1 CORRIGENDUM #4 for LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA-TWO YEARS ARC Tender Doc. No.: 05/51/23SA/GNGPL/001D-ii Date: Owner : GNGPL Sl. No. Description Volume Tender Page No. Clause / Para / Section Amendment / Addition / Modification / Deletion Schedule of Rates Rev. 1 is enclosed herewith as Annexure-I, which shall supersede Schedule of Rates enclosed in tender documents. 1 SCHEDULE OF RATES I Section-VI Amendment Notes: i) Bidder must consider Schedule of Rates Rev. 1 while submitting their bid, failing which bid shall be rejected. ii) Bid Sheets (Schedule of Rates Rev. 1 (Price Bid)/ Schedule of Rates Rev. 1 (Unpriced Bid) must be downloaded only from for bid submission on the e-tender portal.) 2 Terms of Payment I Ann.-5 to SCC Amendment Revised Terms of Payment is enclosed herewith as Annexure-II, which shall supersede the Terms of Payment given in tender documents. 3 Reply to Pre-bid Queries Clarifications Reply to Pre-bid queries is enclosed herewith as Annexure-III. Note: Any addendum/corrigendum/clarifications shall be integral part of the Bidding Documents and shall be submitted by bidders duly signed & stamped in their bid. Dr. P. K. Sharma DGM (Contracts) MECON, Delhi Page 1 of 1

2 Annexure I Schedule of Rates Rev. 1 (Separately Attached) Notes: i) Bidder must consider Schedule of Rates Rev. 1 while submitting their bid, failing which bid shall be rejected. ii) Bid Sheets (Schedule of Rates Rev. 1 (Price Bid)/ Schedule of Rates Rev. 1 (Unpriced Bid) must be downloaded only from for bid submission on the e tender portal.)

3 Goa Natural Gas Pvt. Ltd. LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA TERMS OF PAYMENT (ANNEXURE-5 TO SPECIAL CONDITIONS OF CONTRACT)

4 Goa Natural Gas Pvt. Ltd. LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA ANNEXURE-5 TO SCC 1.0 TERMS OF PAYMENT Pending completion of the whole works, provisional progressive payments for the part of work executed by the contractor shall be made by Owner on the basis of said work completed and certified by the Owner s representative as per the agreed milestone payment schedule and the percentage break-ups given below. Contractor shall submit his invoices to the Owner s representative monthly in the manner as instructed by Owner. Each invoice will be supported by documentation acceptable to Owner and certified by the Owner s representative. Payments made by owner to the contractor for any part of the work shall not deem that the Owner has accepted the work. The Contractor has to raise the RA bill on monthly basis and payment shall be made as per the following terms:- For SOR item % In continuous stretches of minimum 100 Mtrs. including trench less laying or total scope whichever is less after completion of trenching, lowering, electro-fusion jointing of pipeline, backfilling and compaction for the complete stretch as per the scope of work. 10% Testing of network, Pre-Commissioning of the system, installation of Permanent Markers & Valve chambers, 10% Commissioning or gas charging of the PE pipeline (case decided by EIC) and material re-conciliation 10% Submission of all documents, submission of NOC, Submission of As built drawings. Closure of contract, Submission of final bill. For SOR item % After Complete area wise restoration as per the standards (bidder may note that restoration work shall be carried out after successful testing and commissioning / gas charging in respective area). 20% After obtaining NOC from respective local authorities / Third party agencies designated by land owning agencies.. 10% After Completion of all works and closure of contract. For SOR item 1.3 to % Installation of casing & carrier pipe or only carrier pipe, electrofusion joining with main pipeline,

5 Goa Natural Gas Pvt. Ltd. LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA 20% 10% After testing, backfilling of moling pits, restoration of pits, commissioning / gas charging of pipeline. After submission of documents, submission of As Built drawing, completion of all works and closure of contract For SOR item 1.7, 1.8 & % Upon supply and Complete installation of item s and all its associated work. 10% After submission of documents and closure of contract For SOR Item No. 1.10: Liasioning Work Payment for the Liasioning work shall be made for the actual length of network laid as follows: 50% Payment on approval for the length applied 40% Payment for the length applied shall be paid on the start of laying work. 10% Payment along with final bill for actual length laid. For SOR item % After completion of the work in all respects. 10% After submission of documents and closure of contract For SOR item % Upon Complete installation of Items and its associated work 20% Testing of installations and commissioning. 10% After submission of documents and closure of contract For SOR item 3.1 to 3.7, 4.1, % After completion of the work in all respects. 10% After submission of documents and closure of contract 2. Any other work (Not mentioned above) a) Completion of individual work progressively : 90% b) Completion of all activities and their acceptance submission Of final documents, final bill and acceptance of these by owner thereafter for successful closure of work order: : 10 % Note: Any further breakup of each activity for the payment purpose can be done depending upon the site situation/requirement and recommendation by EIC and approval of construction in-charge.

6 Goa Natural Gas Pvt. Ltd. LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA 3. Payment Methodology I. The Contractor shall raise invoices on monthly basis. Bidder shall enclose all documents as per checklist issued by GNGPL/ Mecon including during Kickoff meeting II. III. IV. The payment of the contractor will be released within 15 days from the date of receipt of complete invoice as per terms and condition of the contract. Employer will release payment through e-payments only as detailed in bidding document. All payments against running bills are advance against the work and shall not be taken as Final acceptance of work / measurement carried out till the final bill. V. Further break-up of Lumpsum Prices, if deemed necessary for any progressive payment of individual item may be mutually arrived at between Engineer-in- Charge and the Contractor. VI. VII. VIII. Successful bidder(s) to submit material reconciliation certificate along with each bill. Bills shall be raised by contractor in line with check list attached in Tender document. As per CBDT Notification No. 95/2015 dated , mentioning of PAN no. is mandatory for procurement of goods / services/works/consultancy services exceeding Rs. 2 Lacs per transaction. Accordingly, supplier/ contractor/ service provider/ consultant should mention their PAN no. in their invoice/ bill for any transaction exceeding Rs. 2 lakhs. As provided in the notification, in case supplier/ contractor/ service provider/ consultant do not have PAN no., they have to submit declaration in Form 60 along with invoice/ bill for each transaction. Payment of supplier/ contractor / service provider/ consultant shall be processed only after fulfilment of above requirement. IX. GNGPL s PAN No. is to be intimated later. All RA Bills shall be submitted to EIC of MECON / GNGPL

7 Annexure-III GOA NATURAL GAS PVT. LTD. CGD PROJECT AT NORTH GOA Reply to Bidder's Queries-I for LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA-TWO YEARS ARC Tender Doc. No.: 05/51/23SA/GNGPL/001D-ii Sl. No. Ref. Clause no/ Tender Doc/Page No. Details Query GNGPL/ MECON's Reply 1 What will be the minimum or maximum drilling length in single shot(rocky strata)? The HDD length shall be governed as per the ROU crossing width of river, creek, road and any other utility crossing. 2 Is there any Idling charges if machine & manpower sits idle due to permission or any other factors? 3 How calculation for payment is to be done if rocky/soil comes in single drill,rates applicable will be of rocky strata rates or normal soil Refer Corrigendum.? The tender is floated on ARC basis. No idle charge shall be payable. 4 Executed value of equivalent amount can also be considered if work Tender condtion prevails is not completed in Experience certificate? 5 what will be the consideration of pipe wastage? Kindly refer Annexure-7 to SCC clause no in Vol BID EVALUATION CRITERIA 5.1 Technical Criteria: Kindly include installation and testing of buried hydrocarbon Steel pipeline as per below: The bidder should have successfully executed/ completed in last 7 (Seven) years to be reckoned from the bid due date, at least one single contract* involving laying, installation and testing of buried hydrocarbon Steel pipeline of minimum executed value of Rs. 66 Lakh of 4 NB Tender condtion prevails 7 Alignment Sheet/ Survey Drawing/ Proposed Drawing for Pipeline Laying. Kindly provide Alignment Sheet/ Survey Drawing/ Proposed Drawing for Pipeline Laying. 8 Criteria to take HDD measurement. Kindly clarify Criteria to take HDD measurement. It will be It will be taken from pit to pit taken from pit to pit or actual MDPE pipe laid or actual MDPE pipe laid. 9 SOR No.- 5.1:- Quantity of G.I. Earthing rod (65mm x 3mtr.) Kindly clarify is not mention in SOR. The PE pipeline laying is to be executed in North Goa GA. The route deatil shall be shared with successful bidder. The measurement of laying by HDD shall be from entry pit to exdit pit The SOR No.- 5.1, 5.2 are deleted from SOR. Kindly refer Corrigendum. Page 1 of 2

8 Annexure-III GOA NATURAL GAS PVT. LTD. CGD PROJECT AT NORTH GOA Reply to Bidder's Queries-I for LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA-TWO YEARS ARC Tender Doc. No.: 05/51/23SA/GNGPL/001D-ii Sl. No. Ref. Clause no/ Tender Doc/Page No. Details Query GNGPL/ MECON's Reply 10 Drawing of Earthing Pit. Kindly provide Drawing of Earthing Pit Construction of earthing pit is not kept in this tender scope We have successfully laid, tested kms of MDPE pipeline in Old Goa & Ponda and line is ready for commercial use. However due to non availability of DRS & natural gas, MDPE pipeline network is awaiting for commissioning. Normally GAIL/ Mecon except line completed and ready for commercial use as acceptable PQ. We request you to amend the clause in tender technical qualification accordingly. We have successfully commissioned GAIL steel pipeline project in Bangalore (Karnataka) and we are also bidding in GNGPL steel pipeline tenders. As you know that installation of steel pipeline has critical and too many procedures as compared to MDPE pipeline. Hence we request you to accept steel pipeline qualification also for Technical PQ. Therefore, we request you that kindly change your Technical qualification criteria clause on basis of above mention points and consider us for bidding in GNGPL TENDER "LAYING OF UNDERGROUND PE PIPELINES AT ROCKY AREA IN NORTH GOA GA- TWO YEAR ARC (Bid Document No.: 05/51/23SA/GNGPL/001D-ii)". Tender condtion prevails 12 In the SOR There is no item mention in SOR regarding water body crossing in Goa by using Trenchless (HDD). It is request you to kindly Tender condtion prevails add this item sepreatly in SOR so that bidder can quoted this item. 13 You are requested to kindly estimate rate for HDD in rockey strata as per difficulty of rock in Goa. Goa has Hard rockey strata which will need different rate for work. Tender condtion prevails Note: Any addendum/corrigendum/clarifications shall be integral part of the Bidding Documents and shall be submitted by bidders duly signed & stamped in their bid. Page 2 of 2