1 ATTACHMENT 4 New Eastside Regional Park Phase 1 BIM (Building Information Modeling) 3D Design & Modeling Program Requirements Bidders to be aware all BIM are for your information only and are not for estimating or construction purposes.

2 BIM REQUIREMENTS a. Building Information Modeling (BIM) Deliverables: BIM Deliverables are in addition and in conjunction to all other contracted deliverables. b. This project will be utilizing Building Information Modeling (BIM). As part of this process the following trades shall utilize a Three Dimensional CAD program capable of creating intelligent objects as the tool to create their shop drawings (Authoring Tool): c. UNDERGROUND SITE UTILITIES & CIVIL (Topography, water supply pipes, etc.) d. HVAC (Sheet Metal), MECHANICAL PIPING & EQUIPMENT e. PLUMBING f. ELECTRICAL g. FIRE PROTECTION h. STRUCTURAL STEEL i. STRUCTURAL CONCRETE j. STRUCTURAL MASONRY k. LOW VOLTAGE SYSTEMS & PHOTOMETRIC SYSTEMS l. MISCELLANEOUS m. All select subcontractors are required to have and use Navisworks (Version 2018 or newer) as the collaborative software as a coordination tool. Select subcontractors must demonstrate the ability and willingness to use Authoring Tool and the Authoring Tool s interoperability with the Navisworks software. In addition to general contract requirements, the select subcontractors are also required to provide 3D model(s) of their scope of work as outlined below in both native (DWG, RVT, Etc) and Navisworks (.NWD or.nwc) format. n. A preliminary BIM Project Execution Plan (PxP) is attached, the final PxP will be completed after subcontractor selection. Sundt will hold a BIM Kickoff Meeting after subcontractor selection with all subcontractors participating in the BIM process to review the PxP at the location specified by the Project BIM manager. Subcontractor s lead Drafter/Modeler, Project Manager and Field Foreman/Superintendent will be required to attend this meeting in person. The lead drafter from each subcontractor will be required to attend all subsequent collaboration meetings as outlined in the PxP at the location and frequency as determined by Sundt. Web meeting attendance for weekly coordination meetings is permitted. o. Should unavoidable conflicts be encountered during the preparation or review of the coordination models and supplemental drawings or Shop Drawings, or during construction, they shall be promptly brought to Sundt Construction, in writing for resolution. p. Coordinated Shop drawings must be signed off by each coordinating trade and Sundt Construction prior to submitting to the Owner. Sundt or BIM Lead will create a Sign off Schedule, which will be coordinated with construction team. q. Shop drawings should accurately reflect the coordinated BIM. Subcontractor shall remove and replace all work that does not comply with the signed off and approved coordinated shop drawings at subcontractor s own expense. Repair or replace any other Work or property damaged by these operations at no additional cost to Sundt Construction or the Owner. r. Where the Drawings are diagrammatic, showing only the general arrangement of the systems, subcontractor shall have responsibility for the fitting of materials and equipment to other parts of the equipment and structure, and to make adjustments as necessary or required to resolve space problems, preserve service room, and avoid architectural and structural elements and the Work of other trades. Contractor may be required to identify certain areas to relocate installations within the spaces depicted on the Drawings, e.g., ductwork may be shifted within the space shown to accommodate other systems. Such functional relocations shall not be deemed a change to the requirements of the Contract. In the event a rerouting of a system appears necessary, Contractor shall clearly highlight the proposed rearrangement on the submitted Shop Drawings. s. Do not obstruct spaces and installations required to be clear for operation, maintenance, part replacement or Applicable Code Requirements. Do not cover any piping, wiring, ducts, or other installations until they have been inspected and approved and required inspection certificates issued. Ensure that anchorage, blocking, joining, and other detailing are provided as required. 1.2 GENERAL a. All models to be provided to Sundt in file format of the Authoring Tool as well as Navisworks Document Format (.NWD) or Navisworks Cache Format (.NWC). Please refer to

3 for information on files that can be converted to Navisworks format by using exporter utilities. b. All elements of the project to be created in 3 Dimensions with spatially correct size and real world coordinates c. Equipment, doors, and windows to have manufacture and model attached, if known d. The collaboration meetings will be held at a location to be determined by Sundt that best suits the project s needs. e. Sundt will set up a project collaboration service or website for the sole purpose of exchanging modeling data. Each firm will be responsible to update their portion of the collaborated model for the use in the weekly clash detection meeting. In some occasions, firms will be asked to post more frequently for coordination purposes. f. All references to LOD xxx are to BIMForum s 2016 Level of Development Specification which can be found at UNDERGROUND SITE UTILITIES & CIVIL (Topography, etc.) : i. Autodesk Civil 3D ii. Autodesk Map b. Model existing site topography as a TIN surface c. Model proposed site topography as a TIN surface d. Model all underground utilities 1.5 or larger in diameter beyond 5-0 of building e. Model all bundled conduit or piping [LOD 300] f. Model all vaults, manholes, tanks, and underground storage containers [LOD 300] g. Model all duct banks [LOD 300] h. Model all backwash preventers and control valves [LOD 200] i. Model all other site structures needed that are not included in the architectural package j. Model all areas and systems that will require coordination with other building components or systems 1.4 HVAC (Sheet Metal), MECHANICAL PIPING & EQUIPMENT : iii. CADDUCT iv. AutoCAD Fabrication CADmep v. All other formats must be preapproved in writing b. Model all HVAC systems [LOD 300] c. Model all ductwork including flanges, connections and flex duct [LOD 300] d. Model all diffusers and return air ducts [LOD 300] e. Model all hard piping including, but not limited to underground piping within 5-0 from the edge of building [LOD 300] f. Model all gravity fed piping regardless of size [LOD 300] g. Model all curbs and equipment pads [LOD 300] h. For all equipment requiring installation or maintenance clearances, model the clearance as a separate semi-transparent element in the assembly [LOD 300] i. Model all access panels [LOD 300] j. Model all seismic bracing, hangers and supports for piping and ductwork, including vertical run support steel [LOD 300] k. Model and specify all penetrations and openings needed for routing with all contractors [LOD 300] l. Model all other areas deemed necessary by Sundt for HVAC, Mechanical Piping & Equipment m. Model insulation on all systems which are needed n. Model all temporary systems o. Model all areas and systems that will require coordination with other building components or systems that

4 1.5 PLUMBING : iii. CADDUCT iv. AutoCAD Fabrication CADmep v. All other formats must be preapproved in writing b. Model all plumbing systems [LOD 300] c. Model all hard piping including underground piping within 5-0 from the edge of building [LOD 300] d. Model all gravity fed piping regardless of size [LOD 300] e. Model all curbs and equipment pads [LOD 300] f. For all equipment and piping requiring installation or maintenance clearances, model the clearance as a separate semi-transparent element in the assembly [LOD 300] g. Model all access panels [LOD 300] h. Model all seismic bracing, hangers and supports for piping, including vertical run support steel [LOD 300] i. Model and specify all penetrations and openings needed for routing with all contractors [LOD 300] j. Model all other areas deemed necessary by Sundt for Plumbing k. Model all insulation on all systems which are needed l. Model all temporary systems m. Model all areas and systems that will require coordination with other building components or systems that 1.6 ELECTRICAL iii. AutoCAD Fabrication CADmep iv. All other formats must be preapproved in writing b. Model all electrical systems [LOD 300] c. Model all distribution boxes [LOD 300] d. Model all non-flexible conduit runs of 1 diameter or larger [LOD 300] e. Model all bundled and ganged conduit [LOD 300] f. Model all underground conduit runs within 5-0 from the edge of building [LOD 300] g. Model all curbs and equipment pads [LOD 300] h. Model all fixtures [LOD 300] i. Model specialty systems (Fire Alarm, A/V, Security, Access Control and Telecom, etc.) [LOD 300] j. For all fixtures requiring installation or maintenance clearances, model the clearance as a semi-transparent item in the assembly [LOD 300] k. Model all access panels [LOD 300] l. Model all seismic bracing, hangers, cable trays and supports, including vertical run support steel [LOD 300] m. Model and specify all penetrations and openings needed for routing with all contractors [LOD 300] n. Model all other areas deemed necessary by Sundt for Electrical o. Model all temporary systems p. Model all areas and systems that will require coordination with other building components or systems that 1.7 FIRE PROTECTION iii. CAD MEP iv. SprinkCAD v. HydraCAD

5 vi. AutoCAD Fabrication CADmep vii. All other formats must be preapproved in writing b. Model all fire sprinkler systems, sprinkler drops and risers [LOD 300] c. Model all piping runs [LOD 300] d. Model all access panels [LOD 300] e. Model all seismic bracing, hangers and pipe supports, including vertical run support steel [LOD 300] f. Model all other areas deemed necessary by Sundt for Fire Protection g. Model all areas and systems that will require coordination with other building components or systems that 1.8 STRUCTURAL STEEL ii. Tekla iii. Autodesk Advanced Steel iv. All other formats must be preapproved in writing b. Model all full height walls and all framing systems c. Model all columns, beams, joists, purlins and trusses d. Model all ledgers and angles e. Model all framing pertaining to soffits, ceilings, skylights and shafts f. Model all penetrations and openings g. Model all seismic bracing, connection plates, kickers, hangers and supports h. Model all other areas deemed necessary by Sundt for Structural i. Support Steel 1.9 STRUCTURAL CONCRETE ii. Tekla b. Model all concrete walls [LOD 300] c. Model all concrete decks [LOD 300] d. Model all concrete slabs [LOD 300] e. Model all concrete substructure [LOD 300] f. Model all concrete superstructure [LOD 300] g. Model all concrete ramps [LOD 300] h. Model all concrete columns [LOD 300] i. Model all light pole bases [LOD 300] j. Model all grade beams and footings including steps [LOD 300] k. Model all zone of influence [LOD 300] l. Model all reinforcing steel and post tension strands where needed for coordination with other trades m. Model all RFI changes related to Concrete [LOD 300] n. Model all other areas deemed necessary by Sundt for Structural Concrete o. Model all areas and systems that will require coordination with other building components or systems that 1.10 STRUCTURAL MASONRY ii. Tekla b. Model all Masonry walls [LOD 300] c. Model all Masonry systems [LOD 300] d. Model all penetrations and openings e. Model all RFI changes related to Masonry f. Model all other areas deemed necessary by Sundt for structural masonry

6 g. Model all areas and systems that will require coordination with other building components or systems that 1.11 LOW VOLTAGE SYSTEMS AND PHOTOMETRIC SYSTEMS iii. Trimble (QuickPen) iv. CAD MEP v. All other formats must be preapproved in writing b. Model all electrical systems. [LOD 300] c. Model all distribution boxes [LOD 300] d. Model all conduit runs of 1.5 diameter or larger [LOD 300] e. Model all bundled conduit [LOD 300] f. Model all underground conduit runs within 5-0 from the edge of building [LOD 300] g. Model all fixtures [LOD 300] h. Specialty systems (Fire Alarm, A/V, Security, Access Control and Telecom, etc.) [LOD 300] i. For all fixtures requiring installation or maintenance clearances, model the clearance as a semi-transparent item in the assembly. [LOD 300] j. Model all access panels [LOD 300] k. Model all seismic bracing, hangers, cable trays and supports [LOD 300] l. Model and specify all penetrations and openings needed for routing with all contractors m. Model all other areas deemed necessary by Sundt for Low Voltage Systems and Photometric Systems. n. Model all areas and systems that will require coordination with other building components or systems that 1.12 SECURITY CEILINGS, WALLS (METAL AND MASONRY) & SCREENS ii. StrucSoft Solutions MWF (Metal Wood Framer) b. Model all ceilings [LOD 300] c. Model all framing systems [LOD 300] d. Model all seismic bracing, kickers, hangers and supports [LOD 300] e. Model all Ceiling thicknesses needed for clearance [LOD 300] f. Model all full height walls Model all framing systems [LOD 300] g. Model all columns and beam [LOD 300] h. Model all ledgers and angles [LOD 300] i. Model all soffit, ceiling, skylight, and shaft framing [LOD 300] j. Model all penetrations and openings [LOD 300] k. Model all seismic bracing, kickers, hangers and supports [LOD 300] l. Model all other areas deemed necessary by Sundt for Security Ceilings, Walls & Screens [LOD 300] m. Model all areas and systems that will require coordination with other building components or systems that 1.15 KITCHEN EQUIPMENT (COMMERCIAL KITCHEN AREA) ii. Autodesk Revit MEP i iv. All other formats must be preapproved in writing b. Model all Equipment systems [LOD 300] c. Model all Equipment connections [LOD 300] d. Model all cabinetry [LOD 200]

7 e. Model all hard piping including underground piping to 5-0 from edge of building [LOD 300] f. Model all gravity fed piping regardless of size [LOD 300] g. Model all curbs and equipment pads [LOD 300] h. For all equipment requiring installation or maintenance clearances, model the clearance as a semitransparent item in the assembly [LOD 300] i. All access panels [LOD 300] j. Model all seismic bracing, hangers and supports for piping and ductwork [LOD 300] k. Model all other areas deemed necessary by Sundt 1.16 MISCELLANEOUS b. Model all under floor air distribution and/or raised access flooring areas [LOD 300] c. Model all furniture systems [LOD 300] d. Model all artwork [LOD 200] e. Model all fountains and pools [LOD 200] f. Model all access controls [LOD 200]