1 Architectural Inspection Building Assessment Survey Asset: I.S. 323 (OLD IS 180) - QUEENS, 320 BEACH 104 STREET, New York, Inspection Id Inspection Type Time In Last Edited SA : Architectural - Senior :04 AM :02 PM AA : Architectural - Associate :23 AM :52 AM Asset Data Was the building fully accessible for inspection Inspection Access Comment Principal(s) Information Custodian Fireman Principal Name Organization Did you meet with this Principal? Did this Principal provide feedback? Summary of Principal's Feedback Answer Building Square Footage Comments on the Area Comments on the Stories (Floors) plus Basements Comments on the Number of Classrooms 55 No 2nd Floor Girls Shower Room - sealed off Brian O'Connell I.S. 323 (Old IS 180) - Queens Yes Yes The Principal provided the following comments: 1 - The building's Air ing and Heating is very inconsistent from season to season and requires an upgrade. 2 - Exterior Masonry Walls have many deficiencies and require repairs on an ongoing basis. 3 - There are various locations of water infiltration through wall and roof that need to be addressed. 4 - Student and Staff Toilet Rooms have original finishes and require an upgrade with new Tile Floors and Walls. 5 - Staff and Student Toilet Rooms require a plumbing upgrade as many fixtures are original and deficient. 6 - Many of the Sidewalks at the school perimeter are cracked and need to be replaced. 7 - The Main Entrance Doors to the school are original with many of them difficult to open and close properly and need to be replaced. 8 - The exterior perimeter lighting is inadequate and needs to be upgraded in several locations. 9 - Auditorium Seating damaged during Hurricane Sandy still exist and requires replacement. Robert Chiacherre Raymond Velez None Comments on the Year Built 1958 Student Population 1245 Staff Population 105 Weather 3+Crawl Space Fair PB/A&W Page 1 of 62

2 Facade Photo Building Assessment Survey Main Entrance Photo Corner of Beach 104th Street and Rockaway Freeway - Northeast View Roof Photo Facade A - Beach 104th Street Roof 1 - North View PB/A&W Page 2 of 62

3 Building Assessment Survey Have any Systems/Major Building Components been upgraded? Have there been any New Building Additions? Tandem Schools? Leased Space? Yes Systems: Partial Exterior Walls waterproofing (Facade facing Beach Channel Drive) Year: 2017 Systems: New Computer Room (inside Cafeteria) Year: 2016 Systems: Exterior Doors Replacement (11 - except the Main Entrance); Roofing Replacement (Roof 4); Corridor Ceiling Tiles replacement Year: 2015 Systems: Auditorium Flooring, Curtains replacements; Gymnasium Flooring replacement; Corridor Flooring replacement Year: 2013 Systems: New Computer Lab; Roofing replacement (Roof 1); Temporary Roof Fence installation (for Rooftop Chiller replacement) Year: 2011 Systems: Science Lab renovation; Windows, Window Guards, Leaders and Gutters, Roof Barriers, Bulkhead Doors replacements; Partial Exterior Walls repointing Year: 2010 Systems: Roofing Replacement Year: 1995 No No No Priority Priority Exist Last Year? Priority Category Description Component Affected Location Description Person(s) Notified Person(s) Title PhotoImage Yes Tripping Hazard Broken stair tread edges are potential tripping hazards. STAIRS/RAMP S: Stairs and Landings Exit 9 Vestibule, Stair A/1 Raymond Velez Fireman Structural Engineer Required Structural Type Description Component Affected Location Description Person(s) Notified Person(s) Title PhotoImage Deteriorated Masonry CMU backup wall has 1/2" wide step crack approximately 10ft long with displacement present. STRUCTURAL COLUMNS/BE AMS/BEARIN G WALLS 2nd Floor - rear wall of the East Fan Room Raymond Velez Fireman Deteriorated Masonry Vertical cracks at the interior block wall (varying widths up to 3/4" wide) spanning Floors 1-3 is a potential safety hazard. EXTERIOR EXTERIOR WALLS Various locations at corridor windows along the Beach Channel Drive façade. Raymond Velez Fireman Accessibility Accessibility Status PB/A&W Page 3 of 62

4 Architectural Inspection Accessibility Status Is the primary or secondary entrance on an accessible route? Is the building a multi-story building? Are all floors of the building accessible through compliant means? Are SOME floors other than the 1st floor and basement accessible through compliant means? Do any of the following spaces exist on the First floor? Classroom, Art Room, Auditorium, Cafeteria, Computer, Gymnasiums, Library, Multipurpose Room, Science Labs For the rooms that do exist, are SOME of them accessible on the 1st floor? Boys and Girls or Unisex accessible toilets exist on the 1st floor? Building Assessment Survey Yes Yes No No Yes Yes Yes Physical Breakdown Structure Exists Complies Required FUNCTIONAL ACCESSIBILITY Exterior Routes Exterior Entrances & Exits Exterior H/C Lifts No No Exterior Ramps and Railings Yes Yes Interior Routes Corridor and Lobby H/C Lifts No No Interior Corridor Doors and Hardware Yes Yes Interior Corridors and Lobbies No Change in Elevation Interior Elevators Interior Lobby Doors and Hardware Interior Ramps Rooms & Spaces Art Rooms Room 140 Yes Auditorium 1st Floor Yes Cafeteria 1st Floor Yes Classrooms 1st Floor Yes No No 2nd - 3rd Floor No Not on Accessible Route Computer Rooms Rooms 145, and Room inside Cafeteria Yes Gymnasium 1st Floor Yes Library Room 219 No Not on Accessible Route Main Office Room 117 Yes Multi-purpose Room Nurse's Room Room 147 Yes Pool Science Lab Rooms 317/319B, 323A/327 No Not on Accessible Route Toilet Rooms (Boys) 1st Floor - Room 138 Yes Toilet Rooms (Girls) 1st Floor - Room 135 Yes Toilet Rooms (Staff) 1st Floor No Turning Radius No Lever-type Hardware Water Closet Arrangement No No Yes Yes PB/A&W Page 4 of 62

5 Building Template Building Assessment Survey Inspection Architectural EXTERIOR AREAWAY AWNINGS AND CANOPIES CHIMNEY Material Type(s) Roof Plan reference Masonry 3 - Fair BRICK: OPEN JOINTS Quantity 50 REPOINT PB/A&W Page 5 of 62

6 EXTERIOR CHIMNEY Photo1 Building Assessment Survey COPING Roof Plan reference Chimney METAL: LIFTED OFF Quantity 10 L.F. -IN-KIND Photo1 CORNICE DOORS DOORS AND FRAMES Roof Between Fair and Poor METAL: DETERIORATED DOOR - MINOR DETERIORATION PB/A&W Page 6 of 62

7 EXTERIOR DOORS DOORS AND FRAMES Roof Plan reference Building Assessment Survey Quantity 1 EACH MAINTENANCE Photo1 Roof Plan reference Exit door from Cafeteria METAL: DETERIORATED DOOR AND FRAME - MAJOR DETERIORATION Quantity 3 EACH Urgency of Action PRIORITY 4 Purpose of Action LEVEL 4 PB/A&W Page 7 of 62

8 EXTERIOR DOORS DOORS AND FRAMES Photo1 Building Assessment Survey DOOR HARDWARE LINTELS Roof Plan reference Main Entrance at Seaside Avenue Y STEEL: MINOR RUSTING Quantity 20 L.F. MAINTENANCE Photo1 TRANSOM/SIDE LIGHT Exit Doors - Facade C 4 - Between Fair and Poor METAL: DENTED, MINOR RUSTING PB/A&W Page 8 of 62

9 EXTERIOR DOORS TRANSOM/SIDE LIGHT Roof Plan reference Building Assessment Survey Quantity 20 MAINTENANCE Photo1 Facade C EXTERIOR WALLS Material Type(s) Replacement Quantity 34,200 Replacement Uom Instance on All Facades Instance Masonry, Steel Instance Quantity 34,200 Instance Roof Plan reference 4 - Between Fair and Poor BRICK: WATER INFILTRATION IN NON-INSTRUCTIONAL SPACE PB/A&W Page 9 of 62

10 EXTERIOR EXTERIOR WALLS Elevation Building Assessment Survey Quantity 10 REPAIR Urgency of Action PRIORITY 5 Purpose of Action LEVEL 4 Photo1 Roof Plan reference Stair A/1, Stair A/ - Vestibule X, K BRICK: MAJOR BULGING, STEEL DAMAGE Elevation Quantity 100 REMOVE AND REBUILD PB/A&W Page 10 of 62

11 Building Assessment Survey Architectural Inspection EXTERIOR EXTERIOR WALLS Urgency of Action PRIORITY 5 Photo1 Roof Plan reference Facade B takes at 3rd Floor Corridor Window BRICK: MAJOR / THRU CRACKS Elevation Quantity 20 REMOVE AND REBUILD Urgency of Action PRIORITY 4 Photo1 Southeast Exit - HC Ramp PB/A&W Page 11 of 62

12 EXTERIOR EXTERIOR WALLS Roof Plan reference Building Assessment Survey BRICK: DETERIORATED MASONRY SILLS Elevation Quantity 15 L.F. REMOVE AND Photo1 Roof Plan reference Facade H BRICK: OPEN JOINTS PB/A&W Page 12 of 62

13 EXTERIOR EXTERIOR WALLS Elevation Building Assessment Survey Quantity 200 REPOINT Photo1 Roof Plan reference Facade H BRICK: MINOR CRACKS AND SPALLING Elevation Quantity 10 RESTITCH PB/A&W Page 13 of 62

14 Building Assessment Survey Architectural Inspection EXTERIOR EXTERIOR WALLS Photo1 EXTERIOR SOFFITS Roof Plan reference Facade H STUCCO/PLASTER: MINOR CRACKS/SPALLING Elevation Quantity 10 REPAIR PB/A&W Page 14 of 62

15 EXTERIOR EXTERIOR SOFFITS Photo1 Building Assessment Survey LOADING DOCK LOUVER Roof Plan reference Facade H - Above Southeast Exit Doors MAJOR RUSTING Elevation Quantity 10 Photo1 PB/A&W Page 15 of 62

16 EXTERIOR LOUVER Building Assessment Survey Facade C PARAPETS Material Type(s) Masonry Replacement Quantity 12,000 Replacement Uom C.F. Instance on All Facades (except Facade A) Instance 3 - Fair Instance Quantity 12,000 Instance C.F. BRICK: MAJOR DETERIORATION/CRACKS Roof Plan reference Quantity 100 REMOVE AND REBUILD Urgency of Action PRIORITY 4 Photo1 Roof over Auditorium Stage PLAZA DECK ROOF Roofing Replacement Quantity 71,000 Replacement Uom ROOF HATCH/SMOKE HATCH LEADERS, GUTTERS, DOWNSPOUTS, SCUPPERS ROOF BARRIER PB/A&W Page 16 of 62

17 EXTERIOR ROOF Roofing ROOF BARRIER ROOF CAGE ROOF FENCE ROOFING Instance on Modified Bitumen: Roof 1 Instance Instance Quantity 25,430 Instance Does the roof have major mechanical equipment sitting on Dunnage Steel less than 18" above the Roofing? Installation Year 2011 Source of Installation Instance on Built-Up: Roof 4 Instance No Documented 1 - Good Instance Quantity 1,570 Instance Does the roof have major mechanical equipment sitting on Dunnage Steel less than 18" above the Roofing? Installation Year 2015 Source of Installation Instance on Built-Up: Roofs 2, 3, 5 Instance No Documented 3 - Fair Instance Quantity 44,000 Instance Does the roof have major mechanical equipment sitting on Dunnage Steel less than 18" above the Roofing? Installation Year 1995 Source of Installation Roof Plan reference Building Assessment Survey No Documented BUILT-UP: ROOFING: MAJOR ACTIVE ROOF LEAKS IN INSTRUCTIONAL SPACE Quantity 50 Urgency of Action PRIORITY 5 ROOFING WITHOUT MAJOR EQUIPMENT REMOVAL PB/A&W Page 17 of 62

18 Building Assessment Survey Architectural Inspection EXTERIOR ROOF Roofing ROOFING Photo1 Roof Plan reference Room 239 (Auditorium Projection Room similar) BUILT-UP: ROOFING: LOSS OF GRAVEL Quantity 200 INSTALL NEW GRAVEL Urgency of Action PRIORITY 4 Photo1 Roof 2 Location/Instance Built-Up: Roofs 2, 3, 5 Quantity 44,000 BUILT-UP: ROOFING: BEYOND USEFUL LIFE Urgency of Action PRIORITY 1 PB/A&W Page 18 of 62

19 EXTERIOR ROOF Roofing ROOFING Photo1 ROOFING DRAINS Specialties BULKHEAD/PENTHOUSE Roof Plan reference Building Assessment Survey No photo recorded 3 - Fair BULKHEAD/PENTHOUSE WALLS/EXTERIOR: WATER INFILTRATION Quantity 50 REPAIR Urgency of Action PRIORITY 5 Photo1 BH4 BULKHEAD/PENTHOUSE WALLS/: CMU CRACKS/SPALLING PB/A&W Page 19 of 62

20 EXTERIOR ROOF Specialties BULKHEAD/PENTHOUSE Roof Plan reference Building Assessment Survey Quantity 80 MAINTENANCE Photo1 CUPOLA/ SPIRES/ TOWERS DORMER DUNNAGE STEEL SKYLIGHT/ROOF VENT Material Type(s) Roof Plan reference BH2 1 - Good Glass 5 - Poor SHAFT VENTS DAMAGED Quantity 4 PB/A&W Page 20 of 62 EACH

21 Building Assessment Survey Architectural Inspection EXTERIOR ROOF Specialties SKYLIGHT/ROOF VENT MAINTENANCE Photo1 Roof Plan reference Skylight DAMAGED FLASHING Quantity 25 L.F. MAINTENANCE Photo1 ROOF/GRAVITY TANK STAIRS/RAMPS: EXTERIOR BUILDING CHEEK/FLANK WALLS RAILINGS Skylight 3 - Fair PB/A&W Page 21 of 62

22 EXTERIOR STAIRS/RAMPS: EXTERIOR RAILINGS Roof Plan reference Building Assessment Survey RUST - MINOR Quantity 10 L.F. MAINTENANCE Photo1 STAIRS/RAMPS Roof Plan reference HC Ramp at Facade F 4 - Between Fair and Poor CONCRETE: CRACKS/SPALLING - MAJOR Quantity 50 PB/A&W Page 22 of 62

23 EXTERIOR STAIRS/RAMPS: EXTERIOR STAIRS/RAMPS Photo1 Building Assessment Survey Facade E - F corner WINDOWS Replacement Quantity 16,600 Replacement Uom EXTERIOR GUARDS 3 - Fair RUST - MINOR Roof Plan reference Elevation Quantity 160 MAINTENANCE PB/A&W Page 23 of 62

24 EXTERIOR WINDOWS EXTERIOR GUARDS Photo1 Building Assessment Survey Rusted Screens - Facade C LINTELS WINDOWS Material Type(s) Aluminum Instance on Aluminum - Other: All Facades Instance 1 - Good Instance Quantity 16,600 Instance Installation Year 2010 Source of Installation Documented POOLS STRUCTURAL COLUMNS/BEAMS/BEARING WALLS 3 - Fair MASONRY BEARING WALL: BULGING/DISPLACED Location/Instance 2nd Floor Quantity 90 REPAIR Urgency of Action PRIORITY 5 Purpose of Action LEVEL 5 Photo1 Rear of (East)-Fan Room 241 PB/A&W Page 24 of 62

25 Building Assessment Survey Architectural Inspection STRUCTURAL FLOOR STRUCTURE FOUNDATION WALLS Material Type(s) Concrete ROOF STRUCTURE VAULTS-BUNKERS AUDITORIUM Instance on 1st Floor Seats Ceiling Instance on 1st Floor Seats PLASTER: CRACKS/SPALLING Location/Instance Near Stage Right Quantity 20 Photo1 Near Stage Right Door(s) Instance on 1st Floor Seats Fixed H/C Lift Instance on 1st Floor Seats Fixed Seating Instance on 1st Floor Seats Location/Instance Quantity Fair DAMAGED/BROKEN/INOPERABLE Seats A/5,104, B/9, C/4, D/2, and others EACH PB/A&W Page 25 of 62

26 Building Assessment Survey Architectural Inspection AUDITORIUM Fixed Seating Photo1 Seat B/9 Floor Finish Instance on 1st Floor Seats Sliding-folding Partition Instance on 1st Floor Seats Stage Instance on 1st Floor Seats Stage Instance on 1st Floor Seats RAILINGS/MISSING Location/Instance Stage Right Quantity 5 L.F. Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 Stage Curtain Rigging Instance on 1st Floor Seats Stage Curtains Stage Right 1 - Good PB/A&W Page 26 of 62

27 Building Assessment Survey Architectural Inspection AUDITORIUM Stage Stage Curtains Instance on 1st Floor Seats 1 - Good Walls Instance on 1st Floor Seats BRICK: CRACKS/SPALLING Location/Instance Stage Right, Stage Center Quantity 120 Photo1 Stage Right Window Curtains/Shades/Blinds Instance on 1st Floor Seats CAFETERIA Instance on 1st Floor Ceiling Instance on 1st Floor ACOUSTIC TILES ON PLASTER: DAMAGED/MISSING Location/Instance Near Rear Entrance, Near Serving Area Quantity 15 PB/A&W Page 27 of 62

28 CAFETERIA Ceiling Photo1 Building Assessment Survey Near Rear Entrance Door(s) Instance on 1st Floor 4 - Between Fair and Poor METAL: DETERIORATED DOOR AND FRAME Location/Instance West Entrance, East Entrance Quantity 2 EACH MAINTENANCE Photo1 West Entrance Fixed Equipment Instance on 1st Floor Floor Finish Instance on 1st Floor Sliding-folding Partition Stage Walls Instance on 1st Floor Instance on 1st Floor Instance on 1st Floor Location/Instance PLASTER: CRACKS/SPALLING Windows on West Side, Northwest Corner PB/A&W Page 28 of 62

29 Building Assessment Survey Architectural Inspection CAFETERIA Walls Quantity 15 Urgency of Action PRIORITY 4 Purpose of Action LEVEL 4 Photo1 Northwest Corner M Window Curtains/Shades/Blinds Instance on 1st Floor CLASSROOMS/CORRIDORS/ADMIN SPACES Ceiling GYPSUM BOARD: DAMAGED/DETERIORATED Location/Instance Room 208 Quantity 10 Photo1 Room 208 PLASTER: CRACKS/SPALLING - ACTIVE LEAK Location/Instance Room 239 Quantity 15 Urgency of Action PRIORITY 5 PB/A&W Page 29 of 62

30 Building Assessment Survey Architectural Inspection CLASSROOMS/CORRIDORS/ADMIN SPACES Ceiling Photo1 Room 239 ACOUSTIC TILES ON PLASTER: DAMAGED/MISSING Location/Instance Corridor near Rooms 136, 203, 332B, Near Stair D/1 Quantity 25 Photo1 Corridor near Room 332B ACOUSTIC TILES: DAMAGED/MISSING Location/Instance Room 110 Quantity 10 Photo1 Room 110 PB/A&W Page 30 of 62

31 Building Assessment Survey Architectural Inspection CLASSROOMS/CORRIDORS/ADMIN SPACES Door(s) 5 - Poor METAL: DETERIORATED DOOR Location/Instance Corridor near Rooms 219, 235 Quantity 3 EACH MAINTENANCE Photo1 Corridor near Room 219 METAL: DETERIORATED DOOR AND FRAME Location/Instance Room 308 Quantity 1 EACH MAINTENANCE Photo1 Room 308 WOOD: DETERIORATED DOOR Location/Instance Rooms 105, 202, 305, 311, 319B, and others Quantity 9 EACH MAINTENANCE PB/A&W Page 31 of 62

32 Building Assessment Survey Architectural Inspection CLASSROOMS/CORRIDORS/ADMIN SPACES Door(s) Photo1 Room 305 Floor Finish TERRAZZO: CRACKS Location/Instance Main entrance Quantity 20 Photo1 Main entrance SHEET VINYL: BROKEN/DETERIORATED Location/Instance Room 215 Quantity 10 Photo1 PB/A&W Page 32 of 62

33 Building Assessment Survey Architectural Inspection CLASSROOMS/CORRIDORS/ADMIN SPACES Floor Finish Room 215 VINYL TILES: TRIPPING HAZARD - ELECTRICAL OUTLET Location/Instance Room 105 Quantity 10 Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 Room 105 VINYL TILES: DETERIORATED SUBSTRATE Location/Instance Corridor near Room 112, Room 239 Quantity 30 Photo1 Room 239 VINYL TILES: BROKEN/DETERIORATED/MISSING TILES Location/Instance Room 208 Quantity 10 PB/A&W Page 33 of 62

34 Building Assessment Survey Architectural Inspection CLASSROOMS/CORRIDORS/ADMIN SPACES Floor Finish Photo1 Room 208 Walls Location/Instance Quantity 85 PLASTER: CRACKS/SPALLING Corridor near Rooms 145, 200, 239, Near Stair D/1, Main Entrance Lobby, and others Photo1 Corridor near Room 200 GYPSUM BOARD: DETERIORATED Location/Instance Rooms 317, 321 Quantity 25 PB/A&W Page 34 of 62

35 Building Assessment Survey Architectural Inspection CLASSROOMS/CORRIDORS/ADMIN SPACES Walls Photo1 Room 321 PLASTER: CRACKS/SPALLING Location/Instance Corridor near Room 300, Corridor near Gymnasium Quantity 20 Urgency of Action PRIORITY 4 Purpose of Action LEVEL 4 Photo1 Corridor near Room Y, M Specialties Classroom Locker(s) Fixed Seating GYMNASIUM Instance on 1st Floor Ceiling Instance on 1st Floor ACOUSTIC TILES ON PLASTER: DAMAGED/MISSING Location/Instance Right Side Quantity 55 PB/A&W Page 35 of 62

36 GYMNASIUM Ceiling Photo1 Building Assessment Survey Right Side Door(s) Instance on 1st Floor Fixed Equipment Instance on 1st Floor Floor Finish Instance on 1st Floor VINYL TILES: BROKEN/DETERIORATED/MISSING TILES Location/Instance Office Quantity 20 Photo1 Office Seating Instance on 1st Floor Sliding-folding Partition Stage Walls Instance on 1st Floor Instance on 1st Floor PB/A&W Page 36 of 62

37 Building Assessment Survey Architectural Inspection GYMNASIUM Walls Instance on 1st Floor MASONRY: CRACKS/SPALLING Location/Instance Right Side, Near Windows, Near Entrance from Corridor Quantity 65 Photo1 Near Entrance from Corridor Window Curtains/Shades/Blinds Instance on 1st Floor DOOR HARDWARE 3 - Fair GUARDS DETERIORATED/TORN-OUT/MISSING Location/Instance Stair C/2 Quantity 40 Photo1 KITCHEN Instance on 1st Floor Stair C/2 PB/A&W Page 37 of 62

38 Building Assessment Survey Architectural Inspection KITCHEN Ceiling Instance on 1st Floor Door(s) Instance on 1st Floor 5 - Poor METAL: DETERIORATED DOOR AND FRAME Location/Instance Mop Room Quantity 1 EACH MAINTENANCE Photo1 Mop Room METAL: DETERIORATED DOOR Location/Instance Office Quantity 1 EACH MAINTENANCE Photo1 Office Location/Instance Quantity 1 METAL: DAMAGED LOUVER Large Stock Room in Rear EACH MAINTENANCE PB/A&W Page 38 of 62

39 Building Assessment Survey Architectural Inspection KITCHEN Door(s) Photo1 Large Stock Room in Rear Floor Finish Instance on 1st Floor 4 - Between Fair and Poor CERAMIC TILE: TRIPPING HAZARD - ELECTRICAL OUTLET Location/Instance Serving Area near Windows Quantity 5 Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 Serving Area near Windows CONCRETE: CRACKS Location/Instance Large Stock Room in Rear Quantity 25 PB/A&W Page 39 of 62

40 KITCHEN Floor Finish Photo1 Building Assessment Survey Large Stock Room in Rear CERAMIC TILE: BROKEN/MISSING TILES Location/Instance Store Room, Serving Area, Main Food Prep Area Quantity 50 Photo1 Store Room Walls Instance on 1st Floor 3 - Fair PLASTER: CRACKS/SPALLING Location/Instance Large Stock Room in Rear Quantity 65 PB/A&W Page 40 of 62

41 KITCHEN Walls Photo1 Building Assessment Survey Large Stock Room in Rear CERAMIC TILE: BROKEN/ MISSING Location/Instance Near Windows, Serving Area Quantity 20 Photo1 Near Windows LIBRARY Instance on Room 219 Built-in Furnishing Instance on Room 219 Ceiling Instance on Room 219 Door(s) Instance on Room 219 Location/Instance Quantity Fair WOOD: DETERIORATED DOOR Store Room EACH MAINTENANCE PB/A&W Page 41 of 62

42 Building Assessment Survey Architectural Inspection LIBRARY Door(s) Photo1 Store Room Floor Finish Instance on Room 219 VINYL TILES: TRIPPING HAZARD - ELECTRICAL OUTLET Location/Instance Near Windows Quantity 10 Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 Near Windows Walls Instance on Room 219 PLASTER: CRACKS/SPALLING Location/Instance Store Room Quantity 30 PB/A&W Page 42 of 62

43 LIBRARY Walls Photo1 Building Assessment Survey Store Room LOCKER ROOM Instance on 2nd Floor - Boys Alternative use Yes Instance on 2nd Floor - Girls Alternative use Yes Ceiling Instance on 2nd Floor - Boys Instance on 2nd Floor - Girls Door(s) Instance on 2nd Floor - Boys 4 - Between Fair and Poor WOOD: DAMAGED LOUVER Location/Instance Corridor Entrance near Shower Room Quantity 1 EACH MAINTENANCE Photo1 Corridor Entrance near Shower Room Location/Instance Quantity 1 METAL: DETERIORATED DOOR Entrance from Corridor PB/A&W Page 43 of 62

44 Building Assessment Survey Architectural Inspection LOCKER ROOM Door(s) EACH MAINTENANCE Photo1 Entrance from Corridor Floor Finish Instance on 2nd Floor - Boys CONCRETE: CRACKS Location/Instance Near Shower Room Quantity 10 Photo1 Locker Room Lockers Instance on 2nd Floor - Girls Instance on 2nd Floor - Boys Walls Instance on 2nd Floor - Boys Instance on 2nd Floor - Girls Near Shower Room PB/A&W Page 44 of 62

45 Building Assessment Survey Architectural Inspection LOCKER ROOM Walls MULTI-PURPOSE ROOM SCIENCE DEMO ROOM SCIENCE LAB Instance on Rooms 317/319B, 323A/327 Alternative use No Fixed Equipment Instance on Rooms 317/319B, 323A/327 SCIENCE PREP ROOM Instance on Room 321 Alternative use No Fixed Equipment Instance on Room 321 SHOWER ROOM Instance on 2nd Floor - Boys (500 SF) Alternative use Yes Instance on 2nd Floor - Girls Inaccessible Ceiling Instance on 2nd Floor - Boys (500 SF) 3 - Fair PLASTER: CRACKS/SPALLING Location/Instance Center Quantity 20 Photo1 Door(s) Instance on 2nd Floor - Boys (500 SF) Floor Finish Center PB/A&W Page 45 of 62

46 Building Assessment Survey Architectural Inspection SHOWER ROOM Floor Finish Instance on 2nd Floor - Boys (500 SF) CERAMIC TILE: BROKEN/MISSING TILES Location/Instance Center Quantity 15 Photo1 Center Walls Instance on 2nd Floor - Boys (500 SF) CERAMIC TILE: BROKEN/ MISSING Location/Instance Center Quantity 10 Photo1 Center STAIRS/RAMPS: Ceiling Do Letter Stair Signs Exist? Yes Location/Instance Stair C/2 PLASTER: CRACKS/SPALLING - ACTIVE LEAK PB/A&W Page 46 of 62

47 Building Assessment Survey Architectural Inspection STAIRS/RAMPS: Ceiling Quantity 20 Urgency of Action PRIORITY 5 Photo1 Stair C/2 PLASTER: CRACKS/SPALLING Location/Instance Stair A/2,3 Quantity 40 Urgency of Action PRIORITY 4 Purpose of Action LEVEL 4 Photo1 Stair A/ M Door(s) METAL: DETERIORATED DOOR AND FRAME Location/Instance Stair D/1 Quantity 1 EACH MAINTENANCE PB/A&W Page 47 of 62

48 STAIRS/RAMPS: Door(s) Photo1 Building Assessment Survey Stair D/1 Partition Railings Stairs and Landings STONE: BROKEN/MISSING Location/Instance Stairs A/2, B/Bulkhead, C/2 Quantity 25 Photo1 Stair A/2 METAL: RUST - MAJOR Location/Instance Stair C/1,2 Quantity 10 PB/A&W Page 48 of 62

49 STAIRS/RAMPS: Stairs and Landings Photo1 Building Assessment Survey Stair C/2 TERRAZZO: CRACKS Location/Instance Stair C/1 Quantity 20 Photo1 Stair C/1 TERRAZZO: CRACKS Location/Instance Exit 9 Vestibule, Stair A/1 Quantity 25 Urgency of Action PRIORITY 5 Purpose of Action LEVEL 6 Photo1 Exit 9 Vestibule PB/A&W Page 49 of 62

50 Building Assessment Survey Architectural Inspection STAIRS/RAMPS: Stairs and Landings VINYL TILES: BROKEN/DETERIORATED/MISSING TILES Location/Instance Stair from Gymnasium to Boys Locker Room Quantity 25 Photo1 Stair from Gymnasium to Boys Locker Room Walls Location/Instance Quantity 100 PLASTER: CRACKS/SPALLING - ACTIVE LEAK Stair A/1 - Vestibule, Stair leading to the Auditorium Projection Booth across from Stair C/1 Urgency of Action PRIORITY 5 Purpose of Action LEVEL 4 Photo1 Stair A/1 - Vestibule M GLAZED BLOCK: CRACKS/SPALLING - ACTIVE LEAK Location/Instance Stair A/1 Quantity 15 Urgency of Action PRIORITY 5 PB/A&W Page 50 of 62

51 STAIRS/RAMPS: Walls Photo1 Building Assessment Survey Stair A/1 GLAZED BLOCK: CRACKS/SPALLING Location/Instance Stairs A/1, D/1,2 Quantity 80 Photo1 Stair D/2 TOILET ROOMS - STAFF Ceiling PLASTER: CRACKS/SPALLING Location/Instance Kitchen Quantity 10 PB/A&W Page 51 of 62

52 TOILET ROOMS - STAFF Ceiling Photo1 Building Assessment Survey Kitchen Door(s) 5 - Poor METAL: DETERIORATED DOOR AND FRAME Location/Instance 3rd Floor Staff Quantity 1 EACH MAINTENANCE Photo1 3rd Floor Staff WOOD: DETERIORATED DOOR Location/Instance Gymnasium Office, Room 137 Quantity 2 EACH MAINTENANCE Photo1 PB/A&W Page 52 of 62

53 TOILET ROOMS - STAFF Door(s) Building Assessment Survey Gymnasium Office Floor Finish 5 - Poor CERAMIC TILE: BROKEN/MISSING TILES Location/Instance 3rd Floor Staff, 2nd Floor Staff, Room 137 Quantity 60 Photo1 3rd Floor Staff Stalls Walls PLASTER: CRACKS/SPALLING Location/Instance 2nd Floor Staff Quantity 25 Photo1 2nd Floor Staff Location/Instance CERAMIC TILE: BROKEN/ MISSING 3rd Floor Staff, 2nd Floor Staff, Gymnasium Office PB/A&W Page 53 of 62

54 Building Assessment Survey Architectural Inspection TOILET ROOMS - STAFF Walls Quantity 40 Photo1 2nd Floor Staff TOILET ROOMS - STUDENTS Ceiling Door(s) 5 - Poor WOOD: DETERIORATED DOOR Location/Instance Room 212 Quantity 1 EACH MAINTENANCE Photo1 Room 212 Floor Finish Location/Instance Quantity Fair CERAMIC TILE: BROKEN/MISSING TILES Rooms 212, 216, Girls Locker Room PB/A&W Page 54 of 62

55 Building Assessment Survey Architectural Inspection TOILET ROOMS - STUDENTS Floor Finish Photo1 Room 216 Stalls 3 - Fair BROKEN/MISSING Location/Instance Room 212 Quantity 1 EACH Photo1 Room 212 Walls CERAMIC TILE: BROKEN/ MISSING Location/Instance Room 216, Girls Locker Room Quantity 40 PB/A&W Page 55 of 62

56 TOILET ROOMS - STUDENTS Walls Photo1 Building Assessment Survey Room 216 LIFE SAFETY F.D. HOLDING AREA STEEL STAIRS SITE CONTAINERIZATION Drainage System for Asphalt Drainage System for Concrete Catch Basins/Manhole - Surrounded by concrete Culverts - Concrete Covering Drainage System for Soil DRINKING FOUNTAINS FENCES 4 - Between Fair and Poor CHAIN LINK: DAMAGED/DETERIORATED Location/Instance Walkway Entrance on Beach Channel Drive Quantity 50 Photo1 Location/Instance Walkway Entrance on Beach Channel Drive WROUGHT IRON: RUST - MAJOR Along Seaside Avenue, Along Beach 104th Street PB/A&W Page 56 of 62

57 Building Assessment Survey Architectural Inspection SITE FENCES Quantity 280 Photo1 Along Seaside Avenue Location/Instance Quantity 35 CONCRETE CURB: DAMAGED/DETERIORATED Corner of Rockaway Freeway and Seaside Avenue, Along Beach 104th Street Photo1 Corner of Rockaway Freeway and Seaside Avenue CHAIN LINK: DAMAGED POST/RAIL Location/Instance Corner of Rockaway Freeway and Seaside Avenue Quantity 10 L.F. PB/A&W Page 57 of 62

58 SITE FENCES Photo1 Building Assessment Survey Corner of Rockaway Freeway and Seaside Avenue WROUGHT IRON: DAMAGED/DETERIORATED Location/Instance Along Rockaway Freeway, Along Beach 104th Street Quantity 160 Photo1 Along Rockaway Freeway IRRIGATION SYSTEM PAVING Student Non-Use Gravel Exists? Asphalt Concrete Pavers Student Use Site Sidewalks & Walkways Asphalt Concrete Location/Instance Quantity 750 Yes 4 - Between Fair and Poor DAMAGED/DETERIORATED/MISSING SECTIONS Walkway on North Side of Building PB/A&W Page 58 of 62

59 Building Assessment Survey Architectural Inspection SITE PAVING Site Sidewalks & Walkways Concrete Urgency of Action PRIORITY 4 Purpose of Action LEVEL 4 Photo1 Walkway on North Side of Building L DAMAGED/DETERIORATED/MISSING SECTIONS Location/Instance Beach 104th Street near Rockaway Freeway, Near Seaside Avenue Quantity 100 Photo1 Near Seaside Avenue Pavers DOT Sidewalk Asphalt Concrete Location/Instance Quantity Between Fair and Poor DAMAGED CURBS Rockaway Freeway, Beach Channel Drive, Beach 104th Street, Seaside Avenue L.F. PB/A&W Page 59 of 62

60 SITE PAVING DOT Sidewalk Concrete Photo1 Building Assessment Survey Beach 104th Street Location/Instance Quantity 1,200 DAMAGED/DETERIORATED/MISSING SECTIONS Rockaway Freeway, Seaside Avenue, Beach Channel Drive, Beach 104th Street Photo1 Beach Channel Drive Pavers PLAYGROUNDS PLAYING SURFACE RETAINING WALLS Are there any Retaining Walls 6' OR higher facing public street/sidewalk? Location/Instance Quantity 30 No 3 - Fair CAST IN PLACE CONCRETE: CRACKS/SPALLING - MINOR Along Rockaway Freeway REPAIR Photo1 No photo recorded PB/A&W Page 60 of 62

61 SITE RETAINING WALLS Location/Instance Quantity 15 CAST IN PLACE CONCRETE: DETERIORATED EXPANSION JOINT Along Rockaway Freeway L.F. Photo1 Building Assessment Survey Along Rockaway Freeway CAST IN PLACE CONCRETE: CRACKS/SPALLING - MAJOR Location/Instance Along Rockaway Freeway Quantity 60 Photo1 Along Rockaway Freeway SEATING Benches Concrete Metal/Wood/Plastic Bleachers SITE WALLS (NOT RETAINING WALLS) STAIRS/RAMPS: EXTERIOR Railings PB/A&W Page 61 of 62

62 SITE STAIRS/RAMPS: EXTERIOR Railings Site Cheek/flank Walls Stairs/ramps Building Assessment Survey PB/A&W Page 62 of 62