Size: px
Start display at page:

Download "Energy Imbalance Market Update"

Transcription

1

2 Energy Imbalance Market Update Topics Covered: Background Implementation Update & Timeline Operational Overview Settlements Overview Appendix A - Charge Codes & Allocation Method Appendix B Information Resources and Contacts 1

3 Background Energy Imbalance Market (EIM) The real-time market to manage transmission congestion and optimize energy imbalance (positive or negative) to balance supply and demand deviations for the EIM Area through economic bids submitted by EIM Participating Resource Scheduling Coordinators in the fifteen and five minute markets. 2

4 Background NV Energy Recap of Timetable NV Energy performs analyses and pursues Nevada regulatory approval to join the CAISO EIM in April, Public Service Commission of Nevada grants approval in Docket No on NV Energy performs stakeholder meetings and files OATT amendments with FERC in March 2015 targeting an October 1, 2015 market entry date. CAISO began EIM operations on 11/1/2014 with PacifiCorp as the first EIM Entity to join. FERC grants conditional approval to NV Energy on May 14,

5 Background Timetable continued FERC conditions include several future filings NV Energy must petition for authority to sell into its own BAA at market based rates (market power study). To be filed Friday, July 24. File any tariff changes for any solutions found pursuant to FERC s investigation of PacifiCorp s price excursions. Abide by market readiness criteria being developed and approved by FERC prior to any EIM entity joining the market. Within 15 months after go-live, file an informational report addressing whether sufficient data exists to alter the flexible ramping constraint allocation method. 4

6 Background EIM Terminology Review Market Operator - CAISO Operates the market model, produces dispatches EIM Entity BAA that has joined the EIM Participating Resource Resource that bid energy into the market Non-Participating Resources Resources within Balancing Areas not submitting bids Scheduling Coordinator Interfaces with Market Operator (EESC and PRSC) Data Schedules and forecasts System model Outages Dispatch instructions RTM: Real-Time Market FMM: Fifteen Minute Market RTD: Real-Time Dispatch RTUC (RTPD): Real-Time Pre-Dispatch 5

7 Background EIM Terminology Review EIM Transfer: Real-time energy dispatch instructions (1) NV Energy BAA and the CAISO BAA (2) NV Energy BAA and PacifiCorp east (3) CAISO BAA and PacifiCorp west Load Aggregation Point (LAP): A set of Pricing Nodes used for the settlement of demand in the EIM. NV Energy will use one LAP. Locational Marginal Price (LMP): The marginal cost ($/MWh) of serving the next increment of demand at a Pnode (price node). 6

8 Background NV Energy EIM - Generation Resources Participating Resources All participating resources are owned by NV Energy 25 aggregated units 6,230 megawatts of capacity Non-participating Resources 48 aggregated units 3,818 megawatts maximum capacity NV Energy units without controls Third-party generators Power Purchase Agreements Network transmission customers Unique Resource IDs tie each resource to NV Energy s network model 7

9 Implementation Schedule Update June 18, 2015 Began early market simulation testing July Simulation testing and settlement statement verification/development August - Customers to receive base schedule application portal training BSAP July 23, 2015 Promote NV Energy s market model into CAISO production environment August 3, 2015 Start structured market simulation testing and continue settlement statement development 8

10 Implementation Schedule Update TRANSMISSION CUSTOMERS START SENDING FORECAST DATA August 25, 2015 NV Energy OATT, Attachment P o o o o o Section EIM Entity submits transmission customers hourly base schedule, forecast data for non-participating resources and resource plans to MO Section EIM Entity submits load, resource and interchange data to MO Section Transmission customers submit forecast data to EIM Entity (participating , non-participating , variable energy resources , load and wheeling ) Section Meter Data for non-participating resources Section 5 Transmission Operations o Section 6 System Operations under Normal and Emergency Conditions o Section 7 - Outages September 1, 2015 Start parallel non-binding market tests OCTOBER 1, MARKET OPERATION GO-LIVE 9

11 Operational Overview Base Schedules Operating Hour Security Events 10

12 Operational Overview Base Schedules Transmission Customers provide a Preliminary base schedule Final base schedule serves as the financially binding starting point for the realtime energy imbalance market Transmission Customer Base Schedule (Attachment P, Section 4.2.4) An energy schedule that provides hourly forecasts for load, resource (generation), and interchange. NV Energy OATT, Attachment P, Section

13 Operational Overview Base Schedule - Preliminary Submission Transmission customers submit initial base schedules 7 days before the Operating Day. Method of Submission All generation resources in BA submit using the Base Scheduling Access Portal or BSAP. Loads Submit using means mutually agreed upon submission method with EIM scheduling coordinators. Excel template is provided on the OASIS website. Interchange Wheeling transactions are directed to provide 7 day interchange forecast data per the CAISO and NV Energy OATT. Generators selling outside the system will provide their generation forecast through BSAP and interchange submission through interchange tagging process. 12

14 Operational Overview Base Schedule Final Submission Final Submission in advance of the operating hour. Type Submission Method Initial Deadline Final Deadline NV Energy Generation Non-NV Energy Generation BSAP T-77 T-57 BSAP * T-77 T-57 Interchange e-tags T-77 Requested T-57 * If 100% of a non-nv Energy generator is under contract to NV Energy, the BSAP will be populated by the Resource Optimization group of NV energy. 13

15 Operational Overview Operating Hour 14

16 Operational Overview Operating Hour Base Schedules, Load and Bid Range 15

17 Operational Overview Redispatch 16

18 Operational Overview Security Events and Outages Currently made public on OASIS Under EIM, outage forms will be completed in NV Energy s outage management system in real-time Outages will be posted on OASIS and communicated to CAISO within 30 minutes Outages will be reflected in market results for congestion, EIM dispatches, and settlements 17

19 Planned Outages and Derates Transmission, Participating & Non-participating units Notify EIM Entity at least 7 days in advance Preferably 30 days or sooner EIM Entity submits information to CAISO NV Energy OATT, Attachment P, Section 7 BPM Section 8 18

20 Unplanned Outages and Derates Transmission, Participating & Non-participating units Unplanned Outages As soon as practicable No later than 30 minutes after outage commences Unplanned Derates Report no later than 30 minutes after derate commences lasting longer than 15 minutes and availability is reduced by the greater of 10 MW or 5% of maximum plant output NV Energy OATT, Attachment P, Section 7 BPM Section 8 19

21 Questions 20

22 Settlements Overview Three settlement processes with the EIM 1) CAISO to EIM Participating Resources 2) CAISO to EIM Entity (BA) Settlement Load, nonparticipating resources and interties 3) BA settling with entities within their region 21

23 Settlements Overview Statements and Invoicing Timeline CAISO Daily Statements for Participating Resources and EIM Entities Daily Settlement Statement T+3B Recalculation Settlement Statement T+12B Recalculation Settlement Statement T+55B CAISO Weekly Transactions for Participating Resources and EIM Entities Invoices EESC Payment/Bills to PR Every Wednesday Trading days Monday - Sunday plus recalcs NV Energy EIM Entity Scheduling Coordinator Invoicing Invoice Transmission Customers OATT Section 7.1 amended to enable billing more frequently than once per month 22

24 Settlement Overview CAISO Dispute Timeline Note that Section 7.1 of OATT provides for the flexibility to expedite billing of EIM settlements to better match CAISO s dispute resolution timeline. ESQMD Estimated Settlement Quality Meter Data 23

25 Settlement Overview EIM Entity Customer Invoicing Two categories of billings to transmission customers 1. Non-imbalance related charges billed monthly a) Schedule 1, Scheduling, System Control and Dispatch b) Schedule 2, Reactive Supply & Voltage Control c) Schedule 3, Regulation and Frequency Response d) Schedule 5, Operating Reserve Spinning e) Schedule 6, Operating Reserve Supplemental f) Schedule 7, Long-term Firm and Short-term Firm g) Schedule 8, Non-firm point-to-point h) Schedule 10, Loss compensation i) Schedule 11, Regulatory & Frequency Response for Generators selling outside the Control Area 24

26 Settlement Overview Billing to EIM Entity Customers Two categories of billings to transmission customers 2. Imbalance or EIM billings a) Schedule 1A, EIM Administrative Services b) Schedule 4, Energy Imbalance c) Schedule 9, Generator Imbalance d) EIM Uplifts NV Energy OATT, Attachment P, Section 8 BPM Section 9 25

27 Settlement Overview Energy Imbalance Customer Invoicing Why bill more frequently than monthly? More complex calculation and billing More data points driven by the real time market Multiple CAISO charge codes see Appendix A NV Energy s FERC approved allocation methods of CAISO charges The CAISO dispute timeline 14 Business days to dispute T+12B data 22 Business days to dispute T+55B data Transmission customers may identify disputable items that require filing a timely dispute with CAISO. 26

28 Next Steps Registrants for today s webinar will be ed a copy of the presentation, NV Energy OATT in Adobe, and the EIM Business Practice Manual. Further announcements will be made on OATi. Attendees of this webinar will receive an notice of any EIM related information. If others in your organization need to be added, please NVE-EIM@nvenergy.com and provide the contact information. questions to: Operational Questions EIMOperations@nvenergy.com Other Questions NVE-EIM@nvenergy.com 27

29 Questions 28

30 Appendix A - CAISO Charge Codes EIM Entity Allocation Methods Charge Code Description Allocation EIM BPM Section 4564 GMC-EIM Transaction Charge Measured Demand Schedule 1A in OATT 4575 SMCR -Settlements, Metering, and Client Relations Measured Demand Schedule 1A in OATT Minute Market (FMM) Instructed Imbalance Energy EIM Settlement Direct Charge Real Time Dispatch (RTD) Instructed Imbalance Energy EIM Settlement Direct Charge Real Time Uninstructed Imbalance Energy EIM Settlement Load Ratio Share Overscheduling and Underscheduling Load Charges Imbalance Ratio Share Under Scheduling and Over Scheduling Load Proceeds from other Balancing Areas Load Ratio Share Real Time Imbalance Energy Offset - System Measured Demand Uplift 29

31 Appendix A - CAISO Charge Codes EIM Entity Allocation Methods Charge Code Description Allocation EIM BPM Section 7056 Flexible Ramp Up Cost Allocation Measured Demand Uplift 8989 Daily Neutrality Adjustment Measured Demand Uplift 8999 Monthly Neutrality Adjustment Measured Demand Uplift Real Time Imbalance Energy Offset EIM Measured Demand Uplift Real Time Bid Cost Recovery Allocation EIM Measured Demand Uplift Real Time Congestion Offset EIM Measured Demand Uplift Real Time Marginal Losses Offset EIM Measured Demand Uplift 6194 Spinning Reserve Obligation Payment to PR's ratio share - Charge to TC's load that exceeds their resources Non-spinning Reserve Obligation Payment to PR's ratio share - Charge to TC's load that exceeds their resources

32 Appendix A Measured Demand Allocation Measured Demand Common Service Provision 1.25D of OATT Includes (1) metered load volumes, including losses pursuant to Schedule 10, in NV Energy s BAA, plus (2) e-tagged export volumes from the NV Energy BAA, including losses pursuant to Schedule 10 (excluding Dynamic Schedules that support EIM Transfers). Example using hypothetical data. 31

33 Appendix B Other Resources or Contacts Resources NV Energy OATT - Attachment P (located in the current OATT) EIM folder includes additional information EIM Business Practice CAISO website Tariff link located at lower left corner Section 29 relates to EIM market // This CAISO website is a good resource of education and updates into the Energy Imbalance Market. Contacts Operations & Scheduling: EIMOperations@nvenergy.com Other Questions - NVE-EIM@nvenergy.com Tariff and Other General Questions contact Bill Trigero at (775) Settlements & Billing contacts Cory Herbolsheimer, (775) Tori Benavidez, (775)