D D D. Worktrrite-Up and Bid DocumentlBy Trade. Lorrie & Bernie Debord Crystal Lane Tahlequah, OK (918)

Size: px
Start display at page:

Download "D D D. Worktrrite-Up and Bid DocumentlBy Trade. Lorrie & Bernie Debord Crystal Lane Tahlequah, OK (918)"

Transcription

1 ~ 'ix~"('i~ ::::'~~'; ~"",'N. ;,~:.!(;;:;'t!~ ;;;;' ;;'.r;.;;.."f!.~:;;;ky;''i~y;,~., ;, ;:. ;:;,~':::if :1:;;;:;r;.~;;;::.~;;;;:.'t;';::;m~ ~.Y;, ;r;"'!'!..r;,,~:;;;;;,r~'t;,-:m:;';, ;' ;:S;;;;:;:::;";'!X:;;:;.~JKi.~;. 1;:.~.'i,,;:*.; ;i;'-';:;;;>>>:.=;;:;;;:;'~::;;' ;;:;.,'m'i;x;;;;' N;'~; ::K;X,~;;;:;X:i>!;:;';'~;;!. :;'~ ' ' = ;;!:'; ;~;;;:';'i.~'!.%~' ;;;", :;'\ :';:~~ ;;K'i;\.~r; K:::K:;.~;;.''i)i.;r:;;;.'.; ;;;.'~1,=;:~:;;'~:;;~Y:;,~.'!!.'~~; X;;;;:;.~'f.';~:':"~~::::;:' 'X.'.:";;:;;~;Y;;';.';";.';';;';'=;;, ;;. m"""'~':~';>;;;:.\.. :::;~ ;;;;g:::».;':;,:.;;: ;;"'~~;x:":;. :;~,' :;;'i{i; ;;:;;:;i:;;;:;.=. Worktrrite-Up and Bid ocumentlby Trade Lorrie & Bernie ebord 1206 Crystal Lane Tahlequah, OK (918) Contractor Name: Contractor Signature: This document must be signed to be a valid bid. PROJECT TYPE: Rehabilitation Bid ue ate: Appliances 1 Area: KTCHEN ishwasher/nstall new. nstall new Energy Star certified dishwasher. iv.# 10.F. 2 Area: KTCHEN iv.# 10.F Oven/Range/Gas/30"/Free Standing. nstall new 30" free standing gas range/oven with clock, oven window and one-year manufacturer's warranty. 3 Area: KTCHEN iv.# 10.F Refrigerator/Top Freezer/Energy Star/18.2 C.F. Mimium Sizellnstall new. nstall new 18.2 C.F. (minimum size) refrigerator with top freezer. Must be Energy Star compliant. 4 Area: KTCHEN iv.# Vent-A-Hood/36"/Ext. Ventedllnstall new kitchen vent-a-hood (ext.vent)/36" Carpentry 5 Area: KTCHEN iv.# Base Cabinets/Replace/Oak. Replace base cabinets with new cabinets, pre-finished oak. 14 LF Print ate: Thursday, March 8, Crystal Lane Tahlequah, OK Page 10[8

2 Carpentry 6 Area: ENTRE STRUCTURE iv.# 6.N Base Trim/Pine Colonial 2-1/4" Solid/Replace. Replace base trim, colonial, solid pine,2-1/4". BOO F 7 Area: EXTEROR iv.# 6.p. Corner Boards/Replace/2" x 6"/Pressure Treated. Replace corner boards with new pressure treated 2" x 6". Work shall include prime (1 coat) and paint (2 coats) to match existing. Replace corner boards in rear of home, match existing. 8 Area: KTCHEN iv.# BSF Countertop/laminate/Replace. Remove existing countertop and replace with new laminate countertop and backsplash. 9 Area: EXTEROR iv.# B.A. oor/exterior/6-panel Steel/Pre-Hung/Replace. Replace exterior entrance door with new pre-hung-steel six panel door. Work shall include paint-both sides, lockset, deadbolt & peephole. 60lF 10 Area: KTCHEN iv.# 10.G Fire Extinguisherllnstall. nstall new fire extinguisher. 11 Area: EXTEROR iv.# B.C Garage Vehicle oor/steel/16' x T/Replace. Replace existing garage vehicle door with new steel overhead garage vehicle door--16' X T. 12 Area: BATHROOM #1 iv.# 10.E. Mirror/Beveled Glass/Replace. Replace mirror with new beveled glass mirror. Repair all surfaces to match existing. 1BSF Print ate: Thursday, March 8, Crystal Lane Tahlequah, OK Page2of8

3 Carpentry 13 Area: BATHROOM #1' iv.# 10.E. 2. Paper Holder/Replace paper holder 14 Area: NTEROR iv.# 8.A Passage oor, Jamb & Trim/Pre-Hung/6-Pane/Replace passage door & lockset with new pre-hung 6-Panel. Work shall include paint both sides. 2 Ea 12 Ea 15 Area: EXTEROR iv.# 15 Siding/lap Siding/Remove existing lap siding. Replace all damaged siding. 16 Area: EXTEROR iv.# 8.B Storm oorninyl Clad. Replace storm/screen door with new vinyl clad storing storm door. 17 Area: BATHROOM #1 iv.# 10.E. 2. Towel Bar/Replace. Replace exising towell bar with new towel bar. Match existing size or as specified in Comments below. 18 Area: BATHROOM #1 iv.# 6.0 6lF Vanity Base Cabinet/Pre-Finished Oak. Replace existing vanity with new pre-finished oak vanity base cabinet. ' 19 Area: KTCHEN iv.# Wall Hung Cabinets/Replace/Pre-Finished pre-finished oak cabinet(s). Oak. Replace wall hung cabinet(s) with new 60SF 14 F Print ate: Thursday, March 8, Crystal Lane Tahlequah, OK Page 3 0/8

4 Trade Work escription / Comments Gen. Spec. Qty Unit ltembid Carpentry 20 Area: EXTEROR iv.# 8.G Window/ReplaceNinylThermopane/Low-E. Replace window with new Solid Vinyl window/single hung. Use Am. Craftsman Series 2160-Vinyl or written approved equal. nclude frame, sill, sash, trim, hardware, screen, repair & paint of int. and ext. surfaces. rywall & Finish 21 Area: ENTRE STRUCTURE iv.# 9.0. rywall/ceiling Or Wall/Small Area/Replace 1/2". Replace small area of drywall with new 1/2" drywall. Work shall include tape, bed, texture and paint to match existing as closely as possible. Repair and replace in living room and interior of home. Electrical 22 Area: NTEROR iv.# B Ceiling Fan, Light Kit & Circuit Wiring/52". nstall new ceiling fan (52" w/lifetime warranty) with light kit, switch, cover plate and wiring. 23 Area: ENTRE STRUCTURE iv.# Cover Plate/Outlet/ nstall new outlet cover plate 24 Area: ENTRE STRUCTURE iv.# Cover Plate/Switch/nstall 25 Area: UTLTY ROOM #1 ryer Outlet & Circuit/220v. new switch cover plate. nstall new 220 dryer outlet & circuit. iv.# Ea 256 SF 5 Ea 24Ea 10 Ea Print ate: Thursday, March 8, Crystal Lane Tahlequah, OK Page 4 0[8

5 Electrical 26 Area: BATHROOM #1 iv.# 13 Light Fixture/Bathroom/4 Light/Replace. Replace existing light fixture with new 4 Light/Globe, wall mounted light fixture. Replace in both bathrooms 27 Area: BATHROOM #1 iv.# Light Fixture/Heat-Vent-Light/lnstall new bathroom light (100 watt), heater (1450 watt), vent fan (70 CFM) and switch. Fan shall be vented out of attic to code. 28 Area: EXTEROR iv.# Light Fixture/Porch/Replace exterior porch light. 29 Area: HALLWAY #1 iv.# Light Fixture/Room/Replace. Replace existing light fixture with new 15 inch, round, flush mount, ceiling light fixture and 55 watt compact flourescant lighting. Fixture allowance $ Area: KTCHEN iv.# Light Fixture/Room/Replace. Replace existing light fixture with new 15 inch, round, flush mount, ceiling light fixture and 55 watt compact flourescant lighting. Fixture allowance $ Ea Print ate: Thursday, Marcil 8, Crystal Lane Tahlequah, OK Page S 0/8

6 Electrical o 31 Area: ENTRE STRUCTURE iv.# Ea 11 Smoke etector/battery Operatedllnstall new smoke detector, battery operated (10 year lithium battery). All bedrooms and hallways adjacent to bedrooms. Use Firex #4015 or written approved equal. nstall in all bedrooms, Flooring hallway and kitchen. 32 Area: ENTRE STRUCTURE iv.# 9.M Carpet & Pad/Level nstall in all bedrooms, Loop/26 oz.ll nstall new carpet (26 oz., level loop )and pad (15 oz.). hallway and living room. 33 Area: ENTRE STRUCTURE iv.# 9.L Vinyl Floor Tile. Replace existing flooring with new vinyl floor tile/12" x 12" x 1/8". nstall in bathrooms HVAC and laundry room. 34 Area: EXTEROR iv.# 12 HVAC EquipmentiCentral/HVAC/3 Ton. nstall HVAC equipment. AlC=13 SEER; HEAT=Furnace). NSE AN OUTSE EQUPMENTNCLUNG AR HANLER, COPPER LNES, CONENSOR COLS, EVAP. COLS. AN COMPRESSOR. Paint & Finish 35 Area: EXTEROR iv.# 9.N.4 Siding & Trim/Paint/Two Coats. Paint exterior siding & trim (two coats). oes include soffit & fascia. nclude cleaning, caulking and filling of small holes. NOTE:SF=WALL AREA. 115 SY 100SF o o 1250 SF o Print ate: Thursday, March 8, Crystal Lane Tahlequah, OK Page6of8

7 Trade Work escription / Comments. Gen. Spec. Qty Unit tem Bid Paint & Finish 36 Area: EXTEROR iv.# 9.N.3 Walls & Ceiling/Orywall/PaintlTwo coats. Paint walls & ceiling in entire area. Work shall include minor repairs to surfaces. SF=ACTUAL SURFACE AREA OF WALLS & CELNG. Plumbing 37 Area: BATHROOM #1 iv.# 11.A Bathtub-Shower Combination/Acrylic fiberglass/pre-fab/2 Piece. Replace existing bathtub/shower combination with new 2 piece acrylic fiberglas tub/shower unit. 38 Area: BATHROOM #1 iv.# 11.A Commode & Seat/nstall new commode, seat, supply line, shutoff and wax seal. Use American Standard Cadet or written approved equal. 39 Area: KTCHEN iv.# 11.A Faucet/Kitchen/Single Handle. Replace kitchen faucet with new single handle faucet, supply lines & shutoffs. 40 Area: BATHROOM #1 iv.# 11.A Lavitory FaucetNanity/lnstall new vanity faucet, drains, supply lines & shutoffs. 41 Area: BATHROOM #1 iv.# 11.A Shower Faucet & Oiverter/Single Lever/nstall new bath/shower faucet with diverter. Work shall include installation of pre-fab access panel or removal and replacement of wall materials on opposite wall to faucet SF Print ate: Thursday, Marcil 8, CrystaLLane Tahlequau, OK Page 70/8

8 Plumbing 42 Area: KTCHEN iv.# 11.A Sink & Faucet/Kitchen. nstall new stainless steel kitchen sink (33" x 22" x 7") & Faucet (Use elta single-handle model100-wf or written approved equal). Work shall include new drain lines, trap and shutoffs (2). 43 Area: NTEROR iv.# 11.A Water Heater/Gas/40 Gallon/Replace. Replace existing gas water heater with new 40 gal. gas water heater. Work shall include elevating to 18" (if in garage), replacement of TPR; all combustion air, gas & electrical hook-ups for code legal installation. Roofing 44 Area: EXTEROR iv.# 7.A. Roofing/Heritage/30 Year Warranty. nstall fiberglass shingles/minimum 30 year warranty/use Marlarkey/Tamko or written approved equal. 26Sq ' Remove and replace shingles, replace any damaged decking. Site Work 45 Area: ENTRE STRUCTURE iv.# 1250 SF Cleanup/Final. Final cleanup of entire Project. Remove all debris from yard and home. All construction shall be in accordance with local codes, manufacturers' recommended installation procedures, good quality workmanship practices, General Specifications and Lead- Based Paint requirements when applicable. Conflicts between requirements will be resolved by compliance with the more stringent requirement. Contractor awarded the job will be responsible for conducting safe work practices that comply with OSHA Construction Standards for Asbestos Workers. Asbestos report, where required, will be attached if areas tested are 1% or greater. See attached Asbestos Sampling Report for location and testing of Planned Work Activities. Total: Print ate: Thursday, March 8, Crystal Lane Tahlequah, OK Page 8 of8