1 University of Ottawa SECTION Lees Av. Campus HYGENIC PVC WALL & CEILING September 22, 2008 Recommissioning Phase 2 Page 1 of 5 1 General 1.1 RELATED WORK.1 Gypsum Board: Section Finish & Colour Schedule: Section Sealants: Section REFERENCES.1 ASTM D ASTM D a..3 ASTM E84-91a..4 ASTM D256 Impact.5 ASTM D638 Tensur.6 ASTM D696 Coefficient of Linear Thermal Expansion.7 ASTM D732 Punch Shear Strength.8 ASTM D4060 Abrasion Resistance.9 CAN/ULC SS102-M88 Fire Test 1.3 SUBMITTALS.1 Submit duplicate 300 x 300mm sample piece of specified wall cladding material along with sample of system as per Section Submit shop drawings to show panel layout, treatment at joints and proposed treatment where wall cladding finishes up to the door and window trims as per Section Shop drawings to locate required ceiling frame for use by drywall trade..3 Submit copy of Statement of Quality Assurance..3 Submit maintenance data for wall cladding, for incorporation into Operation and Maintenance Manual as per Section QUALITY ASSURANCE.1 All work to be performed by qualified tradesmen fully experienced in all aspects of installation procedures for the wall claddings specified herein..2 Wall and ceiling cladding installer to have minimum 2 years experience installing PVC wall products.

2 University of Ottawa SECTION Lees Av. Campus HYGENIC PVC WALL & CEILING September 22, 2008 Recommissioning Phase 2 Page 2 of 5.3 The successful wall and ceiling contractor must produce a mock-up area showing internal and external corners and all accessories. The approved mock-up area will determine the level of workmanship acceptable for the installation of the specified wall cladding. 1.5 PRODUCT STORAGE.1 Sheets must be stored flat, fully supported, and left for 24 hours to attain ambient room temperature prior to installation at minimum 18degrees Celsius. 1.6 ENVIRONMENTAL REQUIREMENTS.1 Install panels in temperature and humidity conditions approximating the operating environment of the finished room..2 Consult other trades in advance and make provisions for work of other trades, to avoid future repairs. 1.7 WARRANTY.1 The Warranty is with respect to this section of work extended from one year to five years. Provide a written guarantee in the form specified in Section Warranty shall be for the product and product s installation against discolouration and impact resistance. 2 PRODUCTS 2.1 WALL MATERIAL.1 Material.1 Supply and install in accordance to recommendations set out by wall cladding manufacturer..2 Altro Whiterock Wall Cladding Extruded 3.0m x 1.220m x 2.0mm thick sheets, colour white by Compass Flooring Ltd., Adhesive.1 Two component polyurethane for non-absorbent surfaces eg Mapei Planicrete W or approved equal. Written approval for alternate required by manufacturer of wall covering product..2 Single component latex for absorbent surfaces eg Chembond 1651 or approved equal. Written approval for alternate required by manufacturer of wall covering product..3 Accessories.1 Including but not limited to: A831 Joint Strip A832 Transition Strip

3 University of Ottawa SECTION Lees Av. Campus HYGENIC PVC WALL & CEILING September 22, 2008 Recommissioning Phase 2 Page 3 of 5 A807 Start and Edge Trim.4 Install all around Room E0024 Environmental Exposure. 2.2 CEILING MATERIALS.1 Material.1 Supply and install in accordance to recommendations set out by ceiling material manufacturers..2 Altro Whiterock Ceiling Cladding P m x 0.25m x 9mm tongue and groove system extruded from double skin profiles linked with vinyl fins..3 Metal furring runners, hangers, tie wires, inserts, anchors to CSA A82.30 Galvanized. Note Item No to be supplied and installed by drywall trade.4 Accessories:.1 Including but not limited to: P258 Intermediate or Centre Joint Section P259 Start and Edging Trim P255 External Corner P257 Internal Corner.2 Install at ceiling of Room E0024 Environmental Exposure. 3 EXECUTION 3.1 INSPECTION OF EXISTING AND SUBSTRATE WALL CONDITION.1 Ensure wall substrates are smooth and level to within 3mm in 3m..2 Install cement board, minimum thickness 12mm fastened to studs or battens at centres not greater than 400mm. It is not necessary to install corner beads or fill joints. 3.2 APPLICATION OF WALL PANELS.1 Dry-fit sheet prior to fixing..2 Bevel leading edges of sheet prior to welding seams or fitting joint and cap strips..3 Apply adhesive to back of sheet uniformly following adhesive label..4 Offer sheet to wall substrate allowing for a 3mm gap. Roll sheet thoroughly with a wall roller to ensure full adhesion.

4 University of Ottawa SECTION Lees Av. Campus HYGENIC PVC WALL & CEILING September 22, 2008 Recommissioning Phase 2 Page 4 of 5.5 Cut sheet neatly to accommodate pipes, electrical boxes etc providing a 3mm gap for expansion..6 Fit sheets neatly at door and window trim providing a 3mm gap for expansion..7 Thermoform all inside and outside corners and specific shapes to fit building contours..8 Install joint strips (A831) to each sheet as installation progresses..9 Stop the A831 joint strip 9mm short of the bottom of the sheet. Cut away the back of the A831 joint strip. Install Altro cap tile (A832) to bottom edge of sheet when all of the panels have been installed. In order to follow the thermoformed internal and external corners the transition strip will have to be notched..10 Apply a bead of recommended sealant along the bottom edge of the panel..11 Cap off panel edge with A807 Start and Edge Trim..12 Provide water tight seal to all pipes, projections, door and window trims using ICL319 sealant (matching)..13 Upon completion of the installation remove the protective film..14 Wash with dilute soap/detergent solution and rinse with clean water. 3.3 INSPECTION OF CEILING FRAMING.1 Ensure ceiling framing is level within 3mm in 3mm.2 Ensure layout of suspended grid meets requirement of P250 panels, light fixtures and access panels. 3.4 INSTALLATION OF CEILING PANELS.1 Layout level ceiling line around room perimeter.2 Secure perimeter channel to ceiling line by fastening at 610mm o.c..3 Set out access panels.4 Fix soffit cleats and hanger sections at centres specified to suit desired grid system.5 Continue installing grid system following manufacturer s instructions.6 Fit vinyl extrusion P259 to underside of perimeter channel using ½-6 c/s s/t screws.7 Fit P250 ceiling boards at right angles to main grid section using ½-6 c/s s/t screws..8 Clean all boards using safe solvent cleaner

5 University of Ottawa SECTION Lees Av. Campus HYGENIC PVC WALL & CEILING September 22, 2008 Recommissioning Phase 2 Page 5 of 5.9 Apply anti-static solution to all boards..10 Seal all perimeter with Altro approved sealant..11 Seal all ends of boards around lights and access panels with Altro approved sealant..12 Upon completion remove protective film from panels..13 Clean with an anti static solution with anti-static solution recommended by Altro Whiterock. END OF SECTION

6

7 University of Ottawa SECTION Lees Av. Campus METAL TOILET PARTITIONS September 22, 2008 Recommissioning Phase 2 Page 1 of 3 1 General 1.1 RELATED WORK.1 Rough Carpentry: Section SAMPLES.1 Submit actual sample of hardware and connection pieces..2 Submit in accordance with Section SHOP DRAWINGS.1 Submit shop drawings in accordance with Section Indicate fabrication details, plans, elevations, hardware, and installation details. 1.4 MAINTENANCE DATA.1 Provide maintenance data for maintenance of stainless steel for incorporation into Operation and Maintenance Manual specified in Section PROTECTION.1 Protect metal surfaces during shipment and installation. Do not remove until immediately prior to final inspection. 1.6 WARRANTY.1 Warrant the work of this section for 10 years. Provide a written guarantee in the form specified in Section Warrant against breakage, corrosion, delamination and defects in factory workmanship. 2 Products 2.1 MATERIALS.1 Sheet steel: commercial quality to ASTM A526M with ZF001 designation zinc coating..2 Fasteners: Stainless steel tamperproof type screws and bolts..3 Overhead Brace: Extruded aluminum channel with satin finish of anti-grip design..4 Pilaster Shoe: Stainless steel, 76mm high. Type 304 with satin finish. 2.2 HARDWARE.1 Hinges: All hardware, mounting brackets and fasteners to be stainless steel except for hinges and latch. Doors shall be equipped with a gravity type hinge mounted on the lower pilaster hinge bracket. Door hinges shall be fully concealed within the thickness of the door and adjustable to permit the door to come to rest at any position when not latched.

8 University of Ottawa SECTION Lees Av. Campus METAL TOILET PARTITIONS September 22, 2008 Recommissioning Phase 2 Page 2 of 3.2 Latchset: Each door to be equipped with a concealed latch with face mortised flush with edge strip of door..3 Wall and Connecting Brackets: Stainless steel brackets and fasteners to be used to secure panel to stiles and panel to wall..4 Coat Hook: Stainless steel combination coat hook and bumper maximum 29mm projection. steel..5 Door Pull: Barrier free D type, 140mm long suited for outswinging doors, stainless.6 Door Stop: shall be combined stop and keeper. 2.3 FABRICATION.1 Fabricate doors, panels and pilasters, of two sheets of panel flatness zinc coated steel, A446 Grade A. Laminated under pressure to a honeycomb core for sound deadening and rigidity. Formed edges to be welded together and interlocked under tension with a roll-formed oval crown locking bar, mitred, welded and ground smooth at the corner. Honeycomb to have a maximum 25mm cell size with a compressive strength of 31 psi..2 Panels to be 25m m thick with 20 Ga cover sheet x 1460mm high set 318mm above floor. Doors 600mm wide unless otherwise indicated..3 Pilasters to be 32mm thick with 20 Ga cover sheet x 2083mm high to sizes indicated..4 Fabricate cubicles for handicapped to Ontario Building Code..1 Equip outswinging doors with pulls on both sides..2 Design latch to meet O.B.C (b). 2.4 PRODUCT.1 Hadrian Manufacturing Inc. headrail braced toilet compartments with handicapped lever thumbturn, mitred, welded, and ground corners, masonite reinforced honeycomb core panels, concealed hinge mountings, gravity hinge, reinforced pilaster, anti-grip top rail, locking bar and latch with safety release..2 Colour to be selected from Manufacturer s Standard Range. 3 Execution 3.1 PARTITION ERECTION.1 Install partitions secure, plumb and square..2 Leave 12mm space between wall and panel or end pilaster..3 Anchor Fixing Brackets to Masonry-Concrete Surfaces Using Screws and Shields: To hollow block walls using bolts and toggle type anchors..4 Attach panel and pilaster to brackets with stainless steel tamperproof type screws and bolts..5 Provide for adjustment of floor variations with a floor bracket and levelling channel which is an integral assembly of the pilaster. All levellers to be installed to facilitate future adjustments.

9 University of Ottawa SECTION Lees Av. Campus METAL TOILET PARTITIONS September 22, 2008 Recommissioning Phase 2 Page 3 of 3.6 Secure pilasters to floor with fasteners provided..7 Equip each door with one set of hinges, latch set, 1 doorstop, and one combination coat hook/bumper. Adjust and align hardware for proper function. Set door open position at 30 0 to front..8 Where anchorage points penetrate vertical or horizontal ceramic tile finishes coat bolts with silicone, prevent water from penetrating behind ceramic. 3.2 OVERHEAD BRACED PARTITIONS.1 Attach pilasters to floor with pilaster supports and level, plumb and tighten installation with levelling device..2 Secure pilaster shoes in position..3 Secure headrail to pilaster face with not less than two fasteners per face..4 Set tops of doors parallel with overhead brace when doors are in closed position. 3.3 SCREENS.1 Anchor screen panels to walls with panel brackets and vertical upright consisting of tubular headrail stock and end sockets. 3.4 SCHEDULE.1 Room E1104 single screen with door..2 Room E2204 single screen with door..3 Room 1141 or 2237 new panel to match existing..4 Room E0005 three standard stalls, one hcap stall.5 Room E0007 one urinal screen, one standard stall, one handicap stall END OF SECTION

10

11 University of Ottawa SECTION Lees Av. Campus PLASTIC SHOWER PARTITION September 22, 2008 Recommissioning Phase 2 Page 1 of 3 1 General 1.1 RELATED WORK.1 Toilet and Bath Accessories: Section Grab Bars: Section Rough Carpentry: to provide and locate all wood blocking/reinforcing as per manufacturer s instructions. 1.2 SAMPLES.1 Submit actual sample of hardware and connection pieces..2 Submit in accordance with Section SHOP DRAWINGS.1 Submit shop drawings in accordance with Section Indicate fabrication details, plans, elevations, hardware, and installation details. 1.4 MAINTENANCE DATA.1 Provide maintenance data for maintenance of stainless steel for incorporation into Operation and Maintenance Manual specified in Section PROTECTION.1 Protect metal surfaces during shipment and installation. Do not remove until immediately prior to final inspection. 1.6 WARRANTY.1 Warrant the work of this section for 10 years. Provide a written guarantee in the form specified in Section Warrant against breakage, corrosion, delamination and defects in factory workmanship. 2 Products 2.1 MATERIALS.1 Solid phenolic shower compartment partitions..2 Fasteners: Stainless steel tamperproof type screws and bolts..3 Overhead Brace: Extruded aluminum channel with satin finish of anti-grip design..4 Pilaster Shoe: Stainless steel, 76mm high. Type 304 with satin finish.

12 University of Ottawa SECTION Lees Av. Campus PLASTIC SHOWER PARTITION September 22, 2008 Recommissioning Phase 2 Page 2 of HARDWARE.1 Institutional hardware 0.67 Hinges, door latches, door keepers, u channels, and angle brackets are constructed of 18-8S, type 304, heavy guage stainless steel satin finish: one piece, full height hinge is 16ga (1.6mm); one piece door keeper is 8ga (4.4mm); one piece, full height u channels and angle brackets are 18 ga (1.2mm). U-channels secure panels to stiles and angle brackets secure panel and stiles to walls. Door latch slides on a shock resistant nylon track. A locked compartment may be opended from outside by lifting door to disengage latch from keeper. Black rubber bumper on the latch serves as a door bumper. Two vinyl-coated door stops prevent door from being kicked out by vandals. Theft resistant, stainless steel pin head, torx screws to be furnished with door hardware, U-channels and angle brackets. Doors to be equipped with a self-closing hinge by Bobrick. 2.3 FABRICATION.1 Stiles: 19mm thick solid phenolic core with fused melamine surface sheets, 200mm wide x 2160mm high..2 Doors, 19mm thick solid phenolic core with fused melamine surface to sizes indicated x 1470mm high..3 Panels to be 13mm thick solid phenolic core with fused melamine surface to size indicated x 1470 high..4 Polish edges of composite laminated plastic panels. Chamfer exposed edges uniformly at approximately 20 degrees..5 Fabricate cubicles for handicapped to Ontario Building Code..1 Equip outswinging doors with pulls on both sides..2 Design latch to meet O.B.C (b). 2.4 PRODUCT.1 Acceptable Product: Headrail braced Melamine faced solid phenolic shower compartments by Bobrick with handicapped lever thumbturn, gravity hinge, anti-grip top rail, locking bar and latch with safety release. Bobrick overhead braced partitions furnished with institutional hardware, including factory installed threaded inserts for door hardware attachment. 3 Execution 3.1 PARTITION ERECTION.1 Install partitions secure, plumb and square..2 Leave 12mm space between wall and panel or end pilaster..3 Anchor Fixing Brackets to Masonry-Concrete Surfaces Using Screws and Shields: To hollow block walls using bolts and toggle type anchors..4 Attach panel and pilaster to brackets with stainless steel tamperproof type screws and bolts.

13 University of Ottawa SECTION Lees Av. Campus PLASTIC SHOWER PARTITION September 22, 2008 Recommissioning Phase 2 Page 3 of 3.5 Provide for adjustment of floor variations with 10mm thick, corrosion resistant, chromatetreated, double zinc plated steel levelling bar bolted to base of solid phenolic stile. Secure stile to floor with two 10mm dia threaded rods. Conceal levelling device with stainless steel satin finish shoe..6 Secure pilasters to floor with fasteners provided..7 Equip each door with one set of hinges, latch set, 1 doorstop, and one combination coat hook/bumper. Adjust and align hardware for proper function. Set door open position at 30 0 to front..8 Where anchorage points penetrate vertical or horizontal ceramic tile finishes coat bolts with silicone, prevent water from penetrating behind ceramic. 3.2 OVERHEAD BRACED PARTITIONS.1 Attach pilasters to floor with pilaster supports and level, plumb and tighten installation with levelling device..2 Secure pilaster shoes in position..3 Secure headrail to pilaster face with not less than two fasteners per face..4 Set tops of doors parallel with overhead brace when doors are in closed position. 3.3 SCHEDULE.1 Shower partitions in Rooms E0005 and E0005B..2 Shower partitions in Rooms E0007 and E0007B. END OF SECTION

14

15 University of Ottawa SECTION Lees Av. Campus MANUFACTURED SPECIALTIES September 22, 2008 Recommissioning Phase 2 Page 1 of 2 1 General 1.1 RELATED WORK.1 Section 09111: Metal Studs System..2 Section 09250: Gypsum Board. 1.2 DELIVERY STORAGE.1 Deliver items in original packing cartons..2 Store all items in dry, clean, protected areas. 1.3 SAMPLES.1 Submit samples of items when requested by the Architect. 1.4 SHOP DRAWINGS.1 Submit shop drawings for all items for Consultant s review. 1.5 CO-ORDINATION.1 Co-ordinate supply and installation of all specified items..2 Where manufacturer installs, clarify with Contractor before submitting Tenders..3 Supply sleeves, bolts, anchors, templates and other items required to other trades for building-in of units specified in this Section. 1.6 MAINTENANCE DATA.1 Provide operating guidelines and maintenance instructions for the fireplaces to be incorporated into the maintenance manual specified in Section Products 2.1 MANUFACTURER.1 Each item is specified by manufacturer s name and catalogue number..2 Other manufacturers may submit bids on equivalent items providing bids are accompanied by complete details and specifications. 2.2 AV RPOJECTION SCREENS.1 Projection Screens: Three (3) mm x 2440mm Manually operated, spring roller projection screen for wall installation consisting of case, screen, mounting accessories, and other components necessary for complete installation; Da-Lite Model C 40252

16 University of Ottawa SECTION Lees Av. Campus MANUFACTURED SPECIALTIES September 22, 2008 Recommissioning Phase 2 Page 2 of 2.2 Method of installation: Wall mounted Projected mounting with 254/356mm nonadjustable brackets..3 Screen case: Fabricated in one piece from 22 gauge steel sheet with 12 gauge end caps and scratch-resistant white polyester finish. Provide end caps with integral roller brackets and universal mounting brackets for wall or ceiling mounting..4 Roller: 91.4 mm diameter steel with heavy duty spring and steel end caps..5 Viewing surface securely attached to steel roller at top and at bottom to steel tubular slat with vinyl end caps. Provide pull cord. 2.3 AV PROJECTOR CEILING MOUNT.1 Chief Ceiling Mounts: Three (3) Chief projector mount assemblies complete with:.1 Chief RPAU universal projector ceiling mount plate..2 Chief CMA adjustable extension column (18-24 ).3 Chief CMA101 ceiling plate..2 Provide miscellaneous steel framing and mounting plates across steel floor / roof structure joists as required to anchor projector mount to. Provided 6mm steel plate 400mm wide x 700mm long (length required to span between joists c/w bolted connections to existing joist bottom chord members. Three locations required. 3 Product 3.1 INSTALLATION.1 Install all items in accordance with reviewed shop drawings and manufacturer s instructions. 3.2 PROTECTION.1 Protect completed work until issuance of certificate of final completion. END OF SECTION