1 For inquiries related to the projects listed below Please or the staff person listed for the project. County Road (CR) Number Location / Township Description of Work County Staff 1.1 km East of Hwy 7 to City of Peterborough Limits / Hwy 7 Easterly for approximately 1.17 km / CR 38 Northerly 1.1 km Douro-Dummer Hwy 7 Easterly for approximately 2.10 km Hwy 115 to Hwy 7A CR 9 Northerly for approximately 1.40 km CR 29 Westerly to CR 23 for approximately 1.00 km CIREAM with HMA Overlay Road Full Urbanization with Curb and Gutter, Sidewalk, Storm and Culvert Replacement CIREAM with HMA Overlay Consultant/ Contractor CoCo Paving Drain Bros. September 2016 CoCo Paving CIREAM = Cold in-place recycling with expanded asphalt mix HMA = Hot Mix Asphalt 1 of 8

2 County Road (CR) Number Location / Township Description of Work County Staff CR 19 Northerly to CR 1 for approximately 2.25 km CR 1 Northerly to the South Limits of the Settlement Area of Bridgenorth for approximately 3.30 km CR 18 to Hilliard St 14 th Line of Smith for approximately 3.30 km. Northerly to CR 22 Arborview Dr Southerly to Miller Rd for approximately 2.8 km Miller Rd to CR18 approximately 7.3 km City of Peterborough Limits Northerly to CR 23 for approximately 3.70 km Environmental Assessment and Design Pulverization, Grade Raise and Double Surface Treatment Single Surface Treatment Consultant/ Contractor Ltd WSP 2017 Ltd Royel Paving Royel Paving Ltd CIREAM = Cold in-place recycling with expanded asphalt mix HMA = Hot Mix Asphalt 2 of 8

3 County Road (CR) Number Douro Depot Location / Township Description of Work County Staff CR 47 Southerly for approximately 2.0 km Havelock-Belmont- Methuen CR 46 to 1.85 km North (Drain Bros. Pit Entrance) Havelock-Belmont- Methuen CR 45 approximately 5.00 km south of Hwy 7 Asphodel-Norwood Unimin Rd Northerly for approximately 8.2 km Havelock-Belmont- Methuen Douro Depot Parking Lot Douro-Dummer Pulverization, Grade Raise and Double Surface Treatment Pulverization, Grade Raise and HMA Overlay Culvert Reline Pulverization, Grade Raise and Double Surface Treatment Removal and Replacement of HMA Consultant/ Contractor Royel Paving August 2016 Drain Bros. Fall 2016 All Services Royel Paving CoCo Paving September 2016 CIREAM = Cold in-place recycling with expanded asphalt mix HMA = Hot Mix Asphalt 3 of 8

4 Bridge Location Description of Work County Staff Cordova Culvert Lower Buckhorn Bridge Trent Canal Bridge Dutch Line Bridge Newell s Bridge Warsaw Arena Culvert Indian River Bridge CR 48 within the Settlement Area of Cordova Mines Havelock-Belmont- Methuen CR 23 within the Settlement Area of Buckhorn CR 23 within the Settlement Area of Buckhorn Trent Lakes On Dutch Line Rd approximately 2.0 km East of CR 121 Trent Lakes 4 th Line Asphodel Asphodel-Norwood Ford St in the Village of Warsaw Douro-Dummer Division Rd Douro-Dummer Replacement of Cross-Culvert Bridge Rehabilitation Bridge Rehabilitation Bridge Demolition and Installation of Steel Beam Guiderail Deck Repairs and Installation of Steel Beam Guiderail Stone Wall Repair Pave Bridge Approaches Consultant/Contractor Drain Bros. Fall 2016 National Structures April 1 Nov 26 National Structures April 1 Nov 26 Baltimore Development & Services Baltimore Development & Services Baltimore Development & Services CoCo Paving CIREAM = Cold in-place recycling with expanded asphalt mix HMA = Hot Mix Asphalt 4 of 8

5 Bridge Location Description of Work County Staff Scarlett Villa Bridge Tully s Bridge Hutchinson Dr Lily Lake Rd Pave Bridge Approaches Design only Bridge Replacement Martin O Grady Ext. 325 mogrady@county.peterborough.on.ca Consultant/Contractor CoCo Paving WSP 2017 CIREAM = Cold in-place recycling with expanded asphalt mix HMA = Hot Mix Asphalt 5 of 8

6 Transportation Plan Projects Airport Road CR20 James A. Gifford Causeway Location Description of Work County Staff CR 11, Mervin Line to South Airport Limits Otonabee-South Monaghan CR 18 to CR 23 CR 18 to CR 14 Pre-loading Contract for Reconstruction Design only Functional Design Design only Permit Approvals and Design of Road Widening Consultant/Contractor Drain Bros. Winter 2016 N/A Bytown Eng. N/A TBD CR21 Tupper St to Union St Township Watermain Replacement and Sidewalks County Road Resurfacing Stacy Gerow Public Works Clerk Township of Or Carchidi Excavating Accurex CR21 Phase 1 Union St to Cavan St Watermain Replacement and Road Reconstruction August to October 31 WSP CIREAM = Cold in-place recycling with expanded asphalt mix HMA = Hot Mix Asphalt 6 of 8

7 Transportation Plan Projects CR21 Phase 2 Location Description of Work County Staff Cavan St to Huston St Design only Watermain Replacement and Road Reconstruction Consultant/Contractor TBD N/A CIREAM = Cold in-place recycling with expanded asphalt mix HMA = Hot Mix Asphalt 7 of 8

8 Other Activities Location Description of Work County Staff Contractor Crack Sealing Various Locations Filling of Cracks in Pavement Surface Martin O Grady ext. 325 MOGrady@county.peterborough.on.ca Upper Canada Road Services Pavement Marking and Line Painting All County Roads Painting and Delineation of Road Surfaces Martin O Grady ext. 325 MOGrady@county.peterborough.on.ca Provincial Fall Year Planning of Infrastructure Needs Hwy 115 Gateway Sign All County Roads and Bridges Hwy 115 east of Glamorgan Road Needs Assessments, Infrastructure Inspections, Project Management, Engineering and Design. Design and Tender of Entrance Sign to be Installed on Hwy 115 Manager, Engineering & Design Manager, Engineering & Design Varies Fall 2016 RKLA Architects CIREAM = Cold in-place recycling with expanded asphalt mix HMA = Hot Mix Asphalt 8 of 8