Loshan pipe manufacturing Co. LOSHAN PROFILE

Size: px
Start display at page:

Download "Loshan pipe manufacturing Co. LOSHAN PROFILE"

Transcription

1 Loshan manufacturing Co. LOSHAN PROFILE Loshan manufacturing company ranks among Iranian civil contractors which owns manufacturing factory. The company is active in line installation for sewerage by jacking, microtunnelling and vacuum methods and operates permanent factory for production of concrete and box culvert. Loshan was commissioned the factory in 1994.It has manufactured more than 65 kilometers concrete and box culvert and its production is one of the best qualities in Iran. Loshan company expanded it s capability to carry out jacking project in 1998 and nowadays it has over 7 years of experience in jacking, microtunnelling and underground utility construction in all ground condition. Loshan company is accomplishing virtually many types of jacking and microtunnelling from 250 mm to 1600 mm in diameter in many areas, since the project has been located in Khoramshahr,Loshan micro tunneling has developed significant expertise in very loose ground condition under water table.we have been ranked for urban installation as the 4 th grade by planning and management governmental organization. Considering the Loshan experiences, machinery, certification and background Loshan bid and perform bigger project in the future.

2 Pipe manufacturing factory facilities: Batching plant for produce concrete. Produce armature steel cage unit. Two lines of vibro press concrete machine ) Pedershaab) PE lining production unit Equipment for measuring the mechanical specification of concrete and s Gantry crane & lift truck mm 2 area for storage. Guest house Factory production: A :Concrete with PVC lining suitable for jacking nominal diameter 400 mm B :Concrete pip with PE suitable for open trench nominal diameters 600 mm-800 mm 1000mm-1200mm-1400mm-1600mm C :Concrete with PE lining suitable for jacking nominal diameters 600mm-800mm-1200mm-1600mm-2200mm Box culvert Concrete box culvert suitable for bridges and all urban installation nominal size , , , , mm concrete segment Suitable for making sinking shaft diameter 6.50m

3

4 Loshan microtunnelling and jacking machinery Type of machine Loshan hand shield 1600 Loshan hand shield 1200 Herrenknecht excavator MH Herrenknecht excavator MH Herrenknecht AVN 700 Herrenknecht AVN 1200 Wirth Soltau RVS 80 Type of product 1600 mm concrete 1200 mm concrete 1600 mm concrete 1600 mm concrete 600 mm concrete 1200 mm concrete PE/PVC and polycrete Operation system Quantity Specification Hydraulic jacking Excavation and muck removal by hand Hydraulic jacking Excavation and muck removal by hand Hydraulic jacking, excavation and muck removal. Hydraulic jacking, excavation and muck removal. Slurry microtunnelling machine Slurry microtunnelling machine Auger drilling Loshan LS PE /PVC Auger drilling Wirth Soltau RVS 350 Wirth Soltau RVS 250 Wirth -Soltau RVS mm concrete 600 mm concrete 1200 mm concrete 2 10 Slurry microtunnelling machine 1 Slurry microtunnelling machine Slurry microtunnelling machine line installation in stable ground condition line installation in stable ground condition line installation in loose ground condition above water table line installation in loose ground condition above water table line installation in all ground condition under water table line installation in all ground condition under water table line installation in soft ground under water table line installation in soft ground under water table line installation in all ground condition under water table line installation in all ground condition under water table line installation in all ground condition under water table

5 Hand shield machine AVN 700

6 AVN 1200

7 RVS 600

8 THE OTHER MACHINARY GPR: Ground penetrating radar. This radar shows all objects under ground before excavation Lubrication sets 5 tons gantry crane 30 tons truck crane 16 tons truck crane 400 kw diesel generator 500 kw diesel generator well point system

9 Completed projects Project Client M Type Completion The main sewerage collector of Karaj Tehran sewerage network Drainage of Kordestan highway Tehran Power ministry mm concrete 1999 Power ministry mm polycrete 2000 Tehran municipality mm concrete with ground treatment 2000 The main sewerage collector of Tehran Power ministry mm and 1600mm concrete 2004 The main sewerage collector of Khoramshahr Abadan Sewerage network Anzali Sewerage network The main Sewerage collector of Rasht Anzali Sewerage network Vacuum sewage system Anzali Sewerage network Power ministry mm concrete 2004 Power ministry mm concrete 2004 Power ministry mm concrete 2005 Power ministry mm concrete Power ministry mm PE PN10 Power ministry mm Concrete Ardabil water project Power ministry mm Concrete Tehran sewerage network Power ministry mm Concrete Start at 2012 Start at 2013

10

11

12

13 Corporate data Founded: 1994 Paid up capital: 60000$ Employees: 240 )March 30, 2010) Engineers &managers: 20 Administrators : 30 Operators : 20 Technicians : 20 Labors : 150 Head Office: Loshan Co.Building 4 th Alley Ostad Moein St. Golsar Blvd Rasht - Iran address: Director manager: Technical & Commercial manager: Tel & Fax : info@loshanco.com Kazem Sedghinejad Tel : address : sedghi@loshanco.com Farhad Mehdizadeh Tel : address : mehdizadeh@loshanco.com

14