ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

Size: px
Start display at page:

Download "ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015"

Transcription

1 ELMIRA HIGH SCHOOL GYMNASIUM ANNEX NOVEMBER 19, 2015

2

3 TABLE OF CONTENTS PROGRAM SUMMARY DESIGN EXPLORATION EXISTING SITE PLAN - ANALYSIS DEMOLITION SITE PLAN PROPOSED SITE PLAN PROPOSED FLOOR PLANS DEMOLITION FLOOR PLANS ROOF PLAN PERSPECTIVE SECTIONS 3D VIEWS CODE ANALYSIS MATERIALITY TEAM NARRATIVES CIVIL STRUCTURAL ELECTRICAL MECHANCIAL

4

5 SUMMARY 01.0 PROGRAM

6 DARK PURPLE INDICATES GYM & LOBBY ADDITION LIGHT PURPLE INDICATES NEW SIDING SCOPE YELLOW INDICATES REROOFING SCOPE BOND GOALS From District Website Expand and renovate Elmira High School to include a second gymnasium and meet Title IX criteria $3,700,000 The addition of a second gymnasium will serve not only the needs of high school students and athletes but will also alleviate the impact to all of the community schools and programs by providing critically needed space. The school must also meet Title IX criteria by expanding the girls support facilities to be equal to those for the boys. Minor renovations will occur at the high school to accommodate these additions. Address student safety and security, including seismic work, at all sites $600,000 Safety improvements at all sites top the list of needs. This goes beyond just a reaction to a single event but includes an overall approach to improving the environment by addressing line of sight, hardening of the perimeter, better access control, expansion of the existing camera systems, and reducing opportunities for bullying and vandalism. Seismic remediation will also be performed at all of the facilities based on a recent structural assessment of the buildings and a prior state-sponsored evaluation. Acquire technology to support classroom instruction and technology infrastructure $1,300,000 Technology continues to play a critical part of the learning environment. While the District makes annual strides in the availability and access to these tools, wireless access in all buildings, improved student computers and labs, and teaching aids for audio and video in the classroom still remain on the to-do list in order to be competitive with neighboring school districts and provide comparable opportunities for all Fern Ridge students. While improvements to the phone and intercom systems address the technology requirements, they also add to the investment in student and staff safety. Improve, repair, and develop facilities and sites to preserve remaining assets and systems and plan for growth $2,900,000 Additional capital investments in roofs, mechanical systems, and parking lots will ensure that our buildings continue to serve the community at least as long as Elmira Elementary School already has.

7 ELMIRA HIGH SCHOOL Fern Ridge School District High School Design Summary As discussed among District Representatives and Designers GYM ANNEX ADDITION: Create an Annex Gymnasium to allow practice and competitions for boys and girls basketball, volleyball, wrestling, etc. Existing gymnasium will remain as primary competition space. o Annex gym does not require natural light o Annex gym does not require full school spectator seating (450 occupants) although that would be ideal, if possible. At a minimum, provide spectator seating for 200 occupants. o Annex gym would require new restrooms to accommodate addition. o Annex gym should contain three separate storage areas for individual sports. o Annex gym should be sprinklered. Note: Due to impacts to neighboring building, existing gymnasium building (with gym, locker rooms, and upper level gym space) to be sprinklered. Create a new lobby / main entry at front of school. Build-out of lobby will be bid as an Additive Alternate. o Lobby should contain display areas for athletic accomplishments and trophies for all sports, athletic hall of fame, and academic accomplishments. o Lobby should provide a secure entry into high school campus. o Lobby should contain a concession stand space. LOCKER ROOM RENOVATION: Upgrade Girls Locker Room to same level as Boys Locker Room per Title IX o Design separate locker areas (home and away / PE) o Add team rooms for at least two teams (home and away) o Upgrade finishes to match boys level of finishes Replace Lockers Replace Tile Replace Plumbing Fixtures (except shower heads) Replace Light Fixtures Repaint Walls and Ceilings EXTERIOR UPGRADES: Exterior Envelope Upgrades: o Re-Roofing: Reroof existing gymnasium & lockers (Building E), and technology classrooms/hallway (Building D), and Junior/Senior Hallway. Include insulation above existing deck per current codes (R-20 minimum). Re-roofing to be PVC 60 mil product. o Siding Replacement: Replace board and batten siding on existing gymnasium south and east façades. Siding material TBD. Basis of design is varying width metal panel with cementitious accents. INTERIOR UPGRADES: IT / Electrical Upgrades: o See Electrical Summary o Projectors: Replace all classroom projectors will wall mounted options o Wireless: Complete wireless coverage throughout school o Security Cameras: system extended and replaced throughout school o Access Control: main ingress doors to be card-keyed, as well as common/ public facilities o PA System upgrade per District Standards Mechanical o See Mechanical Summary o Sprinkler gymnasium building to be brought up to code Site o See Civil Summary o Patch asphalt parking lot as required o Reroute utilities below gymnasium addition o Regrade walkways around new addition for proper drainage General Description Elmira High School (EHS) is an existing high school within Fern Ridge School District. EHS serves grades 9-12 and has approximately 450 students. The school is designed with a campus format that includes individual buildings connected by exterior covered walkways. The campus as a whole is contained and secured by fencing and gates except at the south main entry. The majority of the existing school facility was built in 1963, with additions and renovations done in 1967, 1983, 1999, 2000, and The main entry and administration office are on the south center of the site, directly south of the proposed addition. The campus is located on a 22.5 acre site and includes parking, football field and track, soccer field, baseball field and softball field. The site is accessed from Fir Grove Lane to the north and east and from Falcon Drive to the South. The school mascot is the Falcon.

8

9 DESIGN EXPLORATION 02.0 EXISTING SITE PLAN - ANALYSIS 02.1 DEMOLITION SITE PLAN 02.2 PROPOSED SITE PLAN 02.3 PROPOSED FLOOR PLANS WEST - NEW GYMNASIUM ADDITION EAST - GIRLS LOCKER ROOM IMPROVEMENTS DEMOLITION PLANS WEST - COURTYARD EAST - GIRLS LOCKER ROOM ROOF PLAN PERSPECTIVE SECTIONS D VIEWS - EXTERIOR D VIEWS - INTERIOR 02.9

10 EXISTING PHASING PLAN

11 ELMIRA HIGH SCHOOL Fern Ridge School District EXISTING SITE PLAN

12 DEMOLISH EXISTING ROOFING MEMBRANE & REPLACE WITH NEW DEMOLITION SITE PLAN DEMOLISH EXISTING ROOFING MEMBRANE & REPLACE WITH NEW REMOVE WOOD BATT & BOARD SIDING AND REPLACE WITH NEW SIDING ON SOUTH AND EAST FACADES OF EXISTING GYM REMOVE WOOD CANOPIES OVER EXTERIOR WALKWAYS

13 ELMIRA HIGH SCHOOL Fern Ridge School District PROPOSED SITE PLAN

14 13 SEATS 9 SEATS 17 SEATS 17 SEATS 17 SEATS 3 SEATS 11 SEATS 17 SEATS 3 SEATS 11 SEATS 17 SEATS 3 SEATS 11 SEATS 17 SEATS 3 SEATS 11 SEATS 1ST 11 SEATS 17 SEATS 11 SEATS 3 SEATS 9 SEATS 1ST 3 SEATS 11 SEATS 3 SEATS 11 SEATS 3 SEATS MATCHLINE - 1 / A1.1 MATCHLINE - 1 / A1.1 CLR 5' - 8" LOBBY 118 STORAGE ' - 4" AUX GYM 100 STORAGE ' - 10" STORAGE ' - 4" 85' - 9" 9' - 5" 21' - 6" 6' - 6" 25' - 0" 9' - 11" CONCESSIONS 119 WOMEN'S RESTROOM ' - 6" VESTIBULE " CLR 26' - 0" MEN'S RESTROOM ' - 9" 20' - 0" CLR 4' - 0" CLR 4' - 0" 95' - 2" 1' - 6" ALIGN ALIGN 6' - 0" N EXISTING CANOPY COLUMNS, TYP. COVERED WALKWAY 126 EXTENT OF BLEACHERS IN CLOSED POSITION SENIOR HALL 127 TROPHY CASE EXISTING TRANSACTION WINDOW BOOKKEEPER 128 GLASS SEE-THROUGH TROPHY CASES ALTERNATE LOBBY EGRESS DOOR ALTERNATE LOBBY NEW SECURITY DOOR ADMIN RECEPTION 146 PROPOSED PLAN - WEST (AREA B) SCALE: 1/20 = 1-0 COVERED WALKWAY 147 OFFICE 130 BOYS TEAM ROOM 131 TOILET 132 P.E. OFFICE 133 FOOTBALL TEAM ROOM 129 DRYING 137 DRYING 138 TOILET 136 SHOWER 145 SHOWER 141 BOYS P.E. LOCKER ROOM 134 FRESHMAN HALL 135 WOMEN'S RESTROOM 142 CONCESSIONS 143 BOYS TEAM ROOM 140 MEN'S RESTROOM 139 JANITOR 144 NEW DOOR TO FOOTBALL LOCKER ROOM, TBD (SOME LOCKER DEMO REQ D) NEW DOOR CONNECTING OFFICE & STORAGE NEW SEISMIC JOINT EXISTING 2-HOUR FIRE WALL NEW 2-HOUR FIRE WALL LOBBY ROOF LINE ALTERNATE LOBBY EXTENTS ALTERNATE LOBBY ROOF LINE

15 ELMIRA HIGH SCHOOL Fern Ridge School District TOILET 110 SHOWER 109 GIRLS P.E. LOCKER ROOM 112 GIRLS VISITING TEAM ROOM DRYING ' - 5 3/8" STAIR 123 STAIR 120 TOILET 125 OFFICE 122 STORAGE 124 2' - 0" GIRLS HOME TEAM ROOM ' - 0" 2' - 0" GIRLS HOME TEAM ROOM STORAGE 114 STORAGE 121 MATCHLINE - 1 / A1.2 MATCHLINE - 1 / A1.2 N NEW MIRRORS NEW PLUMBING FIXTURES, TYP. NEW TOILET PARTITIONS NEW TILE FLOOR PROPOSED PLAN - EAST (AREA A) SCALE: 1/20 = 1-0 INFILL WALL NEW LOCKERS & BENCHES NEW WALLS & MIRRORS WHITEBOARD 44 NEW HALF-HEIGHT LOCKERS & BENCHES 92 NEW HALF-HEIGHT LOCKERS & BENCHES NEW WALL & DOORS NEW BENCHES & WHITE BOARD

16 MATCHLINE - 1 / AD1.1 MATCHLINE - 1 / AD1.1 N DEMOLISH EXISTING COLUMNS & CANOPIES AROUND COURTYARD DEMOLITION PLAN - WEST (AREA B) SCALE: 1/20 = 1-0 CUT OPENING IN EXISTING CMU WALL FOR NEW DOOR CUT OPENING IN EXISTING CMU WALL FOR NEW DOOR DEMOLISH EXISTING SHED NEW LOBBY ALTERNATE: DEMOLISH EXISTING STOREFRONT AND WALL TO ALLOW FOR 2 ND SECURITY DOOR TO BE ADMIN OFFICE

17 ELMIRA HIGH SCHOOL Fern Ridge School District MATCHLINE - 1 / AD1.2 N DEMOLISH EXISTING PLUMBING FIXTURES (SINKS & TOILETS) DEMOLISH TOILET PARTITIONS MATCHLINE - 1 / AD1.2 DEMOLITION PLAN - EAST (AREA A) SCALE: 1/20 = 1-0 DEMOLISH DOOR & EXISTING STORAGE ROOM DEMOLISH ALL EXISTING LOCKERS & BENCHES DEMOLISH DOOR & EXISTING OFFICE DEMOLISH SLIDING BARN DRYING AREA DEMOLISH ALL EXISTING LOCKERS & BENCHES CUT OPENINGS IN EXISTING CMU WALL FOR NEW DOORS CUT OPENINGS IN EXISTING CMU WALLS FOR NEW WINDOWS GENERAL NOTES: DEMOLISH ALL EXISTING TILE & LIGHT FIXTURES WITHIN GIRLS LOCKER ROOMS AND REPLACE WITH NEW INDICATES EXTENTS OF WORK

18 1 1/2" / 12" 1 1/2" / 12" 3" / 12" N NEW CANOPY NEW ROOF RE-ROOF NEW ROOF PROPOSED ROOF PLAN SCALE: 1/32 = 1-0 RE-ROOF RE-ROOF

19 ELMIRA HIGH SCHOOL Fern Ridge School District PERSPECTIVE SECTIONS

20 3D VIEWS - EXTERIOR