1 PROJECT SPECIFICATIONS

2 CITY OF PORTLAND BUREAU OF ENVIRONMENTAL SERVICES PROJECT SPECIFICATIONS FOR ANKENY PUMP STATION UPGRADE BES project number E07833 STANDARD REQUIREMENTS (DIVISION 0) GENERAL REQUIREMENTS (DIVISION 1) CONSOLIDATED PROJECT SPECIFICATIONS The preparer of the consolidated project specifications for this Project: Date: f r-2/j-l( Signature Sheet 1

3 CITY OF PORTLAND BUREAU OF ENVIRONMENTAL SERVICES PROJECT SPECIFICATIONS FOR ANKENY PUMP STATION UPGRADE BES project number E07833 ENGINEER OF RECORD CERTIFICATION(s): Signing as the Engineer of Record for the sections listed below: Section Division 01 Signing as the Engineer of Record for the sections listed below: EXPIRES: 12/31/2012 Division 02 Division 14 Sections: 09900, 10441, 11000, 11002, 11005, 11010, 11015, 11020,11021, 11050, 11305, 11328, 11347, 15050, 15061, 15062, 15064, 15066, 15067, 15075, 15085, 15090, 15095, 15096,15097,15101,15110,15118,15124,15131,15136, 15147, 15150, 15151, 15153, 15179, 15180, 15184, 15185, 15200, 15250, 15400, 15401, 15440, 15461, Signature Sheet 2

4 Signing as the Engineer of Record for the sections listed below: Division 03 Division 04 Division 05,"--..",.?- ~ Division 07 Sections: Signing as the neer of Record for the sections listed below: Division 08 Sections: 09110; 09250; 09300; 10200; 10520; Signature. Sheet 3

5 Signing as the Engineer of Record for the sections listed below: Sections: 15632, 15784, 15858, 15859, 15863, 15873, 15891, 15903, 15952, EXPIRES: Signature Sheet 4

6 Signing as the Engineer of Record for the sections listed below: Sections: 11060, 16176, Division 17 EXPIRES: 12131/2012 Signature Sheet 5

7 Signing as the Engineer of Record for the sections listed below: Sections: 16000, 16030, 16110, 16120, 16125, 16140, 16175, 16310, 16311, 16322, 16421, 16445, 16450, 16460, 16470, 16500, 16702, 16710, 16920, Signature Sheet 6

8 PROJECT SPECIFICATIONS TABLE OF CONTENTS ANKENY PUMP STATION UPGRADE PROJECT NO. E07833 Work to Be Done VOLUME 1 OF3 PROJECT SPECIFICATIONS DIVISION DIVISION Standard Requirements (see detailed table of contents in ) GENERAL REQUIREMENTS General Specifications Summary of Work Temporary Work and Suggested Work Sequence Measurement and Payment Permits Safety and Health Insurance Project Meetings Shop Drawings and Other Submittals Construction Schedules - Type X Contractor Quality Control Acceptance Inspection and Testing Facility Startup Operations and Maintenance (O&M) Data Contractor Facilities, Temporary Control, and Staged Construction Construction Waste Management Protection and Maintenance of Work and Property Environmental Controls Product Delivery, Storage, and Handling Contract Closeout Cleaning Project Record Documents Environmental Conditions Seismic Anchorage and Bracing Requirements Standard Forms SITE WORK Demolition Special Procedures Lead Paint Asbestos Abatement Site Preparation E07833

9 DIVISION DIVISION DIVISION DIVISION DIVISION 6 DIVISION DIVISION DIVISION SITE WORK (continued) Earthwork Sheeting, Shoring, and Bracing Asphalt Pavement Concrete Curbs, Gutters, and Walks CONCRETE Formwork Concrete Reinforcement Cast-in-Place Concrete Precast Concrete Grout MASONRY Unit Masonry METALS Structural Metals Anchor Bolts Miscellaneous Metalwork Metal Stairs Handrailing Grating, Steel Stairs, Floor Plates, Safety Stair Treads, and Cover Plates Hot-Dip Zinc Coating Mechanical Zinc Coating NOT USED THERMAL AND MOISTURE PROTECTION Sealants DOORS AND WINDOWS Steel Doors and Frames Access Hatches Finish Hardware Glass and Glazing FINISHES Steel Studs Gypsum Wallboard Tilework Coating Systems E07833

10 DIVISION SPECIALTIES Louvers Warning Signs Fire Extinguishers and Cabinets Toilet Accessories VOLUME 2 OF 3 DIVISION EQUIPMENT General Requirements for Equipment Rigid Equipment Mounts Machine Alignment Equipment Controls Noise Requirements and Control Vibration and Critical Speed Limitations Vibration Isolation Systems General Requirements for Centrifugal and Axial Flow Pumping Equipment Electric Motors Custom Engineered Vertical Constant-Speed Non-Clog and Non-Clog Mixed-Flow Centrifugal Pumps with Inlet Nozzle Diameters 16 Inches and Greater Supplied with Independent Motor Support Regenerative Turbine Pumps Submersible Wastewater Pumps for Sump Pumping Applications DIVISION 12 DIVISION 13 DIVISION DIVISION NOT USED NOT USED CONVEYING SYSTEMS Jib Cranes Monorail and Hoist Bridge Cranes and Hoists MECHANICAL Piping Systems Steel Pipe Ductile Iron Pipe Plastic Pipe Copper Piping Stainless Steel Piping Joint Gaskets, Piping Connections Expansion Joints and Flexible Metal Hose E07833

11 DIVISION DIVISION MECHANICAL (continued) Piping Appurtenances Pipe Hangers and Supports Seismic Restraints for Piping Gate Valves Eccentric. Plug Valves Spring-Loaded Swing Check Valves Reduced Pressure Principle Backflow Preventers Large Diameter Ball Valves Knife Gate Valves Solenoid Valves Specialty Valves Wastewater Air Release and Vacuum Valves Pressure Regulating Valves Control Unit Schedule Electric Power Actuated Valve and Gate Schedules Manual Valve and Gate Operators and Operator Appurtenances Powered Valve and Gate Actuators and Appurtenances Hoses and Nozzles Insulation for Exposed Piping and Equipment Plumbing Process Drainage Plumbing Fixtures Air Gap Tank Electric Water Heaters Electric Unit Heaters Split System Heat Pump Unit Centrifugal Roof Supply Fans In-Line Centrifugal Fans Propeller Wall Fans Centrifugal Roof Exhaust Fans Sheet Metal Ductwork Diffhsers, Grilles, and Registers Ventilation System Control Devices Heating, Ventilating, and Air Conditioning Systems Testing, Adjusting, and Balancing ELECTRICAL General Requirements for Electrical Work Electrical Acceptance Testing Raceways, Boxes, and Supports 600 Volt Conductors, Wire and Cable Medium Voltage Conductors and Cable Wiring Devices Miscellaneous Electrical Devices E07833

12 DIVISION DIVISION ELECTRICAL (continued) Local Control Panels Low Voltage Switchgear Low Voltage Switchboards Pad-Mounted Distribution Transformers S urge Arresters Instrument Transformers, Meters, Switches and Accessories Surge Protective Devices Grounding System Dry-Type Transformers (600 Volts and Less) Lighting and Power Panelboards Luminaires Liquid Level Controls Telemetry Systems Neutral Grounding Resistors Medium Voltage Pad-Mounted Switchgear 600 Volt Motor Control Centers 600 Volt Reduced-Voltage Solid-State Motor Starters INSTRUMENTATION General Requirements for Instrumentation and Control Process Instrumentation and Control System Testing Instrument and PLC Control Panels Annunciator Systems Instrument Air Transmission Systems Instrument Index Process Taps and Primary Elements Transmitters Process Switches Miniature Case Electronic Panel Instruments Machinery Vibration Monitoring and Protection Systems Control Strategies E07833

13 SUPPLEMENTAL INFORMATION See Appendix Volume 3 of 3 DRAWINGS E07833

14 WORK TO BE DONE 1. WORK TO BE DONE A. Contract is for the constructions of the. Work under this contract includes, but is not limited to: 1. Demolishing existing sewage pumps, piping systems, electrical building, electrical distribution equipment, control equipment, seal water system, hydraulic system, restroom plumbing fixtures, and HV AC equipment. 2. Removal and disposal of asbestos containing material (ACM) and lead based paint (LBP). See hazardous building assessment report in index. 3. Providing temporary electrical power system for the maintenance of pump station operations. 4. Constructing structural frames, walls and beams. 5. Constructing new stairways, ladders, platforms, catwalks, and access hatch. 6. Installing new electrical power distribution equipment and lighting systems. 7. Installing new electrical instrumentation and control equipment. 8. Constructing a new restroom facility with new restroom fixtures and appurtenances. 9. Modifying the existing wet well wall. 10. Installing four sewage pumps. 11. Installing all required piping, isolation valves, fittings, pipeline pigging, and flow meter equipment. 12. Modifying the existing storm pump valves and piping to add a recirculation line to the wet well to exercise the storm protection pumps. 13. Constructing a new seal water system. 14. Installing new HV AC equipment including louvers. 15. Upgrading the potable and non-potable water system, including reduced pressure backflow assemblies (RPBA's) and water heater. 16. Painting interior walls, equipment and existing roof 2. APPLICABLE SPECIFICATIONS Bidder shall incorporate all applicable provisions of the Standard and General Requirements contained within this document. Project No. E07833 WORK TO BE DONE

15 The City of Portland 2010 Standard Construction Specifications (as revised) are incorporated by reference into these specifications. 3. OWNER'S REPRESENTATIVE/ENGINEER Owner's Representative: Engineer of Record: Dan Bush 1120 SW 5 th Avenue, Room 1100 Portland, Oregon Brown and Caldwell 6500 SW Macadam Ave Suite 200 Portland, Oregon BES Design PM Jeff Hanks 5001 N. Columbia Boulevard Portland, Oregon TIME FOR COMPLETION The work shall be completed within 810calendar days after receipt of the written Notice to Proceed. ** END OF SECTION ** Project No. E07833 WORK TO BE DONE