1 The City of Hudson Oaks currently uses the following Codes: 2003 International Building Code 2003 International Mechanical Code 2003 International Residential Code 2003 International Fire Code 2003 International Plumbing Code 2003 International Fuel Gas Code 2003 International Energy Conservation Code 2002 National Energy Code All codes have been amended to include the North Central Texas Council of Government s Regional Code Council suggested amendments, which are available for download at A. NEW CONSTRUCTION REVIEW & INSPECTION S (COMMERCIAL & RESIDENTIAL) (Add both TABLE A-1 & A-2 for plan review and building inspections plus square foot cost for electrical, plumbing and mechanical (See Table C). SEE ALSO: TABLE D. OTHER S NEW RESIDENTIAL; AND/OR TABLE E. OTHER S COMMERCIAL AS APPLICABLE TABLE A-1 PLAN REVIEW ADD $50.00 APPLICATION TO EACH PROJECT TOTAL VALUATION SCHEDULE $1.00 TO $ $23.50 $ to $2, $23.50 for the first $ plus $3.05 for each additional $ or fraction thereof, to and including $2, $2, to $25, $69.25 for the first $2, plus $14.00 for each additional $1, or fraction thereof, up to and including $25, $25, to $50, $ for the first $25, plus $10.10 for each additional $1, or fraction thereof, up to and including $50, $50, to $100, $ for the first $50, plus $7.00 for each additional $1, or fraction thereof, up to and including $100, $100, to $500, $ for the first $100, plus $5.60 for each additional $1, or fraction thereof, up to and including $500, $500, to $1,000, $3, for the first $500, plus $4.75 for each additional $1, or fraction thereof, up to and including $1,000, $1,000, and over $5, for the first $1,000, plus $3.15 for each additional $1, or fraction thereof. Page 1

2 TABLE A-2 BUILDING INSPECTION TOTAL VALUATION SCHEDULE $1.00 TO $ $23.50 $ to $2, $23.50 for the first $ plus $3.05 for each additional $ or fraction thereof, to and including $2, $2, to $25, $69.25 for the first $2, plus $14.00 for each additional $1, or fraction thereof, up to and including $25, $25, to $50, $ for the first $25, plus $10.10 for each additional $1, or fraction thereof, up to and including $50, $50, to $100, $ for the first $50, plus $7.00 for each additional $1, or fraction thereof, up to and including $100, $100, to $500, $ for the first $100, plus $5.60 for each additional $1, or fraction thereof, up to and including $500, $500, to $1,000, $3, for the first $500, plus $4.75 for each additional $1, or fraction thereof, up to and including $1,000, $1,000, and over $5, for the first $1,000, plus $3.15 for each additional $1, or fraction thereof. TABLE B OTHER CONSTRUCTION REVIEW AND INSPECTION S Re-Inspection fees Inspections for which no fee is specifically indicated Additional plan review required by changes, additions or revisions to plans $ per hour (billed in one hour increments) $ per hour (billed in one hour increments) plus $50.00 application fee. $ per hour (billed in one hour increments) Page 2

3 TABLE C OTHER PERMIT S Permit Application $50.00 Commercial Remodel (Existing and New Foundation) Table A-1 & A-2 plus $0.12 sq. ft. (see Table C sq. ft. multiplier) plus permit application fee. Occupancy Permit also required if traffic flow changes (wall is moved, door(s) moved, etc.) Demolition Permit $ Fence Permit $50.00 application fee only Fire Alarm Review Project Valuation < $500,000 = $ ; Valuation > $500,000 = $2, Fire Sprinkler Review Irrigation (Residential) $ No permit application fee Square footage less than 4900= not required; Square footage 4900 or greater = $2, No permit application fee Irrigation (Commercial) Mechanical Change Out Occupancy Table A-1 & A-2 based on valuation, plus permit application fee $ (Inspection only) water heater, A/C unit changeout $ (needed with new building and ownership change) Propane Tanks (for pools) $ Residential Add-On / Remodel (new foundation and existing foundation) Solicitation Permits Table A-1 & A-2 plus sq. ft. multiplier (see Table C sq. ft. multiplier), plus permit application fee $10.00 per solicitor; background check performed and approved by Chief of Police no application fee Page 3

4 TABLE C OTHER PERMIT S (CONTINUED) Sign Permit (Permanent Sign) Sign Permit (Temporary Sign) Signs - No permit required Septic Permit Swimming Pool (residential) Swimming Pool (public/commercial) Table A-1 & A-2 based on valuation of sign; includes wall, pole, monument, canopy, awning, marquee, pole banner, electronic price), plus permit application fee $50.00 per year; includes feather flags and banners, also includes refacing of signs no application fee Window, Nameplate, Mailbox, Real Estate, Construction, Balloons, Insignia and/or business logo flags, American flags, garage sale $ for Conventional (non-aerobic) $ for Professional (aerobic) Table A-1 & A-2 based on valuation of pool, plus permit application fee Annual Inspection $ Well Permit $ TABLE C OTHER PERMIT S (CONTINUED)- SQUARE FOOT MULTIPLIER SQUARE FOOT MULTIPLIER Electrical Permit Plumbing Mechanical $0.10 per sq. ft. < 10,000 sq. ft. (new construction) $0.06 per sq. ft. >10,000 sq. ft. (new construction) $0.03 per sq. ft. (residential remodel) $0.12 per sq. ft (commercial remodel) $0.10 per sq. ft. < 10,000 sq. ft. (new construction) $0.06 per sq. ft. >10,000 sq. ft. (new construction) $0.03 per sq. ft. (residential remodel) $0.12 per sq. ft (commercial remodel) $0.10 per sq. ft. < 10,000 sq. ft. (new construction) $0.06 per sq. ft. >10,000 sq. ft. (new construction) $0.03 per sq. ft. (residential remodel) $0.12 per sq. ft (commercial remodel) Page 4

5 TABLE D OTHER CONSTRUCTION S NEW RESIDENTIAL Irrigation OTHER CHARGES $188.50; must provide backflow inspection Occupancy Permit $ Septic Permit (If applicable) Sewer Impact Fee (If applicable) $ Conventional (non-aerobic) $ Professional (aerobic) ¾ = $1, = $3, ½ = $6, = $9, = $31, = $62, Sewer Tap Fee (if applicable) $ Water Impact Fee Hudson Oaks & Regional Totals Water Tap Fee Wireless Meter Fee ¾ = $2, = $4, ½ = $ = $14, = $43, = $77, $ per line (i.e., domestic / irrigation) Current market rate; by size of meter no application fee Page 5

6 TABLE E OTHER CONSTRUCTION S NEW COMMERCIAL Fire Alarm Review Project Valuation < $500,000 = $950; Valuation > $500,000 = $2, Includes application fee Fire Sprinkler Reivew Square footage less than 4900= not required Square footage 4900 or greater = $2, Includes application fee Health Food Permit (if required) $ for less than 1 hour (application fee included) $ for greater than 1 hour (larger buildings) (application fee incl.) Irrigation Meter Current market rate; by size of meter no application fee Occupancy $ Sewer Tap Fee $ each line Sewer Impact Fee ¾ = $1, Water Impact Fee Hudson Oaks and Regional Totals 1 = $3, ½ = $6, = $9, = $31, = $62, ¾ = $2, = $4, ½ = $ = $14, = $43, = $77, Water Meter Water Tap Public Works Improvements (water lines, sewer lines, streets) Current market rate; by size of meter no application fee $ each line (i.e., 1 domestic / 1 irrigation) no application fee 4% of project cost, plus engineering review costs Page 6