OUTDOOR FOOTBALL FIELD

Size: px
Start display at page:

Download "OUTDOOR FOOTBALL FIELD"

Transcription

1 integated systems www integalspo com APPLICATION AREAS Mini football fields, pivate buildings, pivate schools and pivate businesses and public entepises SYSTEM DESCRIPTION: Mini footbal fields with composite steel constuction and synthetic tuf floo, the ceiling and the sides ae suounded with netting. FEATURES: Small football fields ae convenient 5-a-side and 8-a-side football. It offes safety and comfotable playing on FIFA appoved synthetic tuf and suounding nets ae on the sides and the ceiling. OUTDOOR FOOTBALL FIELD

2 integated systems www integalspo com Field Sizes Concete Wall Wate Dainage Width: M Width: 30 CM Height: 50 CM Gavel (25 CM) TECHNICAL INFORMATION Dainage pipes ae placed into concete wall at 8 metes intevals in gavel floo. Fixed system, Scewed system Length: M C25- C30 Concete Concete (15 CM) Wate is evacuated fom suface by % 0.05 slope on concete floos. Suppot poles and diagonal connections Panel Fence Height. 6-8 M Asphalt 9 CM Wate is evacuated fom suface by % 0.05 slope on asphalt floos. Length: Accoding to poject Height:6-8 M Optional 100 % Polyamid thead Pcs 40 MM, 50 MM, 55 MM, 60 MM, Goal Posts Side s 12x12 CM 400 W Metal Halogen Lamps High UV esistance between -30 C +50 C Goal Posts Gey EPDM Ganule, Geen EPDM Ganule, Potective, Scoe Boad Ceiling s :15x15 CM 200 W LED Fibilated Monofilament 3d geneation 4th geneation Scoe Boad Concete Wall INSTALLATION METHOD The mould must be made vey smoothly by using plywood plates. The gound must be compacted well and levelled. Gavel layes must be speaded equally on the gound and must be levelled. Thee must not be cougation on concete o asphalt sufaces. Modula System : It must be poduced in factoy conditions. Fixed system: It must be connected by welding machines in the poject aea. It is fixed to the constuction fom outside of the field at cetain intevals with special connecting wies. Panel systems ae fixed to the constuction by special clips. It is bonded by polyamide theads with a special bonding way. lamps ae adjusted and installed to lighten eveywhee of the playing aea. Atificial gass capets ae glued with polyeste tape and special PU glue which has high esistance to UV lights and manufactued accoding to football pefomance fom special PE poducts.all capets ae joined in the socce field.white gass colou which is weaved in the factoy fo lines ae placed. Aſte that silica sand and sb ganules ae filled accoding to FIFA standads.the last stage is bushing the field and the field becomes eady fo playing.

3 integated systems www integalspo com Standad: Geen Optional : All RAL codes Standad:Geen COLORS Standad:White Optional: Black Standad: Geen Optional: Light Geen, Dak Geen, Blue, Red, Yellow Felt Ganules Glue Silica Sand Othes Adhesive and Deivative Othe Mateials Between +5 ~ +30 C Between -10 ~ + 40 C ADVANTAGES Resistance against wind and snow Stong constuction with suppot poles Galvanized and PVC coated wie fence, it has elasticity to potect playes and stengthened with a steel wie. Resistance to ball hits, having exta thead intense in goal posts fo ball hit and tuning to pevious shape aſte hiting. Low cost lighting,patial lighting featue, esistance fo outside weathe conditions. Cental electic system,cable and lighting which have esistance fo outside weathe conditions. The closest pefomance to natual gass, low isk of injuy, 24 hous can be played on, zeba colo option is available. Pepaed in special sizes and bonded. 3M - 6M widths in olls Sack 4 M in olls and bonded. 2 M in olls and bonded. in 50Kg /1000 Kg big sacks 21+4 KG in buckles. in 50 Kg/1000 Kg sacks in special size boxes PRODUCT PACKAGING in diffeent types, palletised, sack o othe types. PRODUCT STORAGE

4 integated systems www integalspo com and Painting PRODUCTION AND INSTALLATION PERIODS Poduction: 3 Days Installation : 10 days Poduction: 4 Days Installation : 5 days Poduction: 3 Days Poduction: 7 Days Supply: 2 Days Poduction: 10 Days Installation : 7 days Poduction: 2 Days Installation : 1 day can't wok simultaneously. can't wok simultaneously. Painting 5 Yeas 1-10 Yeas 3 Yeas 2-5 Yeas 2 Yeas 5-7 Yeas 2 Yeas WARRANTY PERIODS Snow and wind diffe fom aea to aea. 10 Yeas of waanty if it is galvanized. Wie fence may have cambes due to ball hits. It must be coected by maintenance. Goal post net: 2 yeas Side and Ceiling net: 5 yeas depends on the thickness and type.

5 OUTDOOR FOOTBALL FIELDS EXAMPLES OF APPLICATIONS integated systems