Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications

Size: px
Start display at page:

Download "Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications"

Transcription

1 Carter's Oshkosh (SIS) # The Center at Pearland Parkway - Pearland, TX Scope Of Work / Bid Qualifications Please fill out the blanks associated with your trade scope or work with the words "Yes" or "No" and submit with your bid proposal. Most of your blanks should have the word "Yes" in them to have a fully qualified bid. Concrete Structural Steel Framing and Drywall Provide doweling, vapor barrier, re-bar, concrete, and labor as required to in-fill existing slab leave out at the rear of the space per note 3 on sheet A0.1 (Approximately 50' x 5' = 250 SF) Furnish and install new steel angles, plates, etc. as required to support (2) new RTU's per details on structural drawings S-001 and S-002 Confirm that your bid includes the cost for all field welding of steel members per drawings Confirm that your bid includes providing all equipment, lifts, materials, tools, and labor as required to complete the steel scope of work. Does your bid include the cost for a 3rd party inspection for steel? Does your bid include the cost for all tape / float / finish of new drywall to paint ready condition? Furnish and install new framing, sound batt insulation, and drywall (both sides) for new demising walls per note 7 and wall type 1/A5.1 on sheet A1.1 Furnish and install new drywall on existing metal studs at rear wall and front wall per note 27 on sheet A1.1 Furnish and install new framing and drywall at new sales / stock walls per drawings Furnish and install new framing and drywall at new hall walls per drawings Furnish and install new framing and drywall at new office walls per drawings Furnish and install new framing and drywall at new sales area corner bumpouts per drawings Furnish and install new framing and drywall at new display walls per drawings Furnish and install new framing and drywall at new fitting room walls per drawings Furnish and install new framing and drywall at new sales area wing walls per drawings Furnish and install new framing and drywall at new column furrouts per drawings Furnish and install new framing and drywall for mop sink wing walls and water heater platform Furnish and install new plywood on top of water heater platform per detail 8 on A5.2 Confirm that all walls are figured to be built per wall sections on sheets A5.1 and connection details on sheet A5.2 Confirm that your bid includes providing and installing insulation in walls that call for it per wall sections on sheets A5.1 and A5.2 Furnish and install in-wall blocking for toilet room accessories per elevations on A3.3 Furnish and install plywood backer board for security equipment per elevation 2 on A3.4 Furnish and install new in-wall blocking for new drinking fountain per elevation 6 on A3.4 Furnish and install in-wall blocking for fitting room accessories per elevations on A3.6 Furnish and install new plywood backer for new mop sink faucet per detail 8 on A5.2

2 Acoustical Ceilings Furnish and install new 2 x 4 acoustical ceiling grid and tile per ceiling type CL1 on sheet A2.1 Confirm that your bid is based on using either Armstrong Ultima #1913 or USG Mars Clima Plus #88185 ceiling tiles per CL1 on sheet A2.1 (No substitutions) Confirm that your bid includes 2 additional tie wires per each 2 x 4 and 2 x 2 light fixtures. (Approx. 132 wires)

3 Glass and Glazing Provide labor and equipment as required to remove portion of existing storefront system and entry door per note 2 on sheet A0.1 Furnish and install new glazing channels and glass as required for new side lites and transom per note 2 on sheet A3.1 Furnish and install new pair of entry doors and all associated hardware per note 1 on sheet A3.1 and door schedule on sheet C1.2 (Owner will provide and install Record Automatic Openers) Flooring Painting Install owner provided vinyl plank at sales area (Owner provides adhesive) (Approx. 4,216 SF) Install owner provided vct stockroom, office, and hallway (Approx. 641 SF) Install owner provided vinyl base at stockroom, office, and hallway (Approx. 156 LF) Install owner provided sheet vinyl with integral cove base and heat welded seams at (2) toilet rooms Provide (9) moisture tests prior to installing flooring Provide labor as required to install (1) new entry mat per drawings Provide an ALTERNATE PRICE to skim coat concrete slab to prep for new flooring material (If included, please breakout) sanding) Does your bid include the cost for all tape / float / finish of new drywall to paint ready condition? Provide labor and materials as required to paint all interior walls per drawings Provide labor and materials as required to paint all doors / frames per door schedule Provide labor and materials as required to paint all drywall soffits per drawings Provide labor and materials to putty, caulk, and (2) coats of paint for 1" x 4" trim around the perimeter of the sales area per elevations on A3.2 Provide labor and materials to putty, caulk, and (2) coats of paint for trim, WD3, and wall caps at backwrap area per details on sheet A3.2, A4.1, and A4.2 Provide labor and materials to putty, caulk, and (2) coats of paint on wood base at sales area

4 Plumbing Furnish and install (2) new "Toto" toilets (No substitutions) with all required piping and accessories per plumbing drawings and specifications on sheet P1.0 Furnish and install (2) new lavs and faucets with all required piping and accessories per plumbing drawings and specifications on sheet P1.0 Furnish and install (2) new floor drains with trap primers and all required piping and accessories per plumbing drawings and specifications on sheet P1.0 Furnish and install new water heater w/ expansion tank and all required piping and accessories per plumbing drawings and specifications on sheet P1.0 Furnish and install new mop sink w/ faucet and all required piping and accessories per plumbing drawings and specifications on sheet P1.0 Furnish and install new drinking fountain with all required piping and accessories per plumbing drawings and specifications on sheet P1.0 Furnish and install all required floor and wall clean-outs as required per drawings Furnish all required fittings, valves, piping, supply lines, traps, etc. as required Confirm that your bid is based on all water piping being done in copper (No CPVC or Pex) Did you include cutting or patching the concrete as required for underground work? Did you include the cost for plumbing permit? If not, do you know about how much it will run? HVAC Provide labor and equipment as required to cut open existing metal deck for (2) new RTU openings Furnish and install (2) new RTU's (RTU-1 and RTU-2) with all scheduled accessories per note 1 on sheet M1.0 and equipment schedule on sheet M1.0 Furnish and install new curbs for RTU's per note in equipment schedule on sheet M1.0 Furnish and install gas piping with associated gas pipe supports from existing gas meter location to (2) new RTU's per notes 5, 6, and 7 on sheet M1.0. (Note: the existing gas meter is approximately 85' of pipe length away from the location where note 6 is on our drawings. Total pipe length will be about 135') Furnish and install new condensate drain piping for (2) new RTU's per note 2 on sheet M1.0 Provide labor and material as required to change filters on (2) RTU's at the end of construction Furnish and install (2) new "Lightstat" TME-POI thermostats (No substitutions) per note 3 on M1.0 Furnish and install all low voltage control wiring as required for thermostats Furnish and install all new rectangular and round externally insulated metal ductwork as specified per layout and sizes shown on sheet M1.0 Furnish and install new flex ductwork as required from branch ducts to diffusers per sheet M1.0 Furnish and install all new diffusers as specified on the drawing M1.0 and scheduled on M1.0 Furnish and install all new return air and transfer grilles as specified on the drawing M1.0 and as scheduled on M1.0 Furnish and install (2) new exhaust fans (TEF-1 and TEF-2) and associated exhaust ductwork through roof per notes 12 and 13 on M1.0 and as scheduled on M1.0 Furnish and install manual volume dampers at all branch lines Provide certified air balance per CFM ratings shown on M1.0 Confirm that your bid includes providing your own scissor lift as required for your scope of work? Confirm that your bid includes providing a crane as required to set the new RTU's. Did you include the costs for HVAC permits? If not, how much do you think it is?

5 Electrical Provide labor and material as required to provide temporary lighting and a temporary outlet for power Provide conduits, boxes, and labor as required to extend the existing feeder conduit to the new panel location (Approximately 25') Furnish and install new feeder wire from the existing disconnect switch on the building to the new panel locations (Approximately 50') Furnish and install (2) new electrical panels (Panel "HA" and Panel "LA") with all associated breakers and wiring per notes 6, 7, 10, and 11 on sheet E0.0 Furnish and install new 30 KVA transformer with all associated conduits and wiring per notes 8 and 9 on sheet E0.0 Provide labor and wiring as required to install new lighting control panel (Provided by Lakeview) Deduct if you included the Lighting Control Panel as Lakeview will purchase this directly Furnish and install new conduits, boxes, wiring, disconnect switch, and final connection for (2) new RTU's per mechanical equipment schedule on sheet E2.0 Furnish and install all new conduits, boxes, wiring, and receptacles as required for all new outlets per electrical drawings Furnish and install all new conduits, boxes, wiring, and devices as required for all new switches and occupancy sensors per electrical drawings. Furnish and install all new wiring and final connections to (2) new exhaust fans per mechanical equipment schedule on sheet E2.0 Furnish and install all new conduits, boxes, and pull-strings as required for all new phone and data devices per drawings (Low voltage wiring by others) Furnish and install all new conduit stubs, boxes, and pull-strings as required for all new speakers per drawings (Low voltage wiring by others) Furnish and install all new conduit stubs, boxes, and pull-strings as required for all new security devices per drawings (Low voltage wiring by others) Furnish and install conduits, boxes, wiring, and devices as required for new door buzzer system per note 7 on sheet E2.0 Furnish and install new conduits, boxes, wiring, switch, and final connection for new water heater per mechanical equipment schedule on sheet E2.0 Furnish and install new conduits, boxes, wiring, final connection, and installation of (2) new hand dryers at the toilet room. (Lakeview will provide the hand dryers) Furnish and install new conduits, boxes, and wiring as required for new storefront signage per drawings Furnish and install all miscellaneous wiring, devices, and connections as required per electrical drawings Furnish all conduits, wiring, boxes, and labor as required to install and wire all owner provided light fixtures and lamps per drawings. Does your bid include the cost to cut and patch the concrete as required for cash wrap conduits? Confirm that your bid includes providing your own scissor lift as required for your scope of work? Does your bid include the cost for the electrical permit? If not, do you know how much it will run? Fire Alarm Furnish and install all new fire alarm devices as required per mall requirements and local codes. Furnish and install all conduits, boxes, wiring, and devices as needed for complete installation. Confirm that your bid includes providing all required drawings and submittals. Confirm that your bid includes the cost for the permit fees as needed. Confirm that your bid includes providing all tools, equipment, lifts, materials, and labor as needed to complete your scope of work. Confirm that your bid includes providing all required tie-in to the mall main fire alarm system. Confirm that your bid includes all required testing, programming, and inspections as required.

6 Have you ever worked at The Center at Pearland Parkway before?

7 Sprinkler Did you do a site visit prior to submitting a bid for this project? Have you ever worked at The Center at Pearland Parkway before? Confirm that your bid includes the cost to relocate and add new heads as required for store layout. Confirm that your bid includes the cost for drawings as required for permit? Confirm that your bid includes the cost for permit fees? Confirm that your bid includes the cost for all required inspections? Confirm that your bid includes the cost for all required hydraulic calculations if required by local jurisdiction? Does the local jurisdiction require a hydro test at the completion of project? If so, please confirm that your bid includes all costs associated with this work? Confirm that your bid includes providing your own scissor lift as required for your scope of work? What is your hourly rate for time and material work? Roofing Provide labor and materials as required to flash in (2) new RTU curbs (Approximately 8' x 5' curbs each) Provide labor and materials as required to flash in (1) new exhaust duct curb (Approximately 12" x 12") Provide labor and materials as required to flash in (1) new (4") plumbing vent pipe