
More informationRecover Troubled Projects
white paper series Recover Troubled Projects Critical Actions to Take at the Organization and Project Levels Despite the sobering statistics on project failure, there s good news. The statistics regarding
More informationProactive Quality Risk Management
Proactive Quality Risk Management Klavs Esbjerg, CEO, Epista Life Science About Epista Life Science Epista Life Science is a consultancy dedicated to continuously improving regulatory compliance. We turn
More informationCOLLABORATIVE SUPPORT ENHANCES THE TECHNICAL SUPPORT EXPERIENCE
COLLABORATIVE SUPPORT ENHANCES THE TECHNICAL SUPPORT EXPERIENCE 1 IMPLEMENT A COLLABORATIVE SUPPORT MODEL TO IMPROVE CUSTOMER AND EMPLOYEE SATISFACTION Poor technical support service significantly impacts
More informationRegulators REALLY DO CARE about Trade Reporting Data Quality
DerivOps North America Sample Regulators REALLY DO CARE about Trade Reporting Data Quality Lloyd Altman Scope. Present the regulatory time line for the next 3 Years Explore how the Regulators are looking
More informationQUICK FACTS. Implementing Business Intelligence and Retail Signal Solutions for Sony PlayStation TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES
[ Manufacturing, Enterprise Applications and Middleware Services ] TEKSYSTEMS GLOBAL SERVICES CUSTOMER SUCCESS STORIES Client Profile Industry: Video and computer entertainment Global Revenue: $77.58 billion
More informationSoftware Quality Engineering Courses Offered by The Westfall Team
Building Skills is a 3-day course that is a subset of our course. The course is designed to provide a fundamental knowledge base and practical skills for anyone interested in implementing or improving
More information