1 o TABLE ~ Del~a -, Refers to 8.01 April 28, 2014 Regular Meeting

2 .....'. 1. SCOPE OF WORK 2. BUDGET 3. SCHEDULE ~ -, Del~a I

3 - - - New building envelope to meet the BeBe Electrical re-wiring, exterior signage, exterior lighting, score clock, security cameras Paint interior truss & ceiling Replace undersized dehumidification system Upgrade refrigeration room to meet Boiler Branch Safety Order New fire alarm panel Spin room relocation Water slide tower removal Demolish the existing failed fa~ade and lead abatement

4 The existing building has 3 separate building envelope components Stucco cladding over steel studs Exposed Cast in Place concrete band. ' Split face concrete Block. ele ental -, Del~a I Ladner Leisure Center April 28, 2014, 4

5 Stucco wall The stucco installed over metal lath and building paper is attached to steel studs exterior to the structural steel frame. poor thermal efficiency No rainscreen to allow drainage. Ladner Leisure Center April 28,

6 ',',.' '.'. Concrete Band The steel rebar in the wall has corroded causing the concrete to spall. This wall needs to be repaired and protected with a coating or cladding. The existing concrete band is not insulated Ladner Leisure Center April 28,

7 _. Split Face Concrete Block The existing split face concrete is a durable finish however, it is not insulated. There is significant heat loss from dressing rooms and lower offices. Ladner Leisure Center April 28,

8 Insulated Metal Sandwich Panels Glass Colour Band over existing concrete band Stone Veneer Rainscreen assembly elemental, Del~a I Ladner Leisure Center April 28,

9 '-' ~ - Metal Sandwich Panel The insulated panel is installed over the structural steel frame eliminates cold bridging. Excellent thermal efficiency (R7.2/inch) meets ASHRAE 2010 in a 3 inch panel. Locally manufactured panels allows for delivery and installation prior to mid August ~-, I Delta I Ladner Leisure Center April 28,

10 Elemental is proposing to clad the building using the Metal Panel colour Metallic Bright Silver which will blend with the existing stucco colours of the Pool and the Giants addition. The panel cost is very cost effective $12-15/ s.f. installed compared to a conventional wall system that would require several trades to install at 4 to six ti mes the cost. Ladner Leisure Center April 28,

11 Ladner Leisure Center April 28,

12 Continuous Air & Thtnnal Barn S. TiqhtJy S&1 d air barrier p! \Ier the warm a'r from enten ng the ar 6. (ooler air re os In the arena When installed the building will have a complete air and thermal barrier system. The panels provide a vapour barrier on both sides of the wall. elemental Ladner Leisure Center April 28,

13 The insulated panels have an integrated clip system which would allow a colour band to be installed over the insulated metal panel. elemental ~ -, Del~a I Ladner Leisure Center April 28, The colour band proposed is a translucent colour in the Delta RGB R92 G127 B

14 -~. '---~- The existing split face concrete block walls at the lower part of the building provide a durable finish. The limitation of this wall system is that the heated rooms at lower level are not insulated to meet Ashrae elemental The building is costly to ~eat due to poor thermal insulation. Ladner Leisure Center April 28,

15 We are proposing to cover this insulation with a stone veneer cladding to closely match the colours of stone on "the existing pool building. Ladner Leisure Center April 28,

16 elemental Elemental is proposing to provide insulation on these walls using a polyurethane spray foam insulation. A two inch layer of foam provides an R12 insulation that meets ASH RAE requirements for mass walls. We are proposing to cover this insulation with a stone veneer cladding to closely match the colours of stone on the existing pool building. Ladner Leisure Center April 28,

17 Proposed brick veneer Shadow Stone in Steel Grey, matches colour range of stone at pool building el mental -, Del~a I Ladner Leisure Center April 28,

18 ..- Signage will be backlit aluminum channel letters in Delta blue elemental -, Del~a I Ladner Leisure Center April 28, '

19 Soft costs $362,000 Hard costs $2,887,000 Contingency $370,000 5% G.S.T. $181,000 $3.8 M Project Budget -, Del~a I

20 April 28 Council consideration given to CM, type of fa~ade replacement; and budget approval August 15 Start of making ice November 10 Total completion -, Del~a I