PFP Project Campus(es) Category Type Building(s) State Funds Local Funds Total Funds Change Requested. SM Utility MORRIS MEMORIAL ADM

Size: px
Start display at page:

Download "PFP Project Campus(es) Category Type Building(s) State Funds Local Funds Total Funds Change Requested. SM Utility MORRIS MEMORIAL ADM"

Transcription

1 SM Project Summary for (Planned) HVAC Replacement- John SM Mechanical JOHN MUIR H $0 $339,753 $339,753 Yes Muir Building Air Handlers ALL(SO.HALL) and Condensers Replaster Pools and repair SM Other Campus-wide $0 $1,000,000 $1,000,000 Yes concrete deck Replace Roof and Skylights SM Roof JOHN MUIRH $0 $646,432 $646,432 Yes - John Muir Building ALL(SO.HALL) Replace Switchgear - Morris Building SM Utility MORRIS MEMORIAL ADM $0 $287,693 $287,693 Yes Aspen - Replace Air Handler SM Mechanical ASPEN (G.E. SEMINAR) $0 $109,225 $109,225 Yes John Muir Restroom SM Roof JOHN MUIR H $0 $586,160 $586,160 Yes Renovation, ALL( SO.HALL) Replace doors Oak Pavilion and Roll-Up Doors at Madrone SM Exterior OAK PAVILION, MADRONE (AUTO TECH) $0 $100,000 $100,000 Yes Yes Science Community Center SM Mechanical Campus-wide $209,666 $0 $209,666 Yes Replace Couplings

2 FUSON2 SM Project Summary for (Planned) HVAC, SM Mechanical PHYSICAL ED MEN $150,000 $150,000 $300,000 Yes Replacement Men's P.E. Replace SM Utility FORUM, FOUNDERS $120,500 $120,500 $241,000 Yes Switchgear, HALL Forum/Founders Hall Install Emergency SM Utility AGRICULTURE, ART, $165,750 $165,750 $331,500 Yes and Exit Lighting - CLASSROOM ANNEX, Various Buildings FORUM, ELECTRONICS, JOURNALISM, MUSIC Fir and Oak- HVAC SM Mechanical FIR (INTERDISCIPL.), $192,500 $192,500 $385,000 Yes Replace Boilers OAK PAVILION HVAC Replacement - Ansel Adams Building Air Handlers and Condensers SM Mechanical ANSEL ADAMS HALL(N. HALL $125,000 $125,000 $250,000 Yes Replace Roof SM Roof BECKWITH RESIDENCE, $55,000 $55,000 $110,000 Yes Beckwith Farms BECKWITH GARAGE Tenaya Complex - SM Roof TENAYA COMPLEX (N. $297,500 $297,500 $595,000 Yes Reroof AUTO) Agriculture Building SM Utility AGRICULTURE $50,000 $50,000 $100,000 Yes -Sewer Line Replacement Replace Subpanels, John Muir and Ansel Adams SM Utility ANSEL ADAMS HALL(N. HALL, JOHN MUIR H ALL(SO.HALL) $150,000 $150,000 $300,000 Yes

3 SM Project Summary for (Planned) Repaint Sierra & Yosemite Hall buildings SM Exterior SIERRA HALL (SIERRA $0 B), YOSEMITE HALL (SIERRA A) $170,607 $170,607 Yes

4 SM Project Summary for (Planned) Dogwood/Repaint 4,707 Square Feet SM Exterior Campus-wide $0 $6,543 $6,543 Yes HVAC, Replacement El Capitan SM Mechanical EL CAPITAN CTR (CABARET) $199,750 $199,750 $399,500 Yes HVAC, Replace Evaporative Coils, Music Building SM Mechanical MUSIC $180,500 $180,500 $361,000 Yes Oak Pavilion - Replace Sewer Pumps/Controls SM Mechanical Campus-wide $225,000 $225,000 $450,000 Yes Replace Roofs at Poultry and Curtains SM Roof TIOGA (POULTRY BROODER), TIOGA at Swine Unit (POULTRY LAYER HOUSE, FEED MILL $180,000 $180,000 $360,000 Yes Recoat, Yosemite Hall SM Roof YOSEMITE HALL (SIERRA A) $317,000 $317,000 $634,000 Yes Beckwith Farms- Sewer, Hot, & Cold Plumbing Line Replacement SM Utility BECKWITH RESIDENCE $50,000 $50,000 $100,000 Yes Replace Switchgear, SM Utility ELECTRONICS $120,500 $120,500 $241,000 Yes Electronics

5 SM Project Summary for (Planned) Replace Switchgear, Stadium SM Utility Campus-wide $120,500 $120,500 $241,000 Yes Replace Roof and Skylights - Ansel Adams Building SM Roof ANSEL ADAMS HALL(N. HALL $225,000 $225,000 $450,000 Yes Women's P.E. - Replace Air Handler SM Mechanical PHYSICAL ED WOMEN $62,000 $62,000 $124,000 Yes HVAC Replacement, Library, SM Mechanical LIBRARY $125,000 $125,000 $250,000 Yes AC3 HVAC, Replace Mixing SM Mechanical FOUNDERS $180,500 $180,500 $361,000 Yes Boxes, Founders Hall/Phase HALL II Willow - Electrical & Lighting Upgrade SM Utility WILLOW (CR.ARTS) $100,000 $100,000 $200,000 Yes Oak Pavilion - Storm Drain SM Utility Campus-wide $25,000 $25,000 $50,000 Yes Recoat, Sierra Hall SM Roof SIERRA HALL (SIERRA B) $317,000 $317,000 $634,000 Yes Replace Switchgear, El Capitan SM Utility ELCAPITAN CTR (CABARET) $97,500 $97,500 $195,000 Yes Sequoia - Roof Repair SM Roof SEQUOIA (LIFE SCI) $95,000 $95,000 $190,000 Yes

6 SM Project Summary for (Planned) Access District-wide SM Other Campus-wide $199,750 $199,750 $399,500 Yes Control, Phase I Replace Oak SM Exterior OAK PAVILION $25,000 $25,000 $50,000 Yes Exterior Doors Buckeye/Busi SM Exterior BUCKEYE (BUSINESS) $0 $7,763 $7,763 Yes ness/repaint 5,585 Square Feet Reroof, Mary SM Roof MARY STUART ROGERS ST $247,500 $247,500 $495,000 Yes Stuart Rogers LR Building HVAC, Yosemite SM Mechanical MAINTENANCE OFFICE, $125,000 $125,000 $250,000 Yes Replacement District PLUMBING SHOP Maintenance Office* Shops District Faciliti as- Maintenance Shop Heater and Cooler Replacement Yosemite District Office* SM Mechanical CC CARP & TRANSP SHOP, CC RECEIVING & GROUNDS $47,500 $47,500 $95,000 Yes Replace SM Utility TIOGA $97,500 $97,500 $195,000 Yes Switchgear, COMPLEX(POULTRYLAB, Poultry and TIOGA (POULTRY BROODER), Swine Units TIOGA (POULTRY LAYER HOUSE, FEED MILL, GESTATION BARN, BOAR BARN, FARROW & WEAN BARN, GROWER BARN, FINISHING BARN

7 SM Project Summary for (Planned) Cedar/Gener al Ed. Lecture /Repaint 4,672 Square Feet SM Exterior CEDAR (GEN.ED.LEC.) $0 $6,500 $6,500 Yes Oak and Toyon- Flooring Replacement SM Other OAK PAVILION, TOYON (FORESTRY) $100,000 $100,000 $200,000 Yes John Muir SM Other JOHN MUIR H ALL(SO.HALL) $50,000 $50,000 $100,000 Yes Building- Replace Tower Doors Ansel Adams -Replace Tower Doors SM Other ANSEL ADAMS HALL(N. HALL $50,000 $50,000 $100,000 Yes Reroof, SM Roof ELECTRONICS $215,000 $215,000 $430,000 Yes Electronics Replace Floor Coverings, Ansel Adams and John Muir Classrooms SM Other ANSEL ADAMS HALL(N. HALL, JOHN MUIR H ALL(SO.HALL) $0 $267,050 $267,050 Yes Oak Pavilion - Repair Elevator SM Mechanical OAK PAVILION $62,500 $62,500 $125,000 Yes