1 ADDENDUM OSU and the A&M Systems Purchasing Department ADDENDUM P MWC ADDENDUM # 3 Issue Date: July 5, 2017 The Purpose of this Addendum # 3 is to provide Questions and Answers, Contractor Requirement Clarifications, A New Bid Form as a result of Addendum 2, and the Pre-Bid Conference Sign-In Sheet. Questions and Answers 1 Page Contractor Requirement Clarifications 1 Page New Bid Form 3 Pages o This new bid form replaces the bid form that was sent out with the original bid packet and should be used in its place, as Add Alternate 1 was removed by Addendum 2 Pre-Bid Conference Sign-In Sheet 1 Page All other specifications remain unchanged. All inquiries during the bid and evaluation process must be directed to the Buyer of Record, OSU and the A&M Systems Purchasing Department, by phone at , fax , purchase@okstate.edu, or if you are responding to an online solicitation please use the associated Question and Answer Board. Contact with the end user or department during the bid and evaluation process may disqualify bid. REVISION DATE ADDENDUM 1

2 P MWC ADDENDUM # 3 Questions and Answers 1 NOC Utility Extension Issue Date: July 5, 2017 QUESTION 1: Please confirm request for pricing for Alternate #1. I do not recall it being mentioned at pre-bid meeting. ANSWER 1: Alternate #1 was removed in Addendum #2. QUESTION 2: Project specification starting on page 8 of 247, reference Bid package #1 and Bid Package #2. Drawings only support Bid Package #1. Please confirm this bid is only for Bid Package #1. ANSWER 2: This bid package is for Bid Package #1 ONLY. QUESTION 3: Revised drawings that show Hot water and DCW entry and routing locations were said to be UPDATED and distributed this week. How will those drawings be incorporated into the bid documents and the current drawing(s) excluded? a. Will this drawing also identify complete Alternate #1? ANSWER 3: The drawings are incorporated as Addendum #2. (a) See answer #1. QUESTION 4: Natural Gas Line. Please identify desired separation of tasks between contractor and OSU in regards to piping, valves, valve boxes, bedding material, tracer wire, marking tape, backfill/compaction and as built drawings. ANSWER 4: When excavating the ductbank trench a bench should be excavated to the Natural Gas Line depth on the north side of the ductbank. When the ductbank is installed the OSU personnel will install the Natural Gas Line prior to the contractor backfilling the bench area on the north side of the trench. OSU personnel will install all Natural Gas Line components including the bedding material, marker tape and tracer wire. The OSU surveyor will as-built the Natural Gas Line. The contractor shall backfill and compact the excavated bench and trench. OSU personnel will be readily available to coordinate the work with the contractor. Questions and Answers Page 1 of 1

3 ADDENDUM June 29, 2017 OKLAHOMA STATE UNIVERSITY NOC UTILITIES PROJECT - BID PACKAGE NO. 1 PROJECT NUMBER: FRANKFURT-SHORT-BRUZA ASSOCIATES, P.C. ARCHITECTS-ENGINEERS-PLANNERS OKLAHOMA CITY, OKLAHOMA Items in this addendum take precedence over the original bid documents. Items not specifically revised remain in effect. This addendum consists of 1 page: Contractor Requirement Clarification This project will require working in electric vaults with energized feeders. To be awarded this project, the contractor shall have personnel with the required OSHA training for working in vaults with energized feeders. The contractor shall further ensure the required shielding be utilized, when necessary, while working in a vault with energized feeders. END OF ADDENDUM FSB/OKLAHOMA STATE UNIVERSITY NOC UTILITIES A

4 OSU and the A&M Systems Purchasing Department Bidders shall note that bid must be made on this form. Amounts of the Bid shall be completely filled in, both in figures and in writing. Enclose the bid form in a sealed envelope plainly marked and addressed as follows: 1. The name and address of the bidder shall appear on the upper left hand corner of the envelope 2. The lower left hand corner of the envelope shall be marked as follows: Bid for: NOC Utility Extension P MWC Bid Due Date and Time: July 7, 2017 at 3:00:00 PM CT 3. The envelope shall be addressed to: Chief Procurement Officer 1224 N Boomer Road Oklahoma State University Stillwater, Oklahoma Failure of the bidder to execute and submit the following forms with their proposal may result in disqualification of the bid: a) A Completed and Signed Bid Form (All Pages) b) A Completed, Signed, and Notarized Bid Affidavit c) A Completed and Signed Certificate of Compliance with Executive Order (as amended) d) Bid Securities with required Power-of-Attorney attached e) Proof of Commercial Licensing as required by law, if applicable, (see General Provisions A.30) f) All Other Documents as required by the Specifications, if any A copy of each of the documents is bound in the specifications. Should any bidder have questions concerning the execution of these forms, he should contact the Chief Procurement Officer, Oklahoma State University, Stillwater, OK Phone: _ REVISION DATE ADDENDUM 3-1

5 DATE: PROPOSAL OF: BUSINESS NAME (hereinafter called Bidder ), (a Corporation/ partnership/ an individual/ Other (Please specify) ) doing business as: TO: The Board of Regents for the Oklahoma Agricultural and Mechanical Colleges acting for and on behalf of Oklahoma State University, Stillwater, OK (hereinafter called Owner ) The Bidder, in compliance with your Invitation for Bids for Project: P MWC - NOC Utility Extension having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the work, including the availability of materials and supplies, and to perform the work required by the project in accordance with the contract documents, within the time set forth in Instructions to Bidders, and at the prices stated below. These prices are to cover all expenses incurred in performing the work required by the contract documents, of which this bid is a part. Bidder acknowledges receipt of the following addenda: (to acknowledge an addendum please record the addendum number and the issue date in the space provided below) Days required for completion of job days. (if required by Specifications, Please Specify) BASE BID Bidder agrees to perform all of the work described in the plans and specifications as being in the Base Bid for the sum of Dollars ($ ). (Amounts shall be shown in both words and figures. In case of discrepancy, the amount shown in words will govern.) REVISION DATE ADDENDUM 3-2

6 Respectfully Submitted, COMPANY NAME; REPRESENTATIVE: (Please Print Name & Title) ADDRESS: CITY, STATE, ZIP TELEPHONE FAX NUMBER: FEI/SS NUMBER: SIGNATURE: TYPE OF BUSINESS: PLEASE CHECK ALL THAT APPLY Large Business: Small Business: 1. Small Disadvantaged-Owned: 2. HUBZone Business: 3. Women-Owned: 4. Veteran-Owned: 5. Service Disabled Veteran-Owned: 6. Sheltered Workshop: 7. Historically Black Colleges & Universities: 8. Registered in System for Award Management (SAM): Yes: No: [END OF ] REVISION DATE ADDENDUM 3-3