1 CITY OF ROSEVILLE CONSTRUCTION STANDARDS - CST Abbreviations AB 1-3 Section 11 Purpose and Definitions 11-1 Purpose PD Construction Practice PD Definitions PD 1 Section 12 Construction Area Traffic Control Devices Description TC 1 Traffic Control Plans TC 2 Section 21 Contractor s and Developer s Responsibilities 21-1 General CD Contractor s Responsibility CD 1 A. Plans CD 1 B. Notification CD 1 C. U.S.A. Marking CD 2 D. Testing CD 2 E. Cultural Resources CD 2 F. Hazardous or Toxic Materials and Contaminated Soils CD 2 G. Working Hours CD 3 H. Emergency Contact Person CD 3 I. Traffic Control CD 3 J. Preservation of Property CD 6 K. Personnel CD 7 L. Weather CD 7 M. Trenching Safety CD 7 N. Trailer and Material Storage CD 7 O. Street Cleaning CD 8 P. Interruption of Parking Areas CD 8 Q. Contractor Employee Vehicle Parking CD 8 R. Construction Safety CD 8 S. Blasting and Explosive Requirements CD 9 T. Pavement Milling Requirements CD 9 U. Discharge Fluid from Boring Operations CD 9 V. Concrete Truck Washout Area CD 9 1 of 8

2 21-3 Developer s Responsibility CD 10 A. Record Drawings CD Minimum Requirements for Model Home Building Permits CD Minimum Requirements for Production Home Building Permits CD Requirements for Subdivision Certificate of Completion (C.O.C.) CD Residential Occupancies During Residential Building CD Guarantee and Warranty CD 14 A. Subdivision Improvements CD 14 B. Encroachment Permit Improvements CD 15 C. Underground Warranty Work Within City Street Right-of-Way CD 16 D. EUD s Policy on Warranty Repairs on Sewer Stub and Services CD Materials CD 17 A. Approved Equal CD 17 B. Unapproved Materials CD 18 Section 31 Trench Backfill 31-1 General TB Trench Backfill TB 1 A. Existing Streets TB 1 B. Jetting TB 2 C. Material TB 2 D. Placement of Material TB 2 E. Typical compaction Equipment and Maximum Lift Depths Achieved by Proper Compaction TB 3 F. Pipe Bedding References TB 3 Section 56 Signs General SN 1 Overhead Sign Structures (Signal Mounted) Material SN Sign Panels and Fastening Hardware SN 3 Roadside Signs Material SN A Metal Pole SN D Sign Panel Fastening Hardware SN Sign Panel Installation SN 6 2 of 8

3 Section 71 Streets 71-1 General ST Connection to Existing Improvements ST 1 A. Existing Stub Street Connection ST 1 B. Street Widening ST 1 C. Sawcutting ST Construction Staking ST Installation ST 2 A. Subgrade ST 2 B. Aggregate Base and Subbase ST 4 C. Concrete ST 5 D. Asphalt Concrete Paving ST 11 E. Sound and Retaining Walls ST 19 F. Survey Monuments ST 20 G. Street Barricades ST 20 H. Pavement Removal ST 20 I. Utility Boxes ST 20 J. Slurry Seal Follow-up ST 20 K. Detector Loop Related Paving ST Materials ST 21 A. Aggregate Base and Subbase ST 21 B. Concrete ST 21 C. Asphalt Concrete ST 21 D. Lime/Fly Ash or Cement Treated Subbase ST 22 E. Truncated Domes ST 22 F. Graffiti Coating ST 22 G. Epoxies, Patching Material ST 22 H. Reinforcement Bar ST 23 I. Concrete Curing Compound ST 23 J. Slurry Seal ST 23 Section 81 Domestic Water Supply System Construction 81-1 General W Connection to Existing Facilities W Construction Staking W Earthwork W Dewatering W Pipe Bedding W Concrete Cradles, Arches, Encasements and Trench Dams W Pipe Zone Backfill W Pipe Installation W Service Installation W Abandonment of Services and Mains W 11 3 of 8

4 81-12 Appurtenances Installation W Testing Procedures W Repairing Installed Improvements W Punchlist Process W Materials W 17 Section 82 Markers and Delineators Description MD F Reflectors MD 1 Section 84 Traffic Stripes and Pavement Markings Description TM Tolerances and Appearances TM 1 Thermoplastic Traffic Stripes and Pavement Markings Material TM Application TM 3 Section 85 Pavement Markers Description PM Non-reflective Pavement Markers PM Placement PM 1 Section 86 Traffic Signals, Lighting and Electrical Systems General SG Equipment List and Drawings SG Maintaining Existing & Temporary Electrical Systems SG Foundations SG Standard, Steel Pedestal and Post SG A Conduit Material SG B Conduit Use SG C Conduit Installation SG Pull Boxes SG B Cover Marking SG Conductors SG A Conductor Identification SG B Multiple Circuit Conductors SG E Signal Interconnect Cable SG Wiring SG B Wiring Installation SG C Connectors and Terminals SG D Splicing SG E Splice Insulation SG F Fused Splice Connectors SG 15 4 of 8

5 Bonding and Grounding SG Service SG Testing SG B(2) Ground SG C Functional Testing SG Signal Activation SG Controller Cabinet Assembly SG Emergency Vehicle Preemption Equipment SG Vehicle Signal Faces SG B Signal Sections SG Light Emitting Diode Signal and Pedestrian Module SG Backplates SG Programmed Visibility Vehicle Signal Faces (PV Display) SG B Front Screen SG Pedestrian Signal Faces SG Signal Mounting Assemblies SG A(4) Vehicle Detectors Construction Materials SG A(5) Vehicle Detectors Installation Details SG E Detector Loop Circuitry SG Pedestrian Push Button Assemblies SG High Pressure Sodium Luminaires SG Internally Illuminated Street Name Signs SG Photoelectric Controls SG B(4) Wiring SG Removing Electrical Equipment SG 27 Section 91 Sanitary Sewer System Construction 91-1 General SS Connection to Existing Facilities SS Construction Staking SS Earthwork SS 2 A. Excavations SS 2 B. Trench Width SS 2 C. Compaction SS 2 D. Weather SS 2 E. Existing Roadways SS 2 F. Excess Material SS Dewatering SS Pipe Bedding SS Concrete Cradles, Arches, and Encasements and Trench Dams SS Pipe Zone Backfill SS Pipe Installation SS Manhole Installation SS Service Installation SS 12 5 of 8

6 91-12 Testing of Installed Improvements SS Punchlist Process SS Repairing Installed Improvements SS Abandoning Sewer Stubs and Services SS Materials SS Illegal Use of Sewer System SS Conditionally Approved SS 21 Section 101 Drainage General DR Construction Staking DR Drop Inlet Installation DR Manhole Installation DR 2 A. Bases DR 2 B. Cones DR 3 C. Joints DR 3 D. Connections DR 3 E. Grade Rings DR 4 F. Frames and Covers DR 4 G. Adjusting Existing Manhole Frames DR 4 H. Compaction DR Junction Boxes/Vaults DR Pipe Installation DR 4 A. Excavation DR 4 B. Trench Width DR 5 C. Pipe Bedding DR 5 D. Laying Pipe DR 5 E. Non Rigid (PVC/HDPE) Pipe Testing DR 6 F. Pipe Laying Tolerances DR 6 G. Trench Backfill DR 6 H. Cast-in Place Concrete Pipe DR 7 I. Pavement Cutting and Repaving DR 7 J. Cleaning of Storm Drain System DR Channel Lining Installations DR 7 A. Surface Preparation DR 7 B. Reinforcement DR 7 C. Joints DR 7 D. Weep Holes DR 8 E. Cutoff Walls DR 8 F. Geotextil Linings DR Materials DR 9 A. Backfill Material DR 9 B. Drop Inlets DR 9 C. Manholes DR 9 D. Storm Drain Pipe DR 10 E. Stormwater Treatment Devices DR 11 6 of 8

7 F. Outlet and Inlet Structures DR 11 G. Slurry Cement Backfill DR 11 H. Lined Channels DR 11 I. Metal Storm Drain Marker DR A Abandoning Storm Drains DR 12 Section 111 Grading General GR Construction Staking GR 1 A. Channels GR 1 B. Erosion Control Measures GR 1 C. Pads GR 1 D. Retaining Walls GR 2 E. Roadways GR Installation GR 2 A. Channels GR 2 B. Erosion Control Measures GR 2 C. Pads GR 5 D. Retaining Walls GR 5 E. Roadways GR 6 F. Tree Grading GR 6 G. Grading Adjacent to Wetlands GR Materials GR 8 A. Retaining Walls GR 8 B. Tree Fencing GR 8 C. Wetland Preserve Fencing GR Soil Testing Procedures and Frequencies GR 9 A. Field Testing GR 9 B. Minimum Reporting Requirements GR 10 C. Mass Grading Testing Frequencies GR 10 D. Trench Backfill Testing Frequencies GR 10 Section 141 Recycled Water System Construction General RW Connection to Existing Facilities RW Construction Staking RW Earthwork RW 2 A. Excavation RW 2 B. Trench Width RW 2 C. Compaction RW 3 D. Weather RW 3 E. Existing Roadways RW 3 F. Excess Material RW Dewatering RW 3 7 of 8

8 141-6 Pipe Bedding RW Concrete Cradles, Arches and Encasements and Trench Dams RW Pipe Zone Backfill RW Pipe Installation RW Service Installation RW Appurtenances Installation RW On-Site Recycled Water Facilities RW 10 A. Inspections RW 10 B. Coverage Test for On-site Irrigation Systems RW 10 C. Controller Charts RW 11 D. Conversion from a Potable System to Recycled Water Supply RW 11 E. Conversion from Recycled Water to Potable Water Supply RW 11 F. On-Site Pipe Identification RW 12 G. Quick Coupling Valves RW 13 H. Sprinklers RW 13 I. Warning Labels RW 13 J. Valve Boxes and Tags RW 14 K. Strainers RW 14 L. On-Site Recycled Water Piping RW 15 M. On-Site Potable Water Piping RW Testing Procedures RW 17 A. Public System (Offsite) RW 17 B. Private System (Onsite) RW Repairing Installed Improvements RW 18 A. PVC RW 18 B. Concrete Cylinder Pipe Repairs RW Punchlist Process RW Materials RW 19 A. Approved Equal RW 19 B. Conditionally Approved Material RW 20 C. Unapproved Materials RW 20 D. Recycled Water Main RW 20 E. Services RW 21 F. Appurtenances RW 21 Section 151 Solid Waste Construction General SW Approved Plans SW Inspection SW Punchlist Process SW Materials SW 1 8 of 8