1 Country Partner ALSTOM NU Product Waves Paris, France 2015

2 1 st Wave NUPB Casting For APA pump, high quality required (Supplier to be approved by customer) Presentation title - 07/04/15 P 2

3 1 st Wave NUPB Small Welded Structure Example Small Welded Example Criteria Carbon Steel or Duplex ASTM Standards Diameter: 600mm to 4,000mm Height: 300mm to 6,000mm Weight: 0.1 tons to 11 tons Presentation title - 07/04/15 P 3

4 1 st Wave - Large Pressure Vessel/ Tank Example Large PV/ Tank Example Criteria Presentation title - 07/04/15 P 4

5 1 st Wave - NUE Modules 4 NUE Modules WPM010 GCT Bypass Material is Free is with exception of: Piping supports and steel structures Responsible to quote: Material handling & Assembly Steel Structure & Piping Mechanical Erection Tests & Controls Trial assembly of sub-modules Preservation WPM063 Extraction Pumps WPM070 MSR & VPU Drain Tanks WPM090 AHP Lines to HP6 Presentation title - 07/04/15 P 5

6 2 nd Wave - NUE Medium Tanks NUE Various Medium Tanks Carbon Steel. Example size: Control Air Receiver Tanks 12.7m3 Service Air Receiver tank 12.7m3 H2 Gas Seperator tank 8m3 Demineralised Water Storage tank 34m3 CCW Head and Emergency tank 42.5m3 Hydraulic Seals Tank 7m3 Drain Flash Tank 2m3 Buffer Tank 1.725m3 Presentation title - 07/04/15 P 6

7 2 nd Wave - NUPB Machine Pump Shafts NUPB Machine Pump Shafts Dye penetrant test Examples: Material: Carbon or Duplex Main part is in Duplex steel - X2CrNiMoN or in case of high corrosion super duplex - X2CrNiMoCuN Length from 2 meters up to 8 meters Diameter from 100 to 180 mm Machined pump shafts Other materials: Stainless steel and low alloy steel Diameter under 100 Upper shaft - 8 meters dia 544 weight 15,45 tons X20Cr13 Pump shaft 4 meters dia 458 weight 5 tons X20Cr13 Scope of supply : Material supply, Machining, grinding machining, control, Packing and Transport up to Nantes work shop. Dimensionnel control Lead time critical! Presentation title - 07/04/15 P 7

8 2 nd Wave NUE/ NUCC GRP Piping Key Criteria/ Examples Erection services + Supply / Fabrication. Supplier required to have Min annual turnover of 7M The GRP Erection Work Package covers all the GRP piping erection works (including testing) of the turbine island, for an approximate weight of 100 tons for 2 units. The piping materials are free-supplied prefabricated up to a certain extent to the erection contractor by Alstom in the base case. This package includes the supply, fabrication and erection of steel supports (in the range of 100 tons for 2 units) as well as the installation of free-supplied valves and in-line components. Erection services include all necessary site logistics including scaffolding, temporary works and temporary site facilities. Alternatively, this package could be extended to the supply and fabrication of GRP piping to form a turnkey subcontract. Presentation title - 07/04/15 P 8

9 2 nd Wave NUE/NUCC Secondary Steel Structures Key Criteria/ Examples Erection services + Design / Supply / Fabrication. The Secondary Steel Structures Erection Work Package covers all the secondary steel structures erection works (mainly platforms and associated metal works, not forming part of the turbine hall main structure, together with small permanent handling devices) of the turbine island, for an approximate weight of 2000 tons handling devices for 2 units. The materials are considered free-supplied prefabricated up to a certain extent to the erection contractor by Alstom in the base case. Erection services include all necessary site logistics including scaffolding, temporary works and temporary site facilities. The preferred option would be to extend this package to the design, supply of materials and fabrication of these structures to form a turnkey subcontract. Presentation title - 07/04/15 P 9