1 Discussion of the Stucco Identification of All Panels
2 Mock-Up Stucco Identification Review: Review of Home Inspector Observations by Mock-Up: What type of system is Mock-Up Number and why? Where did you look. What did you look for.
3 Mock-Up 1 side a What clues to the type of system are visible?
4 Mock-Up 1 side a System is crushed by ledger; probably EIFS.
5 Mock-Up 1 side a System is crushed by hand rail support; probably EIFS.
6 Mock-Up 1 side a Weep casing at bottom of wall above deck flashings; MD-EIFS?.
7 Mock-Up 1 side a Appears paper is visible at edge; MD-EIFS?
8 Mock-Up 1 side a PVC weep starter track at bottom of wall; MD-EIFS?
9 Mock-Up 1 side a Look for damaged or incomplete areas; MD-EIFS!
10 Mock-Up 1 side b Not plastered.
11 Mock-Up 2 side a What clues to the type of system are visible?
12 Mock-Up 2 side a System appears backwrapped; EIFS?
13 Mock-Up 2 side a No PVC starter track no visible paper; probably Barrier EIFS.
14 Mock-Up 2 side a Weep casing at bottom of wall above deck flashings; may be MD-EIFS or it could be Barrier or Face Seal EIFS.
15 Mock-Up 2 side a No paper is visible at edge; Barrier EIFS?
16 Mock-Up 2 side a Bottom of wall is back wrapped with no drainage; Barrier EIFS?
17 Mock-Up 2 side a Look for damaged or incomplete areas; Barrier EIFS!
18 Mock-Up 2 side b What clues to the type of systems are visible?
19 Mock-Up 2 side b Galvanized weep casing at bottom of wall; probably HCS.
20 Mock-Up 2 side b System sounds solid; possible corner aid visible; probably HCS.
21 Mock-Up 2 side b Stucco netting, corner aid and casing visible; HCS.
22 Mock-Up 2 side b Look for damaged or incomplete spots. Metal weep casing, building paper, EPS, stucco netting & cementitious base coat; HCS!
23 Mock-Up 2 side b Stucco netting, corner aid and casing visible; HCS.
24 Mock-Up 2 side b Look for damaged or incomplete spots! Weep casing, building paper, XPS, stucco netting & cementitious base coat; HCS!
25 Mock-Up 3 side a What clues to the type of system are visible?
26 Mock-Up 3 side a System appears to have galvanized weep casing; probably HCS.
27 Mock-Up 3 side a Galvanized weep casing at bottom of stucco; implies HCS.
28 Mock-Up 3 side a Galvanized weep casing at bottom of wall above low roof; implies HCS.
29 Mock-Up 3 side a Head flashing with end dam and galvanized weep casing above flashing; HCS.
30 Mock-Up 3 side a Bottom of wall terminated about 2 inches above slab with galvanized weep casing; HCS.
31 Mock-Up 3 side a Look for damaged or incomplete areas. Metal casing, building paper, lath and corner aid; HCS.
32 Mock-Up 3 side b View of properly installed kickout flashing in HCS.
33 Mock-Up 3 side b Looking at a kickout from the wall sheathing out; kickout flashing sealed to casing.
34 Mock-Up 3 side b Kickout flashing is missing and casing just above roof shingles; this makes wall vulnerable to water intrusion.
35 Mock-Up 3 side b Looking at a missing kickout location from the wall sheathing out; daylight visible through gaps.
36 Mock-Up 4 side a What clues to the type of system are visible?
37 Mock-Up 4 side a Look near vents and other penetrations; cement board substrate is visible.
38 Mock-Up 4 side a Cement Board substrate with fiberglass mesh is visible at edge of wall cladding; DEFS or DA.
39 Mock-Up 4 side a inch PVC weep accessory at bottom of wall cladding; Most likely DA.
40 Mock-Up 4 side a Head flashing is present but no other information can be obtained at this window.
41 Mock-Up 4 side a Look for damaged or incomplete areas; this mock-up revealed casings, paper, cement board, etc; DA.
42 Mock-Up 4 side b Look for damaged or incomplete areas; 3 or 4 systems on this side.
43 Mock-Up 4 side b Improper Barrier EIFS on open studs. Note: if this was Polyisocyanurate Insulation then this could be an old PI system.
44 Mock-Up 4 side b Old DEFS or DA system on open framing with no moisture resistive barrier and only cement board joints taped. Note: DensGlass substrate was permitted by some manufacturers with only joints taped; most have failed.
45 Mock-Up 4 side b DEFS or DA system on open framing with moisture resistive barrier and only cement board joints taped; this was an intermediate phase of DA systems.
46 Mock-Up 4 side b Hard Coat Stucco on open framing with Weather Resistive Barrier, stucco netting, scratch coat and brown coat.