SECTION B3 SERIES COS451 FRONT GLAZED STACKING SYSTEM

Size: px
Start display at page:

Download "SECTION B3 SERIES COS451 FRONT GLAZED STACKING SYSTEM"

Transcription

1 SECTION B SERIES COS51 FRONT GLAZED STACKING SYSTEM for STOREFRONT / WINDOW WALL x ½ for 1 GLASS ARCHITECTURAL DETAILS EXTERIOR GLAZED Effective October

2 INTERIOR GLAZED Effective October 01

3 SECTION B SERIES COS51 OFFSET GLAZE STACKING SYSTEM for STOREFRONT/WINDOW WALL " X ½" FOR 1" GLAZING TABLE OF CONTENTS SERIES COS51 System Features Typical Details...1 Corner and Column Cover Details...1 Offset Hung Doorframe Details Center Hung Doorframe Details...17 Wind Load and Dead Load Charts...18 CSI Specifications...S1 - S Effective October 01

4 SYSTEM FEATURES Series COS51 is an offset glazed multi-purpose storefront and window wall stacking system designed for exterior or interior glazing. Stacking systems feature continuous head and sill channels allowing vertical and horizontal members to be stacked into position at the job site. Any infiltrated water drains into the continuous sill channel where it drains to the exterior through a series of weep holes. System accepts Series 00, 00 & 500 Entrance Doors. System Features: Injection molded ABS plastic end dams to keep infiltrated water contained within the sill channel where it is weeped to the exterior through weep holes backed with baffles. SHIM Full height ABS plastic molded end dams to keep infiltrated water contained within subsill receptor where it is weeped to exterior through weep holes backed with baffles. ED51 End Dam Intermediate horizontals are rolled over anchor clips attached to the vertical mullions. Each horizontal is then attached to the anchor clip with a concealed fastener. COS Horizontal Clip COS51-10 (Shown) COS51-6 (Similar) AF10- #10 x ⅜" PPH SD Effective October 01

5 SYSTEM FEATURES PERFORMANCE TESTING RECAP TEST METHOD Air Infiltration Test at 6. psf (ASTM E8) Uniform Load Deflection Test at (ASTM E0) Water Infiltration Test at (ASTM E1) Uniform Load Structural Test at (ASTM E0) TEST RESULTS <0.060 cfm/ft +/- 0 psf 8 psf +/- 0 psf Internal injection molded ABS plastic water deflectors allowing infiltrated water to drain into sill channel as illustrated. HEAD Anchor Hole at Head and Sill Continuous Head Channel VERTICAL MULLION WD51-1 ABS Plastic Molded Water Diverters HORIZONTAL Glass not shown for clarity. Glass Weep Continuous Sill Channel SILL Weep Slots backed with WB-1 0 ppi polyester baffles Effective October

6 FRAME DESIGN FEATURES Exterior Glazed Head Continuous head channel Allows direct structural anchoring to substrate Exterior Glazed Horizontal Horizontal attaches to vertical with anchor clips and concealed fasteners Compression fitting exterior glass stop Each end is fitted with WD51 water deflectors providing for excellent water control Exterior Glazed Sill Continuous sill channel with ABS plastic injection molded end dams positioned at each end Continuous sill channel allows infiltrated water to be weeped to exterior through a series of Ø ¼ weep holes backed with baffles Sill channel allows for direct attachment to substrate which eliminates blind seals Compression fitting exterior glass stop 6 Effective October 01

7 FRAME DESIGN FEATURES Interior Glazed Head Continuous head channel Interior Hook-type glass stop designed to resist positive and negative wind forces on glass unit Allows direct structural anchoring to substrate Interior Glazed Horizontal Horizontal attaches to vertical with anchor clips and concealed fasteners Interior Hook-type glass stop designed to resist positive and negative wind forces on glass unit Each end is fitted with WD51 water deflectors providing for excellent water control Interior Glazed Sill Continuous sill channel with ABS plastic injection molded end dams positioned at each end Continuous sill channel allows infiltrated water to be weeped to exterior through a series of Ø ¼ weep holes backed with baffles Subsill pan allows for direct attachment to substrate which eliminates blind seals Effective October

8 FRAME DESIGN FEATURES Vertical Mullion Tubular mullions allow for anchor clips and roll-over horizontals Accepts structural steel reinforcement when required in high wind load areas EPDM Top Load reinforced anti-stretch wedge glazing gasket Expansion Mullion (Optional) For elevations having long continuous horizontal runs expansion mullions may be required 8 Effective October 01

9 FRAME DESIGN FEATURES 90 External Corner Mullion Two piece snap together corner mullion eliminates unsightly rivets or screws Accepts structural steel reinforcement when required in high wind load areas 90 Internal Corner Mullion Two piece matting corner mullion eliminates unsightly rivets or screws Accepts structural steel reinforcement when required in high wind load areas Effective October

10 FRAME DESIGN FEATURES 15 External Corner Mullion Two piece compression fitting corner mullion eliminates unsightly rivets or screws Accepts structural steel reinforcement when required in high wind load areas 15 Internal Corner Mullion Two piece compression fitting corner mullion eliminates unsightly rivets or screws Accepts structural steel reinforcement when required in high wind load areas 10 Effective October 01

11 FRAME DESIGN FEATURES Typical Wall Jamb One piece full depth glazing pocket allows for direct attachment to substrate without countersinking fastener Flat filler plate is not required Alternate Wall Jamb Alternate two piece wall jamb using vertical mull with flat filler plate Anchor attachment to substrate requires countersinking fastener heads Effective October

12 1 Effective October 01

13 TYPICAL DETAILS 1 Ext. Glz. Int Glz KEY ELEVATION FRAME HEIGHT MULLION LENGTH " D.L.O. " D.L.O. " 1 /" 1 /" COS51-8 CWW51- COS COS51-1 /" COS51-6 COS COS51-7 GSK-1 (Typ) COS51- COS51- FRAME HEIGHT MULLION LENGTH " D.L.O. " D.L.O. " 1 /" COS51-10 CWW51-1 COS51- GSK-1 (Typ) COS51- COS51-5 CWW51-1 GSK-8 at COS51-5 only 5 COS /" 1 /" EXTERIOR GLAZE 1 /" 1 /" INTERIOR GLAZE 7 CWW51-9 STL- 8 (as Required) COS51-11 CWW COS (Typical) 1 /" 1 /" GSK-1 (Typ) " D.L.O. " D.L.O. " 1 /" Effective October

14 CORNER DETAILS 1 90º 90º 15º 5º KEY ELEVATION 1 CWW51- AF10-1 GSK-1 (Typ) CF50-0 CWW51-8 CF50-1 CWW51-1 /" CWW51- CWW51-1 CWW51-8 5º CWW /" 90º D.L.O. 1 /" 1 /" 15º 1 /16" CF50-1 CWW51-8 D.L.O. 1 /16" CF50-0 OTHER CORNER COMBINATIONS CF50-11 CF51-11 CF50-11 CWW50- Formed Aluminum Trim CWW51-8 NO POCKETS (Post) COLUMN COVERS ONE POCKET (Terminating End) Formed Aluminum Trim Formed Aluminum Trim 90º Varies CWW51-8 CWW51-8 CWW51-8 CWW51-8 CWW Effective October 01

15 Exterior or Interior Glazed 1 Head Detail from Page 1 1 HORIZONTAL OFFSET HUNG DOORFRAME DETAILS A A A A A A KEY ELEVATION ENTRANCE 1 /" FRAME HEIGHT " DLO Exterior or Interior Glazed Head Detail from Page /" " CF00-8 CF51-1 1" Insulated Glass 7 /16" DLO " 1 7 /16" DOOR OPENING CWW51- CF00-11 Sealant CF51- CF00-1 /" " COC CF51- CF00-1 A 7 /16" DLO CWW51- " 1 7 /16" CF00-11 Sealant COC CF51- CF00-1 A at DOOR CD100-8 T50 at DOOR CD100-8 CF T50 A 1" Insulated Glass Effective October

16 VERTICAL OFFSET HUNG DOORFRAME DETAILS KEY ELEVATION ENTRANCE COS STL- (as Required) CWW51- CWW51-10 COS STL- (as Required) CWW51- CWW50-10 Sealant CF00-11 CF00-11 CF00- CF00- GSK-1 (Typ) COS51- CWW51- CWW51- COS51- GSK-1 (Typ) COS51- COS51- D.L.O. " 1 7 /16" D.L.O. D.L.O. 1 7 /16" " D.L.O. " " /8" /8" T50 5 CF CD100-1" Insulated Glass 16 Effective October 01

17 CENTER HUNG DOORFRAME DETAILS Exterior or Interior Glazed 1 Head Detail from Page KEY ELEVATION ENTRANCE 1 /" FRAME HEIGHT " DLO 7 /16" DLO CWW51- " 1 7 /16" Exterior or Interior Glazed Head Detail from Page 1 CF00-11 CF50-1 Sealant COC CF51-1" Insulated Glass 9 CD100-1 /" at DOOR " COC CF50- CF51- CD100-6 Optional Weathering T50 COS STL- (as Required) CWW51- CWW COS STL- (as Required) 7 8 CWW51- CWW51-10 Sealant CF00-11 CF00-11 GSK-1 (Typ) COS51- CWW51- CWW51- COS51- GSK-1 (Typ) COS51- COS51- D.L.O. " 1 7 /16" D.L.O. D.L.O. 1 7 /16" " D.L.O. " " /8" /8" Effective October

18 WINDLOAD CHARTS Mullion designed for L/175 deflection ratio and the following allowing stresses: Aluminum allow 606-T6; allowable stress for windload 1,99 psi. Steel reinforcement allowable stress for wind load 6,666 psi. Curves represent the limit values and are based on criteria for simple beam, uniformly loaded, using the distribution of wind forces on the wall with rectangular loading. Glass is not considered as contributing to resistance of deflection. 1 1 (1) (1.5) () (.5) (1) (1.5) () (.5) () 15 1 (.5) Mullion Height in Feet (Meters) 1 (.5) 11 A 10 B () 9 C 8 D (.5) E 7 () 6 5 (1.5) Mullion Spacing in Feet (Meters) COS51-11 Limitations of vertical mullions for: CURVES A = 15 psf CURVES B = 0 psf CURVES C = 5 psf CURVES D = 0 psf Mullion Height in Feet (Meters) 1 A () 1 B (.5) 11 C D 10 () E 9 8 (.5) 7 () 6 5 (1.5) Mullion Spacing in Feet (Meters) COS51-11 STL- DEADLOAD CHARTS Deadload charts are based on 1/8 maximum allowable deflection at center point of the horizontal member and on a glass weight of 6.5 psf. 10 (1.5) () (.5) (1.5) () (.5) 10 Height of Glass in Feet (Meters) A B COS51-6 1" Glass = 6.5 PSF.5.5 Height of Glass in Feet (Meters) A B.5.5 COS Mullion Span in Inches (Meters) 1" Glass = 6.5 PSF Glass shall rest on two setting blocks located at: CURVES A = 1/ points CURVES B = 1/8 points from corners (Whichever is larger) Mullion Span in Inches (Meters) 1" Glass = 6.5 PSF 18 Effective October 01

19 Cardinal Commercial Products ALUMINUM WINDOW WALL/STOREFRONT SYSTEM SERIES COS51 GUIDE SPECIFICATIONS SECTION 0810 ALUMINUM ENTRANCES AND STOREFRONT SYSTEMS This suggested guide specification has been developed using the current edition of the Construction Specifications Institute (CSI) Manual of Practice, including the recommendations for the CSI Part Section Format and the CSI Page Format. The developmental concept and organizational arrangement used by the American Institute of Architects (AIA) MASTERSPEC Program were recognized in the preparation of this guide specification. Neither CSI nor AIA endorse specific manufacturers and products. The preparation of the guide specification assumes the use of standard contract documents and forms, including the Conditions of the Contract, published by the AIA. PART 1 GENERAL 1.01 Summary A. Section Includes: Architectural Aluminum Products by CARDINAL COMMERCIAL PRODUCTS, including perimeter trims, stools, accessories, shims and anchors, and perimeter sealing of storefront framing. 1. Types of Architectural Aluminum Products by CARDINAL COMMERCIAL PRODUCTS include: a. COS51: x -1/ (outside) or (inside) Offset Glazed storefront system for 1 insulated glazing. EDITOR NOTE: BELOW RELATED SECTIONS ARE SPECIFIED ELSE WHERE, HOWEVER, CARDINAL COMMERCIAL PRODUCTS RECOMMENDS SINGLE SOURCE RESPONSIBILITY FOR ALL OF THESE SECTIONS AS INDICATED IN.07 SOURCE QUALITY CONTROL. B. Related Sections: 1. Division 7 Section Vapor Barriers between glazed wall systems and adjacent construction. Division 7 Section Fire Stopping. Division 7 Section Joint Sealants for joint sealants installed as part of aluminum entrance and storefront system. Division 8 Section Glazed Aluminum Curtain Walls 5. Division 8 Section Aluminum Windows Walls 6. Division 8 Section Aluminum Entrances and Storefronts 7. Division 8 Section Aluminum Mall Sliding Doors 8. Division 8 Section Finish Hardware 9. Division 8 Section Glass and Glazing EDITOR NOTE: REFER TO INDEX FOR ANY AND ALL APPLICABLE STANDARDS. 1.0 References (Industry Standards) 1.0 System Description A. Storefront System Performance Requirements: 1. Air Infiltration: The test specimen shall be tested in accordance with ASTM 8. Air infiltration rate shall not exceed 0.06 cfm/ft at a (static) air pressure differential of 6. PSF.. Water Resistance, (static): The test specimen shall be tested in accordance with ASTM 1 for (outside) or (inside). There shall be no leakage at a minimum static air pressure differential of 8 PSF as defined in AAMA Uniform Load: A static air design load of 0 PSF shall be applied in the positive and negative direction in accordance with ASTM E 0. There shall be no deflection in excess of L/175 of the span of any framing member at design load. At structural test load equal to 1.5 times the specified design load, no glass breakage or permanent set in the framing members in excess of 0.% of their clear spans shall occur. 1.0 Submittals A. General: Prepare, review, approve, and submit specified submittals in accordance with Conditions of the Contract and Division 1 Submittals Sections. Product data, shop drawings, samples, and similar submittals are defined in Conditions of the Contract. B. Quality Assurance/Control Submittals: 1. Test Reports: Submit certified test reports showing compliance with specified performance characteristics Warranty A. Project Warranty: Refer to Conditions of the Contract for project warranty provisions. B. Manufacturer s Product Warranty: Submit, for Owner s acceptance, manufacturer s warranty for storefront system as follows: 1. Warranty Period: Two () years from Date of Substantial Completion of the project. The Limited Warranty shall begin in no event later than six months from date of shipment by CARDINAL COMMERCIAL PRODUCTS without regard to the date selected as substantial completion. In addition, entrance door corner construction shall be supported with a lifetime warranty for the life of the door under normal use. Effective October S1

20 1.06 Quality Assurance A. Qualifications: 1. Installer Qualifications: Installer experienced (as determined by contractor) to perform work of this section who has specialized in the installation of work similar to that required for this project and who is acceptable to product manufacturer.. Manufacturer Qualifications: Manufacturer capable of providing field service representation during construction, approving acceptable installer and approving application method. B. Pre-Installation Meetings: Conduct pre-installation meeting to verify project requirements, substrate conditions, manufacturer s installation instructions, and manufacturer s warranty requirements Delivery, Storage, and Handling A. Ordering: Comply with manufacturer s ordering instructions and scheduling requirements to avoid construction delays. B. Packing, Shipping, Handling, and Unloading: Deliver materials in manufacturer s original, unopened, undamaged containers with identification labels intact. C. Storage and Protection: Store materials protected from exposure to harmful weather conditions. Handle storefront material and components to avoid damage. Protect storefront material against damage from elements, construction activities, and other hazards before, during and after storefront installation. PART PRODUCTS EDITOR NOTE: RETAIN BELOW ARTICLE FOR PROPRIETARY METHOD SPECIFICATION; ADD PRODUCT ATTRIBUTES, PERFORMANCE CHARACTERISTICS, MATERIAL STANDARDS, AND DESCRIPTIONS AS APPLICABLE. DO NOT USE THE PHRASE OR EQUAL / OR APPROVED EQUAL, OR SIMILAR PHRASES, USE OF SUCH PHRASES CAN CAUSE AMBIGUITY IN THE SPECIFICATIONS DUE TO THE DIFFERENT INTERPRETATIONS AMONG THE DIVERGENT PARTIES OF THE CONSTRUCTION PROCESS AND READERS OF THESE SPECIFICATIONS. SUCH PHRASES REQUIRE EXTENSIVE AND COMPLETE REQUIREMENTS (PROCEDURAL, LEGAL, REGULATORY, AND RESPONSIBILITY) FOR DETERMINING OR EQUAL..01 Manufacturers (Acceptable Manufacturers/Products) A. Acceptable Manufacturers: 1. Address: Cardinal Commercial Products, LLC 915 Heller Street Louisville, KY 018 Contact Numbers: a. Telephone: b. Fax: c. ccpinfo@cardcompro.com d. Web address: cardcompro.com. Proprietary Product(s)/System(s): CARDINAL COMMERCIAL PRODUCTS a. Series: COS51 Offset Glazed Storefront EDITOR NOTE: RETAIN BELOW FOR ALTERNATE MANUFACTURERS/PRODUCTS AS SPECIFIED IN THE CONTRACT DOCUMENTS. COORDINATE BELOW WITH BID DOCUMENTS (IF ANY), AND DIVISION 1 ALTERNATES SECTION. CONSULT WITH CARDINAL COMMERCIAL PRODUCTS FOR RECOMMENDATIONS ON ALTERNATE MANUFACTURERS AND PRODUCTS MEETING THE DESIGN CRITERIA AND PROJECT REQUIREMENTS. CARDINAL COMMERCIAL PRODUCTS RECOMMENDS OTHER MANUFACTURERS REQUESTING APPROVAL TO BID THEIR PRODUCT AS AN EQUAL, MUST SUBMIT THEIR REQUEST IN WRITING (10) DAYS PRIOR TO CLOSE OF BIDDING. b. Finish/Color: (See.06 Finishes) c. Framing Member Profile: x -1/ nominal dimension; Offset Glazed Stacking System Provide continuous head and sill channels with formed brake metal splice sleeves located at center of vertical mullions as required for thermal expansion and to ensure a continuous sill gutter to handle infiltrated water. The sill channel shall have end dams and ¼ diameter weep holes located at approximately 6 on each side of vertical mullions to allow infiltrated water to weep to the exterior. Each weep hole shall be backed by foam baffles to reduce air infiltration. B. Alternate (Manufacturers/Products): In lieu of providing below specified base bid/contract manufacturer, provide below specified alternate manufacturers. Refer to Division 1 Alternates Section. 1. Base Bid/Contract Manufacturer/Product: CARDINAL COMMERCIAL PRODUCTS a. Product: Aluminum Storefront System b. Series COS51 Offset Glazed Storefront System: x -1/ nominal dimension, Offset Glazed Stacking System. Alternate # Manufacturer/Product: a. Product: b. Series: c. Framing Member Profile:. Alternate # Manufacturer/Product: a. Product: b. Series: c. Framing Member Profile: S 0 Effective October 01

21 C. Substitutions: 1. General: Refer to Division 1 Substitutions for procedures and submission requirements. a. Pre-Contract (Bidding Period) Substitutions: Submit written requests ten (10) days prior to bid date. b. Post-Contract (Construction Period) Substitutions: Submit written request in order to avoid storefront installation and construction delays.. Substitution Documentation a. Product Literature and Drawings: Submit product literature and drawings modified to suit specific project requirements and job conditions. b. Certificates: Submit certificate(s) certifying substitute manufacturer (1) attesting to adherence to specification requirements for storefront system performance criteria. c. Test Reports: Submit test reports verifying compliance with each test requirement for storefront required by the project. d. Product Sample and Finish: Submit product sample, representative of storefront for the project, with specified finish and color.. Substitution Acceptance: Acceptance will be in written form, either as an addendum or modification, and documented by a formal change order signed by the Owner and Contractor..0 Materials A. Aluminum (Storefront and Components): 1. Material Standard: Extruded Aluminum, A9606T6 and/or A95050-H alloy and temper.. Member Wall Thickness: Each framing member shall have a wall thickness sufficient to meet the specified structural requirements.. Tolerances: Reference to tolerances for wall thickness and other cross-sectional dimensions of storefront framing members are nominal and in compliance with AA Aluminum Standards and Data..0 Accessories A. Fasteners: Where exposed, shall be Stainless Steel. B. Gaskets: Glazing gaskets shall comply with ASTM C 86 and be extruded of silicone compatible EPDM rubber that provides for silicone adhesion. C. Perimeter Anchors: When steel anchors are used, provide insulation between steel material and aluminum material to prevent galvanic action..0 Related Materials A. Sealants: Refer to Joint Treatment (Sealants) Section. B. Glass: Refer to Glass and Glazing Section..05 Fabrication A. General: 1. Fabricate components per manufacturer s installation instructions and with minimum clearances and shim spacing around perimeter of assembly, yet enabling installation and dynamic movement of perimeter seal.. Accurately fit and secure joints and corners. Make joints flush, hairline and weatherproof.. Arrange fasteners and attachments to conceal from view..06 Finishes EDITOR NOTE: SELECT BELOW FINISH AND COLOR FROM CARDINAL COMMERCIAL PRODUCTS S STANDARD COLORS. CUSTOM COLORS ARE AVAILABLE UPON REQUEST FROM CARDINAL COMMERCIAL PRODUCTS. OTHER POLYESTER POWDER COATINGS CONFORMING TO AAMA 60 ARE AVAILABLE. CONSULT WITH YOUR CARDINAL COMMERCIAL PRODUCTS REPRESENTATIVE FOR OTHER SURFACE TREATMENTS AND FINISHES. A. Shop Finishing 1. Color Anodizing Conforming to AA-M1CA, AAMA 611, Architectural. Class. I. Anodic Coating (Color: #1 Dark Bronze). (Standard). Clear Anodizing Conforming to AA-M1CA1, AAMA 611, Architectural. Class. II. Anodic Coating (Color: #11 Clear) (Standard). AAMA 605, Fluoropolymer Powder Coating (Color: ).. AAMA 60, Polyester Powder Coating. (Color: ). 5. Other: Manufacturer Type Color: )..07 Source Quality Control A. Source Quality: Provide aluminum storefront specified herein from a single source. 1. Building Enclosure System: When aluminum curtain wall are part of a building enclosure system, including entrances, entrance hardware, windows, curtain wall framing and related products, provide building enclosure system products from a single source manufacturer. Effective October S

22 PART EXECUTION.01 Examination A. Site Verification of Conditions: Verify substrate conditions (which have been previously installed under other sections) are acceptable for product installation in accordance with manufacturer s instructions. Verify openings are sized to receive specified system and sill plate is level in accordance with manufacturer s acceptable tolerances. EDITOR NOTE: COORDINATE BELOW ARTICLE WITH MANUFACTURER S RECOMMENDED INSTALLATION DETAILS AND INSTALLATION INSTRUCTIONS. 1. Field Measurements: Verify actual measurements/openings by field measurements before fabrication; show recorded measurements on shop drawings. Coordinate field measurements, fabrication schedule with construction progress to avoid construction delays..0 Installation A. General: Install storefront systems plumb, level, and true to line, without warp or rack of frames with manufacturer s prescribed tolerances and installation instructions. Provide support and anchor in place. 1. Dissimilar Materials: Provide separation of aluminum materials from sources of corrosion or electrolytic action contact points.. Glazing: Glass shall be (outside) or (inside) glazed and held in place with extruded EPDM glazing gaskets on both sides of the glass.. Water Drainage: Water deflectors shall be installed at each end of intermediate horizontal allowing infiltrated water to drain down the vertical member s glazing pocket into a full height subsill receptor where it weeps to the exterior through a series of weep slots backed with baffles to reduce air infiltration. B. Related Products Installation Requirements: 1. Sealants (Perimeter): Refer to Division 7 Joint Treatment (Sealants) Section.. Glass: Refer to Division 8 Glass and Glazing Section. a. Reference: ANSI Z97.1, CPSC 16 CFR 101 and GANA Glazing Manual.0 Field Quality Control A. Field Tests: Architect shall select storefront units to be tested as soon as a representative portion of the project has been installed, glazed, perimeter caulked and cured. Conduct tests for air infiltration and water penetration with manufacturer s representative present. Tests not meeting specified performance requirements and units having deficiencies must be corrected as part of the contract amount. 1. Testing: Testing shall be performed per AAMA 50 by a qualified independent testing agency. Refer to Division Testing Section for payment of testing and testing requirements. a. Air Infiltration Tests: Conduct tests in accordance with ASTM E 78. Allowable air infiltration shall not exceed 1.5 times the amount indicated in the performance requirements or 0.09 cfm/ft, which, ever is greater. b. Water Infiltration Tests: Conduct tests in accordance with ASTM E No uncontrolled water leakage is permitted when tested at a static test pressure of two-thirds the specified water penetration pressure but not less than 8 PSF. B. Manufacturer s Field Services: Upon Owner s request, provide manufacturer s field service consisting of product use recommendations and periodic site visit for inspection of product installation in accordance with manufacturer s instructions..0 Protection and Cleaning A. Protection: Protect installed product s finish surfaces from damage during construction. Protect aluminum storefront system from damage from grinding and polishing compounds, plaster, lime, acid, cement, or other harmful contaminants. B. Cleaning: Repair or replace damaged installed products. Installed products are to be cleaned in accordance with manufacturer s instructions prior to owner s acceptance. Remove construction debris from project site and legally dispose of debris. DISCLAIMER STATEMENT This guide specification is intended for use by a qualified construction specifier. The guide specification is not intended to be verbatim as a project specification without appropriate modifications for the specific use intended. The guide specification must be used and coordinated with the procedures of each design firm, and the particular requirements of a specific construction project. END OF SECTION 0810 S Effective October 01