1 REHABILITATION OF DOLOW ORIENTATION CENTRE Reintegration and Durable Solutions

2 Sheet No. Content G-01 Index Sheet A-01 A-02 A-03 A-04 A-05 A-06 A-07 A-08 3D-01 3D-02 3D-03 3D-04 3D-05 Existing Site Plan Proposed Site Plan Proposed Caffeteria Block Plan Proposed Caffeteria Block Elevations Proposed Caffeteria Block Roof Plan & Section Proposed Fence New Openings' Schedule Existing Site Photos 3D Projection 01 3D Projection 02 3D Projection 03 3D Projection 04 3D Projection 05 E-01 Electrical Layout M-01 Mechanical Layout INDEX SHEET G-01 N/A

3 W.C W.C W.C Cafeteria hall Existing building Existing kerbs to be rehabilitated and painted Store Kitchen Inside compound of (Square Park/Orientation center) Proposed new cafeteria attached with kitchen and toilets Existing kerbs to be rehabilitated and painted Existing Monument Existing garden trees Existing kerbs to be rehabilitated and painted Existing kerbs to be rehabilitated and painted Remove and clear from the rubbish brushes, level and compact inside the compound area Existing building Main entrance Existing Plastic elevator water tank *130cm high fence wall, *The fence wall should be rehabilitated including the smashed short pillars *Provide and fix150cm high steel railing above the fence wall Provide a new gate with same design of the existing gate Dolow Orientation Center EXISTING SITE PLAN A-01 1:300

4 LANDSCAPING EXISTING BUILDING New kerb around monument NEW CAFFETERIA BLOCK -Caffeteria -Kitchen -Store -Washrooms LANDSCAPING RK R EW A C PA N ACCESS ROAD Rehabilitate Existing masonry kerbs SEPTIC TANK Rehabilitate Existing masonry wall - Add 1500mm (H) steel railing above existing wall 6R x 150 6G x 300 UP DOWN 6 Existing monument LANDSCAPING EXISTING BUILDING Provide new Gate 4000mm wide ELEVATED WATER TANK ACCESS ROAD PROJECT DETAILS Project : Tittle: PROPOSED SITE PLAN Checked & Approved by: Drawn by: Drawing Tittle: Sheet No. A-02 Scale: 1:300

5 0 1 2 E A B C D E 7,900 2,100 1,400 1,200 3,000 1,600 1,500 4,800 2, ,900 1, STORE FLOOR SCREED 900 2,000 2,100 1,400 1,200 3,000 E S-01 14,200 1,200 1,200 1,200 1,200 4,400 3,300 1, ,600 1,500 3,000 1,500 1,000 GENTS FLOOR SCREED +300 LADIES FLOOR SCREED +300 CAFFETERIA 300 X 300 CERAMIC TILES E-02 E CORRIDOR FLOOR SCREED KITCHEN 300 X 300 CERAMIC TILES , , , ,200 1,500 1, ,200 1,200 1,200 1,200 4,400 3,300 1,500 14,200 S-01 PROPOSED CAFFETERIA FLOOR PLAN A-03 1:45

6 A B C D E Highest Point 4,848 Highest Point 4,848 Roof Level 3,500 Roof Level 3,500 Lintel Level 2,700 Lintel Level 2,700 Window Sill Level 1,200 Window Sill Level 1,200 Floor Level G.L. 300 Floor Level G.L. 300 ELEVATION E-01 ELEVATION E E D C B A Highest Point 4,848 Highest Point 4,848 Roof Level 3,500 Roof Level 3,500 Lintel Level 2,700 Lintel Level 2,700 Window Sill Level 1,200 Window Sill Level 1,200 Floor Level G.L. 300 Floor Level G.L ,500 3,300 4,400 1,200 1,200 1,200 1,200 ELEVATION E-03 ELEVATION E-04 PROPOSED CAFFETERIA ELEVATIONS A-04 1:50

7 4,800 4,400 15,400 6,200 A B C D E 9, FALL FALL FALL FALL 200mm x 200mm R.C. Ring Lintel 300mm (H) x 200mm R.C. Ring beam to S.E. details 12mm chipboard ceiling nailed on wooden framework 28 Gauge G.I. Sheet roofing on 100 x 50mm sawn timber trusses. Roof incline angle = 25 deg. D C B A FALL 3,000 Highest Point 4,848 Roof Level 3,500 3 Lintel Level 2, mm x 1500mm M.S. Casement window to Schedule 4 5 FALL FALL 1,200 Window Sill Level Floor Level G.L. 1, mm thick Masonry Walls plastered and painted to approval 6 3,000 1,200 1,400 2, ,900 PROPOSED CAFFETERIA ROOF PLAN & SECTION A-05 1:50

8 55,000 1,300 1,500 3,625 2,755 DOWN R x 150 6G x UP 2,550 4,500 29,550 1,300 1,500 30,600 Existing 1300mm (H) Masonry fence to be rehabilitated and painted to approval New 4000mm wide MS gate to match existing design Additional 1500mm (H) MS welded grill above existing Masonry wall Existing 1300mm (H) Masonry fence to be rehabilitated and painted to approval Additional 1500mm (H) MS welded grill above existing Masonry wall 1,950 4,000 PROPOSED GATE FENCE DETAILS 26,000 4,000 28,000 PROPOSED FENCE EXTENSION A-06 1:60/1:250

9 900 1,500 1, ,500 2,400 2,400 2,400 OPENING IMAGE NAME QTY WIDTH HEIGHT DESCRIPTION 900 D M.S. Panel Swing Door with lockable door latch and 3 welded hinges 1,500 D M.S. Panel Double Swing Door with lockable door latch and 3 welded hinges on each side 800 D Wooden Flush Swing Door with lockable door latch and 3 hinges 1,500 W M.S. Casement Window with fixed main sash and side hung side sashes and a top hung transom above the main sash W M.S. Casement Window with Louvred transom 1,500 1 W Precast Concrete Ventilation blocks OPENINGS SCHEDULE A-07 N/A

10 EXISTING PHOTOS PROJECT DETAILS Project : Tittle: Drawing Tittle: Checked & Approved by: Drawn by: EXISTING PHOTOS Sheet No. A-08 Scale: N/A

11 3 DIMENSIONAL PROJECTION 3D-01 N/A

12 3 DIMENSIONAL PROJECTION 3D-02 N/A

13 3 DIMENSIONAL PROJECTION 3D-03 N/A

14 3 DIMENSIONAL PROJECTION 3D-04 N/A

15 3 DIMENSIONAL PROJECTION 3D-05 N/A

16 STORE GENTS LADIES CAFFETERIA CORRIDOR KEY Consumer Unit KITCHEN Twin Socket with Switches One gang Switch 4ft. Flourescent tube light Lighting Circuit Power Circuit ELECTRICAL LAYOUT E-01 ELECTRICAL DRAWINGS 1:40

17 I.C I.C G.T SEPTIC TANK SEPTIC TANK Key G.T Gully Trap I.C Inspection Chamber Ball valve Gate valve ELEVATED WATER TANK Water Plumbing Drainage PROJECT DETAILS Project : Tittle: MECHANICAL LAYOUT Checked & Approved by: Drawn by: Drawing Tittle: Sheet No. M-01 Scale: N/A MECHANICAL DRAWINGS