2 CONTENTS 1.0 PURPOSE OF RFP The Client Agency Project Background Extracting from Outdated Technology: FileNet 3.6 ESE The Project Part I Part II Auditing Requirements Security Requirements Scope of Products and Services Special Requirements for Contract Signing Major Deliverables Out-of-Scope Detail EVALUATION CRITERIA Pricing Technical Management... 11

3 DEFINITIONS ABBREVIATION/TERM Bulky Sub DEFINITION Portions of large documents (1,000 to 100,000 pages) broken into multiple segments to accommodate file size limitations within DJA s outdated FileNet document repository. These segments represent sequential parts of a single document. Core The main document repository and workflow application for Superior Court records, as well as associated databases and workflows used for managing the documents required for Superior Court proceedings. Core is owned and maintained by DJA. DJA MSAR PDF/A-1b POC TIFF TB WBS King County Department of Judicial Administration. (Also known as the Superior Court Clerk s Office.) Magnetic Storage and Retrieval. A sub-set of standards among a suite of PDF-related standards. It was developed to enable the long-term preservation of electronic documents and provides specifications for creation, viewing, and printing of PDF documents. The intent is to preserve documents of record as self-contained images that are not searchable. Proof of Concept. Tagged Image File Format. A static image file type used for preventing edits to electronic documents or images. Terabyte. As a descriptor of required data storage space, a Terabyte is approximately one trillion bytes, or 1,000 Gigabytes. Work Breakdown Structure. A written, hierarchical decomposition of the project into phases, deliverables and/or work packages. It is a tree structure showing a subdivision of effort required to achieve the project. RFP # KAO Document Extraction and Conversion Project 3

4 1.0 PURPOSE OF RFP 1.1 The Client Agency The client agency is King County s Department of Judicial Administration (DJA), also known as the Superior Court Clerk s Office. DJA serves as a customer service office of the Superior Court and manages all records associated with Superior Court cases. The Washington State Constitution identifies Superior Court as a court of record, meaning that all court records need to be retained indefinitely. DJA has Superior Court records dating back to the 1800 s and currently receives more than 7,000 documents each day that must be maintained indefinitely. DJA maintains and manages Superior Court records on a central application known as Core ECR or Core. 1.2 Project Background Images are considered an official court record once scanned and uploaded within the Core ECR system. Shortly after being scanned into Core ECR, hard copy versions of court records are destroyed. As such, it is critical that DJA protect the electronic versions. DJA is seeking proposals for document extraction and conversion for the purpose of establishing a redundant, portable copy of the entire Superior Court record (approximately 6 TB with databases). DJA seeks to establish this copy to protect the Superior Court record in the event of a catastrophic failure of the Core application. DJA intends to replace the Core ECR in the near term, and will eventually move the converted documents into the new Core repository. However, DJA seeks to complete the document extraction and conversion immediately, since failing to protect the existing Superior Court record before system replacement can occur puts the Superior Court record at unacceptable risk Extracting from Outdated Technology: FileNet 3.6 ESE The existing Core ECR system was originally developed in 1999 and is at end-of-life. It is based on an outdated technology set (FileNet 3.6 ESE) that severely limits Core s support, enhancement potential, and operating system platform compatibility. FileNet 3.6 ESE uses a proprietary document repository format to store documents. Given this outdated technology platform, it is conceivable for the Core ECR to fail catastrophically in the near term, making data extraction extremely difficult. DJA therefore seeks to immediately protect Superior Court documents. 1.3 The Project There are two parts to this document extraction and conversion project: Part I accomplishes the extraction and conversion of the overwhelming majority of Superior Court documents. Part II will occur during the months between contract execution and implementation of a new Core system within DJA. Part II accomplishes the same extraction and conversion operations as Part I, only for a much smaller collection of documents. Document Extraction and Conversion Project 4

5 1.3.1 Part I The purpose of this project is to extract PDF and TIFF documents from the FileNet Image Services Server 3.6 ESE; convert these documents to PDF/A-1b format; and provide to DJA an extracted and converted copy of each of the more than 22 million such documents. These 22 million documents contain approximately 148 million pages, totaling to approximately 6TB of data. Superior Court documents currently are contained within approximately two hundred FileNet MSAR storage libraries, which will be provided to the selected contractor by King County. Individual MSARs range up to 32 GB in size and sum in total to approximately 5TB. The MSARs are accompanied by two SQL Server databases, one of which is a standard FileNet 'indexdb' database measuring approximately 5 GB when in compressed SQL Server backup format. The second is a proprietary SQL Server database which contains additional attribute data related to MSAR contents and which measures approximately 30GB when in compressed SQL Server backup format. Once the data has been provided by DJA, the selected contractor shall: A. Extract the electronic documents from the FileNet MSARs; B. Merge separate segments of extremely large documents (Bulky Subs) into single files (see Section 1.4.C); C. Convert all extracted files, regardless of source format, into PDF/A- 1b Image format; D. Validate that the produced files are conformant with PDF/A-1b format; E. Associate the documents to the identifiers contained in databases; F. Maintain a comprehensive audit trail of all extraction and conversion activities; G. Ensure that the visual clarity and completeness of the converted documents is equal to or superior to the documents extracted from the FileNet MSARs. H. Store the converted and (with regard to Bulky Subs) connected documents, associated data, and audit data on a portable storage device for provision to DJA. The first batch of extracted and converted documents shall be submitted to DJA for Acceptance within one week after Acceptance of a Proof of Concept (POC) is achieved (see Section 1.4A below for discussion on POC). Subsequent batches of extracted and converted documents shall be submitted to DJA on a monthly basis until Part I of the project is complete and Accepted. Document Extraction and Conversion Project 5

6 Extraction and conversion, to the specifications outlined above, will occur offsite. The contractor will have no access to DJA systems at any point. There are three primary reasons for this: A. Fragility of Legacy FileNet System: Exposing the outdated Core production system to the processing load of a lengthy export process creates an intolerable risk of catastrophic system failure, directly impacting DJA and Superior Court business continuity. B. Maintaining Schedule: Significant contractor hardware and software resources are required to accomplish this project at the performance level required to meet a timely project schedule. C. Active and Regular Monitoring: Constant monitoring and auditing of the export and conversion process is required to ensure adherence to schedule and acceptable weekly reporting to the DJA Project Manager. By taking the migration and conversion process offsite, the contractor can directly monitor the extraction and conversion processes without having to secure King County resources Part II Part II requires the same extraction and conversion operations as Part I, only for a much smaller body of documents. In order to fully protect Superior Court records during the remaining time period that DJA must use the outdated FileNet technology, the project also requires extraction and conversion of the documents that are filed with the Clerk s Office after the point of transferring the Part I document and data set, and prior to going live with a new Core system. After the contractor has successfully completed a Proof of Concept (POC) (see Section 1.6.A below), DJA will subsequently provide monthly updates covering all of the new documents that have been filed with the Clerk s Office since the last transfer. Part II document transfers will not exceed 200,000 documents in a given month. This process will continue until the point at which DJA goes live with a new Core system, estimated to occur within the next months. Batches of extracted and converted documents shall be submitted to DJA on a monthly basis until Part II of the project is complete and Accepted Auditing Requirements Protecting the integrity of King County s electronic court record is essential. Therefore, King County requires adherence to strict auditing protocols during the life of this project in order to ensure complete and accurate extraction, conversion of court documents, as well as proper association to database values. The required auditing methodology is summarized below: A. General Process Auditing: Once a batch of documents is extracted from FileNet MSARs, the contractor must compare the number of files extracted against what was expected for the total count in the Document Extraction and Conversion Project 6

7 batch. A subsequent comparison of the values must then be made to verify that the data values match by comparing database values such as CaseNumber, SubNumber, SubID, DOCID, and DocumentPageCount. Any variance in total document count or index value must be researched and accounted for, reported and corrected. Weekly reports submitted to DJA by the contractor shall detail the previous week s extraction and conversion activity by volume and file type, as well as whether or not any errors occurred. Weekly reports shall also document the reasons for identified errors and whether or not they have been corrected. To the extent that the source of the previous week s error(s) is unknown, weekly reports shall provide strategies and time estimates for having errors diagnosed and corrected. The status of uncorrected errors will be documented in weekly reports until resolved. Within weekly reports submitted to DJA by the contractor, the total time for the extraction must also be reported, indicating the average time per document and the average time per page. When tracking and reporting the total time for extraction prior to the conversion process, the time will be tracked using three metrics: 1) the amount of time required for the export of documents that export without any failure or issues; 2) the amount of time expended to remediate export failures and successfully export documents that fail the initial attempt at extraction; and 3) the total duration of time from the beginning of the export process until the point in time when all available documents have been successfully exported. Capturing all three metrics of information will enable King County to assess contractor performance against the project schedule. B. Additional Auditing Notes for Proof of Concept (POC) (see Section 1.4 below): As part of the Proof of Concept (POC), a record of the file size and file type of all the documents extracted will be provided by the contractor in order for the County to assess whether the data set used in the POC is a representative sample compared to the full existing body of Superior Court documents. The auditing requirements summarized in Item A above also will be required. C. Bulky Sub Auditing: After the merging of the Bulky Sub documents, an auditing adjustment must be made reflecting the merging of the documents. At that time, a comparison must also be made to compare page counts and segment order between the processes. D. Verifying a Complete Copy of the Electronic Court Record: For any documents that ultimately fail to extract, convert, or connect (Bulky Subs), discovery must be performed to identify and remediate any failures or issues encountered. Any such failures or issues must also be fully documented in the audit report (as explained in Item A Document Extraction and Conversion Project 7

8 above) and must ultimately be identified as either having been corrected or having been verified as necessarily resulting from data that is corrupt or otherwise unavailable in the source FileNet storage libraries Security Requirements The following security protocols will be in place throughout the life of the project: A. During Transit: During transit between DJA and contractor offices, documents and data will be stored on a portable storage device supplied by the contractor. The portable storage device(s) will be delivered directly to and from the two facilities and will remain in the direct possession of a contractor employee at all times until handed off to the designated supervising resource at either location. B. Designated Delivery Point at King County: The designated delivery point for all project deliverables is the Director s Office at King County s Department of Judicial Administration, King County Courthouse, Room 609 located at 516-3rd Ave. in Seattle. C. Contractor Facilities: While stored at contractor facilities, only the assigned project staff will have access to Superior Court documents. D. Confidentiality Agreement: A confidentiality Agreement will also be signed by the contractor prior to contract execution. (See boilerplate included with this RFP.) E. Contractors working outside of the Puget Sound Area: For prospective contractors located outside of the Puget Sound region, it is understood that certain aspects of the aforementioned security protocol may not be practical. For this scenario, contractors must propose a security protocol within Attachment B, Contractor Questions that is at least as secure as the protocol outlined above. 1.4 Scope of Products and Services The scope of contractor services for the Document Extraction and Conversion Project is outlined below: A. Proof of Concept for Conversion of PDF and TIFF Files to PDF/A-1b Format, and Connection of Bulky Subs: DJA will require a Proof of Concept within 30 calendar days of Contract Execution and transfer of sample documents and data from DJA to the contractor. The Proof of Concept must demonstrate successful conversion of PDF and TIFF documents to PDF/A-1b Format, as well as the contractor s ability to connect Bulky Subs into properly-ordered, single documents stored in PDF/A-1b Format. B. Complete Conversion of PDF and TIFF Files to PDF/A-1b Format: Once the Proof of Concept has been formally Accepted, the contractor will be authorized to commence Parts I and II of the project. Document Extraction and Conversion Project 8

9 C. Connect Bulky Subs into Continuous Documents: Connect separate segments of extremely large documents (Bulky Subs) into single, properlyordered PDF/A-1b files. Bulky Subs constitute a very small percentage of the overall material to be extracted and converted. D. Portable Storage: The converted, associated (to descriptive data), and audited documents will then be delivered to DJA on a portable storage device. The portable storage device format is to be proposed within bidder responses to this RFP and must be approved by King County. E. Documented Audit Mechanisms (see Section above): The aforementioned audit mechanisms for the extraction, conversion and transfer to storage processes will be clearly documented in an Audit Report submitted with both the Proof of Concept and again each week during the life of the project. F. Performance Metrics: Regular reporting of document conversion and transfer operation speed is required to assure adherence to the project schedule. This subject matter will also be covered in the weekly reports referenced in item E above. G. Perform Part II: Extract and convert the documents filed with DJA after the Part I file transfer to the contractor and up to the point that a new Core goes live. These documents will be provided to the contractor on a monthly basis over a time period estimated at months. H. Time Frame: o o Contractors must propose a schedule for Part I of this project (see Section 1.5.A below); and Part II of this project is expected to last months. I. Document Quality After Conversion: Upon completion of the document extraction and conversion process, the visual clarity and completeness of the converted documents must be equal to or superior to the documents extracted from the FileNet MSARs. King County will be the final authority on whether document quality is acceptable. 1.5 Special Requirements for Contract Signing A. Project Plan: Contractor will create and incorporate within its proposal a detailed Project Plan that includes: 1) a project schedule; 2) a Work Breakdown Structure (WBS); 3) a project task checklist; 4) a Quality Assurance and Quality Control Plan; 5) a Staffing Plan identifying each particular staff member and their associated responsibilities, as well as a listing of resource-loaded staff hours required to complete all work according to schedule; 6) a suggested format for weekly status reports to the DJA Project Manager; and 7) an Extraction and Conversion Audit Plan compliant with the King County standards outlined in Section above. Document Extraction and Conversion Project 9

10 It is fully expected that the contractor is resourced to meet deadlines listed in the project schedule, as well as the quality assurance and quality control standards referenced in the Project Plan and ultimately the contract. DJA must formally Accept the Project Plan prior to contract signing. The Project Plan will be incorporated into the Contract. B. Confidentiality Agreement: The contractor shall sign a Confidentiality Agreement as documented in Section D above. 1.6 Major Deliverables The major deliverables associated with the Core ECR Document Extraction and Conversion Project include: A. Proof of Concept for Conversion of PDF and TIFF Files to PDF/A-1b Format, and Connection of Bulky Subs: Prior to commencing work on the full scope of the Document Extraction and Conversion Project, the successful contractor is required to complete a Proof of Concept (POC) in order to demonstrate the technical and professional capability required for DJA s Acceptance. DJA will require a Proof of Concept within 30 calendar days of Contract Execution and transfer of sample documents and data from DJA to the contractor. B. Part I and Part II Extraction and Conversion of Superior Court Documents: All records extracted from Core ECR will be converted to PDF/A-1b in their entirety with the same quality and content as the original record. The converted documents will then be placed into a portable storage device (to be proposed by the contractor and approved by the County) for storage at DJA. Both parts include connecting Bulky Subs. C. Weekly Audit and Performance Reports: Reports summarizing the audit and performance results for the document conversion and transfer to storage processes will be submitted weekly in a mutually agreed-upon form to the DJA Project Manager. 1.7 Out-of-Scope Detail Access to any DJA system in any capacity is beyond the scope of this project. Any proposal to replace Core ECR is also beyond the scope of this project. Document Extraction and Conversion Project 10

11 2.0 Evaluation Criteria 2.1 Pricing The total cost for all professional services, including storage, associated with this contract. 2.2 Technical A. Technical Tools: DJA will assess the professional tools used by the contractor to complete this project. The expected performance of any tool(s) will also be assessed. DJA will assess the portable storage device(s) proposed by the contractor for long-term storage of the extracted and converted documents. B. Quality Assurance and Quality Control: DJA will assess the Quality Assurance and Quality Control methods applied to ensure complete and accurate document conversion and reattachment of Bulky Subs. C. Security Protocols: See Section D. Experience with Challenging Extractions. 2.3 Management A. Contractor Qualifications and Capacity to Perform Work: DJA will evaluate the contractor s Project Plan as described above in Section 1.5.A. Staff resources, technical skills and successful project history also will be evaluated, including the contractor s reputation, efficiency, and responsiveness. B. Customer References: DJA will carefully evaluate customer references. Contractors must provide complete and up to date contact information. C. Overview and Project Methodology: DJA will evaluate whether the contractor demonstrates a clear understanding of the project scope. Prospective contractors should present a clear proposal and explain how it meets the requirements and objectives of the project. Proposals must include a clear Project Plan including industry standard and proven project management methodologies. Specific requirements for the Project Plan are covered in Section 1.5.A above. D. Contractor Stability and Support: DJA will assess whether prospective contractors demonstrate a strong commitment to the market sector and to its customers. Responsiveness of the contractor to the problems identified by customers is extremely important, as are turnaround times on solutions to problems and the technical expertise and demonstrated professionalism of contractor s project personnel. King County reserves the right to interview and reject any contractor personnel prior to Contract award. Document Extraction and Conversion Project 11

Sample Company. Risk Assessment and Mitigation Plan

Sample Company. Risk Assessment and Mitigation Plan Sample Company Revision History DATE VERSION DESCRIPTION AUTHOR 08-07-04 0.01 Initial Version F. Jack Anderson 09-07-04 0.02 Revised with changes from team reviews Michael Bennett 09-08-04 2.00 Initial

More information

Request For Proposal Of Printing and Design Services. Marketing Department

Request For Proposal Of Printing and Design Services. Marketing Department Request For Proposal Of Printing and Design Services Marketing Department Released on June 3, 2016 Mosaic Youth Theatre of Detroit Printing and Design Services REQUEST FOR PROPOSAL (RFP) BACKGROUND Mosaic

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 12 PROJECT RECORDS MANAGEMENT

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 12 PROJECT RECORDS MANAGEMENT Project Procedure PROJECT RECORDS MANAGEMENT 09/21/2012 PAGE 1 OF 12 1.0 PURPOSE The purpose of this procedure is to establish the methods and responsibilities for identifying, collecting, indexing, storing,

More information

PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST FOR PROPOSALS

PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST FOR PROPOSALS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST FOR PROPOSALS SUBJECT: P17-025:

More information

Reference B Project Management Requirements

Reference B Project Management Requirements Reference B State of Alaska TABLE OF CONTENTS 1... 2 1.1 Project Life Cycle Methodology... 2 1.2 Preliminary Project Management Narrative and Work Plan... 2 2 Master Project Management Plan and Master

More information

Digitization Project Guidance

Digitization Project Guidance Digitization Project Guidance For State Agencies August 2018 CONTACT US Division of Library, Archives and Museum Collections govarc@wisconsinhistory.org Digitization Project Guidance CONTENTS INTRODUCTION...

More information

Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013)

Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Summary of 47 project management processes (PMBOK Guide, 5 th edition, 2013) Integration Management: processes & activities needed to properly coordinate all aspects of the project to meet stakeholder

More information

Cover Your A$$ Real Time Quality Assurance at the Job Site

Cover Your A$$ Real Time Quality Assurance at the Job Site Cover Your A$$ Real Time Quality Assurance at the Job Site 2 Table of Contents I. Formalized Quality Management USACE Phases of Control ISO 9000 Standards II. Inspections: The Never Ending Paper Trail

More information

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT)

QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) QUALITY ASSURANCE PLAN OKLAHOMA DEPARTMENT OF HUMAN SERVICES ENTERPRISE SYSTEM (MOSAIC PROJECT) MOSAIC Quality Assurance Plan v04.02 Prepared by: Approved by: QUALITY ASSURANCE PLAN APPROVALS QA/QC Program

More information

Request for Quote (RFQ) Information Technology Department Review

Request for Quote (RFQ) Information Technology Department Review Request for Quote (RFQ) Information Technology Department Review The Clerks of Court Operations Corporation ( CCOC ) is a legislatively created corporate entity, created under Section 28.35, Florida Statutes.

More information

Project Management. Risk Management

Project Management. Risk Management Brandt s History of IV&V Success Using over 30 years of experience supporting local, state, and federal agencies, Brandt provides IV&V services using proven, strategic methodologies to ensure project success

More information

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B

WORK PLAN AND IV&V METHODOLOGY Information Technology - Independent Verification and Validation RFP No IVV-B 1. Work Plan & IV&V Methodology 1.1 Compass Solutions IV&V Approach The Compass Solutions Independent Verification and Validation approach is based on the Enterprise Performance Life Cycle (EPLC) framework

More information

REQUEST FOR PROPOSAL (RFP) FOR CONTRACT MANAGEMENT SYSTEM ISSUED BY THE RFP INFORMATION

REQUEST FOR PROPOSAL (RFP) FOR CONTRACT MANAGEMENT SYSTEM ISSUED BY THE RFP INFORMATION REQUEST FOR PROPOSAL (RFP) FOR CONTRACT MANAGEMENT SYSTEM ISSUED BY THE NEW YORK ehealth COLLABORATIVE CONTACT NAME EMAIL ADDRESS SUBMISSION DEADLINE RFP INFORMATION NYeC RFP rfpcontact@nyehealth.org September

More information

QUESTION AGENCY RESPONSE RFP REFERENCE. Estimated amount of 40% is rarely accessed. 2 Environments, Test and Production

QUESTION AGENCY RESPONSE RFP REFERENCE. Estimated amount of 40% is rarely accessed. 2 Environments, Test and Production New York State Housing Finance Agency and State of New York Mortgage Agency Request for Proposals for Temporary Electronic Records Management System Solution QUESTIONS AND ANSWERS: Round 4 dated 11/9/2017

More information

REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES

REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES Family Service Center of Galveston County (hereinafter FSC) is requesting proposals from qualified, professional technology vendors for Information

More information

Identifier Version Author SOP 8.0 Moon, Darci Title: (QMS-SOP) - Global IT Document Control SOP APPROVALS

Identifier Version Author SOP 8.0 Moon, Darci Title: (QMS-SOP) - Global IT Document Control SOP APPROVALS Medtronic Controlled Information This document/record is electronically controlled; printed copies are considered uncontrolled. System of Record: Medtronic Records Control System (MRCS) Identifier Version

More information

Request for Proposal: Community Planning & Development System City of University Place, Washington

Request for Proposal: Community Planning & Development System City of University Place, Washington Request for Proposal: Community Planning & Development System City of University Place, Washington CONTENTS 1. Invitation and Introduction 2. System Expectations and Scope 3. System Demonstration and Product

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK Michigan Commission on Law Enforcement Standards The FileNet Enterprise

More information

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Engineering Design Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal

More information

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th www.pmlead.net PMI, PMP, CAPM and PMBOK Guide are trademarks of the Project Management Institute, Inc. PMI has not endorsed and did not

More information

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3)

PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) PART THREE: Work Plan and IV&V Methodology (RFP 5.3.3) 3.1 IV&V Methodology and Work Plan 3.1.1 NTT DATA IV&V Framework We believe that successful IV&V is more than just verification that the processes

More information

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents

A Primer for the Project Management Process by David W. Larsen 1. Table of Contents A Primer for the Project Management Process by David W. Larsen 1 Table of Contents Description... 2 STAGE/STEP/TASK SUMMARY LIST... 3 Project Initiation 3 Project Control 4 Project Closure 6 Project Initiation...

More information

Information Technology Independent Verification and Validation

Information Technology Independent Verification and Validation Florida Department of Management Services Information Technology Independent Verification and Validation RFP No. Work Plan and Methodology ; 2:30 PM EST 2150 River Plaza Drive Suite 380 Sacramento California

More information

Document Management System Request for Proposals

Document Management System Request for Proposals Document Management System Request for Proposals City of Great Falls PO Box 5021 Great Falls, MT 59403 Contact: Lisa Kunz City Clerk 406-455-8451 lkunz@greatfallsmt.net PROPOSALS DUE: Wednesday AUGUST

More information

RFP Microsoft Dynamics 365 Implementation Services and Managed Services Questions and Answers

RFP Microsoft Dynamics 365 Implementation Services and Managed Services Questions and Answers RFP 42017 Microsoft Dynamics 365 Implementation Services and Managed Services Questions and Answers 1. In the scope of the work there was no mention of security. Do you have advanced security requirements?

More information

Records management policy. Document author Assured by Review cycle. Audit and Risk Committee. 1. Introduction Purpose or aim Scope...

Records management policy. Document author Assured by Review cycle. Audit and Risk Committee. 1. Introduction Purpose or aim Scope... Records management policy Board library reference Document author Assured by Review cycle P017 Head of Compliance Audit and Risk Committee 3 Years This document is version controlled. The master copy is

More information

Table of Contents. Project Agreement Schedule 14

Table of Contents. Project Agreement Schedule 14 Table of Contents PART 1 DEFINITIONS... 3 PART 2 INTEGRATED MANAGEMENT SYSTEM REQUIREMENTS... 6 2.1. Introduction... 6 2.2. Overview... 6 2.2.1 Management System Requirements... 7 2.2.2 Certification...

More information

October 5, 2017 TO ALL PROSPECTIVE OFFERORS: Subject: RFP 17-PR-DET-48 Addendum No. 4 For: TIC Document Management Proposal Due Date: October 27, 2017

October 5, 2017 TO ALL PROSPECTIVE OFFERORS: Subject: RFP 17-PR-DET-48 Addendum No. 4 For: TIC Document Management Proposal Due Date: October 27, 2017 October 5, 2017 TO ALL PROSPECTIVE OFFERORS: Subject: RFP 17-PR-DET-48 Addendum No. 4 For: TIC Management Proposal Due Date: October 27, 2017 The subject RFP 17-PR-DET-48 for Technical Information Center

More information

... Operations Services Department. Request for Proposal. Utility Billing Software

... Operations Services Department. Request for Proposal. Utility Billing Software City of Pleasanton Information Technology Division 123 Main St. Pleasanton, CA 94566 Operations Services Department Utility Billing Software.... Request for Proposal Utility Billing Software Request for

More information

Request for Proposals (RFP) Shared Information Technology (IT) Services for Rural Communities of Scott County, Iowa

Request for Proposals (RFP) Shared Information Technology (IT) Services for Rural Communities of Scott County, Iowa Request for Proposals (RFP) Shared Information Technology (IT) Services for Rural Communities of Scott County, Iowa Response Submission Requirements Submission Deadline: Submission Contact: Submission

More information

International Association of Certified Practicing Engineers

International Association of Certified Practicing Engineers www.iacpe.com Knowledge, Certification, Networking Page: 1 71 IACPE No 19, Jalan Bilal Mahmood 80100 Johor Bahru Malaysia The International is providing the introduction to the Training Module for your

More information

TITLE: Pre-Employment Background Screening Services & Employee Motor Vehicle Record Searches

TITLE: Pre-Employment Background Screening Services & Employee Motor Vehicle Record Searches Northeast Ohio Regional Sewer District Human Resources Department REQUEST FOR PROPOSAL TITLE: Pre-Employment Background Screening Services & Employee Motor Vehicle Record Searches A. Background The Northeast

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall 5-1

Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall 5-1 Copyright 2013 Pearson Education, Inc. Publishing as Prentice Hall -1 Learning objectives Manage the planning process of a project Understand the work breakdown structure of a project Understand different

More information

CITY OF KOTZEBUE REQUEST FOR PROPOSAL ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES

CITY OF KOTZEBUE REQUEST FOR PROPOSAL ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES CITY OF KOTZEBUE REQUEST FOR PROPOSAL 18-01 ADMINISTRATION IT SERVICES FOR FY18 REQUEST FOR PROPOSAL INFORMATION TECHNOLOGY SUPPORT SERVICES Vendors are required to provide as much detail as possible in

More information

LOUISIANA CLERKS REMOTE ACCESS AUTHORITY Request for Qualifications and Proposals For Recording Software Integration and Related Services

LOUISIANA CLERKS REMOTE ACCESS AUTHORITY Request for Qualifications and Proposals For Recording Software Integration and Related Services INQUIRIES AND S June 8, 2018 @ 9:58 AM 1. Is it the intent of LCRAA to build an erecording portal for all vendors to submit to all Parishes in the state? The RFQ&P requires development of software to integrate

More information

ADDENDUM 2. I. The following are revisions to the general information provided in the RFP 744-R1715 posted March 21, 2017:

ADDENDUM 2. I. The following are revisions to the general information provided in the RFP 744-R1715 posted March 21, 2017: ADDENDUM 2 DATE: April 4, 2017 PROJECT: Lab Information System (LIS) and Data Migration RFP NO: 744-R1715 OWNER: TO: The University of Texas Health Science Center at Houston Prospective Bidders I. The

More information

1.0 PART THREE: Work Plan and IV&V Methodology

1.0 PART THREE: Work Plan and IV&V Methodology 1.0 PART THREE: Work Plan and IV&V Methodology 1.1 Multi-Faceted IV&V Methodology Large, complex projects demand attentive and experienced IV&V and project management support to meet expectations. Monitoring

More information

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services

City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services ATTACHMENT A SAMPLE SCOPE OF SERVICES PLC & HMI PROGRAMMING City of San Mateo Clean Water Program Programmable Logic Controller (PLC) and Human Machine Interface (HMI) Programming Services December, 2017

More information

Florida Cleanroom Systems

Florida Cleanroom Systems Florida Cleanroom Systems Design Build Projects / Project Quality Control Plan (PQCP) Quality Control / Quality Assurance Manual May 2010 1 TABLE OF CONTENTS Section 1: Introduction 3 1.1 Defining Plan

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Title Organizational Review LRFP Number 2100.17.01 Project Manager Alan Sorum Submittal Deadline June 17, 2016 Award Announcement July 15, 2016 Submit Proposals to: or Alan Sorum,

More information

Request for Proposal. Outsourced IT & Managed Services. ISSUED DATE: April 12, 2018 SUBMISSION DATE: May 18, 2018 AT 4:00 pm EST

Request for Proposal. Outsourced IT & Managed Services. ISSUED DATE: April 12, 2018 SUBMISSION DATE: May 18, 2018 AT 4:00 pm EST Request for Proposal Outsourced IT & Managed Services ISSUED DATE: April 12, 2018 SUBMISSION DATE: May 18, 2018 AT 4:00 pm EST 1 RFP COORDINATOR: JIM MALLERY VILLAGE MANAGER VILLAGE OF VICKSBURG 2 Table

More information

Project Overview. to the. Request for Proposal. For. PTI SOC2 and SOC3 Audits

Project Overview. to the. Request for Proposal. For. PTI SOC2 and SOC3 Audits Project Overview to the Request for Proposal For PTI SOC2 and SOC3 Audits Date of Issue: 11 August 2017 1 1.0 Introduction 1.1 About this Document The Internet Corporation for Assigned Names and Numbers

More information

REQUEST FOR PROPOSAL (RFP) PROJECT MANAGEMENT SOFTWARE (INFORMAX) Date Issued: 14/01/2019 Due Date: 28/01/2019

REQUEST FOR PROPOSAL (RFP) PROJECT MANAGEMENT SOFTWARE (INFORMAX) Date Issued: 14/01/2019 Due Date: 28/01/2019 REQUEST FOR PROPOSAL (RFP) PROJECT MANAGEMENT SOFTWARE (INFORMAX) Date Issued: 14/01/2019 Due Date: 28/01/2019 NB: This RFP is also available at: http://www.umati.or.tz 1 PROPOSED SCHEDULE OF EVENTS Sr.

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE St. Charles County Ambulance District Base 3 & Training Facility Construction 4169 Old Mill Parkway St. Peters, MO 63376 September

More information

Chapter 2 GALP Implementation Assistance

Chapter 2 GALP Implementation Assistance Chapter 2 GALP The GALP Implementation is based on established data management principles. 1. PRINCIPLES Control is the essential objective behind most data management principles. Effective management

More information

City of Sultan Request for Proposals City Attorney Services

City of Sultan Request for Proposals City Attorney Services The City Council of the ( City ) invites interested law firms and individuals with a minimum of seven (7) years of municipal experience to submit a written proposal to provide City Attorney services. As

More information

REQUEST FOR PROPOSAL. Customer Inquiry Tracking Planning and Implementation Project Phase I March 25, 2014

REQUEST FOR PROPOSAL. Customer Inquiry Tracking Planning and Implementation Project Phase I March 25, 2014 REQUEST FOR PROPOSAL Customer Inquiry Tracking Planning and Implementation Project Phase I March 25, 2014 This Request for Proposal (RFP) is being sent to consulting firms to act as the Consultant in the

More information

REQUEST FOR PROPOSAL: WIOA Integrated Data Systems Report

REQUEST FOR PROPOSAL: WIOA Integrated Data Systems Report REQUEST FOR PROPOSAL: WIOA Integrated Data Systems Report National Association of State Workforce Agencies National Association of Workforce Boards Circulation Date December 18, 2017 Proposal Submission

More information

ELECTRONIC RECORD TRANSFER PROCEDURES

ELECTRONIC RECORD TRANSFER PROCEDURES RECORDS MANAGEMENT CHAPTER 2 ADDENDUM B 1.0. GENERAL The TRICARE Management Activity (TMA) Records Management Office has provided the contractor two options to manage government records, either in paper

More information

DATE: 02/05/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

DATE: 02/05/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF DATE: 02/05/2018 REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF Recruitment, on-boarding and staff administration services United

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

REQUEST FOR PROPOSALS FOR STRATEGIC VISIONING AND PLANNING

REQUEST FOR PROPOSALS FOR STRATEGIC VISIONING AND PLANNING PURPOSE The Rural Community Assistance Partnership (RCAP) has initiated a Request for Proposal (RFP) process to identify a vendor qualified to design and execute a strategic visioning and comprehensive

More information

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services

PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services PROFESSIONAL SERVICES DESCRIPTION FOR THE POSITION OF: Building Commissioning Services SUBMISSION DEADLINE: October 23, 2009 11:00am FAIR AND OPEN PUBLIC SOLICITATION PROCESS FOR PROFESSIONAL SERVICES

More information

Case Study. NCDST Updates Legacy System. With X9 IMAGE CLEARING. For Check 21

Case Study. NCDST Updates Legacy System. With X9 IMAGE CLEARING. For Check 21 Case Study NCDST Updates Legacy System With X9 IMAGE CLEARING For Check 21 February 24, 2009 Contents Introduction...1 The Challenge...2 Objectives...2 Approach...3 Results...8 Lessons Learned...10 Figures

More information

Request for Qualifications

Request for Qualifications 115 South Robinson Street Tehachapi, CA 93561 661-822-2200 www.tehachapicityhall.com Request for Qualifications IT Services Acquisition Schedule The Acquisition Schedule is as follows. The City of Tehachapi

More information

Request for Proposal. for. Building Commissioning Services

Request for Proposal. for. Building Commissioning Services Page 1 of 11 Request for Proposal for Building Commissioning Services State College Area School District High School Project December 15, 2014 Page 2 of 11 Request for Proposal for Building Commissioning

More information

REQUEST FOR PROPOSAL FOR INFORMATION TECHNOLOGY SERVICES

REQUEST FOR PROPOSAL FOR INFORMATION TECHNOLOGY SERVICES REQUEST FOR PROPOSAL FOR INFORMATION TECHNOLOGY SERVICES 2018-003 Pines Behavioral Health 200 Vista Drive Coldwater MI Phone 517-278-2129 1 NOTICE REGARDING DISCLOSURE OF CONTENTS OF DOCUMENT All responses

More information

The total number of billable hours to accomplish all Actions of Goal 2.0 is not to exceed (133) hours.

The total number of billable hours to accomplish all Actions of Goal 2.0 is not to exceed (133) hours. Request For Proposals (RFPs) The Hoh Indian Tribe/Natural Resources Department is planning to work on a project to improve the preservation of cultural resources through the provision of cultural resource

More information

Notice is hereby given of the following changes to the above-referenced SOLICITAITON:

Notice is hereby given of the following changes to the above-referenced SOLICITAITON: FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4381 Fax: (850) 414-4951 ADDENDUM NO. 2 DATE: May 10, 2016 RE: BID #:

More information

KITCHEN RENOVATION PROJECT PLAN 1

KITCHEN RENOVATION PROJECT PLAN 1 KITCHEN RENOVATION PROJECT PLAN 1 Human Resource Management Plan 9.1 Plan Human Resource Management Process Benjamin Srock Embry-Riddle Aeronautical University Worldwide Campus Capstone Project PMGT-69

More information

IBM Case Manager on Cloud

IBM Case Manager on Cloud Service Description IBM Case Manager on Cloud This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized users and recipients of

More information

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR

TOWN OF WINTER PARK REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER / GENERAL CONTRACTOR February 5, 2018 SUMMARY OF CM/GC SELECTION PROCESS FOR DIMMIT II APARTMENT BUILDING The Town of Winter Park requests proposals from qualified Construction Manager / General Contractor (CM/GC) firms for

More information

Addendum I to Intranet Redesign

Addendum I to Intranet Redesign Purchasing Department (O) 864.299.4000 (F) 864.277.5852 561 Mauldin Rd. Greenville, SC 29607 www.rewaonline.org Addendum I to Intranet Redesign Posting Date: January 19, 2018 In published Request for Proposal

More information

ECM Migration Without Disrupting Your Business:

ECM Migration Without Disrupting Your Business: ECM Migration Without Disrupting Your Business: Seven Steps to Effectively Move Your Documents Planning your enterprise content management (ECM) migration is just as important as selecting and implementing

More information

Risk Mitigation in a Core Banking Conversion

Risk Mitigation in a Core Banking Conversion Risk Mitigation in a Core Banking Conversion Greg Meidt, chief information officer Chemical Bank Dick Smies, vice president IBS Conversion Services 1 800 822 6758 Introduction A core banking migration

More information

Table of Contents Section E: Inspection and Acceptance SECTION E INSPECTION AND ACCEPTANCE E-1

Table of Contents Section E: Inspection and Acceptance SECTION E INSPECTION AND ACCEPTANCE E-1 Table of Contents Section E: Inspection and Acceptance SECTION Table of Contents PAGE E-i SECTION E INSPECTION AND ACCEPTANCE E-1 E.1 52.252-2 Clauses Incorporated by Reference (FEB 1998) E-1 E.2 Verification

More information

Space Flight Configuration Management Requirements

Space Flight Configuration Management Requirements LPR 8040.1 Effective Date: January 8, 2009 Expiration Date: January 8, 2014 Langley Research Center Flight Projects Directorate Space Flight Configuration Management Requirements National Aeronautics and

More information

LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 491-SH PERSONNEL TRACKING MANAGEMENT SYSTEM

LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 491-SH PERSONNEL TRACKING MANAGEMENT SYSTEM LOS ANGELES COUNTY SHERIFF S DEPARTMENT REQUEST FOR INFORMATION RFI NUMBER 491-SH PERSONNEL TRACKING MANAGEMENT SYSTEM (PTMS) Table of Contents 1.0 INTRODUCTION... 3 2.0 SYSTEM OVERVIEW AND REQUIREMENTS...

More information

Los Angeles Unified School District Master Services Agreement

Los Angeles Unified School District Master Services Agreement To: (MSA) Contractors Subject: MSA Work Order Solicitation No. 180048 Title: Oracle Developer Services This MSA Work Order Solicitation is issued to interested proposers under the assumptions that (1)

More information

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL

COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL SECTION 01310 COST LOADED CONSTRUCTION SCHEDULES PART 1 - GENERAL 1.01 SCOPE: A. COST LOADED CONSTRUCTION SCHEDULE (Construction Schedule): The WORK under this Contract shall be planned, scheduled, executed,

More information

Medicare Data Solutions RFP FAQ

Medicare Data Solutions RFP FAQ Medicare Data Solutions RFP FAQ Updated 7/22/2016 Q: Are client references specific to the Primary vendor or is it open to the whole team as well including subs? A: Include whichever references you feel

More information

Space Product Assurance

Space Product Assurance EUROPEAN COOPERATION FOR SPACE STANDARDIZATION Space Product Assurance Software Product Assurance Secretariat ESA ESTEC Requirements & Standards Division Noordwijk, The Netherlands Published by: Price:

More information

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM APPROVED BY: JOSE ALBERTO APPROVED ON: 08/10/2017 Rev.: 1 M001 QUALITY MANAGEMENT SYSTEM PAGE: 1 of 20 TABLE OF CONTENTS SECTION TITLE PAGE Table of Contents

More information

EXHIBIT A Scope of Services Program Services Scheduling, GIS and Web Support

EXHIBIT A Scope of Services Program Services Scheduling, GIS and Web Support EXHIBIT A Scope of Services Program Services Scheduling, GIS and Web Support 1. OBJECTIVE The Florida Department of Transportation (FDOT) requires a Vendor to provide for services to support the District

More information

Centerwide System Level Procedure

Centerwide System Level Procedure 5.ARC.0004.1 1 of 17 REVISION HISTORY REV Description of Change Author Effective Date 0 Initial Release D. Tweten 7/17/98 1 Clarifications based on 7/98 DNV Audit and 6/98 Internal Audit (see DCR 98-028).

More information

Request for Proposal for Annual Financial Audit Services

Request for Proposal for Annual Financial Audit Services Request for Proposal for Annual Financial Audit Services RFP # 19_001 Jan 10, 2019 Page 1 I. RFP Timeline The following Timeline has been defined to efficiently solicit multiple competitive proposals,

More information

LEGAL AND HUMAN RIGHTS CENTRE

LEGAL AND HUMAN RIGHTS CENTRE LEGAL AND HUMAN RIGHTS CENTRE Justice Lugakingira House, Kijitonyama, P. O. Box 75254, Dar Es Salaam, TANZANIA Telephone: 2773048, 2773038, Fax: 2773037, E-mail: lhrc@humanrights.or.tz Website www.humanrights.or.tz

More information

INSTRUCTIONS Column A: Column B: Mandatory Preferred Optional Information Column C: Column D: Column F:

INSTRUCTIONS Column A: Column B: Mandatory Preferred Optional Information Column C: Column D: Column F: INSTRUCTIONS One vendor may propose one or more potential solution packages (product configurations) to meet the Department's requirements. Please complete a separate workbook for each proposed solution

More information

REQUEST FOR PROPOSALS FOR STRATEGIC VISIONING AND PLANNING

REQUEST FOR PROPOSALS FOR STRATEGIC VISIONING AND PLANNING REQUEST FOR PROPOSALS FOR STRATEGIC VISIONING AND PLANNING PURPOSE The National Association of Development Organizations (NADO) and the NADO Research Foundation have initiated a Request for Proposal (RFP)

More information

1. INTRODUCTION The Mining Qualification Authority (MQA) is a public entity established in terms of section 45 of the Mine Health and Safety Act, Act No. 29 of 1996 (MHSA) and is a Sector Education and

More information

Clinton Area Transit System

Clinton Area Transit System Clinton Area Transit System Request for Proposal for Domain Server Project RFP #2018-01 Issuing Office: Clinton Area Transit System 215 North Scott Road St. Johns, MI 48879 Procurement Schedule: RFP #2018-01

More information

Put critical information to work. Proven resources and expertise help you deliver for your clients. Pitney Bowes Legal Solutions

Put critical information to work. Proven resources and expertise help you deliver for your clients. Pitney Bowes Legal Solutions Put critical information to work. Proven resources and expertise help you deliver for your clients Pitney Bowes Legal Solutions You deliver for your clients. Let us deliver for you. PITNEY BOWES DELIVERS

More information

Request For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS)

Request For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS) Request For Information (RFI) For a Spectrum Management & Monitoring System (SMMS) Table of Contents 1 Introduction... 3 1.1 About Iraq CMC... 3 1.2 The Iraq CMC Objectives... 3 1.3 RFI Process... 4 2

More information

Ministry of Transportation

Ministry of Transportation Ministry of Transportation Consultant Quality Control (QC) Plan Process Procedures Guide Highway Design Office August, 2006 1 1.0 General The Consultant Quality Control Plan (QC) Process has been in place

More information

Work Plan and IV&V Methodology

Work Plan and IV&V Methodology Work Plan and IV&V Methodology ISG Public Sector has been helping public sector organizations acquire and implement (from a project oversight and organizational change management perspective) new, enterprise-wide

More information

REQUEST FOR PROPOSALS #0140A - REVISED. Request for Proposals for a Business Intelligence and Analytics Platform. In Support Of

REQUEST FOR PROPOSALS #0140A - REVISED. Request for Proposals for a Business Intelligence and Analytics Platform. In Support Of REQUEST FOR PROPOSALS #0140A - REVISED Request for Proposals for a Business Intelligence and Analytics Platform In Support Of ELIZABETH GLASER PEDIATRIC AIDS FOUNDATION ( EGPAF ) 1140 Connecticut Avenue,

More information

I INTRODUCTION A. REVIEW OBJECTIVES AND SCOPE

I INTRODUCTION A. REVIEW OBJECTIVES AND SCOPE I INTRODUCTION I INTRODUCTION On February 14, 2003, the Pennsylvania Public Utility Commission (PA PUC) issued a Request for Proposal (RFP) for a review and evaluation of Verizon Pennsylvania Inc.'s (Verizon

More information

IBM Clinical Trial Management System for Sites

IBM Clinical Trial Management System for Sites Service Description IBM Clinical Trial Management System for Sites This Service Description describes the Cloud Service IBM provides to Client. Client means the contracting party and its authorized users

More information

FOR THE PROVISION OF A TEAMBUILDING FACILITATOR TO CARRY OUT TEAM BUILDING PROGRAMME FOR EXECUTIVES, SENIOR MANAGEMENT AND RETAIL LEADERSHIP.

FOR THE PROVISION OF A TEAMBUILDING FACILITATOR TO CARRY OUT TEAM BUILDING PROGRAMME FOR EXECUTIVES, SENIOR MANAGEMENT AND RETAIL LEADERSHIP. REQUEST FOR QUOTATION 624-18 INVITATION TO TENDER FOR THE PROVISION OF A TEAMBUILDING FACILITATOR TO CARRY OUT TEAM BUILDING PROGRAMME FOR EXECUTIVES, SENIOR MANAGEMENT AND RETAIL LEADERSHIP. Tender Closing

More information

Hiring a Quality Auditor:

Hiring a Quality Auditor: Hiring a Quality Auditor: Your Guide to the Selection Process Contact information Address Phone number Website 20641-374_importance of hiring a quality auditor_r1.indd 1 Copyright 2016 American Institute

More information

Hiring a Quality Auditor:

Hiring a Quality Auditor: Hiring a Quality Auditor: Your Guide to the Selection Process Contact information Address Phone number Website 20641-374_importance of hiring a quality auditor_booklet.indd 1 TABLE OF CONTENTS Introduction...

More information

RFQ ATTACHMENT V: RESPONSE TEMPLATE

RFQ ATTACHMENT V: RESPONSE TEMPLATE Instructions are provided in blue and may be deleted. Please complete your response in the template provided, and indicate clearly where separate documents are provided. Executive Summary 1. Applicant

More information

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.

Request for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO. Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions

More information

Request for Proposal: Website Development, Design, & Implementation. Issued March 26, 2018

Request for Proposal: Website Development, Design, & Implementation. Issued March 26, 2018 Request for Proposal: Website Development, Design, & Implementation Issued March 26, 2018 The City of Winooski Department of Community and Economic Development 27 West Allen Street Winooski, VT 05404 802

More information

REQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California

REQUEST FOR OFFER RFO: For: Business Continuity Program Development Consultant Services. For: Covered California REQUEST FOR OFFER RFO: 2017-04 For: Business Continuity Program Development Consultant Services For: Covered California Date: Tuesday, September 19, 2017 You are invited to review and respond to this Request

More information

Request for Proposals Strategic Planning Facilitation

Request for Proposals Strategic Planning Facilitation Request for Proposals Strategic Planning Facilitation Deadline for Submission: March 6, 2019 1 Section 1: Terms and Conditions 1.1 Issuing Department or Division Department of Operations 1.2 Synopsis or

More information

CUSTOMER AND SUPPLIER ROLES AND RESPONSIBILITIES FOR 21 CFR 11 COMPLIANCE ASSESSMENT. 21 CFR Part 11 FAQ. (Frequently Asked Questions)

CUSTOMER AND SUPPLIER ROLES AND RESPONSIBILITIES FOR 21 CFR 11 COMPLIANCE ASSESSMENT. 21 CFR Part 11 FAQ. (Frequently Asked Questions) 21 CFR Part 11 FAQ (Frequently Asked Questions) Customer and Supplier Roles and Responsibilities for Assessment of METTLER TOLEDO STARe Software Version 16.00, including: - 21 CFR 11 Compliance software

More information

Oakland County Department of Information Technology Project Scope and Approach

Oakland County Department of Information Technology Project Scope and Approach Oakland County Department of Information Technology Project Scope and Approach Project Name: AAT Upgrade - GIS Deployment & Implementation Project ID: D97125GS Leadership Group: Land Department: Equalization/Treasurer

More information