1 BILL OF QUANTITY Name of Work:- Estimate for renovation of S.D.O, No.I Office, Old Control Room of accommodation of E.E, BNED, Bhadrak for Latrine & Bathroom. PART-A Estimated: - Rs. 1, 83, 650/- Time of Completion:- Class of Contractor:- D & above Sl.No Description Qnty Unit Rate Word Figure Single under reamed pile foundation with 1 RCC M20 using 12mm Size black hard granite chips including cost of boring, but excluding cost of M.S/Tor steel and labour charges of cutting bending, binding of steels. (250 mm dia 2mm depth) including curing etc complete 2 RCC M 20 using 20mm and down graded chips including cost of materials & carriage charges (Grade Beam) including curing etc complete 3 m.s Reinforamcement in RCC works including cutting bending, binding and tying with cost of 18 to 20 gauge binding wire cost of M.S road & carriage charges. (Pile) 8 Nos Nos 5.65 Cum Cum 6.04 qntl qntl

2 4 Rigid smooth centering and shuttering for RCC works including false works & dismantling them after casting etc all sqm sqm complete. 5 Supplying all materials, labour T & P for brick work with K.B brick in cm 1:6 in 9.84 Cum Cum super structure including the cost of materials & carriage charges including curing etc complete. 6 Supplying all materials, labour T & P for brick work with K.B brick in cm 1:6 in super structure including the cost of 2.57 Cum Cum materials & carriage charge including curing etc complete cm thick grading core (1:2:2) on roof slab with 6 mm size head granite chips on sqm sqm new works including curing etc complete 8 Supplying all materials, labour, T & P for 12mm thick C.P (1:6) including the cost sqm sqm of materials & carriage charges including curing etc complete. 9 Supplying all materials, labour, T & P for cement washing one coat on plaster with sqm sqm shell lime etc qnty. On above Sl. No Supplying all materials, labour, T & P for finishing wall surface with two coats of water proof cement paint of approveds shade on new work. 11 Supplying all materials, labour, T & P for fitting and fixing of PVC door with PVC chaukhat with cc (1:2:4) including cost of carriage etc all complete 3.62 sqm sqm

3 12 Supplying all materials, labour, T & P for fitting F & P with filling sand including watering ramming to proper density with cost of conveyance royalty & labour charges etc 13 Supplying all materials, Labour, T & P for cc (1:4:8) with 40 mm c.b.h.g metal cost including curing etc complete 0.90 Cum Cum 1.35 cum cum 14 Supplying all materials labour, T & P for 2.5cm thick A.S flooring with 1:2:4 including punning using 12mm c.b.h.g with watering,curing cost conveyance royalty etc all complete sqm sqm 15 Supplying al materials labour T & P for fitting and fixing of glazed tile (2-0 x2-0 ) on floor and walls on 25mm thick bed of cm 1:1 jointed with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of glazed tiles. A. Floor 9.47 Sqm Sqm B. Wall 24.71sqm sqm 16 Supplying all materials, labour, T &P for cutting grovesin pucca floor and walls for taking PVC/G.I pipes making good to the damages 21 mtr mtr

4 17 Supplying all materials, for providing & fixing to wall and floor PVC-classiv confirming to is 4985 and pipe fittings of the following nominal bore with clamps including making good to the wall and floor etc. all complete a) 1 PVC Pipe (Scl80) ori plast 25 Mtr Mtr b) ¾ PVC Pipe (scl 80) ori Plast 8 Mtr Mtr c) 1/2 PVC Pipe (scl 80) ori Plast 18 Mtr Mtr

5 18 Supplying all materials, for fitting & fixing of the following including cost of all materials etc.all complete. a) 23 Orissa pan (Hindustan Make including 2 No p trap etc 2 Nos.) EACH b) 22 x 16 wash basin (Hindustan make) 2 No EACH including all complete c) 10 Ltr L.L PVC cistern 2 Nos including all 2 No EACH complete d) Sqatting urinal including 1 No EACH e) Standing urinal (bowl type) 1 Nos 1 No EACH f) c.p shower with 2 nos 2 No EACH g) c.p towel red (24 long) 2 nos 2 No EACH h) 24 x18 mirror (ply wood sheet) 2 Nos 2 No EACH i) ½ c.p angular stop cock 3 nos 3 Nos EACH j) ½ c.p long body bibcock 4 Nos 4 Nos EACH k) 1 G.M full way value 1 No 1 No EACH l) 4 (110mm) PVC O.D pipe (6kgf/cm2) 22 Mtr Mtr plast 22 mtrs) m) 4 PVC Cowl 2 Nos 2 No EACH n) 4 PVC Door Tel 2 Nos 2 No EACH o) 4 PVC D/J Door Tel 1 Nos 1 No EACH

6 19 Supplying all labour T & P for construction of man hole chamber size (5-0 x5-0 x5-2 Nos Nos 0 ) & 10 thickness including cc 1:2: 4 & cc 1:4:8 with all complete as per P.H specification & direction of engineer in charge 20 Supplying all materials, labour, T & P for fixing wall surface with 2 coats of distemper paint of approved shade on new work sqm sqm

7 BILL OF QUANTITY Name of Work:- Estimate for renovation of S.D.O, No.I Office, Old Control Room of accommodation of E.E, BNED, Bhadrak, Brick Work, and A.S flooring Tile old control room of Bathroom and Latrine. PART-B Estimated Cost:- Rs. 1, 55,500/- Time of Completion:- Class of Contractor:- D & above Sl.No Description Qnty Unit Rate Word Figure 1 dismantling of brick works including window etc all complete 2 brick works with K.B Bricks in cm (1:6) in F & P including the cost of materials & carriage charges. 3 Supplying all materials, labour T& P for 12 mm thick cp (1:6) including cost of materials & carriage charge 0.35 cum cum 5.47 Cum Cum sqm sqm

8 4 5 6 dismantling of A.S flooring including stacking the useful materials for re-sue and removing the derricks within 50mm lead old control room, Account room, counter, Sec-II Open space,veranda 25mm thicks A.S flooring (1:2:4)including punning using 12mm size c.bh.g chips with watering curing including cost of carriage royalty etc all complete only on above sl. No. 4 Supplying all materials, labour, T & P for fixing of glazed tiles (2-0 x2-0 ) in floor on 25mm thicks bed of cm 1:1 jointed with neat cement slurry mixed wiyh pigment to match thye shades of the tiles including rubbing and polishing complete including cost of materials etc floor old control room, account room, Counter, Sec-II open space, Veranda sqm sqm sqm sqm sqm sqm

9 BILL OF QUANTITY Name of Work:- Estimate for renovation of S.D.O, No.I Office, Old Control Room of accommodation of E.E, BNED, Bhadrak, Colour washing, tile flooring of all doors & windows with electrification. PART-C Estimated Cost: - Rs. 1, 45,950/- Time of Completion:- Class of Contractor:- D & above Sl.No Description Qnty Unit Rate Word Figure 1 cement paint in 2 coats of water proofing including cost of materials etc all complete. 2 Supplying all materials, labour T & P for distempering on wall ceiling in approved paint including cost of distemper etc all complete 3 Supplying all materials, labour T& P for fitting & fixing of aluminum door & windows with glass and 9mm thick solid board with door closer aluminum syding with glass including cost of all materials and labour charges all complete sqm sqm sqm sqm sft sft

10 4 5 6 Supplying all materials, Labour, T & P fitting & fixing of MS grill and Ms door with Chaukhata cc (1:2:4) including cost of carriage etc all complete. Supplying painting two coats over one coat primer with approved primer and paints all complete laour charges same as item number 10 i.e Supplying all labour T & P for wiring Division Office building with repudiated make materials, tube CFL bulb main switch MCB and (Cona) 5 pin socket switch finolex wire, cashing taping wiring and cashing pipe, cashing board kit kat fuse. Change over all complete labour charge Kg Kg sqm Sqm L.S 1 Set 1 Set