1 H/S L. R. # M-1 (3br) PROCTOR - II (# 900 BASSHAM HULBERT, OK (918) WorkWrite-Up and Bid Document Contractor Name Contractor Signature Bid Due Date: Area Description Comments Manual Spec Quantity Unit Enter Bid BATHROOM #1 1 Clean/Bathtub-Shower.00 1 EA Combination/Stools/Vanity Sinks 2 Clean/Cabinets/Refinish/Varmish Cabinets LF 2 coats 3 Commode & Seat/Install new commode, seat, supply line, shutoff and wax seal. Use American Standard Cadet or written approved equal. 11.A 1 EA 4 Medicine Cabinet/Steel. Replace existing 11.2.Z 1 EA medicine cabinet with new medicine cabinet/steel frame w/mirror-16"x 22". 5 Paper Holder/Replace paper holder 10.E.2. 1 EA 6 Passage Door/Pre-Hung/Flush- Faced/Replace passage door & lockset with new pre-hung luan/ flush faced. Work shall include paint both Page 1 of 8

2 BATHROOM #1 7 Shower Curtain Rod/Replace. Replace 8.P 1 EA curtain rod. 8 Towel Bar/Install new towel bar/24". 10.E.2. 2 EA BATHROOM #2 9 Clean/Cabinets/Refinish/Varmish Cabinets LF 2 coats 10 Commode & Seat/Install new commode, seat, supply line, shutoff and wax seal. Use American Standard Cadet or written approved equal. 11.A 1 EA 11 Medicine Cabinet/Steel. Install new 11.2.Z 1 EA medicine cabinet/steel frame w/mirror-16"x 22". 12 Passage Door/Pre-Hung/Flush- Faced/Replace passage door & lockset with new pre-hung luan/ flush faced. Work shall include paint both 13 Towel Bar/Install new towel bar/24". 10.E.2. 2 EA BEDROOM #1 Page 2 of 8

3 BEDROOM #1 14 Closet Door/Luan Hollow Core/Replace REPLACE BI-FORD DOOR 15 Passage Door/Pre-Hung/Flush- Faced/Replace passage door & lockset with new pre-hung luan/ flush faced. Work shall include paint both BEDROOM #2 16 Closet Door/Luan Hollow Core/Replace REPLACE BI-FORD DOOR 17 Clothes Rod/Install. Install new closet 6.Z. 8 LF clothes rod. 18 Cover Plate/Outlet/Install new outlet cover 13.D.6. 3 EA plate 19 Passage Door/Pre-Hung/Flush- Faced/Replace passage door & lockset with new pre-hung luan/ flush faced. Work shall include paint both BEDROOM #3 Page 3 of 8

4 BEDROOM #3 20 Closet Door/Luan Hollow Core/Replace REPLACE BI-FORD DOOR 21 Passage Door/Pre-Hung/6-Panel/Replace passage door & lockset with new pre-hung 6- Panel. Work shall include paint both With door stop. DINING ROOM #1 22 Door/Exterior/Adjust. Adjust exterior door. 8.D.2. 1 EA See comments. 23 Floor Tile/Repair existing floor tile/see BY BACK EXTERIOR DOOR. 9.L 6 SF comments. (H/S WILL FURNISH TILE) EXTERIOR 24 Clean Windows, Strom Doors/Repair EA Window Screens, Storm Door Screens. 25 Screen/Aluminum Frame/Rescreen MATCH EXIST WINDOW 8.I 88 SF aluminum window screen. FRAMES 26 Soffit/Cover with Vinyl/Cover soffit with vinyl. RE-NAIL PORCH SOFFIT 15.C. 2 SF 27 Window Sash/Repair window sash as per MATCH EXIST WINDOW 8.G.3 1 EA General Specifications. (GLASS REPLACEMENT) Page 4 of 8

5 HALLWAY #1 28 Door Bell Sytem/Install new door bell 13.D. 1 EA system with bell chime, transformer, one button and bellwire. 29 Thermostat/AC & Electric Heat/Install new thermostat/heating & cooling (low voltage/non-programmable). Use Columbus Electric model RSV420GW or written approved equal. 12.G. 1 EA HVAC 30 Closet Door/Luan Hollow Core/Replace HAVC CLOSET INTERIOR 31 Ceiling Register/Remove/Clean Air 00 8 EA Register/Paint with Appl. Paint/ReInstall 32 Clean/ Switches/Cover/ Outlet/ Cover EA 33 Interior Surfaces/Paint all interior surfaces of structure - Two Coats. Entire interior excluding kitchen and bath cabinets. Work shall include minor repairs to all surfaces. SF=FLOOR AREA OF ENTIRE STRUCTURE. PAINT STORAGE CLOSET, MATCH PAINT TO PROJECT 9.N SF Page 5 of 8

6 INTERIOR 34 Paint/Vinly floor base/brown LF 35 Removed/ Clean/Reinstall/Lite Fixtures/ with EA new 60 watt bulbs 36 Return Air Grill/Remove/Clean Return Air 00 1 EA Grill/Paint with Appl. Paint/Install new filter/clean under Platform. 37 Smoke Detector/Battery Operated/Install new smoke detector, battery operated (10 year lithium battery). All bedrooms and hallways adjacent to bedrooms. Use Firex #4015 or written approved equal. 13.D.11 2 EA 38 Vinyl Floor/Clean/Wax 9.L 1175 SF KITCHEN 39 Clean range/oven/30"/free Standing.00 1 EA 40 Clean/Cabinets/Refinish/Varmish Cabinets CLEAN KITCHEN SINK, LF 2 coats CAULK WALLS 41 Clean/Refrigerator/18CF EA Page 6 of 8

7 KITCHEN 42 Closet Door/Luan Hollow Core/Replace 43 Closet Door/Luan Hollow Core/Replace 44 Drywall/Ceiling/Small Area/Replace 1/2". Replace small area of drywall with new 1/2" drywall. Work shall include tape, bed, texture and paint to match existing as closely as possible. 9.D. 6 SF 45 Vent-A-Hood/30"/Ext. Vented/Install new 10.D.3.D 1 EA kitchen vent-a-hood (ext.vent)/30" LIVING ROOM #1 46 Closet Door/Luan Hollow Core/Replace 47 Door/Exterior/Adjust. Adjust exterior door. 8.D.2. 1 EA See comments. UTILITY ROOM #1 Page 7 of 8

8 UTILITY ROOM #1 48 Closet Door/Luan Hollow Core/Replace REPLACE BI-FORD DOOR 49 Drywall/Wall/Replace 1/2" drywall on wall/finish completely. Work shall include tape, bed, texture and paint to match existing surfaces. 9.D 32 SF 50 Vinyl Floor Tile/Install new vinyl floor tile/12" H/S WILL FURNISH FLOOR 9.L 32 SF x 12" x 1/8". TILE TOTAL Page 8 of 8