Asbestos Management August 2014

Size: px
Start display at page:

Download "Asbestos Management August 2014"

Transcription

1 Asbestos Management August 2014 Thistle Shopping Centre Goosecroft Road Stirling FK8 2GA Survey Information drawn up by: S 2 Partnership Ltd, Glasgow, G2 2JJ v

2 Asbestos Management & Control for Thistle Shopping Centre Thistle Shopping Centre, Stirling Asbestos Management Contents: Green - Asbestos Survey Blue Asbestos Register White - Asbestos Risk Assessment Pink - Asbestos Management Information / Filing Appendix - Asbestos Action Summary (Report of Recommendations) This document has been compiled on behalf of Standard Life Investments Limited by the S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Tel: Fax: info@s2partnership.co.uk S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Version

3 Asbestos Management & Control for Thistle Shopping Centre Site Management Summary Managers responsible for this Asbestos Management system are: Name Tel: Facilities Manager Scott Wells Detailed information and advice about asbestos issues on this site can be obtained from: Name Tel: S2 Partnership Asbestos Adviser Stephen Lang S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Version

4 Asbestos Management & Control for Thistle Shopping Centre Technical and legislative background Asbestos is a naturally occurring mineral which, when milled, produces fibres which have excellent mechanical, chemical and thermal properties. These fibres can be manufactured into a wide range of products with applications in the construction industry. There are three main types of asbestos - chrysotile, amosite and crocidolite; they are usually called white, brown and blue asbestos respectively. However, they cannot be identified just by their colour. Blue and brown asbestos (the two most dangerous forms) have not been imported into the UK since the early eighties and white asbestos since the late nineties. All asbestos is now banned by law. Work with asbestos can release small fibres into the air. Breathing in these fibres can cause fatal diseases. These include: Asbestosis or fibrosis (scarring) of the lungs; lung cancer; and mesothelioma, a cancer of the inner lining of the chest wall or abdominal cavity. There is no cure for asbestos-related diseases. It is possible that repeated low-level exposures may lead to asbestos-related diseases, although high exposure for long periods is linked more clearly to these illnesses. Asbestos-related diseases are currently responsible for about 3000 deaths a year in Britain. There is usually a long delay between first exposure to asbestos and the first symptoms of disease. This can vary between 15 and 60 years. This number is projected to rise to around 10,000 by the year Many of those suffering today from asbestos-related diseases have worked in the building trades. They were carpenters, joiners, shopfitters, plumbers, electricians, gas service engineers etc. They were exposed to asbestos fibres in their day-to-day work with asbestos materials or because work with asbestos was carried out near them. Although the body will get rid of most of the larger fibres that can enter the nose and mouth, tiny fibres can pass into the lower parts of the lung. They can stay there for years and in some cases work their way through the lung lining. The body naturally gets rid of any asbestos fibres that you might take in with food and water. Asbestos fibres cannot be absorbed through your skin. S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Version

5 Asbestos Management & Control for Thistle Shopping Centre Thousands of tonnes of asbestos were used in buildings in the past and much of it is still in place. You are most likely to come across asbestos in these materials: sprayed asbestos and asbestos loose packing - generally used as fire breaks in ceiling voids; moulded or pre-formed sprayed coatings and lagging - generally used in thermal insulation of pipes, boilers; sprayed asbestos mixed with hydrated asbestos cement - generally used as fire protection in ducts, firebreaks, panels, partitions, soffit boards, ceiling panels and around structural steel work; insulating boards used for fire protection, thermal insulation, partitioning and ducts; some ceiling tiles; millboard, paper and paper products used for insulation of electrical equipment, asbestos paper has been used as a fire proof facing on wood fibre board; asbestos cement products, which can be compressed into flat or corrugated sheets. Corrugated sheets are largely used as roofing and wall cladding. Other asbestos cement products include gutters, rainwater pipes and water tanks; thermoplastic floor tiles certain textured coatings. Over the last 25 years asbestos has been legislated against to increasingly control its import, manufacture and use. In addition the exposure limits for asbestos fibres have been regularly reduced. The import and manufacture of asbestos in the UK is now not permitted in any circumstances. The principal legislation bearing on the management of asbestos risk are: The Health and Safety at Work Etc Act 1974 The Control of Asbestos Regulations 2012 The Management of Health and Safety at Work Regulations 1999 (as amended) The Control of Substances Hazardous to Health Regulations 2002 (as amended) The Construction, Design and Management Regulations 2007 The Workplace (Health, Safety & Welfare) Regulations 1992 The Waste (Scotland) Regulations 2011 The Special Waste Amendment (Scotland) Regulations 2004 The S2 Partnership has developed this Asbestos Management system to reflect the responsibilities set out in these statutes. S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Version

6 Added in Asbestos Management & Control for Thistle Shopping Centre Significant Changes in the Status of this Site The following is a summary of the significant changes in occupation, management, ownership or use of this site since the original asbestos management documentation was implemented. Any changes that have an impact on asbestos management must also be entered on the Site Log (Management Section) and on the Asbestos Register, pending review of the system by the asbestos specialist. Taken out Date Description By Date Description By S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Version

7 Asbestos Survey Site: Thistle Shopping Centre Goosecroft Road Stirling FK8 2GA Client: SLI Shopping Centre Trust Date of Assessment: th August 2014 Name of Assessor: Stephen Lang Date for review 27 th August 2015 The S2 Partnership S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 1

8 Contents Survey Brief... 3 Survey Information... 3 Analysis of Samples... 4 Summary of Analysis Results... 4 Site Information... 8 Main Findings... 8 Photographs Asbestos Survey Appendix 1 - Copies of Analysis Reports This Asbestos Survey forms part of an Asbestos Management System and has been compiled on behalf of Standard Life Investments Limited by The S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Tel: Fax: info@s2partnership.co.uk S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 2

9 Survey Brief Survey Commissioned by: On Behalf of: Type of Survey Commissioned: Scott Wells SLI Shopping Centre Trust Management survey to locate as far as reasonably practicable the presence and extent of any suspect ACMs in the building which could be damaged or disturbed during normal occupancy, including foreseeable maintenance and installation, and to assess their condition and recommend risk controls. Any special instructions: N/A Survey Information Survey Carried Out By: Consultant: The S2 Partnership Ltd Gainsborough House 151 West George, Street Glasgow G2 2JJ Stephen Lang Signature: Assisted by: Sam Gallop Date of Survey: 19 th -27 th August 2014 Method of Survey: Survey Conditions: Management survey It should be noted that as far as is reasonably practicable every effort was made during the course of the survey to identify the presence of asbestos containing materials. However, asbestos containing materials may be present, and as yet unidentified, within the fabric of the building or concealed within inaccessible areas. No survey should be considered as definitive and further investigations are recommended should the building be scheduled for demolition or refurbishment. It is the responsibility (as established in HSG264) of the S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 3

10 Areas excluded from survey: Documentation examined: Sampling Protocol: client/duty holder that he/she checks this survey to ensure it accurately reflects the site and the scope of the contract. Any discrepancies or concerns must brought to the attention of the S 2 Partnership within 2 weeks. Shop units N/A Sampling and the assessment of safety risk was carried out in accordance with Guidance Note HSG 264 Asbestos: The Survey Guide (2010) issued by the Health and Safety Executive (HSE), Analysis of Samples Sampling Laboratory Analysis protocol: Scope AASL Analysis carried out in accordance with the procedures set out in HSG 248 Asbestos: The analysts' guide for sampling, analysis and clearance procedures. UKAS Accreditation Reference: UK 2707 Summary of Analysis Results Sample No. Lab. Ref Material Location Asbestos Type TSC/SL/G/001/001 1 INSULATING BOARD PANELS TSC/SL/G/001/002 TSC/SL/G/002/003 TSC/SL/G/003/004 TSC/SL/G/005/005 TSC/SL/1/022/006 TSC/SL/2/038/007 TSC/SL/2/039/008 TSC/SL/2/041/009 2 VERMICULITE 3 INSULATING BOARD CEILING PANELS 4 BITUMEN TO FLOOR 5 BITUMEN DPC 6 INSULATING BOARD TO DRY RISER 7 SPRAYED COATING REMNANTS 8 SPARAYED COATING 9 BITUMEN ROOF FELT S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 4

11 Sample No. Lab. Ref Material Location Asbestos Type TSC/SL/2/048/010 TSC/SL/3/053/011 TSC/SL/3/055/012 TSC/SL/3/059/013 TSC/SL/G/043/014 TSC/SL/2/067/015 TSC/SL/2/067/016 TSC/SL/2/067/017 TSC/SL/3/075/018 TSC/SL/3/078/019 TSC/SL/3/078/020 TSC/SL/3/088/021 TSC/SL/2/096/022 TSC/SL/G/098/023 TSC/SL/G/101/024 TSC/SL/2/113/025 TSC/SL/2/113/026 TSC/SL/EXT/027 TSC/SL/2/117/028 TSC/SL/2/118/029 TSC/SL/B/120/030 TSC/SL/B/120/031 TSC/SL/B/120/032 TSC/SL/B/120/033 TSC/SL/B/123/ VERMICULITE BOXING 11 SPRAYED COATING 12 MASTIC 13 SPRAYED COATING DEBRIS 14 GASKETS 15 INSULATING BOARD TO FIRE DOOR 16 SPRAYED COATING 17 SPRAYED COATING TO BEAMS 18 MASTIC 19 BITUMEN SINK PAD 20 MASTIC LARGE DUCT-WORK 21 VERMICULITE 22 TEXTURED COATING 23 INSULATING BOARD BEAM CLADDING 24 INSULATING BOARD WALL PANELS 25 SPRAYED COATING TO BEAMS 26 SPRAYED COATING DEBRIS 27 MASTIC 28 BITUMEN FELT 29 INSULATING BOARD 30 INSULATING BOARD COLUMN CLADDING 31 INSUALTING BOARD INFILL PANEL 32 MASTIC 33 RED MASTIC 34 GASKETS Chrysotile Chrysotile Amosite/ Chrysotile S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 5

12 Sample No. Lab. Ref Material Location Asbestos Type TSC/SL/CP/125/035 TSC/SL/CP/132/036 TSC/SL/CP/136/037 TSC/SL/CP/137/038 TSC/SL/CP/140/039 TSC/SL/CP/141/040 TSC/SL/CP/142/041 TSC/SL/CP/145/042 TSC/SL/CP/146/043 TSC/SL/3/148/044 TSC/SL/ROOF/W/045 TSC/SL/ROOF/W/046 TSC/SL/ROOF/W/047 TSC/SL/ROOF/156/048 TSC/SL/ROOF/156/049 TSC/SL/R0OF/157/050 TSC/SL/R0OF/157/051 TSC/SL/ROOF/157/052 TSC/SL/ROOF/160/053 TSC/SL/1/164/054 TSC/SL/1/165/055 TSC/SL/1/166/056 TSC/SL/2/180/057 TSC/SL/2/180/058 TSC/SL/2/183/ INSULATING BOARD WALL PANEL 36 MASTIC 37 INSULATING BOARD COLUMN CLADDING 38 VERMICULITE PIPE INSULATION 39 INSULATING BOARD BEAM CLADDING 40 INSULATING BOARD AT STAIRS 41 INSULATING BOARD BOXING 42 TOILET CISTERN 43 BITUMEN SINK PADS 44 INSULATING BOARD TO HATCH 45 BITUMEN ROOF FELT 46 MASTIC 47 CEMENT UNDERCLOAKING 48 INSULATING BOARD TO CEILING 49 MASTIC 50 PROMENADE TILES 51 BITUMEN TO CEILING 52 ROPE 53 BITUMEN TO ROOF 54 MASTIC 55 TEXTURED COATING TO CEILING 56 BITUMEN TO FLOOR 57 TEXTURED COATING TO CEILING 58 TEXTURED COATING TO WALLS 59 INSULATING BOARD CEILING TILES Amosite/ Chrysotile Amosite Chrysotile Chrysotile Chrysotile S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 6

13 Sample No. Lab. Ref Material Location Asbestos Type TSC/SL/2/189/060 TSC/SL/2/191/061 TSC/SL/1/198/062 TSC/SL/1/201/063 TSC/SL/1/200/064 TSC/SL/1/223/065 TSC/SL/2/MALL/066 TSC/SL/2/MALL/067 TSC/SL/2/MALL/ SPRAYED COATING 61 INSUALTING BOARD PANEL 62 INSULATING BOARD CEILING PANELS 63 MASTIC 64 ROPE 65 BITUMEN TO FLOOR 66 SPRAYED COATING RESIDUES 67 INSULATING BOARD WALL PANELS 68 SPRAYED COATING S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 7

14 Site Information Site Address: Site Manager: Thistle Shopping Centre Goosecroft Road Stirling FK8 2GA Scott Wells Date of Construction: 1977 with additions circa 1997 General Site Description: This building comprises a one storey shopping mall with two levels of parking spaces below. A separate six level car park is located beside the shopping mall. Main Findings Location Findings Photo Ref. General Summary Modern sprayed coatings used throughout circa 1997 build. 2x remaining insulating board panels to original car park and service yard. Gaskets, bitumen, toilet cistern, textured coatings and cement panel also present. T2 Car Park Ground Space ref: 001 Parking Area: Metal and concrete ceiling. Breeze block, brick, concrete, metal and timber walls. Concrete and mono-block floor. MMMF expansion joints. Plasterboard fire breaks. Metal trunking and cable trays. Timber and metal door panels. Metal and plastic downpipes. MMMF lagged metal pipes. A sample was obtained of the insulating board panels to columns for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/001/001 indicated this material to comprise a non-acm. A sample was obtained of the vermiculite panels to columns for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/001/002 indicated this P1 P2 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 8

15 Location Findings Photo Ref. Space ref: 002 Space ref: 003 Space ref: 004 Space ref: 005 Space ref: 006 Space ref: 007 Service Yard: Concrete ceiling. Breeze block, brick, concrete and metal walls. Concrete floor. MMMF lagged metal pipes. Metal tank. A sample was obtained of the insulating board panels to external fire escape for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/002/003 indicated this material to comprise a non-acm. It is presumed that there may be gaskets present to the pipe-work. Due to health and safety reasons these could not be sampled. Further investigation will be required prior to any relevant works to this area. Sprinkler Valve Room: Timber ceiling. Breeze block walls. Concrete floor. Metal pipes. Modern electrics. Plastic downpipes. It is presumed that there may be gaskets present to the pipe-work. Due to health and safety reasons these could not be sampled. Further investigation will be required prior to any relevant works to this area. A sample was obtained of the bitumen to the floor for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/003/004 indicated this Plant Cupboard: Timber ceiling. Breeze block and concrete walls. Concrete floor. Metal pipes with rubber gaskets. Metal downpipe. Service Riser: Concrete and timber ceiling. Breeze block, concrete and timber walls. Concrete floor. A sample was obtained of the bitumen damp proof course for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/005/005 indicated this Fire Exit Vestibule: Concrete ceiling. Breeze block walls. Concrete floor. Generator Room: Concrete ceiling. Plasterboard, breeze block and concrete walls. Concrete floor. MMMF expansion joints. Plastic downpipe. Metal S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 9

16 Location Findings Photo Ref. Space ref: 008 Space ref: 009 Space ref: 010 Space ref: 011 Space ref: 012 Space ref: 013 Space ref: 014 Space ref: 015 duct-work. It is presumed that there may be gaskets present to the generator and its associated pipe-work. Due to health and safety reasons these could not be sampled. Further investigation will be required prior to any relevant works to this area. Electrical Room: Concrete ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics. MMMF expansion joints. Fire Exit Vestibule: Concrete ceiling. Breeze block walls. Concrete floor. Store: Concrete ceiling. Breeze block walls. Concrete floor. Store: Concrete ceiling. Breeze block walls. Concrete floor. Electrical Cupboard: Concrete ceiling. Breeze block walls. Concrete floor. Modern electrics. Metal downpipe. Help Point Office: MMMF ceiling tiles with concrete above. Breeze block walls. Modern vinyl on concrete. Fire Exit Vestibule: Concrete and plasterboard ceiling. Breeze block walls. Concrete floor. Electrical Room: Concrete ceiling. Breeze block walls. Concrete floor. Modern electrics. Metal P3 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 10

17 Location Findings Photo Ref. Space ref: 016 Space ref: 017 Space ref: 018 Space ref: 019 Space ref: 020 Space ref: st Floor downpipe. Toilet. MMMF ceiling tiles with concrete above. Ceramic tiled breeze block and concrete walls. Ceramic tiled concrete floor. Ceramic cistern and plastic seat. Engineers Room: MMMF ceiling tiles with timber above. Plaster and brick walls. Modern vinyl on concrete floor. Engineers Store: Concrete ceiling. Breeze block and concrete walls. Concrete floor. Engineers Toilet. MMMF ceiling tiles with concrete above. Ceramic tiled breeze block and concrete walls. Ceramic tiled concrete floor. Ceramic cistern and plastic seat. Vestibule to Lift Lobby: MMMF ceiling tiles with concrete above. Breeze block, plaster and plasterboard walls. Carpet on concrete floor. Vestibule to Lift Lobby: MMMF ceiling tiles with concrete above. Breeze block, plaster and plasterboard walls. Carpet on concrete floor. Space ref: 022 Parking Area: Metal and concrete ceiling. Breeze block, brick, concrete, metal and timber walls. Concrete and mono-block floor. MMMF expansion joints. Plasterboard fire breaks. Metal trunking and cable trays. Timber and metal door panels. Metal S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 11

18 Location Findings Photo Ref. and plastic downpipes. MMMF lagged metal pipes. Insulating board panels to columns were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/001/001 and as such indicated this material to comprise a non-acm. Space ref: 023 Space ref: 024 Space ref: 025 Space ref: 026 Space ref: 027 Space ref: 028 Space ref: 029 Vermiculite panels to columns were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/001/002 and as such indicated this material to comprise a non- ACM. Electrical Room: Concrete ceiling. Breeze block walls. Concrete floor. Modern electrics. Metal downpipe. Fire Exit Vestibule: Concrete and plasterboard ceiling. Breeze block walls. Concrete floor. Fire Exit Vestibule: Concrete and plasterboard ceiling. Breeze block walls. Concrete floor. Store: Concrete ceiling. Timber and concrete walls. Concrete floor. Electrical Cupboard: Concrete ceiling. Breeze block walls. Concrete floor. Modern electrics. Metal downpipe. Fire Exit Vestibule: Concrete and plasterboard ceiling. Breeze block walls. Concrete floor. Service Riser: Concrete and timber ceiling. Breeze block, concrete and timber walls. Concrete floor. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 12

19 Location Findings Photo Ref. Space ref: 030 Space ref: 031 Space ref: 032 Space ref: 033 Space ref: 034 Space ref: 035 Space ref: 036 West Corridor 2 nd Floor Fire Exit Vestibule: Concrete and plasterboard ceiling. Breeze block walls. Concrete floor. Electrical Cupboard: Concrete ceiling. Breeze block walls. Concrete floor. Modern electrics. Metal downpipe. Electrical Cupboard: Concrete ceiling. Breeze block walls. Concrete floor. Modern electrics. Metal downpipe. Fire Exit Vestibule: Concrete and plasterboard ceiling. Breeze block walls. Concrete floor. Vermiculite panels to columns were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/001/002 and as such indicated this material to comprise a non- ACM. Electrical Cupboard: Concrete ceiling. Breeze block walls. Concrete floor. Modern electrics. Metal downpipe. Vestibule to Lift Lobby: MMMF ceiling tiles with concrete above. Breeze block, plaster and plasterboard walls. Carpet on concrete floor. Vestibule to Lift Lobby: MMMF ceiling tiles with concrete above. Breeze block, plaster and plasterboard walls. Carpet on concrete floor. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 13

20 Location Findings Photo Ref. Space ref: 037 Space ref: 038 Space ref: 039 Space ref: 040 Space ref: 041 Space ref: 042 Fire Escape: Concrete and metal ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF beam cladding. MMMF expansion joints. Corridor: Metal and plasterboard ceiling. Breeze block walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. A sample was obtained of the sprayed coating remnants to the high level areas for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/038/007 indicated this material to comprise a non-acm. Corridor: Metal and timber ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. A sample was obtained of the sprayed coating to beams and associated overspray for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/039/008 indicated this material to comprise a non-acm. Corridor: Metal and timber ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating to beams and associated overspray were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/039/008 and as such indicated this Corridor: Metal and timber ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating to beams and associated overspray were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/039/008 and as such indicated this A sample was obtained of the bitumen roof felt for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/041/009 indicated this Fire Escape: Concrete and plasterboard ceiling. P4 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 14

21 Location Findings Photo Ref. Space ref: 043 Space ref: 044 Space ref: 045 Space ref: 046 Space ref: 047 Breeze block, plasterboard and concrete walls. Concrete floor. MMMF expansion joints. Plasterboard infill panel. Plasterboard surrounds of dry riser. Gas Room: Concrete ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. A sample was obtained of the gaskets to pipe-work for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/043/014 indicated this material to contain Chrysotile (white) asbestos. Fire Escape: Concrete and plasterboard ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF expansion joints. Plasterboard infill panel. Corridor: Metal and timber ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating to beams and associated overspray were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/039/008 and as such indicated this Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Fire Escape: Concrete and plasterboard ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF expansion joints. Plasterboard infill panel. Corridor: Metal and timber ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating to beams and associated overspray were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/039/008 and as such indicated this P5 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 15

22 Location Findings Photo Ref. Space ref: 048 Space ref: 049 Space ref: 150 Space ref: 151 Space ref: 152 Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Electrics Room: Concrete and MMMF ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics. A sample was obtained of the vermiculite boxing for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/048/010 indicated this Corridor/Lift Lobby: Metal and timber ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. No access could be gained to the lift shafts. Further investigation will be required prior to any relevant works to this area. Fire Escape 10: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. Sprayed coating to beams and associated overspray were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/039/008 and as such indicated this Corridor: Metal ceiling. Breeze block, concrete and plasterboard walls. Concrete floor. MMMF insulated metal beams and pipes. Sprayed coating to beams and associated overspray were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/039/008 and as such indicated this Corridor: Metal ceiling. Breeze block, concrete and plasterboard walls. Concrete floor. MMMF insulated metal beams and pipes. Sprayed coating to beams and associated overspray were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/039/008 and as such indicated this P6 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 16

23 Location Findings Photo Ref. Space ref: 153 Space ref: rd Floor Corridor: Metal ceiling. Breeze block, concrete and plasterboard walls. Concrete floor. MMMF insulated metal beams and pipes. Sprayed coating to beams and associated overspray were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/039/008 and as such indicated this Electrics Room: Metal ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics. Space ref: 050 Space ref: 051 Space ref: 052 Space ref: 053 Electrics Room: Plasterboard ceiling. Plasterboard and breeze block walls, Concrete floor. Modern electrics. MMMF insulated metal beams. Bitumen damp proof course was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/005/005 and as such indicated this material to comprise a non- ACM. Corridor/Lift Lobby: Metal and timber ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. No access could be gained to the lift shafts. Further investigation will be required prior to any relevant works to this area. Corridor: MMMF to timber ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Corridor: MMMF to timber ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 17

24 Location Findings Photo Ref. Space ref: 054 Space ref: 055 Space ref: 056 Space ref: 057 MMMF insulated metal pipes. MMMF insulation to beams. A sample was obtained of the sprayed coating to beams and associated overspray for independent laboratory analysis. Analysis of sample ref: TSC/SL/3/053/011 indicated this material to comprise a non-acm. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Fire Escape: Concrete and plasterboard ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF expansion joints. Plasterboard infill panel. Corridor: MMMF to timber ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this A sample was obtained of the mastic to the metal duct-work for independent laboratory analysis. Analysis of sample ref: TSC/SL/3/055/012 indicated this Corridor: Metal ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Corridor: Metal ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 18

25 Location Findings Photo Ref. Space ref: 058 Space ref: 059 Space ref: 060 Space ref: 061 insulated metal pipes. MMMF insulation to beams. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Corridor: Metal ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Vermiculite was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/048/010 and as such indicated this Electrics Room: Metal ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics with timber panels to rear. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this A sample was obtained of the sprayed coating debris for independent laboratory analysis. Analysis of sample ref: TSC/SL/3/059/013 indicated this Corridor: Metal ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Vermiculite was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/048/010 and as such indicated this Corridor: Metal ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 19

26 Location Findings Photo Ref. Space ref: 062 Space ref: 063 Space ref: 064 Space ref: 065 Space ref: 149 insulated metal pipes. MMMF insulation to beams. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Electrics Room: Metal ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics with timber panels to rear. Vermiculite was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/048/010 and as such indicated this Corridor: Metal ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Store: Metal ceiling. Breeze block and concrete walls. Concrete floor. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Corridor: Metal ceiling. Breeze block, plasterboard and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF insulation to beams. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/053/011 and as such indicated this Lift Motor Room: Timber and MMMF ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics/plant. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 20

27 Location Findings Photo Ref. East Corridor 2 nd Floor Insulating board to the durasteel hatch was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/148/044 and as such indicated this Space ref: 067 Space ref: 068 Space ref: 069 Corridor & Stairs: Metal, plasterboard and concrete ceiling. Breeze block, concrete and plasterboard walls. Modern vinyl and concrete to floor. MMMF insulation to beams. Rubber stair nosings. Metal downpipes. MMMF lagged pipes. Modern electrics. Plasterboard surrounds to dry riser. A sample was obtained of the insulating board panel within fire door at top of stairs for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/067/015 indicated this A sample was obtained of the sprayed coating debris between the block-work on the stairs for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/067/016 indicated this A sample was obtained of the sprayed coating to the beams for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/067/017 indicated this Corridor: Metal ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Rubber stair nosings. Metal downpipes. MMMF lagged pipes. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Corridor: Metal ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Rubber stair nosings. Metal downpipes. MMMF lagged pipes. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this P7 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 21

28 Location Findings Photo Ref. Space ref: 070 Space ref: 092 Space ref: rd Floor Corridor: Metal ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Rubber stair nosings. Metal downpipes. MMMF lagged pipes. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Fire Escape 2A: Concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF to metal beams. Metal downpipe. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Fire Escape 2B: Concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF to metal beams. Metal downpipe. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Space ref: 071 Space ref: 072 Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Plant Room: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. Modern electrics and plant. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 22

29 Location Findings Photo Ref. Space ref: 073 Space ref: 074 Space ref: 075 Space ref: 076 Space ref: 077 Space ref: 078 Store: Metal ceiling. Breeze block and concrete walls. Concrete floor. Metal beams. Plastic pipes. Lift Motor Room: Metal ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics. MMMF clad metal beams. It is presumed that there may be asbestos brake pads to lift plant. Further investigation will be required prior to any relevant works to this area. Store: Metal ceiling. Breeze block and concrete walls. Concrete floor. MMMF clad metal beams. Plastic downpipes. A sample was obtained of the mastic to duct-work for independent laboratory analysis. Analysis of sample ref: TSC/SL/3/075/018 indicated this Store: Metal ceiling. Breeze block and concrete walls. Concrete floor. MMMF clad metal beams. Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Prayer Room: Metal ceiling. Breeze block, plasterboard and concrete walls. Modern vinyl on concrete floor. MMMF clad metal beams. Metal duct-work. Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/3/075/018 and as such indicated this S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 23

30 Location Findings Photo Ref. Space ref: 079 Space ref: 080 Space ref: 081 Space ref: 082 A sample was obtained of the mastic to the large duct-work for independent laboratory analysis. Analysis of sample ref: TSC/SL/3/078/019 indicated this A sample was obtained of the bitumen sink pad for independent laboratory analysis. Analysis of sample ref: TSC/SL/3/078/020 indicated this Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Fire Escape 2A: Plasterboard and concrete ceiling. Breeze block and concrete walls. Concrete floor. Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 24

31 Location Findings Photo Ref. Space ref: 083 Space ref: 084 Space ref: 085 Space ref: 086 Space ref: 087 TSC/SL/2/067/017 and as such indicated this Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Fire Escape 5: Plasterboard and concrete ceiling. Breeze block and concrete walls. Concrete floor. Modern damp proof course. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Fire Escape 2B: Plasterboard and concrete ceiling. Breeze block and concrete walls. Concrete floor. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 25

32 Location Findings Photo Ref. Space ref: 088 Space ref: 089 Space ref: 090 Space ref: 091 Space ref: 148 Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this A sample was obtained of the vermiculite for independent laboratory analysis. Analysis of sample ref: TSC/SL/3/088/021 indicated this Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Corridor: Metal, timber and MMMF to ceiling. Breeze block, concrete and plasterboard walls. Concrete to floor. MMMF insulation to beams. Metal downpipes. MMMF lagged pipes. Fire Escape 11: Timber and concrete ceiling. Breeze block and concrete walls. Concrete floor. Foam insulated metal pipes. Metal downpipes. Sprayed coating and its associated overspray was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/067/017 and as such indicated this Lift Motor Room: Timber and MMMF ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics/plant. A sample was obtained of the insulating board to S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 26

33 Location Findings Photo Ref. T1 Corridor Ground Floor the durasteel hatch for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/148/044 indicated this material to comprise a non-acm. Bitumen roof felt was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/041/009 and as such indicated this Space ref: 098 Space ref: 099 Space ref: 100 Space ref: 101 Corridor: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. A sample was obtained of the insulating board beam cladding for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/098/023 indicated this Corridor/lift lobby: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Corridor: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Stairwell: Concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. A sample was obtained of the insulating board wall S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 27

34 Location Findings Photo Ref. Space ref: st Floor panels for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/101/024 indicated this Store: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Space ref: 103 Space ref: 104 Space ref: 105 Space ref: 106 Corridor: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Corridor/lift lobby: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Modern electrics. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Corridor: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Vestibule: Metal and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 28

35 Location Findings Photo Ref. Space ref: nd Floor Stairwell: Concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Space ref: 108 Space ref: 109 Space ref: 110 Space ref: 111 Space ref: 112 Corridor: Concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Corridor/lift lobby: Concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Corridor: Concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Corridor: Metal, plasterboard and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF fire-breaks. Corridor: Metal, plasterboard and concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. MMMF fire-breaks. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 29

36 Location Findings Photo Ref. Space ref: 113 Space ref: 116 Space ref: 117 Space ref: 118 Space ref: 119 Roof Space: Limited Access Metal ceiling. Plasterboard and breeze block walls. Timber, plasterboard and metal floor. A sample was obtained of the sprayed coating to the beams for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/112/025 indicated this A sample was obtained of the sprayed coating debris for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/112/026 indicated this material to comprise a non-acm Corridor: Metal ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Walkway: Metal ceiling. Roughcast, plaster, brick and metal walls. Concrete floor. A sample was obtained of the bitumen damp felt to the walls for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/117/028 indicated this Corridor/lift lobby: Metal ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. A sample was obtained of the supalux panels for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/118/029 indicated this Former Security Rooms: MMMF ceiling tiles with concrete above. Plaster and brick walls. Carpet on concrete floor. Modern electrics. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 30

37 Location Findings Photo Ref. 3 rd Floor Space ref: 114 Space ref: 115 T1 Car Park Water Tank Room: Metal ceiling. Breeze block walls. Concrete floor. Plastic tank. MMMF insulated pipes. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Insulating board wall panels were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/101/024 and as such indicated this material to comprise a non- ACM. Lift Motor Room: Metal ceiling. Breeze block walls. Concrete floor. Modern lift plant. Insulating board beam cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/098/023 and as such indicated this material to comprise a non- ACM. Service Yard Area Space ref: 120 Service Yard: Metal and concrete ceiling. Breeze block, concrete and brick walls. Concrete floor. MMMF insulated pipe-work limited access below insulation. Metal tank. Metal downpipes. Plastic pipes. Metal and timber infill panels. A sample was obtained of the insulating board column cladding for independent laboratory analysis. Analysis of sample ref: TSC/SL/B/120/028 indicated this A sample was obtained of the insulating board panel to the right hand side of the goods lift for independent laboratory analysis. Analysis of sample ref: TSC/SL/B/120/031 indicated this material to contain Amosite (brown) and Chrysotile (white) asbestos. A sample was obtained of the mastic for independent laboratory analysis. Analysis of sample ref: TSC/SL/B/120/032 indicated this A sample was obtained of the red mastic for P8 P9 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 31

38 Location Findings Photo Ref. Space ref: 121 Space ref: 122 Space ref: 123 Space ref: 124 Space ref: 125 independent laboratory analysis. Analysis of sample ref: TSC/SL/B/120/033 indicated this It is presumed that there may be flash guards present within live electrics. Further investigation will be required prior to any relevant works to this area. It is presumed that there may be gaskets to insulated pipe-work. Further investigation will be required prior to any relevant works to this area. On previous S2 survey dated 8 th September 2010 a cement panel containing Chrysotile (white) asbestos was found. This was not found on current survey, however as there is no record of its removal it should be presumed that sample ref: TSC/CH/SA/005/002 is still in place. South Switch Room: Concrete ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics. Switch Room: Concrete and metal ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics. Wet Riser Room: Concrete ceiling. Breeze block and concrete walls. Concrete floor. Timber infill panels. A sample was obtained of the gaskets for independent laboratory analysis. Analysis of sample ref: TSC/SL/B/123/034 indicated this Switch Room: Concrete and metal ceiling. Breeze block and concrete walls. Concrete floor. Modern electrics. Car Park: Concrete and metal ceiling. Breeze block and concrete walls. Concrete floor. Metal fire hose surrounds. Metal downpipe. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 32

39 Location Findings Photo Ref. Space ref: 126 Space ref: 126a Car Park Generator Room: Concrete and metal ceiling. Breeze block and concrete walls. Concrete floor. It is presumed that there may be gaskets to generator/plant. Further investigation will be required prior to any relevant works to this area. Car Park: Concrete and metal ceiling. Breeze block and concrete walls. Concrete floor. Metal downpipe. Space ref: 127 Space ref: 128 Space ref: 129 Space ref: 130 Space ref: 131 Space ref: 132 Levels 1 & 2: Concrete ceiling. Concrete, plasterboard and timber walls. Concrete floor. Metal duct-work. Plastic pipes. A sample was obtained of supalux panels at sprinkler stop valve room for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/127/035 indicated this material to comprise a non-acm. Lift Motor Room: Concrete ceiling. Brick and concrete walls. Concrete floor. Modern lift plant. Sprinkler Stop Valve Room: Concrete and metal ceiling. Brick and concrete walls. Concrete floor. Rubber gaskets. Electrics Cupboard: Concrete ceiling. Brick and concrete walls. Concrete floor. Modern electrics. Lift Lobby: Concrete ceiling. Brick and concrete walls. Concrete floor. Lift Motor Room: Concrete ceiling. Brick and concrete walls. Concrete floor. Metal beams. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 33

40 Location Findings Photo Ref. Space ref: 133 Space ref: 134 Space ref: 135 Space ref: 136 Space ref: 137 Space ref: 138 A sample was obtained of mastic to the duct-work for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/132/036 indicated this It is presumed that there may be brake pads to lift plant. Further investigation will be required prior to any relevant works to this area. Disabled Toilet. Plasterboard ceiling. Ceramic tiled walls. Modern vinyl on concrete floor. Ceramic cistern and plastic seat. Electrics Cupboard: Concrete ceiling. Brick and concrete walls. Concrete floor. Modern electrics. Store Room: Concrete ceiling. Brick and concrete walls. Concrete floor. Fire Escape Stairs: Concrete ceiling. Brick and concrete walls. Concrete floor. A sample was obtained of insulating board column cladding for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/136/037 indicated this Levels 3 & 4: Concrete ceiling. Concrete, plasterboard and timber walls. Concrete floor. Metal duct-work. Plastic pipes. Insulating board column cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/CP/136/037 and as such indicated this material to comprise a non- ACM. A sample was obtained of the vermiculite cladding to the pipes for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/137/038 indicated this Lift Lobby: Concrete ceiling. Brick and concrete walls. Concrete floor. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 34

41 Location Findings Photo Ref. Space ref: 139 Space ref: 140 Space ref: 141 Space ref: 142 Space ref: 143 Electrics Cupboard: Concrete ceiling. Brick and concrete walls. Concrete floor. Modern electrics. Insulating board above the door was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/CP/136/037 and as such indicated this material to comprise a non- ACM. Duct Below Escalators: Concrete ceiling. Brick and concrete walls. Concrete floor. A sample was obtained of the insulating board beam cladding for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/140/039 indicated this Levels 5 & 6: Concrete ceiling. Concrete, plasterboard and timber walls. Concrete floor. Metal duct-work. Plastic pipes. A sample was obtained of the insulating board to the left hand side of fire escape stairs for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/141/040 indicated this material to contain Amosite (brown) and Chrysotile (white) asbestos. Insulating board above the door was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/CP/136/037 and as such indicated this material to comprise a non- ACM. Stairwell: Metal and concrete ceiling. Plaster, quarry tiles and brick walls. Ceramic tiled concrete floor. Insulating board beam cladding/window surrounds were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/CP/136/037 and as such indicated this A sample was obtained of the insulating board boxing for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/142/041 indicated this Stairs to Shops (exit opposite BHS): Concrete ceiling. Plaster, brick and concrete walls. Ceramic tiled concrete floor. P10 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 35

42 Location Findings Photo Ref. Space ref: 144 Space ref: 145 Space ref: 146 Space ref: 147 Shopping Mall 1 st Floor Help Point Kiosk: Concrete ceiling. Plasterboard walls. Modern vinyl on concrete floor. Toilet: Concrete ceiling. Plasterboard, plaster and brick walls. Modern vinyl on concrete floor. Timber riser behind cistern. A sample was obtained of the Shires Lynx toilet cistern for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/145/042 indicated this material to contain Amosite (brown) asbestos. Kitchen: Concrete ceiling. Plasterboard walls. Modern vinyl on concrete floor. A sample was obtained of the bitumen sink pads for independent laboratory analysis. Analysis of sample ref: TSC/SL/CP/146/043 indicated this Electrics Store: Concrete ceiling. Plasterboard, plaster and brick walls. Modern vinyl on concrete floor. Modern electrics. Timber panels at windows. Space ref: 161 Space ref: 162 Space ref: 163 Toilet Entrance: Plasterboard ceiling. Plasterboard and ceramic tiles to walls. Quarry tiled floor. Calorifier Room: Plasterboard ceiling. Plasterboard and ceramic tiles to walls. Quarry tiled floor. Foam insulated metal calorifier. Female Toilet: Plasterboard ceiling. Plasterboard and ceramic tiles to walls. Quarry tiled floor. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 36

43 Location Findings Photo Ref. Space ref: 164 Space ref: 165 Space ref: 166 Space ref: 167 Space ref: 168 Cleaners Store: Metal ceiling. Breeze block walls. Concrete floor. MMMF insulated metal pipes. Plasterboard beam cladding. A sample was obtained of mastic for independent laboratory analysis. Analysis of sample ref: TSC/SL/1/164/054 indicated this material to comprise a non-acm. Service Riser: Concrete ceiling. Breeze block walls. Concrete floor. MMMF insulated metal pipes. Plastic cisterns. A sample was obtained of the textured coating to the ceiling and walls for independent laboratory analysis. Analysis of sample ref: TSC/SL/1/165/055 indicated this Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/164/054 and as such indicated this Fire Escape: Concrete ceiling. Breeze block walls. Concrete floor. A sample was obtained of the bitumen to the floor for independent laboratory analysis. Analysis of sample ref: TSC/SL/1/166/056 indicated this material to contain Chrysotile (white) asbestos. Textured coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/165/055 and as such indicated this Service Riser: Concrete ceiling. Breeze block walls. Concrete floor. MMMF insulated metal pipes. Plastic cisterns. Textured coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/165/055 and as such indicated this Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/164/054 and as such indicated this Service Riser: Concrete ceiling. Breeze block walls. Concrete floor. MMMF insulated metal pipes. Plastic cisterns. P11 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 37

44 Location Findings Photo Ref. Space ref: 169 Space ref: nd Floor Textured coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/165/055 and as such indicated this Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/164/054 and as such indicated this Male Toilet: Plasterboard ceiling. Plasterboard and ceramic tiles to walls. Quarry tiled floor. Fire Escape Stairs: Plasterboard ceiling. Plasterboard and ceramic tiles to walls. Quarry tiled floor. Space ref: 171 Space ref: 172 Space ref: 173 Space ref: 174 Corridor/Fire Escape: Concrete ceiling. Brick walls. Concrete floor. Metal downpipe. MMMF insulated metal pipes. Corridor Concrete ceiling. Brick walls. Concrete floor. Metal downpipe. MMMF insulated metal pipes. Toilet Corridor: Metal and plasterboard ceiling. Plasterboard, plaster and breeze block walls. Quarry tiled concrete floor. MMMF insulated metal duct-work. Corridor: Plasterboard ceiling with concrete above. Plasterboard and ceramic tiled walls. Quarry tiled concrete floor. MMMF insulated metal duct-work within ceiling void. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 38

45 Location Findings Photo Ref. Space ref: 175 Space ref: 176 Space ref: 177 Space ref: 178 Space ref: 179 Space ref: 180 Space ref: 181 Space ref: 182 Cleaners Store: Concrete ceiling. Plasterboard walls. Quarry tiled floor. Disabled Toilet: MMMF ceiling tiles. Ceramic tiled walls. Quarry tiled floor. Disabled Toilet: Plasterboard ceiling. Ceramic tiled walls. Quarry tiled floor. Disabled Toilet: Plasterboard ceiling. Ceramic tiled walls. Quarry tiled floor. Disabled Toilet: Plasterboard ceiling. Ceramic tiled walls. Quarry tiled floor. Fire Escape at Help Desk: Concrete and plasterboard ceiling. Brick and concrete walls. Concrete floor. A sample was obtained of the textured coating to the ceiling for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/180/057 indicated this material to contain Chrysotile (white) asbestos. A sample was obtained of the textured coating to the walls for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/180/058 indicated this Vestibule: Plasterboard ceiling. Plasterboard and plaster walls. Ceramic tiled floor. Riser: Metal and concrete ceiling. Breeze block walls. Concrete floor. Sprayed coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/189/060 and as such S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 39

46 Location Findings Photo Ref. Space ref: 183 Space ref: 184 Space ref: 185 Space ref: 186 Space ref: 187 indicated this Corridor: Plasterboard ceiling tiles. Plasterboard and breeze block walls. Ceramic tiled floor. A sample was obtained of the insulating board ceiling tiles for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/183/059 indicated this Male Toilet: Plasterboard ceiling tiles. Plasterboard and breeze block walls. Ceramic tiled floor. Insulating board ceiling tiles were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/ and as such indicated this material to comprise a non- ACM. Sprayed coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/189/060 and as such indicated this Disabled Toilet: Plasterboard ceiling tiles. Plasterboard and breeze block walls. Ceramic tiled floor. Insulating board ceiling tiles were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/ and as such indicated this material to comprise a non- ACM. Sprayed coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/189/060 and as such indicated this Baby Change Room: Plasterboard ceiling tiles. Plasterboard and breeze block walls. Ceramic tiled floor. Insulating board ceiling tiles were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/ and as such indicated this material to comprise a non- ACM. Sprayed coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/189/060 and as such indicated this Female Toilet: Plasterboard ceiling tiles. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 40

47 Location Findings Photo Ref. Space ref: 188 Space ref: 189 Space ref: 190 Space ref: 191 Space ref: 192 Plasterboard and breeze block walls. Ceramic tiled floor. Insulating board ceiling tiles were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/ and as such indicated this material to comprise a non- ACM. Sprayed coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/189/060 and as such indicated this Cleaners Store: Plasterboard and concrete ceiling. Breeze block walls. Concrete floor. Plasterboard boxing panels. Ceiling Void Above Toilet Block at Lifts: Metal and concrete ceiling. Breeze block walls. Plastic tank. MMMF insulated pipes. A sample was obtained of the sprayed coating for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/189/060 indicated this Fire Escape Next to Next : Metal and concrete ceiling. Breeze block walls. Concrete floor. Plasterboard beam cladding. Fire Escape next to Primark: Metal and plasterboard ceiling, Breeze block walls. Concrete floor. Sprayed coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/2/189/060 and as such indicated this A sample was obtained of the insulating board above the doors for independent laboratory analysis. Analysis of sample ref: TSC/SL/2/191/061 indicated this Fire Escape to left hand side of Topman: Metal and plasterboard ceiling, Breeze block walls. Concrete floor. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 41

48 Location Findings Photo Ref. Space ref: 193 Space ref: 066 Space ref: 094 Space ref: 095 Space ref: 096 Space ref: 097 Management Suite Fire Escape to right hand side of Debenhams: Metal and plasterboard ceiling, Breeze block walls. Concrete floor. Fire Escape between EE and Vision Express: Concrete ceiling. Breeze block, concrete and plasterboard walls. MMMF insulated metal beams. Metal pipes. Sprayed coating was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/G/053/011 and as such indicated this Vestibule: Concrete ceiling. Plaster, brick and concrete walls. Concrete floor. Fire Escape: Concrete ceiling. Plaster, brick and concrete walls. Ceramic tiles on concrete floor. Store/Sluice: Concrete and plasterboard ceiling. Plasterboard, brick and concrete walls. Quarry tiled floor. A sample was obtained of the textured coating to the ceiling for independent laboratory analysis. Analysis of sample ref: TSC/SL/G/096/022 indicated this material to contain Chrysotile (white) asbestos. Fire Escape: Concrete ceiling. Plaster, brick and concrete walls. Ceramic tiles on concrete floor. Insulating board column cladding was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/CP/136/037 and as such indicated this material to comprise a non- ACM. P12 Space ref: 194 Lift Lobby: Fixed metal ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 42

49 Location Findings Photo Ref. Space ref: 195 Space ref: 196 Space ref: 197 Space ref: 198 Space ref: 199 Space ref: 200 No access within lift shafts. Vestibule: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Store Room: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Corridor: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Cleaners Store: Plaster and breeze block walls. Modern vinyl on concrete floor. A sample was obtained of the insulating board panels to the ceiling for independent laboratory analysis. Analysis of sample ref: TSC/SL/1/198/062 indicated this Corridor: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Insulating board ceiling panels were observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/198/062 and as such indicated this material to comprise a non- ACM. Boiler Room: Concrete ceiling. Breeze block and concrete walls. Concrete floor. MMMF insulated metal pipes. A sample was obtained of the rope to the boiler for S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 43

50 Location Findings Photo Ref. Space ref: 201 Space ref: 202 Space ref: 203 Space ref: 204 Space ref: 205 independent laboratory analysis. Analysis of sample ref: TSC/SL/1/200/064 indicated this It is presumed that there may be gaskets to the boiler and associated pipe-work. Further investigation will be required prior to any relevant works to this area. Female Toilet: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. A sample was obtained of the mastic to the ductwork for independent laboratory analysis. Analysis of sample ref: TSC/SL/1/201/063 indicated this Male Toilet: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/201/063 and as such indicated this Fire Escape: Concrete ceiling. Breeze block and concrete wall. Concrete floor. Office: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Locker Room: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 44

51 Location Findings Photo Ref. Space ref: 206 Space ref: 207 Space ref: 208 Space ref: 209 Space ref: 210 Space ref: 211 Corridor: Plasterboard panels and MMMF tiles to ceiling. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/201/063 and as such indicated this Fire Escape: Concrete ceiling. Breeze block and concrete wall. Concrete floor. Rubber stair nosings. Store: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/201/063 and as such indicated this Staff Room: MMMF ceiling tiles. Plaster and breeze block walls. Modern vinyl on concrete floor. Timber boxing panels. Modern sink pad. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/1/201/063 and as such indicated this Store: Concrete ceiling. Breeze block walls. Concrete floor. Vestibule: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 45

52 Location Findings Photo Ref. Space ref: 212 Space ref: 213 Space ref: 214 Space ref: 215 Space ref: 216 Space ref: 217 Corridor: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Female Toilet: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Male Toilet: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Corridor: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Kitchen: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Office: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 46

53 Location Findings Photo Ref. Space ref: 218 Space ref: 219 Space ref: 220 Space ref: 221 Space ref: 222 Space ref: 223 Meeting Room: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Carpet on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Office: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Carpet on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Office: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Carpet on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Security Office: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Carpet and rubber on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Corridor: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Office/Reception: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Carpet on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 47

54 Location Findings Photo Ref. Space ref: 224 Space ref: 225 Space ref: 226 Shopping Mall Cleaners Store: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Male Toilet: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Female Toilet: MMMF ceiling tiles. Plaster, plasterboard and breeze block walls. Modern vinyl on concrete floor. Ceiling Void Concrete ceiling. Breeze block walls. MMMF insulated metal pipes. Space ref: 227 Plasterboard and metal tiles to ceiling. Plasterboard, plaster and breeze block wall. Modern vinyl on concrete floor. Rubber stair nosings. A sample was obtained of the sprayed coating residues within the ceiling void for independent laboratory analysis. Analysis of sample ref: TSC/SL/MALL/227/066 indicated this material to comprise a non-acm. A sample was obtained of the insulating board wall panels for independent laboratory analysis. Analysis of sample ref: TSC/SL/MALL/227/067 indicated this A sample was obtained of the sprayed coating within the ceiling void for independent laboratory analysis. Analysis of sample ref: TSC/SL/MALL/227/068 indicated this material to comprise a non-acm. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 48

55 Location Findings Photo Ref. Externals Roof off West corridor: Metal and concrete roof. Brick and concrete walls. Metal flashings. Metal duct-work. Modern chiller units/ahu. Metal pipes. Metal fascias. A sample was obtained of the bitumen roof felt for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/W/045 indicated this A sample was obtained of the mastic to the ductwork for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/W/046 indicated this A sample was obtained of the cement undercloaking for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/W/047 indicated this P13 Roof Space at 115 Lift Motor Room: Metal roof. Breeze block, metal and concrete walls. Concrete to ground. Metal duct-work. Modern AHU s. A sample was obtained of the mastic to the ductwork for independent laboratory analysis. Analysis of sample ref: TSC/SL/EXT/027 indicated this Space ref: 155 Space ref: 156 Underside of Bridge Above Road: No access to panels. Presumed to be insulating board. Further investigation will be required prior to any relevant works. South Switch Room: Concrete ceiling. Brick and concrete walls. Concrete floor. It is presumed that there may be asbestos flashguards within the live electrics. Further investigation will be required prior to any relevant works to this area. Plant Room No.2: Concrete ceiling. Brick and concrete walls. Concrete floor. It is presumed that there may be asbestos flashguards within the live electrics. Further investigation will be required prior to any relevant works to this area. A sample was obtained of the cement panel to the P14 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 49

56 Location Findings Photo Ref. Space ref: 157 Space ref: 158 Space ref: 159 ceiling for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/156/048 indicated this material to contain Chrysotile (white) asbestos. A sample was obtained of the mastic to the ductwork for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/156/049 indicated this Plant Room No.1: Concrete ceiling. Brick and concrete walls. Concrete floor. It is presumed that there may be asbestos flashguards within the live electrics. Further investigation will be required prior to any relevant works to this area. A sample was obtained of the loose lying promenade tiles for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/157/050 indicated this material to comprise a non-acm. A sample was obtained of the bitumen to the ceiling for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/157/051 indicated this A sample was obtained of the rope to the plant for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/157/052 indicated this Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/ROOF/156/049 and as such indicated this Master Freeze Lift Room: Concrete ceiling. Brick and concrete walls. Concrete floor. It is presumed that there may be asbestos flashguards within the live electrics. Further investigation will be required prior to any relevant works to this area. It is presumed that there may be asbestos brake pads to the lift plant. Further investigation will be required prior to any relevant works to this area. Plant Room No.4: Concrete ceiling. Brick and concrete walls. Concrete floor. It is presumed that there may be asbestos flashguards within the live electrics. Further P15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 50

57 Location Findings Photo Ref. Space ref: 160 investigation will be required prior to any relevant works to this area. Mastic was observed in this area. This material was observed to be visually similar to sample ref: TSC/SL/ROOF/156/049 and as such indicated this North Tank Room: Concrete ceiling. Brick and concrete walls. Concrete floor. Metal tank with polystyrene insulation. MMMF insulated pipes. A sample was obtained of the bitumen to the floor for independent laboratory analysis. Analysis of sample ref: TSC/SL/ROOF/160/053 indicated this Photographs Photo 1: Sample ref: TSC/SL/G/001/001 Insulating board panels S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 51

58 Photo 2: Sample ref: TSC/SL/G/001/002 Vemiculite cladding Photo 3: Presumed asbestos within generator plant S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 52

59 Photo 4: Sample ref: TSC/SL/2/039/008 Sprayed Coating Photo 5: Sample ref: TSC/SL/2/043/014 Gaskets S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 53

60 Photo 6: Sample ref: TSC/SL/2/048/010 Vermiculite Photo 7: Sample ref: TSC/SL/2/067/015 Insulating board panels within fire door S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 54

61 Photo 8: Sample ref: TSC/SL/B/120/028 Insulating board beam cladding Photo 9: Sample ref: TSC/SL/B/120/031 Insulating board panel above shutter S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 55

62 Photo 10: Sample ref: TSC/SL/CP/141/040 Vermiculite Photo 11: Sample ref: TSC/SL/1/166/056 Bitumen to floor S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 56

63 Photo 12: Sample ref: TSC/SL/G/096/022 Textured coating to ceiling Photo 13: Sample ref: TSC/SL/ROOF/W/047 Cement undercloaking S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 57

64 Photo 14: Presumed insulating board panels to underside of bridge. Photo 15: Sample ref: TSC/SL/ROOF/157/052 Rope S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 58

65 Asbestos Survey Appendix 1 - Copies of Analysis Reports S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Survey - Page 59

66

67

68

69

70

71

72

73 Asbestos Register for Thistle Shopping Centre Asbestos Register Site: Thistle Shopping Centre Goosecroft Road Stirling FK8 2GA Client: SLI Shopping Centre Trust Date of Assessment: th August 2014 Name of Assessor: Stephen Lang Date for review 27 th August 2015 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Register - Page 1

74 Asbestos Register for Thistle Shopping Centre Contents Introduction... 3 Asbestos Register... 4 CAD Drawings... 6 This Asbestos Register forms part of an Asbestos Management System and has been compiled on behalf of Standard Life Group by The S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Tel: Fax: info@s2partnership.co.uk S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Register - Page 2

75 Introduction Asbestos Register for Thistle Shopping Centre This section of the manual comprises the current Asbestos Register. The purpose of the Asbestos Register is to document the location, type and condition of any asbestos known to be present in the building. It is important to keep the Asbestos Register up to date by noting any changes. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Register - Page 3

76 Asbestos Register for Thistle Shopping Centre Asbestos Register Occupant Details: Thistle Shopping Centre Comments / Notes Floor Room Product Type Extent Accessibility Asbestos type Identification Level Damage Surface Treatment (inc. Updated information) Date G 043 Gaskets to pipe-work NQ Difficult Chrysotile Sampled None Unsealed G Textured Coating 60m2 20m2 Medium Chrysotile Sampled None Sealed B 120 Insulating board infill panel 2m2 Medium Amosite Chrysotile Sampled Minor Unsealed CP level Insulating board panel at stairs 2m2 Easy Amosite Chrysotile Sampled None Sealed CP level Toilet Cistern 1No. Easy Amosite Sampled None Sealed Roof 156 Cement panel to ceiling Bitumen to floor 1m2 Difficult Chrysotile Sampled None Unsealed 10m2 Easy Chrysotile Sampled None Composite material G B 1 002,003 & Gaskets NQ Difficult Chrysotile Presumed None Sealed Further investigation required prior to relevant works. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Register - Page 4

77 Asbestos Register for Thistle Shopping Centre Occupant Details: Thistle Shopping Centre Comments / Notes Floor Room Product Type B ROOF CP level 1 ROOF B 120 Cement panel External Ext. Insulating board to underside of bridge Extent Accessibility Asbestos type Identification Level Damage Surface Treatment (inc. Updated information) Flash-guards NQ Difficult Chrysotile Presumed None Sealed Further investigation required prior to relevant works. Brake Pads NQ Difficult Chrysotile Presumed None Sealed Further investigation required prior to relevant works. 1m1 Difficult Chrysotile Sampled None Sealed Not seen during 2014 survey. Presumed to still be in place as no certification of its removal. NQ Difficult Amosite Presumed None Sealed Further investigation required prior to relevant works. Date 19/08/2014 Notes to Asbestos Register: Samples taken and analysed were typical of the materials present throughout the site. They are representative By visual examination it was possible to identify the similarity of material and positions to those analysed S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Register - Page 5

78 Asbestos Register for Thistle Shopping Centre CAD Drawings for this building can be found within S2 Partnership Asbestos Management Survey dated 25 November 2010 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Register - Page 6

79 Asbestos Risk Assessment for Thistle Shopping Centre Asbestos Risk Assessment Site: Thistle Shopping Centre Goosecroft Road Stirling FK8 2GA Client: SLI Shopping Centre Trust Date of Assessment: th August 2014 Name of Assessor: Stephen Lang Date for review 27 th August 2015 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 1

80 Contents Asbestos Risk Assessment for Thistle Shopping Centre Introduction... 3 Asbestos Risk Assessment Criteria... 3 Part A - Risk of Fibre Release (Material Assessment)...3 Part B - Hazard Factors...4 Part C - Assessing Risk with the Risk Level Indicator...5 Part D - Summary of Recommendations for Control...5 Risk Assessment... 6 This Asbestos Risk Assessment forms part of the Asbestos Management Documentation and has been compiled on behalf of Standard Life Group by The S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Tel: Fax: info@s2partnership.co.uk S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 2

81 Asbestos Risk Assessment for Thistle Shopping Centre Introduction The Asbestos Register in the previous section identifies locations on site where asbestos containing materials (ACMs) have been identified, or are presumed to be present. This Risk Assessment part of the Asbestos Management System document examines and assesses the health & safety risks posed by those ACMs. Asbestos Risk Assessment Criteria The assessment is summarised on the attached Risk Assessment Table. There are four main parts: Part A - Considering the Risk of Fibre Release (material assessment) Part B - Considering the Hazard Factors Part C - Assessing current Safety Risk Part D - Recommending Action to Control Risk More detailed explanations of these Parts is found below. Part A - Risk of Fibre Release (Material Assessment) The four main parameters which will determine the amount of fibre release from an ACM when subject to a standard disturbance are: o product type o extent of damage or deterioration o surface treatment o asbestos type In arriving at a numerical assessment of risk for each ACM (The Material Assessment), each parameter is scored as: High 3 Medium 2 Low 1 There are two instances where a score of 0 is permitted: a) Where the material is in good condition without damage, or b) Where the material is a composite such as reinforced plastic, resins, vinyl tiles Range Meaning S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 3

82 Asbestos Risk Assessment for Thistle Shopping Centre 10 or more High potential to release asbestos fibres if disturbed 7 to 9 Medium potential 5 to 6 Low potential 4 or less Very low potential Part B - Hazard Factors The material assessment in Part A above identifies the high risk materials, that is those which will most easily release airborne fibres if disturbed. It does not automatically follow that those materials assigned the highest score in the material assessment will be those that should be given priority for remedial action. Such priority must be determined by risk assessment, which takes into account hazard factors such as: Location of the materials Accessibility The extent of the material Use of the material Occupancy of the area Activities carried on in the area Likelihood/frequency with which maintenance activities are likely to take place in the area Condition, friability and asbestos content of the material Surface treatment of the material The risk assessment can be carried out only with detailed knowledge of all the above information. The risk assessments are made by the surveyor, based on experience, observations, analysis and information provided at the time. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 4

83 Part C - Assessing Risk with the Risk Level Indicator Asbestos Risk Assessment for Thistle Shopping Centre The assessment of health and safety risk considers Fibre Release Potential, together with the Likelihood of Exposure. First Fibre Release Potential Ł Then likelihood of exposureœ Low / Very Low Medium High Highly Unlikely Trivial Risk Tolerable Risk Moderate Risk Unlikely Tolerable Risk Moderate Risk Substantial Risk Likely Moderate Risk Substantial Risk Intolerable Risk Part D - Summary of Recommendations for Control This part contains a summary of recommendations to control risk. Detailed recommendations can be found in the Report of Recommendations section of this Asbestos Smasher system. The priority of recommended action depends on the risk level: Trivial Risk Tolerable Risk Moderate Risk Substantial Risk Intolerable Risk No action is required Additional controls may be necessary, eg. labelling asbestos, instruction and management Consideration may be given to a more cost-effective solution or to improvement that imposes no extra cost Regular monitoring of existing controls is essential Effort is required to reduce the risk Cost of control should be measured and limited Risk control measures should be implemented within a set time scale Think again about the likelihood if a moderate risk is associated with extremely harmful consequences Work should not be started until the risk has been reduced Considerable resources may have to be allocated to reduce the risk Where the risk involves work in progress urgent action should be taken Work should not be started or continued until the risk has been reduced If it is not possible to reduce the risk even with unlimited resources then work must be prohibited No action required Action within MONTHS Action within WEEKS Action within DAYS Action NOW In most cases the risks arising from a hazard will be brought to the Tolerable level by the application of all the suggested controls. If you cannot devise controls to reduce the risk to an acceptable level you should seek advice from the S 2 Partnership. S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 5

84 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Gaskets to pipework Location Space refs: 043 Extent NQ Analysis Sampled Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Chrysotile 1 Product Type Gasket 2 Damage / Condition No damage 0 Surface Treatment Unsealed 1 Total Fibre Release Score 4 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Frequent routine maintenance Difficult Low Good Unsealed High Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Trivial Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 6

85 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Textured Coating Location Space refs: 096 & 180 Extent 60m2 & 20m2 Analysis Sampled Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Chrysotile 1 Product Type Textured Coating 1 Damage / Condition No damage 0 Surface Treatment Sealed 0 Total Fibre Release Score 2 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Frequent routine maintenance Difficult Low Good Sealed Low Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Trivial Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 7

86 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Insulating board infill panels Location Space refs: 120 Extent 2m2 Analysis Sampled Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Amosite & Chrysotile 2 Product Type Insulating Board 2 Damage / Condition Minor 1 Surface Treatment Unsealed 2 Total Fibre Release Score 7 Potential for Fibre Release Medium Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Frequent routine maintenance Medium Medium Fair Unsealed Medium Part C - Overall Assessment of Risk Likelihood of Exposure: Moderate Unlikely Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Encapsulate; Label Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 8

87 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Insulating board panel at stairs Location Space refs: 141 Extent 2m2 Analysis Sampled Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Amosite & Chrysotile 2 Product Type Insulating Board 2 Damage / Condition None 0 Surface Treatment Sealed 1 Total Fibre Release Score 5 Potential for Fibre Release Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy High occupancy Activities carried out Car Park Likelihood and frequency of maintenance activities Frequent routine maintenance Easy Medium Good Sealed Medium Part C - Overall Assessment of Risk Likelihood of Exposure: Tolerable Unlikely Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Label Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 9

88 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Toilet Cistern Location Space refs: 145 Extent 1 No. Analysis Sampled Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Amosite 2 Product Type Reinforced Composite 1 Damage / Condition None 0 Surface Treatment Sealed 0 Total Fibre Release Score 3 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Infrequent maintenance Low Low Good Sealed Medium Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Trivial Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Label Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 10

89 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Cement panel to ceiling Location Space refs: 156 Extent 1m2 Analysis Sampled Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Chrysotile 1 Product Type Cement 1 Damage / Condition Minor 1 Surface Treatment Unsealed 1 Total Fibre Release Score 4 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Infrequent maintenance Difficult Low Fair Unsealed Low Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Trivial Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Label Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 11

90 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Bitumen to floor Location Space refs: 166 Extent 10m2 Analysis Sampled Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Chrysotile 1 Product Type Reinforced composite 1 Damage / Condition None 0 Surface Treatment Composite material 0 Total Fibre Release Score 2 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Infrequent maintenance Difficult Low Fair Unsealed Low Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Trivial Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Label Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 12

91 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Gaskets Location Space refs: 002,003,007,126 & 200 Extent NQ Analysis Presumed Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Chrysotile 1 Product Type Gasket 2 Damage / Condition No damage 0 Surface Treatment Unsealed 1 Total Fibre Release Score 4 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Frequent routine maintenance Difficult Low Good Unsealed High Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Trivial Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Carry out further investigation prior to relevant works. Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 13

92 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Flash-guards Location Space refs: 120 & Extent NQ Analysis Presumed Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Chrysotile 1 Product Type Textile 2 Damage / Condition No damage 0 Surface Treatment Sealed 1 Total Fibre Release Score 4 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Infrequent maintenance Difficult Low Good Sealed High Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Trivial Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Carry out further investigation prior to relevant works. Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 14

93 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Brake pads Location Space refs: 132 & 158 Extent NQ Analysis Presumed Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Chrysotile 1 Product Type Textile 2 Damage / Condition No damage 0 Surface Treatment Sealed 1 Total Fibre Release Score 4 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Infrequent maintenance Difficult Low Good Sealed High Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Trivial Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Carry out further investigation prior to relevant works. Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 15

94 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Cement panel Location Space refs: 120 Extent NQ Analysis Sampled on previous survey (not found on 2014 survey) Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Chrysotile 1 Product Type Cement 2 Damage / Condition No damage 0 Surface Treatment Sealed 0 Total Fibre Release Score 3 Potential for Fibre Release Very Low Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration Internal Occupancy Low occupancy Activities carried out Maintenance activities Likelihood and frequency of maintenance activities Infrequent maintenance Difficult Low Good Sealed Low Part C - Overall Assessment of Risk Likelihood of Exposure: Tolerable Unlikely Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors. Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 16

95 Asbestos Risk Assessment for Thistle Shopping Centre Risk Assessment Material Insulating board to underside of bridge Location External Extent NQ Analysis Presumed Section A - Potential for Fibre Release (Material Assessment) Parameter Criteria Fibre Release Score Asbestos Type Amosite 2 Product Type Insulating board 2 Damage / Condition No damage 1 Surface Treatment Unsealed 2 Total Fibre Release Score 7 Potential for Fibre Release Medium Section B - Hazard Factors Hazard Area Area / Location Use of Area Accessibility Friability Condition Treatment Asbestos Content Factors Taken into Consideration External Occupancy Low occupancy Activities carried out None Likelihood and frequency of maintenance activities Unlikely Difficult Medium Fair Unsealed Medium Part C - Overall Assessment of Risk Likelihood of Exposure: Highly Unlikely Tolerable Part D - Summary of Recommendations for Control (see Asbestos Action Summary for details) Permit to Work Procedure; Monitor condition of ACMs; Inform / Train staff and contractors; Carry out further investigation prior to relevant works. Assessor: Stephen Lang Assessment Date 27/08/14 Reassessment Date 27/08/15 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Risk Assessment - Page 17

96 Asbestos Management & Control for Thistle Shopping Centre Asbestos Management Control Site: Thistle Shopping Centre Goosecroft Road Stirling FK8 2GA Client: SLI Shopping Centre Trust Date of Assessment: th August 2014 Name of Assessor: Stephen Lang Date for review 27 th August 2015 S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 1

97 Contents Asbestos Management & Control for Thistle Shopping Centre Asbestos Management Information... 3 Asbestos Activity Log...4 Air Monitoring...6 Asbestos Abatement...7 Refurbishment Projects...8 Asbestos Disposal...9 Communications with Employees, Contractors and Others...10 Training...11 Asbestos Notice...12 Permit to Work...14 Specialist Review...16 This Asbestos Management section forms part of an Asbestos Management System and has been compiled on behalf of Standard Life Group by The S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Tel: Fax: info@s2partnership.co.uk S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 2

98 Asbestos Management & Control for Thistle Shopping Centre Asbestos Management Information This section of the Asbestos management system is intended to hold information about the way in which asbestos is managed on site. It is separated into several sub-sections for ease of filing. If there is insufficient space for relevant documents to be filed within the manual, you should cross-reference the full location on the appropriate index page. Asbestos Activity: Activity Log Log of asbestos-related activity on site, including a summary of all remedial works, site audits and inspections, maintenance activities affecting asbestos containing materials, etc. Air Monitoring Abatement works Refurbishment Disposal Copy of air monitoring report, together with sampling results File records of any abatement works here, as well as entering a summary on the Asbestos Site Log Details of any refurbishment projects that have been undertaken Copies of Waste Transfer Notes and other documents relating to the safe disposal of ACMs Liaison: Communications Copies of memos and letters to employees and contractors advising of asbestos on site Training: Training Records of asbestos training received by site staff and others, including certificates of attendance Management: Asbestos Notice Copy of a sample notice(s) for contractors Permit to Work Specialist Review Copies of Permits to Work relating to asbestos work Report of any reviews of the status of this Asbestos management manual S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 3

99 Asbestos Management & Control for Thistle Shopping Centre Asbestos Activity Log The Asbestos Activity Log is intended to be a summary of all significant actions that have a bearing on the management of asbestos on site at Thistle Shopping Centre. Examples of information that should be completed on the Log include: Remedial or removal works Maintenance activities affecting asbestos containing materials (ACMs) Inspections Audits Reports of damage If the Log generates a requirement for action, for example the repair of encapsulation material, then that information should be noted. If works are carried out that have an impact on the accuracy of the Asbestos Register (see separate section) then the Register must be updated. This should normally be carried out by an asbestos specialist, although the responsible client manager will need to make notes on the Register and in the Asbestos Site Log. The Asbestos Site Log is filed: On the following Pages S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 4

100 Asbestos Activity Log Asbestos Management & Control for Thistle Shopping Centre Date Asbestos Register Location Ref. Activity By Whom? Comments / Notes Register Updated? S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 5

101 Asbestos Management & Control for Thistle Shopping Centre Air Monitoring If Asbestos Air Monitoring is undertaken on site then copies of the Airborne Fibre Count Analysis Report results can be filed here. Asbestos Air Monitoring Reports are Filed: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 6

102 Asbestos Management & Control for Thistle Shopping Centre Asbestos Abatement Any asbestos abatement activity will be recorded in the Site Asbestos Log above. Abatement works will be specified by the competent specialist and carried out by a contractor approved by that specialist. Any removal works will be carried out by an approved contractor under the supervision of the asbestos specialist. The Asbestos Register must be updated following any abatement works. Detailed specifications concerning abatement works should be filed or referenced here. Asbestos Abatement Specifications and Records are Filed: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 7

103 Asbestos Management & Control for Thistle Shopping Centre Refurbishment Projects Where these take place in areas where asbestos is suspected or known to be present, any works like to result in the disturbance of or exposure to asbestos material should be preceded by a Refurbishment / Demolition survey. Works should be carried out in accordance with the principles of the CDM Regulations regardless of the size of the project Refurbishment Project information is filed: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 8

104 Asbestos Management & Control for Thistle Shopping Centre Asbestos Disposal Any asbestos or material which is presumed to be asbestos must be disposed of in accordance with The Special Waste Amendment (Scotland) Regulations 2004 by authorised contractors and the disposal process must be fully documented. Waste Transfer Notes are Filed: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 9

105 Asbestos Management & Control for Thistle Shopping Centre Communications with Employees, Contractors and Others It is essential that all those who work on site, including employees, visitors and on-site contractors, are advised about the presence of asbestos on site. This is an important part of the safety communication process and is specifically required under Management Regulations. It is important to provide the information in a straightforward way that does not cause undue concern or panic. Communicating asbestos information can best be achieved by maintaining a close relationship on site between the Facilities Manager, employee representatives and on-site contractors. These people should have ready access to the Asbestos manual, especially where asbestos has been identified in areas where they work. Explanations and reassurance will be important. When letters or internal memos are written, copies should be kept available. Copies of Advice Letters are kept: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 10

106 Asbestos Management & Control for Thistle Shopping Centre Training All employees with responsibility for asbestos management activity should receive training to ensure their competence to undertake their responsibilities. Asbestos Training Records are Filed: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 11

107 Asbestos Management & Control for Thistle Shopping Centre Asbestos Notice Where asbestos is known or suspected to be present, occupiers must be notified and given details of the arrangements for controlling contract works through the permit-to-work system. All contractors carrying out work on the site should be notified that asbestos is present and will be expected to address the risks arising from their activities in their risk assessments and method statements A Copy of the Asbestos Notice is filed: On the following Page S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 12

108 Asbestos Management & Control for Thistle Shopping Centre Thistle Shopping Centre ASBESTOS IMPORTANT SAFETY INFORMATION ASBESTOS NOTICE If you are undertaking work on this site you should read this notice carefully. Asbestos is known or suspected to be present in some areas of this site. It is essential that you understand the risks posed by this asbestos as you undertake your work. You should: Ask the Site Manager for a leaflet about the health risks posed by asbestos dust Check the method statement and risk assessments your employer has provided. You must follow the instructions they give about working with asbestos Look at the Asbestos Register in the Asbestos file on site to see if there is asbestos where you are working Look for the asbestos labels which will tell you where the asbestos is in your work area Take note of any special instructions that the Site Manager gives you about asbestos Report any damaged or loose asbestos to the Site Manager IMMEDIATELY IF YOU FOLLOW THESE SIMPLE PROCEDURES YOU WILL NOT BE HARMED Have a safe and successful visit to Thistle Shopping Centre S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 13

109 Asbestos Management & Control for Thistle Shopping Centre Permit to Work The permits used at the site will notify the contractor of the presence of asbestos. The contractor must include a specific assessment of risk related to this hazard in their permit application. If the Facilities Manager is in any doubt about the contractor s capability to work safely in areas where asbestos is known or believed to be present, then a permit should not be issued. A Copy of the Permit to Work form is filed: On the following Page Completed Permits are filed: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 14

110 Asbestos Management & Control for Thistle Shopping Centre CONTRACTORS PERMIT TO WORK Permit No: Application (to be completed by the Contractor) Name: Company: This work was instructed by: WHERE Telephone: Emergency Contact: I apply for a Permit to Work in respect of the following work:- Location: Operation: WHAT Start Time and Date: Finish Time and Date: Operatives names: WHEN Operatives must carry a copy of this permit whilst carrying out the works described The following tools, equipment and materials will be used*: WHO I confirm that I have read site safety rules and understand the restrictions they place on my work I understand that there is ASBESTOS on this site and have read the Asbestos Notice to Contractors I confirm that I have seen and understood my employer's risk assessment for this work I have seen and understood the method statement for these works The significant risks anticipated are*: The following specific controls will be implemented *: HOW Signed: Date: *continue over the page if necessary Any change in the scope of work or the circumstances detailed and assumed in this permit automatically revoke the permit. Such changes must be notified to the Site Manager immediately This permit does not authorise HOT WORK for which a separate permit is required AUTHORITY (to be completed by the Site Manager) Authority is hereby granted solely for carrying out the works detailed above Signed: Date: The completion certificate MUST BE COMPLETED and returned to the Building Manager on completion of the works COMPLETION CERTIFICATE (to be completed by the Contractor and handed to the site manager) The work has been completed as described in the application above. The site has been left in a safe and tidy condition Signed: Date: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 15

111 Asbestos Management & Control for Thistle Shopping Centre Specialist Review The asbestos specialist should carry out a site survey and review the register, drawings and risk assessments at least annually. If any works are carried out which involve disturbance of any asbestos material, this review will be undertaken immediately following completion of the work. Review Reports are filed: S2 Partnership Ltd, Gainsborough House, Glasgow, G2 2JJ Version Asbestos Management Control - Page 16

112 Safety Action Summary for Thistle Shopping Centre Safety Action Summary (Report of Recommendations) For Standard Life Group At Thistle Shopping Centre Goosecroft Road Stirling FK8 2GA 19 th -27 th August 2014 Actions raised in this Report have also been logged onto the client's RiskWise Property Management Webtool, when subscribed S2 Partnership Ltd, Gainsborough House, 151 West George Street, Glasgow, G2 2JJ Version Page 1