Piping Accessories TCC-1. TCC-3 Pipe Penetration System. Pipe Penetration System TCC-5. Pipe Penetration System

Size: px
Start display at page:

Download "Piping Accessories TCC-1. TCC-3 Pipe Penetration System. Pipe Penetration System TCC-5. Pipe Penetration System"

Transcription

1 TCC-1 Pipe Penetration System TCC-3 Pipe Penetration System TCC-5 Pipe Penetration System 54 years of excellence

2 Table of Contents General Information 84 Specifications 85 Assembly Instructions years of excellence

3 General Information Pipe Roller Supports Thybar Corporation pipe roller supports are provided with painted roller, 18 threaded rods, nuts and spring nuts. Hold down brackets are optional. The support has a continuous wood nailer covered by removable counter flashing for an effective method of attaching roofing felts. Water-tight installation is assured. The equipment mounting supports are available in three basic styles as shown in this catalog. Optional Features 1. Equipment support height addition 2. Construction to fit roof pitches 3. Chemically treated wood nailers 4. Several rollers may be lined up horizontally or vertically 5. Equipment support may be any length to suit conditions Dektite Pipe Flashings Made of long life, flexible, weatherproof gray EPDM rubber or silicone Flexible, corrosion resistant aluminum base conforms to any panel configuration EPDM and silicone will not crack or break Pipe diameter markings are clearly indicated for accurate fitting Designed for 1/4 to 24 diameter pipes One piece construction is easy to install Pleated cone adjusts to any roof pitch and allows for complete flexibility EPDM has a continuous service temperature range of -30ºF to + 250ºF Silicone has a continuous service temperature range of 40ºF to + 350ºF Proven resistance to ozone and ultra-violet light Graduated Boot Pipe Penetration Systems Thybar Corporation piping covers feature ABS Thermoplastic Korad Acrylic Cover, Graduated Boots Molded or Weather-Resistant Plastisol and (2) Stainless Steel Pipe Clamps per Boot. Available Configurations: 1. TCC-1: Collar Accommodates Pipes 6 to 10 nominal 2. TCC-3: 3 1/2 & 6 1/2 Collars Accommodates Pipes 1/2 to 5 nominal 3. TCC-5: 3 1/2 Collars Accommodates Pipes 1/2 to 2 1/2 nominal 54 years of excellence

4 Specifications TC-1, TC-2 Provided with 2 x 6 wood nailer. Prime G-90 galvanized steel 18 gauge Fully welded and mitered corners Base flange attachments for securing equipment mounting supports to the building structure 1 1/2 thick 3 lbs. density rigid insulation 3 cant with step for deck insulation 20 gauge insulted counter flashing cap AS A653/A653M TC-3 Provided with 2 x 6 wood nailer. Prime G-90 galvanized steel 18 gauge Fully welded and mitered corners Base flange attachments for securing equipment mounting supports to the building structure 1 1/2 thick 3 lbs. density rigid insulation 20 gauge insulted counter flashing cap AS A653/A653M 54 years of excellence

5 Assembly Instructions Piping roof curb assembly instructions are to be used as general guidelines only. Included with shipment are as-built drawings for proper location of sections and channels. Use as-built drawings to identify and locate match-marked sections (1-1, A-A, etc..) If Piping Accessory curb assembly will not be installed and roofed-in upon receipt, it is recommended that piping accessory should be stored level and adequately supported to avoid damage and, a clean, dry location to avoid possible corrosion problems associated with extended contact with the ground. If the piping accessory curb will be mounted on a new building, it can be assembled at any convenient location and installed as soon as the roof support members are in place. As a general rule, the curb should be placed directly on the roof support members, use tack welding (or other equivalent fastening method) to secure the curb in place. As an alternative, the roof curb can also be mounted on a roof deck. When a deck is used, be sure to provide additional blocking directly below the curb flanges to give further support and minimize vibration. Assembling Roof Curb 1. Select an area conveniently located near the unit installation site, and open the curb shipping carton(s). Verify that all materials, nuts, bolts and gasketing, were received. 2. Caulk all seams and fasten with self-drilling sheet metal screws. 3. Apply adhesive backed gasketing provided with curb to the entire perimeter of the top of roof curb. 4. Install piping cover. Note: These instructions are meant as a general guide only. Some variations may occur, refer to as-built drawings before proceeding. 54 years of excellence

6 TEMS-1 With Multiple Pipe Roller Assemblies Equipment Supports Deck Model Slope Remarks 54 years of excellence

7 TEMS-2 With Multiple Pipe Roller Assemblies Equipment Supports for Deck Model Slope Remarks 54 years of excellence

8 TEMS-3 With Multiple Pipe Roller Assemblies Equipment Supports Deck Model Slope Remarks 54 years of excellence

9 TCC-1 Pipe Penetration System ABS Thermoplastic Korad Acrylic Cover Collar Accommodate Pipes 6 to 10 Nominal Boots Graduated for Standard Pipe Sizes Boots Mold of Weather Resistant Plastisol 2 Stainless Steel Pipe Clamps Included per Boot Standard Features: Heavy gauge galvanized steel 2 X 2 Wood Nailer Model Slope Remarks 54 years of excellence

10 TCC-3 Pipe Penetration System ABS Thermoplastic Korad Acrylic Cover 3 1/2 & 6 1/2 Collars Accommodate Pipes 1/2 to 5 Nominal Boots Graduated for Standard Pipe Sizes Boots Mold of Weather Resistant Plastisol 2 Stainless Steel Pipe Clamps Included per Boot Standard Features: Heavy gauge galvanized steel 2 X 2 Wood Nailer Model Slope Remarks 54 years of excellence

11 TCC-5 Pipe Penetration System ABS Thermoplastic Korad Acrylic Cover 3 1/2 & 6 1/2 Collars Accommodate Pipes 1/2 to 5 Nominal Boots Graduated for Standard Pipe Sizes Boots Mold of Weather Resistant Plastisol 2 Stainless Steel Pipe Clamps Included per Boot Standard Features: Heavy gauge galvanized steel 2 X 2 Wood Nailer Model Slope Remarks 54 years of excellence

12 Pre-Fabricated Roof Curbs TC-1 Curb With TP-2 Piping Cover Standard Features: 1. Factory installed 2 x 6 wood nailer 2. Welded 18 gauge galvanized steel shell and base plate 3. 1 ½ thick, 3 lbs. rigid insulation 4. 1 Cap insulation 5. Fully mitered 3 cant with step for deck insulation gage counter flashing cap Model Slope Remarks 54 years of excellence

13 Pre-Fabricated Roof Curbs TC-2 Curb With TP-2 Piping Cover Model Slope Remarks 54 years of excellence

14 Pre-Fabricated Roof Curbs TC-3 Curb With TP-2 Piping Cover Model Slope Remarks 54 years of excellence

15 Vibro-Mate 54 years of excellence