1 ASBESTOS REINSPECTION REPORT Head Office 10 Atley Business Park Atley Way Cramlington NE23 1WP Hassocks DO, 36 Keymer Road, Hassocks, BN6 8AA J Reinspection Date: 18 May 2017 T E enquiries@ askams.co.uk W www. askams.co.uk Page 1 of 16 Re-inspections / J603525

2 Contents 1. Contract Review 2. Executive Summary (including non and limited accessed areas) 3. Introduction, Agreed Scope of Works, Exclusions and Caveats 4. Survey Findings Register 5. Management Recommendations 6. Asbestos Location Plan 7. Material Test Certificate Page 2 of 16 Re-inspections / J603525

3

4 2. Executive Summary Building / Floor / Room / Component Hassocks DO/G/Room 1/011 Boiler room /Presumed asbestos containing materials within 2 no. sealed live Atmo Gas boilers. Hassocks DO/R/Room 1/201 Loft /Redundant flue Hassocks DO/G/Room 2/003 Office /Asbestos containing materials within safe. Hassocks DO/E/Room 1/External /Damp proof course Hassocks DO/E/Room 1/External /Cement panels adjacent to loading bay. Hassocks DO/E/Room 1/External /Cement flue Sample 1 / Presumed {BM001471} 2 / as BN {BM001472} 3 / Presumed {BM001473} 4 / BN {BM001474} 5 / BN {BM001475} 6 / Strongly presumed as BN {BM001476} Asbestos Type (3) Crocidolite (3) Crocidolite Recommendation No Attention Required, Label No Attention Required, Label No Attention Required, Label No Attention Required, Label No Attention Required, Label No Attention Required, Label Please note: This summary should be read in conjunction with all sections of the report including appendices. CODE R O Y L G T B CH A CR "*" PRIORITY Urgent Removal - Poor condition, not adequately surface treated, vulnerable to damage Immediate Encapsulation Required - Some damage present and vulnerable to further damage but structurally sound. Repair or Remove (Label and arrange in the near future) - Some damage present and/or vulnerable to further damage, but not causing an immediate hazard Remove prior to refurbishment/demolition where the works will affect this material. If the material will be unaffected, it should be incorporated into the in-situ management plan. No Attention Required (Label and inspect at intervals) - Good/reasonable condition and adequately surface treated Inspection Required Prior to Disturbance (Further sampling/analysis) - Presumed asbestos material must be labelled and made known to all maintenance personnel Inaccessible - Inspect prior to disturbance Amosite Crocidolite Page 4 of 16 Re-inspections / J603525

5 3. Introduction and Scope of Works Royal Mail Group Limited commissioned ASKAMS Compliance Services Ltd to undertake a Reinspection Survey of Hassocks DO, 36 Keymer Road, Hassocks The purpose of the reinspection is to identify signs of disturbance, scratches, broken edges, cracked or peeling paint and debris to ACMS previously surveyed. Where deterioration has occurred, a recommendation on what remedial action to take will be made. The scope of the reinspection was defined by (PROJECT MANAGER) and Richard Bennion (Royal Mail Group Limited). This is listed in table 3.1. This report should be read in conjunction with the Service Level Agreement that is in place between ASKAMS Compliance Services Ltd and Royal Mail Group Limited.The document contains an Appendix which details the methodology under which this asbestos reinspection was undertaken. If other materials suspected of containing asbestos come to light during refurbishment or maintenance activities, then work should be stopped until the materials have been sampled and analysed by a laboratory accredited by UKAS for bulk sampling and fibre identification. Save as otherwise provided in the Agreement, pursuant to which the appointment was made, ASKAMS Compliance Services Ltd cannot be held responsible for any damage caused as part of this survey carried out on the Clients behalf. Areas of "No Access" are detailed in the Executive Summary and the Management Recommendations section of this report. Until such time as No Access areas can be subject to Management, Refurbishment or Demolition survey and suspect material analysed by competent persons, these areas should be regarded as containing presumed ACM and the appropriate management procedures should be implemented. Where suspect asbestos containing materials e.g. ceiling finishes, board materials etc exist no attempt (unless otherwise stated) will be made to investigate behind these materials. ASKAMS Compliance Services Ltd has a duty under Regulation 16 of the Control of Asbestos Regulations (2012) to prevent or reduce the spread of asbestos; penetration of such materials without appropriate control measures may be in contravention of this duty. The scope of this reinspection relates only to those Asbestos Containing Materials identified in the original survey report or register provided by the client. Items or areas not covered by this reinspection that are scheduled to undergo works that may result in the release of asbestos fibres should be investigated prior to commencement of such activities. Please note additional information, normally contained in ASKAMS Compliance Services Ltd survey reports has been omitted at the request of the client. This omitted information relates to sampling strategy, material scoring table and report bibliography. This condensed report does not contain any less site specific information than the non-abbreviated report format. Priority Risk Assessments It does not automatically follow that those materials assigned the highest score in the material risk assessment will be the materials that should be given priority for remiedial action. Management priority must be determined by carrying out a priority risk assessment, which will take into account factors such as Maintenance activities (including cleaning if appropriate) Likelihood of disturbance Page 5 of 16 Re-inspections / J603525

6 Human exposure potential Occupant activity or visitors to the building) A methodology for Priority Risk Assessments is described in HSE Guidance document HSG 227 A Comprehensive Guide to Managing Asbestos in Premises. The priority risk assessment can only be carried out with a detailed knowledge of the above factors. Although a surveyor may have some of the information which will contribute to the risk assessment and may be part of an assessment team, the Duty Holder under the Control of Asbestos at Regulations 2012 is required to make the risk assessments. The client should thus complete the priority risk assessments, or where ASKAMS Compliance Services Ltd has done these, confirm the validity of the priority assessments provided. Priority scores are ranked as follows: Priority assessment score Level of risk 10 or more High risk 7-9 Medium risk 5-6 Low risk 2-4 Very low risk Priority Risk Assessments (identified by "*" within this report) are not included in the UKAS accreditation schedule for our laboratory and are therefore not UKAS accredited. This report should not be reproduced except in full without the approval of ASKAMS Compliance Services Ltd and the client. Table 3.1 below lists all survey allowances and access requirements that have been agreed at the scoping stage with the client: 3.1 Scoping Table Reinspection Survey - Access Allowances The following access requirements have been agreed at Quotation Stage As part of a standard Management survey access into structural components of the building fabric will be automatically excluded from the survey scope. Should access be required into any of these locations then please ensure that these are indicated at the time of quotation. Scope of work Required Variation recorded by surveyor No surveyor variations noted during this survey. Page 6 of 16 Re-inspections / J603525

7 4. Survey Findings Register Building Floor / Room Item / Product Product Description Level Of Identification Sample Number Extent Product Type Material Condition Surface Treatment Fibre Identification Accessibility Material Assessment "*"Priority Ass. Score Hassocks DO Ground Floor / Room 1 (011 Boiler room) 1 Presumed asbestos containing materials within 2 no. sealed live Atmo Gas boilers. Identified Presumed {BM001471} 2no. (2) Asbestos ropes and textiles (0)Good Condition Surface Sealed (3) Crocidolite Low 6 5 Hassocks DO Ground Floor / Room 2 (003 Office) 3 Asbestos containing materials within safe. Identified Presumed {BM001473} 1no. (2) Asbestos insulating board (0)Good Condition Surface Sealed (3) Crocidolite Low 6 3 Hassocks DO Roof Void / Room 1 (201 Loft) 2 Redundant flue Identified as BN {BM001472} 1lm Asbestos Cement (0)Good Condition Surface Sealed Low 3 2 Hassocks DO External / Room 1 (External) 4 Damp proof course Identified BN {BM001474} 25lm Bitumen (0)Good Condition (0) Reinforced / well bound Low 2 2 Hassocks DO External / Room 1 (External) 5 Cement panels adjacent to loading bay. Identified BN {BM001475} 10m² Asbestos Cement (0)Good Condition Surface Sealed Low 3 6 Hassocks DO External / Room 1 (External) 6 Cement flue Identified Strongly presumed as BN {BM001476} 1lm Asbestos Cement (0)Good Condition Surface Sealed Low 3 3 Page 7 of 16 Re-inspections / J603525

8 5. Management Recommendations Building Information Description Age Construction Type Delivery Office 1950s Brick External Notes External Notes Downpipes Undertile Edging Fascia Boards Guttering Soffits Lining to Flat Roofs Damp Proof Course Roof Tiles / Slates Internal Notes Internal Notes Predominant Structure of Walls Throughout Predominant Structure of Ceilings Throughout Predominant Nature of Floors Throughout Models of Boilers Present Page 8 of 16 Re-inspections / J603525

9 Sample 1 / Presumed {BM001471} Product Type (2) Asbestos ropes and textiles Recommended Action Building Hassocks DO Damage / Deterioration (0)Good Condition Location Room 1 (011 Boiler room) Surface Treatment Surface Sealed Floor Ground Floor Accessibility Low Product Description Presumed asbestos containing materials within 2 no. sealed live Atmo Gas boilers. Material Risk 6 D - No Attention Required, Label. Fibre Identification (3) Crocidolite Occ Act Dist Exp Maint Activ Total Score Reinspection State No Change Room Information Comments Sample 3 / Presumed {BM001473} Product Type Building Location Hassocks DO Room 2 (003 Office) Damage / Deterioration Surface Treatment Floor Ground Floor Accessibility Low Product Description Fibre Identification Asbestos containing materials within safe. (3) Crocidolite Material Risk 6 Occ Act Dist (2) Asbestos insulating board (0)Good Condition Surface Sealed Exp Maint Activ Reinspection State No Change Room Information Comments Total Score Recommended Action D - No Attention Required, Label. Page 9 of 16 Re-inspections / J603525

10 Sample Building Location 2 / as BN {BM001472} Hassocks DO Room 1 (201 Loft) Product Type Damage / Deterioration Surface Treatment Floor Roof Void Accessibility Low Product Description Redundant flue Material Risk 3 Fibre Identification Occ Act Dist Asbestos Cement (0)Good Condition Surface Sealed Exp Maint Activ Reinspection State No Change Room Information Comments Total Score Recommended Action D - No Attention Required, Label. Sample 4 / BN {BM001474} Product Type Bitumen Building Location Hassocks DO Room 1 (External) Damage / Deterioration Surface Treatment Floor External Accessibility Low Product Description Damp proof course Material Risk 2 Fibre Identification Occ Act Dist (0)Good Condition (0)Reinforced / well bound Exp Maint Activ Reinspection State No Change Room Information Comments Total Score Recommended Action D - No Attention Required, Label. Page 10 of 16 Re-inspections / J603525

11 Sample 5 / BN {BM001475} Product Type Asbestos Cement Building Location Hassocks DO Room 1 (External) Damage / Deterioration Surface Treatment Floor External Accessibility Low Product Description Fibre Identification Cement panels adjacent to loading bay. Material Risk 3 Occ Act Dist (0)Good Condition Surface Sealed Exp Maint Activ Reinspection State No Change Room Information Comments Total Score Recommended Action D - No Attention Required, Label. Sample Building Location 6 / Strongly presumed as BN {BM001476} Hassocks DO Room 1 (External) Product Type Damage / Deterioration Surface Treatment Floor External Accessibility Low Product Description Cement flue Material Risk 3 Fibre Identification Occ Act Dist Asbestos Cement (0)Good Condition Surface Sealed Exp Maint Activ Reinspection State No Change Room Information Comments Total Score Recommended Action D - No Attention Required, Label. Page 11 of 16 Re-inspections / J603525

12 6. Asbestos Location Plan Page 12 of 16 Re-inspections / J603525

13

14

15

16 7. Material Test Certificate No Samples Taken Page 16 of 16 Re-inspections / J603525