1 Metropolitan Washington Airports Authority PROCUREMENT AND CONTRACTS DEPT. AMENDMENT OF SOLICITATION PAGE 1 Metropolitan Washington Airports Authority 1A. AMENDMENT OF SOLICITATION NO. 1B. DATED Procurement and Contracts Dept., MA C138 May 10, Aviation Circle, Suite 154 Washington, DC A. AMENDMENT NO. 2B. EFFECTIVE DATE Telephone: (703) Two (0002) August 16, 2011 The solicitation identified in Block 1A is amended as set forth in Block 3. Hour and date specified for receipt of offers is extended, is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and dated specified in the solicitation or as amended, by one of the following methods: (a) by completing Block 4 and returning copy of the amendment; (b) by acknowledging receipt of this amendment on the Solicitation Offer and Award Sheet, Block 13. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. 3. DESCRIPTION OF AMENDMENT Metropolitan Washington Airports Authority Solicitation 1-11-C138, entitled, Terminal B/C Pre-Security Restroom Renovation, Ronald Reagan Washington National Airport, is amended as follows: 1. Deadline for Submission of Offers is established at 2:00 P.M. local time, September 1, Addendum 001 dated July 28, 2011 is incorporated herein and made a part hereof 3. All other terms and conditions of the solicitation remain unchanged. Except as provided herein, all terms and conditions of the document referenced in Block 1A, as heretofore changed, remain unchanged and in full force and effect. 4A. NAME AND TITLE OF OFFEROR 4B. SIGNATURE 4C. DATE MWAA Form PR-06 (Rev. 1/2003)

2 METROPOLITAN WASHINGTON AIRPORTS AUTHORITY RONALD REAGAN WASHINGTON NATIONAL AIRPORT SOLICITATION RFP 1-11-C138 Terminal B/C Pre-Security Restroom Renovations Addendum Number 1 ITEM 1: REVISIONS TO THE SPECIFICATIONS: Revise Specification , Section 1.9E QC Organization Delete Section 1.9E 1 in its entirety Delete - Section 1.9E 2 in its entirety Table of Contents 1. Revision to Table of Contents as denoted in Attachment 1. ITEM 2: REVISIONS TO THE PLANS: AR01 (Cover Sheet) 1. Revised to include Contractor Staging and operating locations. See Attachment 2 AR Revised to include electrical room numbers that feed restroom power and lighting circuits in Terminal C. See Attachment 3 2. Revised to include fire alarm panel room numbers that feed the restroom fire alarm devices in Terminal C. See Attachment 3 Page 1 of 6

3 AR Include Restroom Location Schedule Part 1 and 2 as part of drawing AR RESTROOM LOCATION SCHEDULE PART 1 B3-511/B3-515 C3-595; C3-597 B2-530; B2-532 Area Below Function/Use Public passenger circulation corridor from Metro station bridge, Delta Shuttle check-in counter, TSA security screening operation Passenger area/tsa security screening operation (partial); concessions service corridor; electric room, MWAA storage room, Tel/com equipment room Public passenger baggage claim area Area Below- Ceiling Finishes 2 x2 lay-in 9-4 +/- AFF (above finished floor) Gypsum board 9-4 +/- AFF (Public/TSA Areas); 2 x4 lay-in 8-0 +/- AFF in service corridor and Tel/com equipment room 2 x2 lay-in /- AFF and gypsum board ceiling soffits 6-9 wide centered on the column lines /- AFF (Public Areas) RESTROOM LOCATION SCHEDULE PART 2 B2-536; B2-538 C2-560; C2-562 C2-566; B2-568 Area Below Function/Use Public passenger baggage claim area; airline baggage service offices Public passenger baggage claim area; airline baggage service offices Public passenger baggage claim area Area Below- Ceiling Finishes 2 x2 lay-in /- AFF and gypsum board ceiling soffits 6-9 wide centered on the column lines /- AFF (Public Areas); 2 x2 lay-in 9-0 +/- AFF (at Bag Service Offices) 2 x2 lay-in /- AFF and gypsum board ceiling soffits 6-9 wide centered on the column lines /- AFF (Public Areas) 2 x2 lay-in /- AFF and gypsum board ceiling soffits 6-9 wide centered on the column lines /- AFF (Public Areas) Page 2 of 6

4 RONALD REAGAN WASHINGTON AIRPORTS AUTHORITY 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATION ADDENDUM NO. 1 JULY 28, 2011 AR Revised General Note 8 to read: ALL ITEMS REQUIRED BY THESE DRAWINGS / DOCUMENTS SHALL MEET THE METROPOLITAN WASHINGTON 2010 DESIGN MANUAL REQUIREMENTS. AR Add General Note 6 to read: 6. Existing Sprinkler System Feed Main to remain in place. The Contractor shall modify the branch piping to accommodate the new sprinkler head locations as shown on this drawing. 2. Add General Note 7 to read: 7. The Contractor shall provide detailed sprinkler system drawings and calculations sealed by a VA State licensed Fire Protection Engineer, as a project submittal. AR Add General Note 6 to read: 6. Existing Sprinkler System Feed Main to remain in place. The Contractor shall modify the branch piping to accommodate the new sprinkler head locations as shown on this drawing. 2. Add General Note 7 to read: 7. The Contractor shall provide detailed sprinkler system drawings and calculations sealed by a VA State licensed Fire Protection Engineer, as a project submittal. AR Add General Note 6 to read: 6. Existing Sprinkler System Feed Main to remain in place. The Contractor shall modify the branch piping to accommodate the new sprinkler head locations as shown on this drawing. Page 3 of 6

5 RONALD REAGAN WASHINGTON AIRPORTS AUTHORITY 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATION ADDENDUM NO. 1 JULY 28, Add General Note 7 to read: 7. The Contractor shall provide detailed sprinkler system drawings and calculations sealed by a VA State licensed Fire Protection Engineer, as a project submittal. AR05 Drawing Series (containing 13 drawing sheets) 1. Include Existing Finish Schedule as part of each sheet in the AR05 drawing series Existing Finish Schedule Sign Type* and Quantities Restroom Group Type - Type - Type - Type - 1A 1B 2A 2B Baggage Level - Terminal B Baggage Level - Terminal C Concourse Level - Terminal B Concourse Level - Terminal C Ticket Level - Terminal B Ticket Level - Terminal C Type - 1A (Lost Articles) Description Type - 1B (Emergency Call) Description Type - 2A (Wheelchair Accessibility) Description Type - 2B (Baby Changing) Description Tactile Braille II per Spec Section ; 16" x 16" +/-; 124 letter characters +/- with corresponding Braille (See Elevation Key Note 15 on the AR05 Series drawings.) Tactile Braille II per Spec Section ; 10" x 10" +/-; 66 letter characters +/- with corresponding Braille (See Elevation Key Note 18 on the AR05 Series drawings.) International Symbol Sign per Spec Section ; Accessibility image; 8" x 8" +/-;(See Elevation Key Note 17 on the AR05 Series drawings.) International Symbol Sign per Spec Section ; Baby Changing image; 8" x 8" +/-;(See Elevation Key Note 16 on the AR05 Series drawings.) PAGE 4 of 6

6 RONALD REAGAN WASHINGTON AIRPORTS AUTHORITY 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATION ADDENDUM NO. 1 JULY 28, 2011 PL02.001, PL and PL Add note 9 to drawings PL , PL and PL as follows: Note 9: Contractor shall provide the necessary labor and materials to remove and replace fifty (50) percent of the floor drains shown on the contract drawings. Replacement floor drains shall be cast iron construction and comply with the following requirements: Basis-of-Design Product: Subject to compliance with requirements, provide J.R. Smith Model 2005 floor drain or a comparable product by one of the following: Josam Company; Josam Div. MIFAB, Inc. Tyler Pipe; Wade Div. Zurn Plumbing Products Group; Light Commercial Operation. Standard: ASME A Pattern: Floor drain. Body Material: Gray iron. Seepage Flange: Required. Anchor Flange: Required. Clamping Device: Required. Outlet: Bottom. Backwater Valve: Not required. Coating on Interior and Exposed Exterior Surfaces: Not required. Sediment Bucket: Not required. Top or Strainer Material: Nickel bronze. Top of Body and Strainer Finish: Nickel bronze. Top Shape: Round. Dimensions of Top or Strainer: Six (6) inch Diameter. Top Loading Classification: Light Duty. Funnel: Not required. Inlet Fitting: Gray iron, with threaded inlet and no-hub or spigot outlet, and trap-seal primer valve connection. PAGE 5 of 6

7 RONALD REAGAN WASHINGTON AIRPORTS AUTHORITY 1-11-C138 TERMINAL B/C PRE-SECURITY RESTROOM RENOVATION ADDENDUM NO. 1 JULY 28, 2011 FA03.001, FA and FA Include North End Loop Assignments Schedule for Terminal C (North End) Restrooms as part of drawings FA03.001, FA and FA03.003: NORTH END LOOP ASSIGNMENT SCHEDULE Ticket Level Restrooms C3 Loop 39, Substation 1 Concourse Level Restrooms C2 Loop 11, Substation 1 Baggage Level Restrooms C1 Loop 4, Substation 1 END OF ADDENDUM NO. 1 PAGE 6 of 6

8 RONALD REAGAN WASHINGTON NATIONAL AIRPORT DCA TERMINAL B/C PRE-SECURITY RESTROOM RENOVATION June 29, 2011 TABLE OF CONTENTS REVISION 1 Licensed Professional Certification LPC-01 to LPC-11 VOLUME I PROCUREMENT AND CONTRACTING REQUIREMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS Supplementary Conditions SPECIFICATIONS GROUP GENERAL REQUIREMENTS SUBGROUP DIVISION 01 GENERAL REQUIREMENTS Summary Measurement and Payment Application for Payment Project Management and Coordination Construction Progress Documentation Photographic Documentation Submittals Quality Requirements References Temporary Facilities and Controls Product Requirements Execution Cutting and Patching Project Closeout Operation and Maintenance Data Project Record Documents END OF GENERAL REQUIREMENTS SUBGROUP FACILITY CONSTRUCTION SUBGROUP DIVISION 02 EXISTING CONDITIONS Selective Structure Demolition DIVISION 03 CONCRETE DIVISION 04 MASONRY TABLE OF CONTENTS TOC-1

9 RONALD REAGAN WASHINGTON NATIONAL AIRPORT DCA TERMINAL B/C PRE-SECURITY RESTROOM RENOVATION June 29, 2011 DIVISION 05 METALS Metal Fabrications Decorative Metal DIVISION 06 WOOD, PLASTICS, AND COMPOSITES Interior Architectural Woodwork DIVISION 07 THERMAL AND MOISTURE PROTECTION Joint Sealants Expansion Control DIVISION 08 OPENINGS Access Doors and Frames DIVISION 09 FINISHES Non-Structural Metal Framing Gypsum Board Tiling Resilient Tile Flooring Fiberglass Reinforced Plastic (FRP) Panels Interior Painting DIVISION 10 SPECIALTIES Signage Toilet Compartments Toilet Accessories DIVISION 11 EQUIPMENT DIVISION 12 FURNISHINGS DIVISION 13 SPECIAL CONSTRUCTION DIVISION 14 CONVEYING EQUIPMENT END OF FACILITY CONSTRUCTION SUBGROUP TABLE OF CONTENTS TOC-2

10 RONALD REAGAN WASHINGTON NATIONAL AIRPORT DCA TERMINAL B/C PRE-SECURITY RESTROOM RENOVATION June 29, 2011 FACILITY SERVICES SUBGROUP DIVISION 21 FIRE SUPPRESSION Not used DIVISION 22 PLUMBING Common Work Results for Plumbing General-Duty Valves for Plumbing Piping Hangers and Supports for Plumbing Piping and Equipment Identification for Plumbing Piping and Equipment Plumbing Insulation Domestic Water Piping Domestic Water Piping Specialties Sanitary, Waste and Vent Piping Sanitary Waste Piping Specialties Plumbing Fixtures DIVISION 23 - MECHANICAL Common Work Results for HVAC Testing, Adjusting, and Balancing for HVAC HVAC Insulation Ductwork Diffusers and Grilles DIVISION 25 INTEGRATED AUTOMATION Not used DIVISION 26 ELECTRICAL Low-Voltage Electrical Power Conductors and Cables Grounding and Bonding for Electrical Systems Hangers and Supports for Electrical Systems Raceway And Boxes for Electrical Systems Identification for Electrical Systems Panelboards Wiring Devices Interior Lighting DIVISION 27 - COMMUNICATIONS DIVISION 28 ELECTRONIC SAFETY AND SECURITY Digital, Addressable Fire-Alarm System Deleted TABLE OF CONTENTS TOC-3

11 RONALD REAGAN WASHINGTON NATIONAL AIRPORT DCA TERMINAL B/C PRE-SECURITY RESTROOM RENOVATION June 29, 2011 END OF FACILITY SERVICES SUBGROUP SITE AND INFRASTRUCTURE SUBGROUP DIVISION 31 - EARTHWORK DIVISION 32 EXTERIOR IMPROVEMENTS DIVISION 33 - UTILITIES DIVISION 34 - TRANSPORTATION FAA SPECIFICATIONS END OF SITE AND INFRASTRUCTURE SUBGROUP PROCESS EQUIPMENT SUBGROUP DIVISION 44 POLLUTION CONTROL EQUIPMENT END OF TABLE OF CONTENTS TABLE OF CONTENTS TOC-4